This is a Women-Owned Small Business (WOSB) Solicitation and Scope of Work for electrical infrastructure upgrades at Mount Morris Dam in Mount Morris, New York. The U.S. Army Corps of Engineers, Buffalo District is seeking a contractor to perform comprehensive replacement and installation of electrical systems, including electrical enclosures, conductors, and grounding systems. The work encompasses four base bid items and three optional items, with a firm-fixed price contract structure requiring performance and payment bonds.
The base work includes: (1) mobilization and demobilization at 60% and 40% payment splits respectively; (2) replacement of 15 electrical panels and 14 junction boxes with new NEMA 4X stainless steel enclosures, plus installation of receptacles and a 30-foot extension; (3) replacement of multiple power conductors ranging from #2 to 3/0 AWG copper with XHHW-2 insulation and equipment grounding conductors; and (4) installation of a new grounding system with two ground rods, approximately 375 feet of ground conductor, and ground access wells. Optional items include connecting the grounding system in the operating gallery, replacing conductors from panel 59 to panel 73, and replacing conduit and receptacles in the grouting gallery. The contractor must provide all materials, testing, as-built drawings, and one-line diagrams, with testing including megger, ground resistance, phase rotation, and arc flash analysis per NETA and IEEE standards. The contract requires a NAICS code of 238210 (electrical contractors) with a size standard of $19,000,000, a pre-bid site visit on April 28, 2026 at 9:30 AM EST, and quotes due through the PIEE system by the date specified in Block 8 of Standard Form 1449. The liquidated damages rate is $1,125 per calendar day for delays, and the project completion date is 180 calendar days following the Notice to Proceed, with substantial electrical work to be completed within 120 days.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W912P426QA0090001_InternalElectric 5.14.26.pdf | ||
| Pre-BidMMD Internal Electric04282026.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WOMEN-OWNED SMALL
BUSINESS (WOSB)
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES
1. REQUISITION NUMBER PAGE 1 OF
2. CONTRACT NUMBER 3. AWARD/EFFECTIVE
DATE
4. ORDER NUMBER 5. SOLICITATION NUMBER 6. SOLICITATION ISSUE
DATE
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME b. TELEPHONE NUMBER (No collect 8. OFFER DUE DATE/
LOCAL TIME
9. ISSUED BY
13b. RATING
14. METHOD OF SOLICITATION
CODE
15. DELIVER TO 16. ADMINISTERED BY CODE
18a. PAYMENT WILL BE MADE BY CODE17a. CONTRACTOR/
OFFEROR
CODE
FACILITY
CODE
CODE
TELEPHONE NUMBER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN
OFFER
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK
BELOW IS CHECKED
REQUEST
FOR QUOTE
(RFQ)
INVITATION
FOR BID
(IFB)
REQUEST
FOR
PROPOSAL
(RFP)
SEE ADDENDUM
19.
ITEM NUMBER
20.
SCHEDULE OF SUPPLIES/SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
(Use Reverse and/or Attach Additional Sheets as Necessary)
25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Government Use Only)
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH
AND DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND
ON ANY ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS
SPECIFIED
29. AWARD OF CONTRACT: REFERENCE OFFER
DATED . . YOUR OFFER ON SOLICITATION
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
30a. SIGNATURE OF OFFEROR/CONTRACTOR
30b. NAME AND TITLE OF SIGNER (Type or print) 30c. DATE SIGNED
31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
31b. NAME OF CONTRACTING OFFICER (Type or print) 31c. DATE SIGNED
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 11/2021)
Prescribed by GSA - FAR (48 CFR) 53.212
10. THIS ACQUISITION IS UNRESTRICTED OR
NORTH AMERICAN
INDUSTRY CLASSIFICATION
STANDARD (NAICS):
SIZE STANDARD:
13a. THIS CONTRACT IS A
RATED ORDER UNDER
THE DEFENSE PRIORITIES
AND ALLOCATIONS
SYSTEM - DPAS (15 CFR 700)
SET ASIDE: % FOR:
11. DELIVERY FOR FREE ON
BOARD (FOB) DESTINATION
UNLESS BLOCK IS MARKED
SEE SCHEDULE
12. DISCOUNT TERMS
ARE ARE NOT ATTACHED
ARE ARE NOT ATTACHED
27a. SOLICITATION INCORPORATES BY REFERENCE (FEDERAL ACQUISITION REGULATION) FAR 52.212-1, 52.212-4. FAR 52.212-3
AND 52.212-5 ARE ATTACHED. ADDENDA
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA
8(A)
ECONOMICALLY
DISADVANTAGED
WOMEN-OWNED SMALL
BUSINESS (EDWOSB)
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
(SDVOSB)
HUBZONE SMALL
BUSINESS
SMALL BUSINESS
NOTE: OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30.
calls)
Created On:
21 Apr 2026, 11:20 AM Central Daylight Time
Solicitation/Contract Form Continuation
FY26 MMD Internal ElectricInstrument Name:
FY26 MMD INTERNAL ELECTRIC
Offer Sheet
Fully completed Offer Sheet for all base items and optional items.
Basis for Award
Best Value Trader-off
Evaluation Factors
1. Experience
Offerors should demonstrate prior completion of projects similar in scope and complexity to this requirement. Key personnel certifications or qualifications relevant to the work may be considered.
Similar Scope: The project involved the comprehensive replacement of electrical distribution systems (panels, conduits, grounding) in an industrial, government, or critical infrastructure facility.
Similar Size: The project had a contract value of at least $250,000.
2. Resources
Offerors should demonstrate the availability of equipment, staffing, and technical resources sufficient to complete the work within the required performance period.
3. Past Performance
The Government will consider the offeror's record of meeting deadlines and resolving performance issues. Past performance may be evaluated using the Contracting Officer's prior knowledge, CPARS, customer surveys, or any other reasonable basis per RFO12.203(a)(2).
: Formal evaluation plans, scoring, and competitive range determinations are not required Note under this simplified acquisition. The Government reserves the right to make award without discussions.
OFFEROR'S QUESTIONS AND COMMENTS
Technical inquiries and questions relating to quote procedures or bonds are to be submitted via
Bidder Inquiry in ProjNet at
W912P426QA009
http://www.ProjNet.org/ProjNet. As noted below, offerors shall not submit their quotes via
ProjNet. Offerors shall submit their bids in accordance with the provisions stated in the solicitation.
To submit and review bid inquiry items, bidders will need to be a current registered user or self-register into system.
The Solicitation Number is: W912P426QA009
The Bidder Inquiry Key is: E6X9G9-C5Z5EJ
Specific Instructions for ProjNet Bid Inquiry Access:
1. From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.
2. Identify the Agency. This should be marked as USACE.
3. Key. Enter the Bidder Inquiry Key listed above.
4. Email. Enter the email address you would like to use for communication.
5. Select Continue. A page will then open stating a user account was not found and will ask you to create one using the provided form.
6. Enter your First Name, Last Name, Company, City, State, Phone, Email, Secret Question, Secret Answer, and Time Zone.
Make sure to remember your Secret Question and Answer as they will be used from this point on to access the ProjNet system.
7. Select Add User. Once this is completed you are now registered within ProjNet and are currently logged into the system.
Specific Instructions for Future ProjNet Bid Inquiry Access:
1. For future access to ProjNet, you will not be emailed any type of password. You will utilize your Secret Question and Secret Answer to log in.
2. From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.
3. Identify the Agency. This should be marked as USACE.
4. Key. Enter the Bidder Inquiry Key listed above.
5. Email. Enter the email address you used to register previously in ProjNet.
6. Select Continue. A page will then open asking you to enter the answer to your Secret Question.
7. Enter your Secret Answer and click Login. Once this is completed you are now logged into the system.
From this page you may view all bidder inquiries or add an inquiry.
Bidders will receive an acknowledgement of their question via email, followed by an answer to their question after it has been processed by our technical team.
Offerors are requested to review the specification in its entirety and to review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry.
The call center operates weekdays from 8AM to 5PM U.S. Central Time Zone (Chicago). The telephone number for the Call Center is 800-428-HELP. Information concerning the status of the evaluation and/or award will NOT be available after receipt of bids/proposals.
NOTES:
1. Offerors shall not submit their proposal via ProjNet, but in accordance with the provisions stated in the solicitation. Any questions regarding acceptable means of submitting offers shall be made directly to the Contract Specialist identified in the solicitation.
2. Government responses to technical inquiries and questions relating to bid procedures or bonds that are submitted to ProjNet in accordance with the procedures above are not binding on the Government unless an amendment is issued on Standard Form 30. In the case of any conflicts, the solicitation governs. Any changes or revisions to the solicitation will be made by formal amendment. Government responses will be limited to: (a) Notice that an amendment will be issued; (b) Reference to an existing requirement contained in the solicitation; or (c) Notice that a response is not necessary.
3. The ability to enter technical inquiries and questions relating to bid procedures or bonds will be disabled twelve (12) calendar days prior to the closing date stated in the solicitation. No Government responses will be entered into the ProjNet system within seven (7) calendar days prior to the closing date stated in the solicitation.
SUPPLEMENTAL INSTRUCTIONS
Electronic Submission: Electronic copies of each volume shall be submitted through the Solicitation Module of the Procurement Integrated Enterprise Environment (PIEE) suite at https://piee.eb.mil/ . Quotes submitted by mail or hand carried will not be evaluated. Quotes sent through proprietary or third-party File Transfer Protocol (FTP) sites or DoD SAFE will not be retrieved. It is the responsibility of the Offeror to confirm receipt of quotes. All quotes received after the exact time specified for receipt shall be treated as late submissions and will not be considered except under facts and circumstances allowed by the FAR. For instructions on how to post an offer, please refer to the Posting Offer demonstration: https://pieetraining.eb.mil/wbt/sol /Posting_Offer.pdf. It is the Offeror's responsibility to obtain written confirmation of receipt of all electronic files of the full quote by emailing the Contracting Officer, Walter Kamad at Walter.
Kamad@usace.army.mil or Contract Specialist, Nathaniel M. Dent at nathaniel.m.dent@usace.
army.mil. If the Solicitation Module is down, the alternate method for bid submission is via email to the Contracting Officer and Contract Specialist identified in the preceding sentence. The Offeror must obtain prior approval from the Contracting Officer to use the alternate submission method.
Offeror requests to use the alternate submission method must be received by the Contracting Officer or Contract Specialist no later than 36 hours prior to the bid submission deadline. Offerors are responsible for ensuring electronic copies are virus free and shall run an anti-virus scan before submission. Electronic copies of each volume shall be compatible with Adobe Acrobat Reader 11.
Electronic Files: File(s) shall be in their native format (i.e. doc, xls, ppt, etc.), or preferably in pdf format, shall be in searchable text. Text and graphics portfolios of the electronic copies shall be in a format readable by Microsoft Office or Adobe applications.
Notes:
- All offerors are reminded to complete and submit with their quote all FAR and DFARS Provisions related to Representations and Certifications, if required.
- Offerors shall complete and submit any additional full text certifications that are included in the solicitation. An offeror may also complete the certifications at https://piee.eb.mil/ in lieu of completing the representations and certifications in this solicitation, provided that all the FAR and DFARS certifications contained in the solicitation have been completed online.
- Remember to fill in and sign the Standard Form 1449, from the front of the Solicitation, before submitting your quote.
- Proposals must be completely uploaded into https://piee.eb.mil/ by the date and time indicated in Block 8
Site Visit
William B. Hoyt II Visitor Center, 6103 Visitor Center Road, Mount Morris, New York 14510.
April 28, 2026 @ 9:30 AM EST
POC: Elias Rafidi
Elias.G.Rafidi@usace.army.mil
Registration in SAM
The System for Award Management (SAM) is the Government's online database of federal contractors. Contractors self-register in SAM at the website https://sam.gov/. Registration is free to all users. In accordance with FAR Provision 52.204-7 SYSTEM FOR AWARD MANAGEMENT, an
W912P426QA009
https://pieetraining.eb.
offeror must be registered in SAM when submitting a bid and must continue to be registered until time of award, during performance, and through final payment of any contract. Offerors who are not currently registered in SAM with the NAICS Code that is indicated in at the front of this Solicitation, are encouraged to start the registration process as soon as possible to ensure that it is complete prior to submission of any quote.
Amendments
Acknowledgement of each amendment by the Offeror must be made by returning a signed copy of the amendment by the time set for receipt of quotes. Explanations or instructions given in a form other than an amendment to the solicitation shall not be binding. Questions (on a non - attribution basis) and answers shall be furnished to all prospective offerors via the website https://piee.eb.mil/ and PROJNET. NOTE: Failure to comply with the above instructions may result in an offeror not being eligible for award.
Additional Clauses
252.236-7001 Contract Drawings and Specifications
As prescribed in (a), use the following clause: 236.570
CONTRACT DRAWINGS AND SPECIFICATIONS (AUG 2000)
(a) The Government will provide to the Contractor, without charge, one set of contract drawings and specifications, except publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by the Contracting Officer.
(b) The Contractor shall--
(1) Check all drawings furnished immediately upon receipt;
(2) Compare all drawings and verify the figures before laying out the work;
(3) Promptly notify the Contracting Officer of any discrepancies;
W912P426QA009
https://www.acquisition.gov/dfars/part-236-construction-and-architect-%E2%80%94-engineer-contracts#DFARS_236.570
(4) Be responsible for any errors that might have been avoided by complying with this paragraph (b); and
(5) Reproduce and print contract drawings and specifications as needed.
(c) In general--
(1) Large-scale drawings shall govern small-scale drawings; and
(2) The Contractor shall follow figures marked on drawings in preference to scale measurements.
(d) Omissions from the drawings or specifications or the misdescription of details of work that are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications.
(e) The work shall conform to the specifications and the contract drawings identified on the following index of drawings:
Title File Drawing No.
(End of clause)
*** END OF NARRATIVE ***
Continuation of Supplies or Services and Prices/Costs
Additional Information/Notes
Continuation of Description
Requirements This project involves the comprehensive upgrade of unserviceable and outdated electrical infrastructure at Mount Morris Dam in Mount Morris, NY. The government intends to award a Firm- Fixed Price construction contract as a result of this solicitation. Performance and Payment Bonds will be required. NAICS Code - 238210 Size Standard - $19,000,000.00
Contract Clauses
FAR Clauses Incorporated by Reference
Number Title Effective Date
Alternate Deviation
Variation Effective Date
52.203-3 Gratuities. 1984-04
52.203-6 Restrictions on Subcontractor Sales to the Government.
(Alternate I)
2020-06 Alternate I 2021-11
52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements.
2017-01
52.204-13 System for Award Management- Maintenance. (Deviation 2026- O0038)
2026-02
52.209-6 Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, Proposed for Debarment, or Voluntarily Excluded. (Deviation 2026- O0038)
2026-02
52.212-4 Terms and Conditions- Commercial Products and Commercial Services. (Deviation 2026-O0038)
2026-02
52.219-8 Utilization of Small Business Concerns. (Deviation 2026- O0038)
2026-02
52.222-35 Equal Opportunity for Veterans. 2026-02
(Deviation 2026-O0038)
52.222-36 Equal Opportunity for Workers with Disabilities. (Deviation 2026- O0038)
2026-02
52.222-37 Employment Reports on Veterans. (Deviation 2026- O0038)
2026-02
52.222-40 Notification of Employee Rights Under the National Labor Relations Act. (Deviation 2026- O0038)
2026-02
52.222-50 Combating Trafficking in Persons. (Deviation 2026-O0038)
2026-02
52.222-54 Employment Eligibility Verification. (Deviation 2026- O0038)
2026-02
52.222-55 Minimum Wages for Contractor Workers Under Executive Order 14026. (Deviation 2026-O0038)
2026-02
52.222-62 Paid Sick Leave Under Executive Order 13706. (Deviation 2026- O0038)
2026-02
52.226-8 Encouraging Contractor Policies to Ban Text Messaging While Driving.
2024-05
52.232-33 Payment by Electronic Funds Transfer-System for Award Management.
2018-10
52.232-40 Providing Accelerated Payments to Small Business
2023-03
Subcontractors.
52.233-3 Protest after Award. (Deviation 2026-O0038)
2026-02
52.233-4 Applicable Law for Breach of Contract Claim. (Deviation 2026- O0038)
2026-02
DFARS Clauses Incorporated by Reference
Number Title Effective Date
Alternate Deviation
Variation Effective Date
252.203-7000 Requirements Relating to Compensation of Former DoD Officials.
2011-09
252.203-7002 Requirement to Inform Employees of Whistleblower Rights.
2022-12
252.204-7004 Antiterrorism Awareness Training for Contractors.
2023-01
252.204-7012 Safeguarding Covered Defense Information and Cyber Incident Reporting. (DEVIATION 2024-
O0013 REVISION 1)
2024-05 Deviation 2024- O0013
2024-05
252.204-7018 Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services.
2023-01
252.204-7020 NIST SP 800-171 DoD Assessment Requirements.
2023-11
252.223-7008 Prohibition of Hexavalent Chromium.
2023-01
252.225-7012 Preference for Certain Domestic Commodities.
2022-04
252.225-7052 Restriction on the Acquisition of Certain Magnets, Tantalum, and Tungsten.
2024-05
252.225-7056 Prohibition Regarding Business Operations with the Maduro Regime.
2023-01
252.225-7060 Prohibition on Certain Procurements from the Xinjiang Uyghur Autonomous Region.
2023-06
252.225-7967 Prohibition Regarding Russian Fossil Fuel Business Operations (Deviation 2024-O0006, Revision 1)
2024-02 Deviation 2024- O0006
2024-02
252.232-7003 Electronic Submission of Payment Requests and Receiving Reports.
2018-12
252.232-7010 Levies on Contract Payments. 2006-12
252.243-7002 Requests for Equitable Adjustment.
2022-12
252.246-7008 Sources of Electronic Parts. 2023-01
252.247-7023 Transportation of Supplies by Sea.
2024-10
FAR Clauses Incorporated by Full Text
Date
Alternate Deviation
Variation Effective Date
52.219-4 Notice of Price Evaluation Preference for HUBZone Small Business Concerns. (Deviation 2026-O0038)
Notice of Price Evaluation preference for HUBZone Small Business Concerns (Feb 2026)
(a) Evaluation preference.
(1) Offers will be evaluated by adding a factor of 10 percent to the price of all offers, except-
(i) Offers from HUBZone small business concerns that have not waived the evaluation preference; and
(ii) Otherwise successful offers from small business concerns.
(b) Waiver of evaluation preference. A HUBZone small business concern may choose to waive the evaluation preference. If the concern waives the preference, the factor will be added to its offer for evaluation purposes.
[ ] Offeror chooses to waive the evaluation preference.
(c) Joint venture. A HUBZone joint venture agrees that, in the performance of the contract, at least 40 percent of the aggregate work performed by the joint venture shall be completed by the HUBZone small business parties to the joint venture. Work performed by the HUBZone small business parties to the joint venture must be more than administrative functions.
(End of provision)
52.219-28 Postaward Small Business Program Rerepresentation.
Postaward Small Business Program Rerepresentation (Feb 2026) (Deviation 2026-O0038)
(a) Definitions. As used in this clause-
Long-term contract means a contract of more than five years in duration, including options.
However, the term does not include contracts that exceed five years in duration because the period of performance has been extended for a cumulative period not to exceed six months under the clause at 52.217-8, Option to Extend Services, or other appropriate authority.
Small business concern-
(1) Means a concern, including its affiliates, that is independently owned and operated, not dominant in its field of operation, and qualified as a small business under the criteria in 13 CFR part 121 and the size standard in paragraph (c) of this clause.
(2) Affiliates, as used in this definition, means business concerns, one of whom directly or indirectly controls or has the power to control the others, or a third party or parties control or have the power to control the others. In determining whether affiliation exists, consideration is given to all appropriate factors including common ownership, common management, and contractual relationships. SBA determines affiliation based on the factors set forth at 13 CFR 121.103.
(b) If the Contractor represented that it was a small business concern, a small disadvantaged business concern, or a joint venture that was any of the small business concerns identified in 19.000(a)(3) prior to award of this contract, the Contractor shall rerepresent its size and socioeconomic status according to paragraph (e) of this clause or, if applicable, paragraph (g) of this clause, upon occurrence of any of the following:
(1) Within 30 days after execution of a novation agreement or within 30 days after modification of the contract to include this clause, if the novation agreement was executed prior to inclusion of this clause in the contract.
(2) Within 30 days after a merger or acquisition that does not require a novation or within 30 days after modification of the contract to include this clause, if the merger or acquisition occurred prior to inclusion of this clause in the contract.
(3) For long-term contracts-
(i) Within 60 to 120 days prior to the end of the fifth year of the contract; and
(ii) Within 60 to 120 days prior to the date specified in the contract for exercising any option thereafter.
(c) The Contractor shall rerepresent its size status in accordance with the size standard in effect at the time of this rerepresentation that corresponds to the North American Industry Classification System (NAICS) code(s) assigned to this contract. The small business size standard corresponding to this NAICS code(s) can be found at https://www.sba.gov/document /support--table-size-standards.
(d) The small business size standard for a Contractor providing an end item that it does not manufacture, process, or produce itself, for a contract other than a construction or service contract, is 500 employees, or 150 employees for information technology value-added resellers under NAICS code 541519, if the acquisition-
(1) Was set aside for small business and has a value above the simplified acquisition threshold;
(2) Used the HUBZone price evaluation preference regardless of dollar value, unless the Contractor waived the price evaluation preference; or
(3) Was an 8(a), HUBZone, service-disabled veteran-owned, economically disadvantaged women-owned, or women-owned small business set-aside or sole-source award regardless of dollar value.
(e) Except as provided in paragraph (g) of this clause, the Contractor shall make the representation(s) required by paragraph (b) of this clause by validating or updating all its representations in the Representations and Certifications section of the System for Award Management (SAM) and its other data in SAM, as necessary, to ensure that they reflect the Contractor's current status. The Contractor shall notify the contracting officer in writing within the timeframes specified in paragraph (b) of this clause, that the data have been validated or updated, and provide the date of the validation or update.
(f) If the Contractor represented that it was other than a small business concern prior to award of this contract, the Contractor may, but is not required to, take the actions required by paragraphs (e) or (g) of this clause.
(g) If the Contractor does not have representations and certifications in SAM, or does not have a representation in SAM for the NAICS code applicable to this contract, the Contractor is required to complete the following rerepresentation and submit it to the contracting office, along with the contract number and the date on which the rerepresentation was completed:
(1) The Contractor represents that it [ ] is, [ ] is not a small business concern under ____NAICS Code assigned to ____contract number.
(2) [Complete only if the Contractor represented itself as a small business concern in paragraph (g)(1) of this clause.] The Contractor represents that it [ ] is, [ ] is not, a small disadvantaged business concern as defined in 13 CFR 124.1001.
(3) Women-owned small business (WOSB) joint venture eligible under the WOSB Program. The Contractor represents that it [ ] is, [ ] is not a joint venture that complies with the requirements of 13 CFR 127.506(a) through (c). [____The Contractor shall enter the name and unique entity identifier of each party to the joint venture: __.]
(4) Economically disadvantaged women-owned small business (EDWOSB) joint venture. The Contractor represents that it [ ] is, [ ] is not a joint venture that complies with the requirements of 13 CFR 127.506(a) through (c). [____The Contractor shall enter the name and unique entity identifier of each party to the joint venture: __ .]
(5) Service-disabled veteran-owned small business (SDVOSB) joint venture eligible under the SDVOSB Program. The Contractor represents that it [ ] is, [ ] is not an SDVOSB joint venture eligible under the SDVOSB Program that complies with the requirements of 13 CFR 128.402.
[____The Contractor shall enter the name and unique entity identifier of each party to the joint venture: __.]
(6) HUBZone joint venture eligible under the HUBZone Program.[ Complete only if the offeror is a HUBZone small business concern. ] The offeror represents, as part of its offer, that It [ ] is, [ ] is not a HUBZone joint venture that complies with the requirements of 13 CFR 126.616(a) through (c). [____The Contractor shall enter the name and unique entity identifier of each party to the joint venture: .] Each HUBZone small business concern participating in the HUBZone joint venture must be certified as a HUBZone concern. [____Contractor to sign and date and insert authorized signer's name and title.]
DFARS Clauses Incorporated by Full Text
Date
Alternate Deviation
Variation Effective Date
252.204-7021 Contractor Compliance with the Cybersecurity Maturity Model Certification Level Requirements.
2025-11
CONTRACTOR COMPLIANCE WITH THE CYBERSECURITY MATURITY MODEL
CERTIFICATION LEVEL REQUIREMENTS (NOV 2025)
(a) Definitions. As used in this clause-
"Controlled unclassified information" means information the Government creates or possesses, or information an entity creates or possesses for or on behalf of the Government, that a law, regulation, or Governmentwide policy requires or permits an agency to handle using safeguarding or dissemination controls (32 CFR 2002.4(h)).
"Current" means-
(1) With regard to Conditional Cybersecurity Maturity Model Certification (CMMC) Status-
(i) Not older than 180 days for Conditional Level 2 (Self) assessments and Conditional Level 2 (certified third-party assessment organization (C3PAO)) assessments, with-
(A) No changes in compliance with the requirements at 32 CFR part 170 since the Conditional CMMC Status date (see 32 CFR 170.16 and 170.17); and
(B) A corresponding affirmation of continuous compliance by an affirming official (see 32 CFR
170.4); and
(ii) Not older than 180 days for Conditional Level 3 (Defense Industrial Base Cybersecurity Assessment Center (DIBCAC)) assessments, with-
(A) No changes in compliance with the requirements at 32 CFR part 170 since the Conditional CMMC Status date (see 32 CFR 170.18); and
(B) A corresponding affirmation of continuous compliance by an affirming official;
(2) With regard to Final CMMC Status-
(i) Not older than 1 year for Final Level 1 (Self), with-
(A) No changes in compliance with the requirements at 32 CFR part 170 since the Final CMMC Status date (see 32 CFR 170.15); and
(B) A corresponding affirmation of continuous compliance, not older than 1 year, by an affirming official;
(ii) Not older than 3 years for Final Level 2 (Self) assessments and Final Level 2 (C3PAO) assessments, with-
(A) No changes in compliance with the requirements at 32 CFR part 170 since the Final CMMC Status date (see 32 CFR 170.16 and 170.17); and
(B) A corresponding affirmation of continuous compliance, not older than 1 year, by an affirming official; and
(iii) Not older than 3 years for Final Level 3 (DIBCAC) assessments, with-
(A) No changes in compliance with the requirements at 32 CFR part 170 since the Final CMMC Status date (see 32 CFR 170.18); and
(B) A corresponding affirmation of continuous compliance, not older than 1 year, by an affirming official; and
(3) With regard to affirmation of continuous compliance (32 CFR 170.22), not older than 1 year with no changes in compliance with the requirements at 32 CFR part 170.
"Cybersecurity Maturity Model Certification (CMMC) status" means the result of meeting or exceeding the minimum required score for the corresponding assessment. The potential statuses are as follows:
(1) Final Level 1 (Self).
(2) Conditional Level 2 (Self).
(3) Final Level 2 (Self).
(4) Conditional Level 2 (C3PAO).
(5) Final Level 2 (C3PAO).
(6) Conditional Level 3 (DIBCAC).
(7) Final Level 3 (DIBCAC).
"Cybersecurity Maturity Model Certification unique identifier (CMMC UID)" means 10 alpha-numeric characters assigned to each CMMC assessment and reflected in the Supplier Performance Risk System (SPRS) for each contractor information system.
"Federal contract information (FCI)" means information, not intended for public release, that is provided by or generated for the Government under a contract to develop or deliver a product or service to the Government. It does not include information provided by the Government to the public, such as on public websites, or simple transactional information, such as information necessary to process payments.
"Plan of action and milestones" means a document that identifies tasks to be accomplished. It details resources required to accomplish the elements of the plan, any milestones in meeting the tasks, and scheduled completion dates for the milestones, as defined in National Institute of Standards and Technology Special Publication 800-115 (32 CFR 170.21).
(b) Framework. The Cybersecurity Maturity Model Certification (CMMC) is a framework for assessing a contractor's compliance with applicable information security protections (see 32 CFR part 170).
(c) Duplication. The CMMC assessments will not duplicate efforts from any other comparable
DoD assessment, except for rare circumstances when a reassessment may be necessary, for example, when there are indications of issues with cybersecurity and/or compliance with CMMC requirements.
(d) Requirements. The Contractor shall-
(1)(i) Have and maintain for the duration of the contract a current CMMC status at the following CMMC level, or higher: CMMC Level 1 Contracting Officer insert: CMMC Level 1 (Self); CMMC Level 2 (Self); CMMC Level 2 (C3PAO); or CMMC Level 3 (DIBCAC) for all information systems used in performance of the contract, task order, or delivery order that process, store, or transmit FCI or CUI; and
(ii) Consult 32 CFR 170.23 related to the flowdown of the CMMC requirements, and flow down the correct CMMC level to subcontracts and other contractual instruments;
(2) Only process, store, or transmit FCI or CUI on contractor information systems that have a CMMC status at the CMMC level required in paragraph (d)(1) of this clause, or higher;
(3) Complete on an annual basis, and maintain as current, an affirmation, by the affirming official (see 32 CFR 170.4), of continuous compliance with the requirements associated with the CMMC level required in paragraph (d)(1) of this clause in the Supplier Performance Risk System (SPRS) (https://piee.eb.mil) for each CMMC UID applicable to each of the contractor information systems that process, store, or transmit FCI or CUI and that are used in performance of the contract;
(4) Ensure all subcontractors and suppliers complete prior to subcontract award, and maintain on an annual basis, an affirmation, by the affirming official (see 32 CFR 170.4), of continuous compliance with the requirements associated with the CMMC level required for the subcontract or other contractual instrument for each of the subcontractor information systems that process, store, or transmit FCI or CUI and that are used in performance of the subcontract; and
(5) If the Contractor has a CMMC Status of Conditional, successfully close out a valid plan of action and milestones (32 CFR 170.21) to achieve a CMMC Status of Final.
(e) Reporting. The Contractor shall-
(1) Submit to the Contracting Officer-
(i) The CMMC UID(s) issued by SPRS for contractor information systems that will process, store, or transmit FCI or CUI during performance of the contract; and
(ii) Any changes in the CMMC UIDs generated in SPRS throughout the life of the contract, task order, or delivery order, if applicable;
(2) Enter into SPRS the results of a current self-assessment for each CMMC UID, not covered by a C3PAO assessment or DIBCAC assessment, applicable to each of the contractor information systems that process, store, or transmit FCI or CUI and that are used in performance of the contract; and
(3) Complete in SPRS on an annual basis and maintain as current an affirmation of continuous compliance by the affirming official (see 32 CFR 170.4) for each self-assessment, C3PAO assessment, or DIBCAC assessment required under the contract in SPRS.
(f) Subcontracts. The Contractor shall-
(1) Insert the substance of this clause, including this paragraph (f) and excluding paragraph (e) (1), in subcontracts and other contractual instruments, including those for the acquisition of commercial products or commercial services, excluding commercially available off-the-shelf items, if the subcontract or other contractual instrument will contain a requirement to process, store, or transmit FCI or CUI; and
(2) Prior to awarding a subcontract or other contractual instrument, ensure that the subcontractor has a current CMMC certificate or current CMMC status at the CMMC level that is appropriate for the information that is being flowed down to the subcontractor based on the requirements at 32 CFR 170.23.
Addendum to Contract Clauses
FAR Clauses Incorporated by Reference
Number Title Effective Date
Alternate Deviation
Variation Effective Date
52.204-9 Personal Identity Verification of Contractor Personnel.
2011-01
52.209-10 Prohibition on Contracting With Inverted Domestic Corporations.
(Deviation 2026-O0038)
2026-02
52.222-3 Convict Labor. (Deviation 2026- O0038)
2026-02
52.222-6 Construction Wage Rate Requirements. (Deviation 2026- O0038)
2026-02
52.223-23 Sustainable Products. (Deviation 2026-O0038)
2026-02
52.227-1 Authorization and Consent. 2020-06
52.227-2 Notice and Assistance Regarding Patent and Copyright Infringement.
2020-06
52.227-4 Patent Indemnity-Construction Contracts.
2007-12
52.228-2 Additional Bond Security. 1997-10
52.228-5 Insurance-Work on a Government Installation.
1997-01
52.228-11 Pledges of Assets (DEVIATION 2021-02 Deviation 2020-04
2020-O0016) 2020- O0016
52.228-14 Irrevocable Letter of Credit. 2014-11
52.228-15 Performance and Payment Bonds-Construction (Deviation 2020-O0016)
2020-06 Deviation 2020- O0016
2020-04
52.232-17 Interest. 2014-05
52.232-23 Assignment of Claims. (Alternate I)
2014-05 Alternate I 1984-04
52.232-27 Prompt Payment for Construction Contracts.
2017-01
52.236-2 Differing Site Conditions.
(Deviation 2026-O0038)
2026-02
52.236-3 Site Investigation and Conditions Affecting the Work. (Deviation 2026-O0038)
2026-02
52.236-5 Material and Workmanship.
(Deviation 2026-O0038)
2026-02
52.236-13 Accident Prevention. (Deviation 2026-O0038)
2026-02
52.236-15 Schedules for Construction Contracts. (Deviation 2026- O0038)
2026-02
52.236-17 Layout of Work. (Deviation 2026- O0038)
2026-02
52.236-21 Specifications and Drawings for Construction. (Deviation 2026- O0038)
2026-02
52.240-91 Security Prohibitions and Exclusions. (Deviation 2026- O0038)
2026-02
52.240-93 Basic Safeguarding of Covered Contractor Information Systems.
(Deviation 2026-O0038)
2026-02
52.242-13 Bankruptcy. 1995-07
52.242-14 Suspension of Work. 1984-04
52.244-6 Subcontracts for Commercial Products and Commercial Services. (Deviation 2026-O0038)
DFARS Clauses Incorporated by Reference
Date
Alternate Deviation
Variation Effective Date
252.201-7000 Contracting Officer's Representative.
1991-12
252.225-7972 Prohibition on the Procurement of Foreign-Made Unmanned Aircraft Systems. (DEVIATION 2024-O0014)
2024-08 Deviation 2024- O0014
2024-08
252.236-7000 Modification Proposals--Price Breakdown.
1991-12
252.244-7999 Subcontracts for Commercial Products or Commercial Services. (DEVIATION 2026- O0015)
2026-02 Deviation 2026- O0015
2026-01
FAR Clauses Incorporated by Full Text
Date
Alternate Deviation
Variation Effective Date
52.211-12 Liquidated Damages- Construction.
2000-09
Liquidated Damages-Construction (Sept 2000)
(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $1,125.00 [Contracting Officer insert amount] for each calendar day of delay until the work is completed or accepted.
(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.
52.217-7 Option for Increased Quantity- Separately Priced Line Item.
1989-03
Option for Increased Quantity-Separately Priced Line Item (Mar 1989)
The Government may require the delivery of the numbered line item, identified in the Schedule as an option item, in the quantity and at the price stated in the Schedule. The Contracting Officer may exercise the option by written notice to the Contractor within 60 calendar days from contract award[insert in the clause the period of time in which the Contracting Officer has to exercise the option]. Delivery of added items shall continue at the same rate that like items are called for under the contract, unless the parties otherwise agree.
52.225-9 Buy American-Construction Materials. (Deviation 2026-
Buy American-Construction Materials (Feb 2026) (Deviation 2026-O0038)
(a) Definitions. As used in this clause-
Commercially available off-the-shelf (COTS) item-
(1) Means any item of supply (including construction material) that is-
(i) A commercial product (as defined in paragraph (1) of the definition of "commercial product" at Federal Acquisition Regulation (FAR) 2.101);
(ii) Sold in substantial quantities in the commercial marketplace; and
(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and
(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4), such as agricultural products and petroleum products.
"Construction material" means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies.
However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.
Cost of components means-
(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or
(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.
Critical component means a component that is mined, produced, or manufactured in the United States and deemed critical to the U.S. supply chain. The list of critical components is at FAR 25.105.
Critical item means a domestic construction material or domestic end product that is deemed critical to U.S. supply chain resiliency. The list of critical items is at FAR 25.105.
Domestic construction material means-
(1) For construction material that does not consist wholly or predominantly of iron or steel or a combination of both-
(i) An unmanufactured construction material mined or produced in the United States; or
(ii) A construction material manufactured in the United States, if-
(A) The cost of its components mined, produced, or manufactured in the United States exceeds 60 percent of the cost of all its components, except that the percentage will be 65 percent for items delivered in calendar years 2024 through 2028 and 75 percent for items delivered starting in calendar year 2029. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic. Components of unknown origin are treated as foreign; or
(B) The construction material is a COTS item; or
(2) For construction material that consists wholly or predominantly of iron or steel or a combination of both, a construction material manufactured in the United States if the cost of foreign iron and steel constitutes less than 5 percent of the cost of all components used in such construction material. The cost of foreign iron and steel includes but is not limited to the cost of foreign iron or steel mill products (such as bar, billet, slab, wire, plate, or sheet), castings, or forgings utilized in the manufacture of the construction material and a good faith estimate of the cost of all foreign iron or steel components excluding COTS fasteners. Iron or steel components of unknown origin are treated as foreign. If the construction material contains multiple components, the cost of all the materials used in such construction material is calculated in accordance with the definition of "cost of components".
Fastener means a hardware device that mechanically joins or affixes two or more objects together. Examples of fasteners are nuts, bolts, pins, rivets, nails, clips, and screws.
Foreign construction material means a construction material other than a domestic construction material.
Foreign iron and steel means iron or steel products not produced in the United States.
Produced in the United States means that all manufacturing processes of the iron or steel must take place in the United States, from the initial melting stage through the application of coatings, except metallurgical processes involving refinement of steel additives. The origin of the elements of the iron or steel is not relevant to the determination of whether it is domestic or foreign.
Predominantly of iron or steel or a combination of both means that the cost of the iron and steel content exceeds 50 percent of the total cost of all its components. The cost of iron and steel is the cost of the iron or steel mill products (such as bar, billet, slab, wire, plate, or sheet), castings, or forgings utilized in the manufacture of the product and a good faith estimate of the cost of iron or steel components excluding COTS fasteners.
Steel means an alloy that includes at least 50 percent iron, between 0.02 and 2 percent carbon, and may include other elements.
"United States" means the 50 States, the District of Columbia, and outlying areas.
(b) Domestic preference.
(1) This clause implements 41 U.S.C. chapter 83, Buy American, by providing a preference for domestic construction material. In accordance with 41 U.S.C. 1907, the domestic content test of the Buy American statute is waived for construction material that is a COTS item, except that for construction material that consists wholly or predominantly of iron or steel or a combination of both, the domestic content test is applied only to the iron and steel content of the construction materials, excluding COTS fasteners. The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.
(2) This requirement does not apply to information technology that is a commercial product or to the construction materials or components listed by the Government as follows:
none________[Contracting Officer to list applicable excepted materials or indicate "none"]
(3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that-
(i) The cost of domestic construction material would be unreasonable.
(A) For domestic construction material that is not a critical item or does not contain critical components.
(1) The cost of a particular domestic construction material subject to the requirements of the Buy American statute is unreasonable when the cost of such material exceeds the cost of foreign material by more than 20 percent;
(2) For construction material that is not a COTS item and does not consist wholly or predominantly of iron or steel or a combination of both, if the cost of a particular domestic construction material is determined to be unreasonable or there is no domestic offer received, and the low offer is for foreign construction material that is manufactured in the United States and does not exceed 55 percent domestic content, the Contracting Officer will treat the lowest offer of foreign construction material that exceeds 55 percent domestic content as a domestic offer and determine whether the cost of that offer is unreasonable by applying the evaluation factor listed in paragraph (b)(3)(i)(A)(1) of this clause.
(3) The procedures in paragraph (b)(3)(i)(A)(2) of this clause will no longer apply as of January 1, 2030.
(B) For domestic construction material that is a critical item or contains critical components.
(1) The cost of a particular domestic construction material that is a critical item or contains critical components, subject to the requirements of the Buy American statute, is unreasonable when the cost of such material exceeds the cost of foreign material by more than 20 percent plus the additional preference factor identified for the critical item or construction material containing critical components listed at FAR 25.105.
(2) For construction material that does not consist wholly or predominantly of iron or steel or a combination of both, if the cost of a particular domestic construction material is determined to be unreasonable or there is no domestic offer received, and the low offer is for foreign construction material that does not exceed 55 percent domestic content, the Contracting Officer will treat the lowest foreign offer of construction material that is manufactured in the United States and exceeds 55 percent domestic content as a domestic offer, and determine whether the cost of that offer is unreasonable by applying the evaluation factor listed in paragraph (b)(3) (i)(B)(1) of this clause.
(3) The procedures in paragraph (b)(3)(i)(B)(2) of this clause will no longer apply as of January 1, 2030.
(ii) The application of the restriction of the Buy American statute to a particular construction material would be impracticable or inconsistent with the public interest; or
(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.
(c) Request for determination of inapplicability of the Buy American statute.
(1)
(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)
(3) of this clause shall include adequate information for Government evaluation of the request, including-
(A) A description of the foreign and domestic construction materials;
(B) Unit of measure;
(C) Quantity;
(D) Price;
(E) Time of delivery or availability;
(F) Location of the construction project;
(G) Name and address of the proposed supplier; and
(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause.
(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.
(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).
(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.
(2) If the Government determines after contract award that an exception to the Buy American statute applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material. However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(3)(i) of this clause.
(3) Unless the Government determines that an exception to the Buy American statute applies, use of foreign construction material is noncompliant with the Buy American statute or Balance of Payments Program.
(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:
Foreign and Domestic Construction Materials…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .