This solicitation is for a full and open unrestricted competition to repair the Little Sodus West Pier located in Sterling, New York. Work includes encapsulating approximately 600 linear feet of the existing pier with new sheet pile walls and a concrete cap. Other tasks involve clearing driving lines, removing sections of existing sheet pile and concrete cap, installing new sheet piles connected with wales and tiebacks, backfilling with granular material, pouring a new concrete cap, and adding safety ladders and concrete stairs. The U.S. Army Corps of Engineers Buffalo District will issue the solicitation as a firm-fixed-price Invitation for Bid, with bids due by February 28, 2022. The repair work addresses issues of pulled and disconnected existing sheet piles no longer contained by the concrete cap.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Abstract IGE adjusted_Sodus FY22.xls | XLS spreadsheet | |
| Amendment 3.pdf | ||
| Amendment One Conformation of Site Visit.pdf | ||
| FULL SOL FY22 LITTLE SODUS WEST PIER REPAIR RTA_Jan26.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The Purpose of this amendment is to answer Questions and Answers, add insurance requirements, and post Roll Call.
1. CONTRACT ID CODE PAGE OF PAGES
1 7
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912P422B0007
X 9B. DATED (SEE ITEM 11)
27-Jan-2022
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
U0002
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
18-Feb-2022
CODE
U.S. ARMY ENGINEER DISTRICT, BUFFALO
1776 NIAGARA STREET
BUFFALO NY 14207-3199
W912P4 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912P422B0007
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
QUESTIONS AND ANSWERS/ROLL CAL
The Following are the Answers to this Solicitation.
1) Can the material excavated for the drive line on the land and water sides be side cast?
a. The village of Fair Haven owns the land adjacent to the pier. Per coordination with the village of Fair
Haven, NY, the drive line material should be hauled offsite.
2) What are the grading requirements on the land side excavation after scrubbing is completed?
a. Any excavations performed by the contractor on the land side of the project must result in the contractor returning the ground to the existing soil elevations at the completion of the project.
3) Can the land side buried boulders and cobbles be side cast?
a. Since the village of Fair Haven, NY owns the land adjacent to the pier, please coordinate with them on side casting any buried boulders and cobbles. Please note there may be concrete, which the village has mentioned should be hauled offsite. The village can provide some suggestions for concrete disposal. The POC is Mayor Jim Basile, jbasile14@yahoo.com, (585) 313-4911.
4) Can the contractor quality control person also be the SSHO? or do they have to separate individuals?
a. Yes, per the specs the SSHO may also serve as the Quality Control Manager. The SSHO may not serve as the Superintendent.
5) The solicitation has a prevailing wage rate for Heavy (Dredging and Marine). Can a wage rate be issued for regular Heavy as well or replace the current since a majority of the work can be accomplished land side without the current wage rates for dredging, floating plant, etc. Currently no wages are listed for operating engineers, laborers, cement finishers, laborers for tree removals, etc.?
a. The solicitation has changed to include two Wage Determinations.
-For in water work, IL18 applies.
-For work done on land, NY36 applies. NY36 is attached
6) Are any contract price escalations allowed for steel?
a. No price escalation are to be included in the contract.
7) Shall the existing site access road that can be utilized be restored to pre construction conditions for example no rutting etc? or are improvements expected?
a. The existing access road is gravel/sand, so it just needs to be restored to pre-construction conditions.
If the main asphalt roadway is damaged somehow, this would need to be repaired to pre-construction conditions, too. The preconstruction survey will document all of this.
8) Please confirm that currently due to DEC permitting in water work can not begin until July 15th 2022.
a. Correct, in-water work cannot currently begin until July 15th per section 01 35 13 paragraph 1.3.1(d).
We have requested an earlier in-water work through NYSDEC, but no decision has been made yet.
9) Sheet C101 indicates approx. 6 trees to be removed. Are those the only trees to be removed or is there a distance from the pier that is desired for trees/brush to be removed? In addition if additional removals are needed to facilitate construction can additional trees/brush be removed?
a. Note 1 should cover this. Any tree, including the stump, interfering with the drive line should be removed, and if it is not in the way it can remain. Please coordinate with the COR at the walk through prior to removals starting.
10) What are the requirements to prevent the public from entering the construction area for example: Temp.
chain link fence panels, orange safety fence, signage, etc.?
a. A chain link fence is noted in the drawings and specs.
11) Please confirm that West Bay Road can be utilized for truck traffic delivery of materials and equipment.
a. It is a public road and there are no posted limits so it can be utilized for truck traffic delivery of materials and equipment.
12) Can a list please be provided of pre bid attendees both onsite and WebEx.
a. WD Malone
b. Veteran Material
c. Ryba Marine
d. Kovilic Construction Co., Inc
e. Music City Renovations & Construction, LLC
f. Marion Hill Associates
g. Great Lakes Dock & Material, LLC
h. Crane-Hogan Structural Systems, Inc.
i. Winn Construction Services, Inc.
j. M. A. BONGIOVANNI, Inc.
13) Can you please clarify who is responsible for providing concrete testing?
a. The contractor is responsible for all concrete testing per the contract specifications.
14) Can you please clarify the insurance coverage requirements?
a. The insurance requirements in FAR Part 28.307-2 apply. See changes to Instructions to Bidders below.
15) Are there requirements/restrictions for utilizing a barge within the channel?
a. As per paragraph 1.3.7 in Section 01 35 13 “Perform the work in a manner as to obstruct navigation as little as possible and, in case, the Contractor's plant obstructs a channel as to make it difficult or endanger the passage of vessels, promptly move plant on the approach of any vessel to such an extent as may be necessary to afford practicable passage.” This is only applicable if the contractor’s barge is within the federal channel and does not apply if said barge is tied up outside of the channel and within project limits.
16) Project document Section 01 35 13, subsection 1.3.9 Temporary Lights, Signals and Buoys Required by the Coast Guard states, “display all temporary lights, signals and buoys required by the U.S. Coast Guard during the project”. The contact phone number provided in this section responds as no longer in service. Can you please clarify what temporary lights, signals and buoys, etc. will be required?
a. Contractor is responsible for coordinating any temporary lights, signals, or buoys the coast guard requires while working close to, or within the federal channel. The POC for the coast Guard should be Doug Sharp for the 9th District.
17) We see that this project is to be bonded. On previous USACE projects there would be a separate CLIN item for activity. We do not see that being the case for this project and was curious as to which CLIN we should have the price part of.
a. Mobilization/Demobilization
18) Specification 05 50 13 Paragraph 2.4 Ladders call out yellow and black paint for the ladders. Are there additional specifications associated with this paint that will be required I.E. paint system to be used?
a. Intent is for the contractor to use a paint and primer that is recommended by the manufacturer for exterior steel surfaces to prevent rust.
b. The color of the ladder is to be changed so that the entire ladder is painted safety yellow.
Roll Call - The Following Firms were at the Site Visit and signed the sign in sheet.
Government- Lex Barker, Kenneth Mackay, Ryan Lenihan, Susan Garand, Todd Kufel, Austin Nilsen, Joshua Feldmann, Thomas Lavean, Frank Lewandowski, Paul Farrell, Michell Hares.
Ryan Hecht DMYLES
Dennis Radanovich Harrison & Burrows Michael Baker Harrison & Burrows Forrest Mager Cold Spring Russell Insogna Winn Construction Cody Donahue Crane-Hogan Ryan Isabell RDI Jeff Hanlon Slate Hill Dan Durocher Lakeshore News Steve Isabell IW Construction Scott Weir MA Bongiovanni WD Malone Veteran Material Travis Lake Chris Bollin Gunnar Galuszka Joe Bailey GLDM Matt Britt Michael Buckley Rodolfo Vazquez
SECTION 00 21 13 - INSTRUCTIONS TO BIDDERS
The following have been modified:
INSTRUCTIONS TO BIDDERS
A Pre-bid/site visit will be conducted on 9 Feb 2022 at 10:00 am Eastern Time.
Where:
1) Virtual:
a) Please use the following call-in information: US Toll Free by phone: 1-844-800-2712, Access Code: 199 715 2669, Security Code: 1234, WebEx Meeting link https://usace1.webex.com/meet/lex.c.barker.
b) For those on-site, location is TBD, likely the fire hall @ 14447 Fair Haven Rd, Sterling, NY 13156.
2) On-site: Travel to 14990 W Bay Rd, Sterling, NY 13156. Park and walk to pier, or drive to pier. Proper PPE required.
Questions concerning this solicitation shall be submitted via electronic mail (e-mail) no later then 11 FEB 2022, 2:00 P.M. EST to kenneth.e.mackay@USACE.Army.mil
BID SUBMISSION:
a. Bids shall be emailed by SAFE to Kenneth Mackay at kenneth.e.mackay@usace.army by 28 FEB 2022 at 2:00 p.m. EasternTime. Please email Mr. Mackay NLT 23 FEB 2022 for the SAFE information.
1. Short Note to the Recipients: Click the Add Files or Drag and Drop your files. For file description, enter
W912P422B0007-FIRMNAME. PLEASE NOTE,
YOU MUST CHANGE THE SEND TO
ADDRESS IN SAFE TO
Kenneth.e.mackay@usace.army.mil
From: kenneth.e.mackay.civ@mail.mil
b. The bid shall include the following elements to be considered for award:
(1) SF 1442: Filled out by the vendor .
(2) All Amendments (SF 30s): Signed if applicable.
(3) Complete CLINs: 0001-0017.
(4) Bid Bond
(5) Acknowledge and complete clause 52.204-24. (5) In accordance with FAR 52.204-7, System for Award Management, registration is required in the System for Award Management (SAM) database located at www.sam.gov. More specifically, "An Offeror is required to be registered in SAM when submitting an offer or quotation, and shall continue to be registered until time of award, during performance, and through final payment of any contract, basic agreement, basic ordering agreement, or blanket purchasing agreement resulting from this solicitation."
(See FAR 52.204-7(b) (1)).
For SAM Customer Service, contact:
Federal Service Desk URL: www.fsd.gov Hours: 8am - 8pm (Eastern Time) US Calls: 866-606-8220 International Calls: 334-206-7828
DSN: 866-606-8220
(6) Provide business CAGE code: __________________________________
(7) Tax Identification Number: ____________________________________
(c) 19.1307 Price evaluation preference for HUBZone small business concerns.
(a) The price evaluation preference for HUBZone small business shall be used in acquisitions conducted using full and open competition. The preference shall not be used -
(1) Where price is not a selection factor so that a price evaluation preference would not be considered (e.g., Architect/Engineer acquisitions); or
2) Where all fair and reasonable offers are accepted (e.g., the award of multiple award schedule contracts).
(b) The contracting officer shall give offers from HUBZ one small business a price evaluation preference by adding a factor of 10 percent to all offers, except -
(1) Offers from HUBZone small business that have not waived the evaluation preference; or
(2) Otherwise successful offers from small business concerns.
(c) The factor of 10 percent shall be applied on a line item basis or to any group of items on which award may be made. Other evaluation factors, such as transportation costs or rent-free use of Government property, shall be added to the offer to establish the base offer before adding the factor of 10 percent.
(d) When the two highest rated offerors are a HUBZone small business and a large business, and the evaluated offer of the HUBZone small business is equal to the evaluated offer of the large business after considering the price evaluation preference, the contracting officer shall award the contract to the HUBZone small business.
(d) The insurance requirements in FAR Part 28.307-2 apply.
(a) Workers’ compensation and employer’s liability. Contractors are required to comply with applicable Federal and State workers’ compensation and occupational disease statutes. If occupational diseases are not compensable under those statutes, they shall be covered under the employer’s liability section of the insurance policy, except when contract operations are so commingled with a contractor’s commercial operations that it would not be practical to require this coverage. Employer’s liability coverage of at least $100,000 shall be required, except in States with exclusive or monopolistic funds that do not permit workers’ compensation to be written by private carriers. (See 28.305(c) for treatment of contracts subject to the Defense Base Act.)
(b) General liability. (1) The contracting officer shall require bodily injury liability insurance coverage written on the comprehensive form of policy of at least $500,000 per occurrence.
(2) Property damage liability insurance shall be required only in special circumstances as determined by the agency.
(c) Automobile liability. The contracting officer shall require automobile liability insurance written on the comprehensive form of policy. The policy shall provide for bodily injury and property damage liability covering the operation of all automobiles used in connection with performing the contract . Policies covering automobiles operated in the United States shall provide coverage of at least $200,000 per person and $500,000 per occurrence for bodily injury and $20,000 per occurrence for property damage. The amount of liability coverage on other policies shall be commensurate with any legal requirements of the locality and sufficient to meet normal and customary claims.
(d) Aircraft public and passenger liability. When aircraft are used in connection with performing the contract , the contracting officer shall require aircraft public and passenger liability insurance . Coverage shall be at least $200,000 per person and $500,000 per occurrence for bodily injury, other than passenger liability, and $200,000 per occurrence for property damage. Coverage for passenger liability bodily injury shall be at least $200,000 multiplied by the number of seats or passengers, whichever is greater.
(e) Vessel liability. When contract performance involves use of vessels, the contracting officer shall require, as determined by the agency, vessel collision liability and protection and indemnity liability insurance .
(End of Summary of Changes)
"General Decision Number: NY20220036 02/18/2022
Superseded General Decision Number: NY20210036
State: New York
Construction Types: Heavy and Highway
County: Cayuga County in New York.
HEAVY AND HIGHWAY CONSTRUCTION PROJECTS.
Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658.
Please note that these Executive Orders apply to covered contracts entered into by the federal government that aresubject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60).
If the contract is entered into on or after January 30, 2022, or the contract is renewed or extended (e.g., an option is exercised) on or after January 30, 2022, Executive Order 14026 generally applies to the contract. The contractor must pay all covered workers at least $15.00 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on that contract in 2022.
If the contract was awarded on or between January 1, 2015 and January 29, 2022, and the contract is not renewed or extended on or after January 30, 2022, Executive Order 13658 generally applies to the contract. The contractor must pay all covered workers at least $11.25 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on that contract in 2022.
The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the Executive Orders and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must still submit a conformance request.
Additional information on contractor requirements and worker protections under the Executive Orders is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/07/2022 1 02/18/2022
ASBE0030-001 05/01/2021
Rates Fringes
Asbestos/Insulator Worker includes application of all materials, protective coverings, coatings and finishings to all types of mechanical systems. Also the application of firestopping material to openings and penetrations in walls, floors, ceilings, curtain walls and all lead abatement......$ 35.00 24.29
HAZARDOUS MATERIAL HANDLER
SCOPE OF WORK: DUTIES
LIMITED TO preparation, wetting, stripping, removal, scrapping, vacuuming, bagging, and disposing of all insulation materials, whether they contain asbestos or not from mechanical system...........$ 35.00 24.29
BOIL0175-001 01/01/2021
Rates Fringes
BOILERMAKER......................$ 35.23 26.61
BRNY0002-014 07/01/2020
SYRACUSE CHAPTER
Rates Fringes
BRICKLAYER
BRICKLAYERS, STONEMASONS,
CEMENT MASONS, PLASTERERS,
POINTER, CLEANERS &
CAULKERS....................$ 35.15 21.03
MARBLE, TILE AND TERRAZZO
FINISHERS...................$ 25.92 18.71
MARBLE, TILE, AND TERRAZZO
WORKERS....................$ 32.22 19.31
BRNY0002-015 06/01/2018
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 37.23 19.51+a
FOOTNOTE:
a. Paid Holidays: Memorial Day, July the 4th, Labor Day, Thanksgiving Day (provided the employee is employed one day before and one day after the holiday).
CARP0277-014 07/01/2021
Rates Fringes
CARPENTER........................$ 33.13 23.90
ELEC0043-009 06/01/2021
Rates Fringes
Electricians:
ENTIRE COUNTY, except Township of Genoa
CABLE SPLICING.............$ 45.10 28.77
ELECTRICIANS...............$ 41.00 28.65
ELEC0241-004 06/01/2019
REMAINDER OF COUNTY
Rates Fringes
ELECTRICIAN......................$ 34.25 27.73
ELEC1249-003 05/04/2020
Rates Fringes
ELECTRICIAN (LINE
CONSTRUCTION: LIGHTING AND
TRAFFIC SIGNAL Including any and all Fiber Optic Cable necessary for Traffic Signal Systems, Traffic Monitoring systems and Road Weather information systems) Flagman.....................$ 27.72 6.75%+33.90 Groundman (Truck Driver)....$ 36.96 6.75%+33.90 Groundman Truck Driver (tractor trailer unit)......$ 39.27 6.75%+33.90 Lineman & Technician........$ 46.20 6.75%+33.90 Mechanic....................$ 36.96 6.75%+33.90
FOOTNOTE:
a. New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Christmas Day, plus President's Day, Good Friday, Decoration Day, Election Day for the President of the United States and Election Day for the Governor of the State of New York, provided the employee works the day before or the day after the holiday.
ELEC1249-004 05/03/2021
Rates Fringes
ELECTRICIAN (Line Construction) Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :
Flagman....................$ 32.82 7%+34.40 Groundman digging machine operator...................$ 49.23 7%+34.40 Groundman truck driver (tractor trailer unit).....$ 46.50 7%+34.40 Groundman Truck driver.....$ 43.76 7%+34.40
Lineman and Technician.....$ 54.70 7%+35.40 Mechanic...................$ 43.76 7%+34.40 Substation:
Cable Splicer..............$ 60.17 7%+35.40 Flagman....................$ 32.82 7%+34.40 Ground man truck driver....$ 43.76 7%+34.40 Groundman digging machine operator...................$ 49.23 7%+34.40 Groundman truck driver (tractor trailer unit).....$ 46.50 7%+34.40 Lineman & Technician.......$ 54.70 7%+35.40 Mechanic...................$ 43.76 7%+34.40 Switching structures;
railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation Cable Splicer..............$ 61.62 7%+35.40 Flagman....................$ 33.61 7%+34.40 Groundman Digging Machine Operator...................$ 50.42 7%+34.40 Groundman Truck Driver (tractor-trailer unit).....$ 47.62 7%+34.40 Groundman Truck Driver.....$ 44.82 7%+34.40 Lineman & Technician.......$ 56.02 7%+35.40 Mechanic...................$ 44.82 7%+34.40
FOOTNOTE:
a. PAID HOLIDAYS: New Year's Day, Presidents' Day, Memorial Day, Good Friday, Independence Day, Labor Day, Thanksgiving Day, Christmas Day, and Election Day for the President of the United States and Election Day for the Governor of New York State, provided the employee works two days before or two days after the holiday.
ELEC1249-008 01/03/2021
Rates Fringes
ELECTRICIAN (Line Construction)
TELEPHONE, CATV
FIBEROPTICS CABLE AND
EQUIPMENT
Cable splicer..............$ 34.78 3%+5.14 Groundman..................$ 17.50 3%+5.14 Installer Repairman- Teledata
Lineman/Technician- Equipment Operator.........$ 33.01 3%+5.14 Tree Trimmer................$ 27.36 3%+9.98
a. New Year's Day, President's Day, Good Friday, Decoration Day, Independence Day, Labor Day, Veteran's Day, Thanksgiving Day, Day after Thanksgiving, Christmas Day.
ENGI0545-010 07/01/2017
Rates Fringes
Power equipment operators:
GROUP 1.....................$ 40.80 25.15+a GROUP 2.....................$ 39.92 25.15+a GROUP 3.....................$ 36.64 25.15+a GROUP 4.....................$ 44.80 25.15+a GROUP 5.....................$ 43.80 25.15+a GROUP 6.....................$ 42.80 25.15+a GROUP 7.....................$ 42.15 25.15+a
POWER EQUIPMENT OPERATORS CLASSIFICATIONS
GROUP 1: Asphalt Curb Machine, Self Propelled, Slipform, Automated Concrete Spreader (CMI Type), Automatic Fine Grader, Backhoe (Except Tractor Mounted, Rubber Tired), Backhoe Excavator Full Swing (CAT 212 or similar type), Back Filling Machine, Belt Placer (CMI Type), Blacktop Plant (Automated), Boom truck , Cableway, Caisson Auger, Central Mix Concrete Plant (Automated), Concrete Curb Machine, Self Propelled, Slipform, Concrete Pump, Crane, Cherry Picker, Derricks (steel erection), Dragline, Overhead Crane (Gantry or Straddle type), Pile Driver, Truck Crane, Directional Drilling Machine, Dredge, Dual Drum Paver, Excavator (All Purpose Hydraulically Operated) (Gradall or Similar), Front End Loader ( 4 cu. yd. and Over), Head Tower (Sauerman or Equal), Hoist (Two or Three Drum), Holland Loader, Maintenance Engineer, Mine Hoist, Mucking Machine or Mole Pavement Breaker(SP) Wertgen; PB-4 and similar type, Power Grader, Profiler (over 105 H.P.)
Quad 9, Quarry Master (or equivalent), Scraper, Fireman, Fork Lift, Form Tamper, Grout Pump, Gunite Machine, Hammers (Hydraulic self-propelled), Hydra-Spiker, ride-on, Hydraulic Pump (jacking system), Hydro-Blaster (Water), Mulching Machine, Oiler, Parapet Concrete or Pavement, Shovel, Side Boom, Slip Form Paver, Tractor Drawn, BeltType Loader, Truck or Trailer Mounted Log , Chipper (Self Feeder), Tug Operator (Manned Rented Equipment Excluded), Tunnel Shovel
GROUP 2: Asphalt Paver, Backhoe (Tractor Mounted, Rubber Tired), Bituminous Recycler Machine, Bituminous Spreader and Mixer, Blacktop Plant (NonAutomated), Blast or Rotary Drill (Truck or Tractor Mounted), Boring Machine, Cage Hoist, Central Mix Plant (NonAutomated) and All Concrete Batching Plants, Cherry Picker (5 tons capacity and under), Concrete Paver (Over 16S), Crawler Drill, Self-contained, Crusher, Diesel Power Unit, Drill Rigs, Tractor Mounted, Front End Loader (Under 4 cu. yd.), Greaseman/Lubrication Engineer, HiPressure Boiler (15 lbs. and over), Hoist (One Drum), Hydro-Axe, Kolman Plant Loader and Similar Type Loaders, L.C.M. Work Boat Operator, Locomotive Mixer (for stabilized base selfpropelled), Monorail Machine, Plant Engineer, Profiler (105 H.P. and under), Grinder, Post Hole
Digger and Post Driver, Power Broom (towed), Power Heaterman, Power Sweeper, Revinius Widener, Roller (Grade and Fill), Scarifier, ride-on, Shell Winder, Skid steer loader (Bobcat or similar), Span-Saw, ride-on, Steam Cleaner, Pug Mill, Pump Crete Ready Mix Concrete Plant Refrigeration Equipment (for soil stabilization)Road Widener, Roller (all above subgrade), Sea Mule, Self-contained Ride-on Rock Drill, Excluding Air-Track Type Drill, Skidder, Tractor with Dozer and/or Pusher, Trencher.
Tugger Hoist, Vermeer saw (ride on, any size or type), Winch, Winch Cat
GROUP 3: A Frame Winch Hoist on Truck , Articulated Heavy Hauler, Aggregate Plant, Asphalt or Concrete Grooving, Machine (ride on), Ballast Regulator, Ride-on Boiler (used in conjunction with production), Bituminous Heater, self-propelled, Boat (powered), Cement and Bin Operator, Compressors, Dust Collectors, Generators, Pumps, Welding Machines, Light Plants, Heaters (hands-off equipment), Concrete Pavement Spreader and Finisher, Concrete Paver or Mixer (16S and under), Concrete Saw (self-propelled), Conveyor, Deck Hand, Directional Drill Machine Locator, Drill, (Core), Drill, (Well,) Farm Tractor with accessories, Fine Grade Machine, Tamper, ride-on, Tie Extractor, ride-on, Tie Handler, ride-on, Tie Inserter, ride-on, Tie Spacer, ride-on, Tire Repair, Track Liner, ride-on, Tractor, Tractor (with towed accessories), Vibratory Compactor, Vibro Tamp, Well Point
GROUP 4: Tower Cranes
GROUP 5: Cranes 50 tons and over
GROUP 6: Cranes 49 tons and below
GROUP 7: Master Mechanic
FOOTNOTE:
a. New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Christmas Day provided the employee has worked the working day before and the working day after the holiday.
IRON0060-007 07/01/2020
Rates Fringes
IRONWORKER
Structural, Ornamental, Reinforcing, Pre-cast Concret Erector, Machinery Mover & Rigger, Fence Erector, Stone Derrikman, Welder, Sheeter, Sheeter Bucker-up...................$ 30.75 28.05
LABO0633-006 07/01/2018
Rates Fringes
LABORER
GROUP 1.....................$ 28.50 21.05+a
GROUP 2.....................$ 28.70 21.05+a GROUP 3.....................$ 28.90 21.05+a GROUP 4.....................$ 29.10 21.05+a
LABORER CLASSIFICATIONS
GROUP 1: Laborers, flaggers, outboard and hand boats.
GROUP 2: Bull float; chain saw, concrete aggregate bin, concrete bootman, gin buggy, hand or machine vibrator, jackhammer, mason tender, mortar mixer, pavement breaker, handlers of all steel mesh; small generators for laborers tools; installation of bridge drainage pipe, pipelayers, vibrator type rollers; tamper, drill doctor, tail or screw operator on asphalt paver, water pump (1-1/2"" and singlediaphram); nozzle (asphalt, gunnite, seeding and sandblasting); laborers on chain link fence erection; rock splitter and power unit; pusher type concrete saw and all other gas, electric, oil and air tool operators; wrecking laborers.
GROUP 3: All rock or drill machine operator (except quarry master and similar type); acetylene torch operator, asphalt raker, powderman.
GROUP 4: Blaster, form setters, stone or granite curb setters.
FOOTNOTE:
a. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day and Christmas Day, provided the employee has worked the working day before and the working day after the holiday.
PAIN0004-027 05/01/2018
Rates Fringes
PAINTER (Bridges)................$ 38.00 27.75
PAIN0677-002 05/01/2019
Rates Fringes
GLAZIER..........................$ 24.75 19.59
PLUM0073-002 05/01/2017
REMAINDER OF COUNTY
Rates Fringes
Plumber, Pipefitter, Steamfitter HVAC and REFRIGERATION
SERVICE
On all HVAC and refrigeration service work; all heating plumbing air conditioning, refrigeration; all servicing of same and Pipefitting work in all schools, hospitals, health related facilities and extended care facilities, including nursing homes.....$ 28.19 21.91
PLUM0267-004 05/01/2019
THE TOWN OF NEW HOPE
Rates Fringes
Plumber, Pipefitter, Steamfitter (Including HVAC Work)............................$ 35.51 24.57
ROOF0195-001 06/01/2021
Rates Fringes
ROOFER...........................$ 29.00 24.61
* SFNY0669-001 01/01/2022
Rates Fringes
SPRINKLER FITTER.................$ 38.96 25.91
SHEE0058-001 05/01/2020
Rates Fringes
Sheet Metal Worker Projects 10 million or less.$ 29.63 21.71 Projects over $10 million...$ 30.63 21.71
TEAM0317-003 07/01/2019
Rates Fringes
TRUCK DRIVER
GROUP 1.....................$ 26.50 25.56+a GROUP 2.....................$ 26.70 25.56+a
FOOTNOTES:
PAID HOLIDAYS: New Year's Day; Memorial Day; Independence Day; Labor Day; Thanksgiving Day; Christmas Day provided employee has worked the working day before and the working day after the holiday.
Work on Hazardous Waste Sites Receive additional $1.50/hr.
TRUCK DRIVERS CLASSIFICATIONS
GROUP 1: Pickups, panel trucks, flatboy material trucks (straight jobs), single-axle dump trucks, dupsters, receivers, greasers, truck tiremen, tandems and batch trucks, semi-trailers, low-boy trucks, asphalt distributor trucks, & agitator, mixer trucks & dumpcrete type vehicles, fuel trucks
GROUP 2: Specialized earth moving equipment-euclid type, or similar off-highway equipment, where not self loaded,straddle (ross) carrier, and self-contained concrete mobile unit, off-highway tandem back-dump, twin engine euipment and double-hitched equipment where not self loaded.
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union, which prevailed in the survey for this classification, which in this example would be Plumbers 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Division National Office Branch of Wage Surveys. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division
U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION"