- Solicitation number
- W912P4-19-T-0002
About this file
UPDATED SOLICITATION The required response date/time has changed: FROM: 03-Jan-2019 06:00 PM TO: 09-Jan-2019 09:00 AM.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| PERFORMANCE_WORK_STATEMENT_HVAC_LRB_UPDATED.pdf | ||
| Price_Breakout_Schedule.xlsx | XLSX spreadsheet | |
| PERFORMANCE_WORK_STATEMENT_HVAC_LRB.pdf | ||
| SITE_VISIT_17_DEC_2018_1600.pdf | ||
| INSTRUCTIONS_TO_OFFEROR.pdf | ||
| Price_Breakout_Schedule.xlsx | XLSX spreadsheet | |
| W912P4-19-T-0002_SOLICITATION.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this modification is to update all the Line Items for Parts (Price of parts is unknow n at this time). The follow ing w ere updated:
1. Per historical costs an estimated cost $500.00 for all buildings is an estimated cost.
2. Estimated cost per historical costs w as added to the Line Item description.
3. An estimated amount of $125.00 w as added to each Line Item. ($125.00 x 4=$500.00) The Performance Work Statement and Price Breakout Schedule w ere updated.
The Unit of Measure for the Line Items for Emergency Repairs and Labor has been changed TO: Hours FROM: Job.
FAR CLAUSE 52.219-14 -- Limitations on Subcontracting w as added.
The Request for Proposal due date has been extended to NLT 09 JAN 2018 at 0900.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 36
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 03-Jan-2019
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912P419T0002
X 9B. DATED (SEE ITEM 11)
06-Dec-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
03-Jan-2019
CODE
U.S. ARMY ENGINEER DISTRICT, BUFFALO
1776 NIAGARA STREET
BUFFALO NY 14207-3199
W912P4 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912P419T0002
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
SOLICITATION/CONTRACT FORM
The required response date/time has changed:
FROM: 03-Jan-2019 06:00 PM TO: 09-Jan-2019 09:00 AM.
SUPPLIES OR SERVICES AND PRICES
CLIN 0005
The CLIN extended description has changed from:
Parts and Supplies – Building #1Contractor to provide Parts and Supplies for the HVAC System in accordance with the attached Performance Work Statement, Contractor's proposal and contract specifications. Period of Performance:
15 JAN 2019 – 14 JAN 2020
To:
Parts and Supplies – Building #1 Contractor to provide Parts and Supplies for the HVAC System in accordance with the attached Performance Work Statement, Contractor's proposal and contract specifications.
Estimated cost of $125.000 per historical data.
Period of Performance: 15 JAN 2019 – 14 JAN 2020
The option status has changed from No Status to Option.
CLIN 0006
The CLIN extended description has changed from:
Parts and Supplies – Building #2Contractor to provide Parts and Supplies for the HVAC System in accordance with the attached Performance Work Statement, Contractor's proposal and contract specifications.Period of Performance:
Parts and Supplies – Building #2 Contractor to provide Parts and Supplies for the HVAC System in accordance with the attached Performance Work Statement, Contractor's proposal and contract specifications.
Estimated cost of $125.000 per historical data.
CLIN 0007
Parts and Supplies – Building #5Contractor to provide Parts and Supplies for the HVAC System in accordance with the attached Performance Work Statement, Contractor's proposal and contract specifications.Period of Performance:
Parts and Supplies – Building #5 Contractor to provide Parts and Supplies for the HVAC System in accordance with the attached Performance Work Statement, Contractor's proposal and contract specifications.
Estimated cost of $125.000 per historical data.
CLIN 0008
Parts and Supplies – Building #6Contractor to provide Parts and Supplies for the HVAC System in accordance with the attached Performance Work Statement, Contractor's proposal and contract specifications.Period of Performance:
Parts and Supplies – Building #6 Contractor to provide Parts and Supplies for the HVAC System in accordance with the attached Performance Work Statement, Contractor's proposal and contract specifications.
Estimated cost of $125.000 per historical data.
Period of Performance: 15 JAN 2019 – 14 JAN 2020
CLIN 0009
The unit of issue has changed from Job to Hours.
CLIN 0010
CLIN 0011
CLIN 0012
CLIN 0017
Parts and Supplies – Building #1Contractor to provide Parts and Supplies for the HVAC System in accordance with the attached Performance Work Statement, Contractor's proposal and contract specifications.Period of Performance:
15 JAN 2020 – 14 JAN 2021
Contractor to provide Parts and Supplies for the HVAC System in accordance with the attached Performance Work Statement, Contractor's proposal and contract specifications.
Estimated cost of $125.000 per historical data.
Period of Performance: 15 JAN 2020 – 14 JAN 2021
CLIN 0018
Parts and Supplies – Building #2Contractor to provide Parts and Supplies for the HVAC System in accordance with the attached Performance Work Statement, Contractor's proposal and contract specifications. Period of Performance:
Contractor to provide Parts and Supplies for the HVAC System in accordance with the attached Performance Work Statement, Contractor's proposal and contract specifications.
CLIN 0019
Parts and Supplies – Building #5Contractor to provide Parts and Supplies for the HVAC System in accordance with the attached Performance Work Statement, Contractor's proposal and contract specifications. Period of Performance:
Contractor to provide Parts and Supplies for the HVAC System in accordance with the attached Performance Work Statement, Contractor's proposal and contract specifications.
CLIN 0020
Parts and Supplies – Building #6Contractor to provide Parts and Supplies for the HVAC System in accordance with the attached Performance Work Statement, Contractor's proposal and contract specifications.Period of Performance:
Contractor to provide Parts and Supplies for the HVAC System in accordance with the attached Performance Work Statement, Contractor's proposal and contract specifications.
CLIN 0021
CLIN 0022
CLIN 0023
CLIN 0024
CLIN 0029
Parts and Supplies – Building #1Contractor to provide Parts and Supplies for the HVAC System in accordance with the attached Performance Work Statement, Contractor's proposal and contract specifications. Period of Performance:
15 JAN 2021 – 14 JAN 2022
Contractor to provide Parts and Supplies for the HVAC System in accordance with the attached Performance Work Statement, Contractor's proposal and contract specifications.
Period of Performance: 15 JAN 2021 – 14 JAN 2022
CLIN 0030
Parts and Supplies – Building #2Contractor to provide Parts and Supplies for the HVAC System in accordance with the attached Performance Work Statement, Contractor's proposal and contract specifications. Period of Performance:
Contractor to provide Parts and Supplies for the HVAC System in accordance with the attached Performance Work Statement, Contractor's proposal and contract specifications.
CLIN 0031
Parts and Supplies – Building #5Contractor to provide Parts and Supplies for the HVAC System in accordance with the attached Performance Work Statement, Contractor's proposal and contract specifications. Period of Performance:
Contractor to provide Parts and Supplies for the HVAC System in accordance with the attached Performance Work Statement, Contractor's proposal and contract specifications.
CLIN 0032
Parts and Supplies – Building #6Contractor to provide Parts and Supplies for the HVAC System in accordance with the attached Performance Work Statement, Contractor's proposal and contract specifications. Period of Performance:
Contractor to provide Parts and Supplies for the HVAC System in accordance with the attached Performance Work Statement, Contractor's proposal and contract specifications.
Estimated cost of $125.000 per historical data.
CLIN 0033
CLIN 0034
CLIN 0035
CLIN 0036
CLIN 0041
Parts and Supplies – Building #1Contractor to provide Parts and Supplies for the HVAC System in accordance with the attached Performance Work Statement, Contractor's proposal and contract specifications.Period of Performance:
15 JAN 2022 – 14 JAN 2023
Contractor to provide Parts and Supplies for the HVAC System in accordance with the attached Performance Work Statement, Contractor's proposal and contract specifications.
Period of Performance: 15 JAN 2022 – 14 JAN 2023.
CLIN 0042
Parts and Supplies – Building #2Contractor to provide Parts and Supplies for the HVAC System in accordance with the attached Performance Work Statement, Contractor's proposal and contract specifications. Period of Performance:
Contractor to provide Parts and Supplies for the HVAC System in accordance with the attached Performance Work Statement, Contractor's proposal and contract specifications.
Period of Performance: 15 JAN 2022 – 14 JAN 2023
CLIN 0043
Parts and Supplies – Building #5Contractor to provide Parts and Supplies for the HVAC System in accordance with the attached Performance Work Statement, Contractor's proposal and contract specifications. Period of Performance:
Contractor to provide Parts and Supplies for the HVAC System in accordance with the attached Performance Work Statement, Contractor's proposal and contract specifications.
CLIN 0044
Parts and Supplies – Building #6Contractor to provide Parts and Supplies for the HVAC System in accordance with the attached Performance Work Statement, Contractor's proposal and contract specifications.Period of Performance:
Contractor to provide Parts and Supplies for the HVAC System in accordance with the attached Performance Work Statement, Contractor's proposal and contract specifications.
CLIN 0045
CLIN 0046
CLIN 0047
CLIN 0048
CLIN 0053
Parts and Supplies – Building #1Contractor to provide Parts and Supplies for the HVAC System in accordance with the attached Performance Work Statement, Contractor's proposal and contract specifications. Period of Performance:
15 JAN 2023 – 14 JAN 2024
Contractor to provide Parts and Supplies for the HVAC System in accordance with the attached Performance Work Statement, Contractor's proposal and contract specifications.
Period of Performance: 15 JAN 2023 – 14 JAN 2024
CLIN 0054
Parts and Supplies – Building #2Contractor to provide Parts and Supplies for the HVAC System in accordance with the attached Performance Work Statement, Contractor's proposal and contract specifications. Period of Performance:
Contractor to provide Parts and Supplies for the HVAC System in accordance with the attached Performance Work Statement, Contractor's proposal and contract specifications.
CLIN 0055
Parts and Supplies – Building #5Contractor to provide Parts and Supplies for the HVAC System in accordance with the attached Performance Work Statement, Contractor's proposal and contract specifications. Period of Performance:
Contractor to provide Parts and Supplies for the HVAC System in accordance with the attached Performance Work Statement, Contractor's proposal and contract specifications.
CLIN 0056
Parts and Supplies – Building #6Contractor to provide Parts and Supplies for the HVAC System in accordance with the attached Performance Work Statement, Contractor's proposal and contract specifications. Period of Performance:
Parts and Supplies – Building #6Contractor to provide Parts and Supplies for the HVAC System in accordance with the attached Performance Work Statement, Contractor's proposal and contract specifications.
CLIN 0057
CLIN 0058
CLIN 0059
CLIN 0060
The following have been added by full text:
UPDATED PRICE BREAKOUT SCHEDULE
BID SCHEDULE
BUFFALO DISTRICT HVAC
BASE WITH 4 OPTION YEARS
BASE YEAR - FY 19
Item No.
Description Unit Qty Unit Price Bid
Total Item Cost
1 Preventative Maintenance Building 1 JOB 1 $0.00 2 Preventative Maintenance Building 2 JOB 1 $0.00 3 Preventative Maintenance Building 5 JOB 1 $0.00 4 Preventative Maintenance Building 6 JOB 1 $0.00 5 Supplies and Parts Building 1 - (Not included in Option total) JOB 1 $125.00 $125.00 6 Supplies and Parts Building 2 - (Not included in Option total) JOB 1 $125.00 $125.00 7 Supplies and Parts Building 5 - (Not included in Option total) JOB 1 $125.00 $125.00 8 Supplies and Parts Building 6 - (Not included in Option total) JOB 1 $125.00 $125.00 9 Emergency Repairs and Labor - Building 1 (Hourly Rate, not included in Option total) HOUR 1 $0.00
10 Emergency Repairs and Labor - Building 2 (Hourly Rate, not included in Option total) HOUR 1 $0.00 11 Emergency Repairs and Labor - Building 5 (Hourly Rate, not included in Option total) HOUR 1 $0.00 12 Emergency Repairs and Labor - Building 6 (Hourly Rate, not included in Option total) HOUR 1 $0.00
Total - Base Year $0.00
OPTION YEAR 1 - FY 20
Item No.
Description Unit Qty Unit Price Bid
Total Item Cost
13 Preventative Maintenance Building 1 JOB 1 $0.00 14 Preventative Maintenance Building 2 JOB 1 $0.00 15 Preventative Maintenance Building 5 JOB 1 $0.00 16 Preventative Maintenance Building 6 JOB 1 $0.00 17 Supplies and Parts Building 1 - (Not included in Option total) JOB 1 $125.00 $125.00 18 Supplies and Parts Building 2 - (Not included in Option total) JOB 1 $125.00 $125.00 19 Supplies and Parts Building 5 - (Not included in Option total) JOB 1 $125.00 $125.00 20 Supplies and Parts Building 6 - (Not included in Option total) JOB 1 $125.00 $125.00 21 Emergency Repairs and Labor - Building 1 (Hourly Rate, not included in Option total) HOUR 1 $0.00 22 Emergency Repairs and Labor - Building 2 (Hourly Rate, not included in Option total) HOUR 1 $0.00 23 Emergency Repairs and Labor - Building 5 (Hourly Rate, not included in Option total) HOUR 1 $0.00 24 Emergency Repairs and Labor - Building 6 (Hourly Rate, not included in Option total) HOUR 1 $0.00
Total - Option Year 1 $0.00
OPTION YEAR 2 - FY 21
Item No.
Description Unit Quan tity
Unit Price Bid
Total Item Cost
25 Preventative Maintenance Building 1 JOB 1 $0.00 26 Preventative Maintenance Building 2 JOB 1 $0.00 27 Preventative Maintenance Building 5 JOB 1 $0.00 28 Preventative Maintenance Building 6 JOB 1 $0.00 29 Supplies and Parts Building 1 - (Not included in Option total) JOB 1 $125.00 $125.00 30 Supplies and Parts Building 2 - (Not included in Option total) JOB 1 $125.00 $125.00 31 Supplies and Parts Building 5 - (Not included in Option total) JOB 1 $125.00 $125.00 32 Supplies and Parts Building 6 - (Not included in Option total) JOB 1 $125.00 $125.00 33 Emergency Repairs and Labor - Building 1 (Hourly Rate, not included in Option total) HOUR 1 $0.00 34 Emergency Repairs and Labor - Building 2 (Hourly Rate, not included in Option total) HOUR 1 $0.00 35 Emergency Repairs and Labor - Building 5 (Hourly Rate, not included in Option total) HOUR 1 $0.00 36 Emergency Repairs and Labor - Building 6 (Hourly Rate, not included in Option total) HOUR 1 $0.00
Total - Option Year 2 $0.00
OPTION YEAR 3 - FY 22
No.
Description Unit Qty Unit Price Bid Total Item Cost
37 Preventative Maintenance Building 1 JOB 1 $0.00 38 Preventative Maintenance Building 2 JOB 1 $0.00 39 Preventative Maintenance Building 5 JOB 1 $0.00 40 Preventative Maintenance Building 6 JOB 1 $0.00 41 Supplies and Parts Building 1 - (Not included in Option total) JOB 1 $125.00 $125.00 42 Supplies and Parts Building 2 - (Not included in Option total) JOB 1 $125.00 $125.00 43 Supplies and Parts Building 5 - (Not included in Option total) JOB 1 $125.00 $125.00 44 Supplies and Parts Building 6 - (Not included in Option total) JOB 1 $125.00 $125.00 45 Emergency Repairs and Labor - Building 1 (Hourly Rate, not included in Option total) HOUR 1 $0.00 46 Emergency Repairs and Labor - Building 2 (Hourly Rate, not included in Option total) HOUR 1 $0.00 47 Emergency Repairs and Labor - Building 5 (Hourly Rate, not included in Option total) HOUR 1 $0.00 48 Emergency Repairs and Labor - Building 6 (Hourly Rate, not included in Option total) HOUR 1 $0.00
Total - Option Year 3 $0.00
OPTION YEAR 4 - FY 23
Item No.
Description Unit Qty Unit Price Bid
Total Item Cost
49 Preventative Maintenance Building 1 JOB 1 $0.00 50 Preventative Maintenance Building 2 JOB 1 $0.00 51 Preventative Maintenance Building 5 JOB 1 $0.00 52 Preventative Maintenance Building 6 JOB 1 $0.00 53 Supplies and Parts Building 1 - (Not included in Option total) JOB 1 $125.00 $125.00 54 Supplies and Parts Building 2 - (Not included in Option total) JOB 1 $125.00 $125.00 55 Supplies and Parts Building 5 - (Not included in Option total) JOB 1 $125.00 $125.00 56 Supplies and Parts Building 6 - (Not included in Option total) JOB 1 $125.00 $125.00 57 Emergency Repairs and Labor - Building 1 (Hourly Rate, not included in Option total) HOUR 1 $0.00 58 Emergency Repairs and Labor - Building 2 (Hourly Rate, not included in Option total) HOUR 1 $0.00 59 Emergency Repairs and Labor - Building 5 (Hourly Rate, not included in Option total) HOUR 1 $0.00 60 Emergency Repairs and Labor - Building 6 (Hourly Rate, not included in Option total) HOUR 1 $0.00
Total - Option Year 4 $0.00
The following have been added by full text:
UPDATED PERFORMANCE WORK STATEMENT
U.S. Army Corps of Engineers® Buffalo District
Performance Work Statement
SPECIFICATIONS FOR HVAC EQUIPMENT
Service and Preventative Maintenance Contract
Customer:
US Army Corps of Engineers, Buffalo District
Prepared By: Eric Monkelbaan LRB Facilities Operations U.S. Army Corps of Engineers Buffalo District 1776 Niagara Street Buffalo, NY 14207
November 2018
1) GENERAL
a) The Contractor shall supply all plant, equipment, materials and labor to perform the services, inspections and tests listed below, and to perform all necessary, equipment repairs. Contractor may also be required to perform Emergancy service calls to identify and correct problems with equipment, identified elsewhere in this Performance Work Statement on an as needed basis. The contractor shall furnish sufficient personnel (Certified HVAC Technician) to perform the work specified. Technician will not only have an EPA 608 Certification but also one of the following; RSES Certificate Member, HVAC Excellence Professional Level Certification, UA Star Certification, or NATE Certification in Service Path specializing in air conditioning, air distribution and hydronics gas heating. Contractor shall be a VYKON SYSTEM INTEGRATOR (VSI) designation or higher (certification letters must be provided, if awarded requirement).
Bidder must have two employees on staff having completed the Tridium Niagara 4 certification. Technicians must be able to modify programming and re-download Tridium Niagara controls currently in Building#1, this will be confirmed at walkthrough before the bid. The technician’s experience shall be no lower than a journeyman’s level. The employees shall conduct themselves in a proper and productive manner at all times and shall not loiter. The employees shall be required by the contractor to maintain themselves and their clothing in a neat and clean manner. The contractor shall not employ those persons whose presence would violate Standards of Conduct, DOD 5500.7-R (DOD Joint Ethics). The contractor shall not knowingly allow any employee who is under the influence. All service technicians will be required to go through a personnel back ground check before they can commence work at work site.
2) INTERFERENCE WITH BUSINESS:
a) Normal duty hours for work shall be from 7:00 a.m. to 3:30 p.m., Monday through Friday with the exception of Federal holidays. Requests for additional work shall require written approval from the Contracting Officer 7 days in advance of the proposed work period. If a shutdown of any equipment is needed during the regular or emergancy maintenance, it shall be coordinated with the COR. A shut down shall not last more than 2 hours for PM.
Shut down of cooling system in computer room cannot exceed 20 minutes. Historically, shutdowns have been extremely rare and should be avoided if possible (without sacrificing safety of contractor personnel).
3) EQUIPMENT COVERED
a) Building #1:
i) Boiler Room: Bryan gas fired boiler (Model 309-W); Bryan gas fired boiler (Model D-650-W-FDG); Air compressor and dryer; A.O. Smith water heater, P/N BT 80;
circulating pumps (total 5).
ii) Control System- Tridium Niagara controls throughout the building that controls all HVAC equipment & scheduling.
iii) Janitor Closet, Second Floor: Carnes humidifier (Model HBHD)
iv) Roof: BOHN Air Handling Unit (Model RT-61-AR) with air cooled condensing unit (2 compressors, 35 & 45 Ton capacity, and 6 fans), condensing unit replaced in 2000;
Roof exhausts (total 3 – 2 restroom exhausts & 1 main stairwell exhaust); Air-Cooled Condenser/Dry Cooler (Model #DDO 112Y).
v) Under Main Stairwell: Yaskawa V1000 Vector Microdrive (2) (Model CIMRVU4A0038FAA) New May 2012.
vi) Computer Room: Liebert HVAC unit (Model #FE072G-CAM).
b) Building #2:
i) Boiler Room: (2) Triangle Tube Prestige natural gas fired boiler (Model Solo 399, Serial #PT0026660 & PT0026664); Bohn Air Handling Unit, Model VCS06ALF, Serial #BLB71; Dunham-Bush chiller, Model PCW008S, Serial #71085001A86A;
Carnes humidifier, Model HBAD; A.O. Smith water heater, P/N BTC 365;
Circulating pumps (total 7); 10 Ton Drake chiller with remote air cooled condenser, Model ES120S2-T3-Z, Serial #D06H0425 (2006 compressor).
ii) Roof: American Energy recovery unit, Model MRA70-55; Roof exhaust fan at south end of building, east side of chimney.
iii) Ground Floor: Baseboard fin tube heating with pneumatic bulb controls.
iv) First & Second Floors: Wall mounted Dunham Bush package fan coil heating and cooling units (16 each); and one (1) ceiling mounted unit in entrance area, wall mounted (2 each), and ceiling mounted (1 each) heating units in back stairway;
ventilation fan (1 each) in roof of back stairway; one (1) heating unit in each restroom on 1st floor; one (1) exhaust fan in men’s room on 1st floor.
c) Building #5:
i) Heaters, Airtherm Model HRW 55A, 6 total (three (3) in storehouse, two (2) in garage, one (1) in fitness center); heaters, Airtherm Model HRW 27A, two (2) total, located in Special Projects record storage room; fin tube radiator (3 each) with controller in front office area, Men’s restroom and Women’s restroom; Roof mounted restroom exhaust fans (2 each).
d) Building #6:
i) Heaters (Unit 2 and Unit 3), Trane Model XB two (2) total, with two (2) total Refrigerant Evaporator Model CC36A34-175L-036, located on the 2nd floor in the closet in the Conference Room on the northwest side of the building. Central Air Conditioner Trane Model 4TTX3036A1000AAAir Conditioning Units four (4) total, located outside on the west side of building 6 (near the slip)
4) MATERIALS
a) Pre-expended bin materials and supplies; The minor materials and supplies that are incidental to a job, and for which the total direct cost of any one material line item shown on the material estimate is $50.00 or less. These materials and supplies shall be furnished by the contractor at no additional charge. Examples of pre-expended bin materials and supplies include, but are not limited to; solder, lead, flux, electrical connectors, electrical tape, fuses, nails, screws, bolts, nuts, washers, spacers , masking tape, sand paper, solvent, cleaners, lubricants, grease, oil, rags, mops, glue, epoxy, spackling compound, joint tape, gases, refrigerants, refrigeration fittings, plumbers tape and compound, clips, welding rods, heat sinks, touch up paint, and plumbing fittings. For materials and supplies over the $50.00, supporting documentation shall be provided to support the price. The price is expected to be fair and reasonable. This pricing will be invoiced separate from the service charge for reimbursement, and recipe included with the Pay
Request.
5) EMERGENCY REPAIRS
a) Service calls to correct system problems/malfunctions shall commence (Certified HVAC technicians(s) on site) within four (4) hours of notification of the contractor of the problem and work shall be performed continuously until the problem(s) has been rectified to the satisfaction of the Government. The Government shall reimburse the contractor at the previously agreed upon hourly rate for emergencies and reimburse all materials. For work on major systems, continuous work shall require work during overtime hours, weekends, and holidays. However, anything that is discovered during the normal maintenance period will not constitute an emergency. If the emergency requires the contractor to work beyond 1530 on a work day or during the weekend while conducting the normal maintenance, the overtime rate shall be applied for work after 1530 or on the weekends. However, all overtime during the normal maintenance period shall be approved by the COR. Major Systems include the following: Heating Boilers and associated pumps; Chillers and associated pumps; Direct Expansion Refrigeration Units;
Air Handling Units (AHU); Yaskawa Micro Drives.
6) PARTS
a) Contractor to provide Parts and Supplies for the HVAC Systems.
b) Price of parts is unknown at this time. $500.00 for all buildings is an estimated cost per historical costs.
7) PREVENTATIVE MAINTENANCE INTERVALS (QUARTERLY)
a) AUTUMN (During the month of October)
i) Building #1:
ii) Boiler Room: Bryan gas fired boiler (Model 309-W); Bryan gas fired boiler (Model D-650-W-FDG); Air compressor and dryer; A.O. Smith water heater, P/N BT 80;
circulating pumps (total 5) Note: Combustion test to be done on all boilers at this time followed by necessary adjustments.
iii) Control System- Calibrate all controls & sensors. Run trends on all equipment including all temperature swings throughout the building and report to building supervisor. Confirm economizer mode & heat are working properly.
iv) Janitor Closet, Second Floor: Carnes humidifier (Model HBHD)
v) Roof: BOHN Air Handling Unit (Model RT-61-AR) with air cooled condensing unit (2 compressors, 35 & 45 Ton capacity, and 6 fans), condensing unit replaced in 2000;
Roof exhausts (total 3 – 2 restroom exhausts & 1 main stairwell exhaust); Air-Cooled Condenser/Dry Cooler (Model #DDO 112Y).
vi) Under Main Stairwell: Yaskawa V1000 Vector Microdrive (2) (Model CIMRVU4A0038FAA) New May 2012.
vii) Computer Room: Liebert HVAC unit (Model #FE072G-CAM).
b) Building #2:
i) Boiler Room: (2) Triangle Tube Prestige natural gas fired boiler (Model Solo 399, Serial #PT0026660 & PT0026664); Bohn Air Handling Unit, Model VCS06ALF, Serial #BLB71; Dunham-Bush chiller, Model PCW008S, Serial #71085001A86A;
Carnes humidifier, Model HBAD; A.O. Smith water heater, P/N BTC 365;
Circulating pumps (total 7); 10 Ton Drake chiller with remote air cooled condenser, Model ES120S2-T3-Z, Serial #D06H0425 (New 2006). Note: Combustion test to be done on all boilers at this time followed by necessary adjustments.
ii) Roof: American Energy recovery unit, Model MRA70-55; Roof exhaust fan at south end of building, east side of chimney.
iii) Basement: Baseboard fin tube heating with pneumatic bulb controls.
iv) First & Second Floors: Wall mounted Dunham Bush package fan coil heating and cooling units (16 each); and one (1) ceiling mounted unit in entrance area, wall mounted (2 each), and ceiling mounted (1 each) heating units in back stairway;
ventilation fan (1 each) in roof of back stairway; one (1) heating unit in each restroom on 1st floor; one (1) exhaust fan in men’s room on 1st floor.
c) Building #5:
i) Heaters, Airtherm Model HRW 55A, 6 total (three (3) in storehouse, two (2) in garage, one (1) in fitness center); heaters, Airtherm Model HRW 27A, two (2) total, located in Special Projects record storage room; fin tube radiator (3 each) with controller in front office area, Men’s restroom and Women’s restroom; Roof mounted restroom exhaust fans (2 each).
d) Building #6:
i) Heaters (Unit 2 and Unit 3), Trane Model XB two (2) total, with two (2) total Refrigerant Evaporator Model CC36A34-175L-036, located on the 2nd floor in the closet in the Conference Room on the northwest side of the building. Central Air Conditioner Trane Model 4TTX3036A1000AAAir Conditioning Units four (4) total, located outside on the west side of building 6 (near the slip)
8) WINTER (DURING THE MONTH OF JANUARY)
a) Building #1:
i) Boiler Room: Bryan gas fired boiler (Model 309-W); Bryan gas fired boiler (Model D-650-W-FDG); Air compressor and dryer; A.O. Smith water heater, P/N BT 80;
circulating pumps (total 5)
ii) Control System- Calibrate all controls & sensors. Run trends on all equipment including all temperature swings throughout the building and report to building supervisor. Confirm heating operation working properly.
iii) Janitor Closet, Second Floor: Carnes humidifier (Model HBHD)
iv) Roof: BOHN Air Handling Unit (Model RT-61-AR) with air cooled condensing unit (2 compressors, 35 & 45 Ton capacity, and 6 fans), condensing unit replaced in 2000;
Roof exhausts (total 3 – 2 restroom exhausts & 1 main stairwell exhaust); Air-Cooled Condenser/Dry Cooler (Model #DDO 112Y).
v) Under Main Stairwell: Yaskawa V1000 Vector Microdrive (2) (Model CIMRVU4A0038FAA) New May 2012.
vi) Computer Room: Liebert HVAC unit (Model #FE072G-CAM).
b) Building #2:
i) Boiler Room: (2) Triangle Tube Prestige natural gas fired boiler (Model Solo 399, Serial #PT0026660 & PT0026664), Serial #BLB71; Dunham-Bush chiller, Model PCW008S, Serial #71085001A86A; Carnes humidifier, Model HBAD; A.O. Smith water heater, P/N BTC 365; Circulating pumps (total 7); 10 Ton Drake chiller with remote air cooled condenser, Model ES120S2-T3-Z, Serial #D06H0425.
ii) Roof: American Energy recovery unit, Model MRA70-55; Roof exhaust fan at south end of building, east side of chimney.
iii) Basement: Baseboard fin tube heating with pneumatic bulb controls.
iv) First & Second Floors: Wall mounted Dunham Bush package fan coil heating and cooling units (16 each); and one (1) ceiling mounted unit in entrance area, wall mounted (2 each), and ceiling mounted (1 each) heating units in back stairway;
ventilation fan (1 each) in roof of back stairway; one (1) heating unit in each restroom on 1st floor; one (1) exhaust fan in men’s room on 1st floor.
c) Building #5:
i) Heaters, Airtherm Model HRW 55A, 6 total (three (3) in storehouse, two (2) in garage, one (1) in fitness center); heaters, Airtherm Model HRW 27A, two (2) total, located in Special Projects record storage room; fin tube radiator (2 each) with controller in front office area, Men’s restroom and Women’s restroom; Roof mounted restroom exhaust fans (2 each).
d) Building #6:
i) Heaters (Unit 2 and Unit 3), Trane Model XB two (2) total, with two (2) total Refrigerant Evaporator Model CC36A34-175L-036, located on the 2nd floor in the closet in the Conference Room on the northwest side of the building. Central Air Conditioner Trane Model 4TTX3036A1000AAAir Conditioning Units four (4) total, located outside on the west side of building 6 (near the slip)
9) SPRING (DURING THE MONTH OF APRIL)
a) Building #1:
i) Boiler Room: Bryan gas fired boiler (Model 309-W); Bryan gas fired boiler (Model D-650-W-FDG); Air compressor and dryer; A.O. Smith water heater, P/N BT 80;
circulating pumps (total 5)
ii) Control System- Calibrate all controls & sensors. Run trends on all equipment including all temperature swings throughout the building and report to building supervisor. Confirm economizer & cooling working properly.
iii) Janitor Closet, Second Floor: Carnes humidifier (Model HBHD)
iv) Roof: BOHN Air Handling Unit (Model RT-61-AR) with air cooled condensing unit (2 compressors, 35 & 45 Ton capacity, and 6 fans), condensing unit replaced in 2000;
Roof exhausts (total 3 – 2 restroom exhausts & 1 main stairwell exhaust); Air-Cooled Condenser/Dry Cooler (Model #DDO 112Y). Under Main Stairwell: Yaskawa V1000 Vector Microdrive (2) (Model CIMRVU4A0038FAA) New May 2012.
v) Computer Room: Liebert HVAC unit (Model #FE072G-CAM) including all associated parts and air cooled condenser on roof.
i) Boiler Room: (2) Triangle Tube Prestige natural gas fired boiler (Model Solo 399, Serial #PT0026660 & PT0026664); Bohn Air Handling Unit, Model VCS06ALF, Serial #BLB71; Dunham-Bush chiller, Model PCW008S, Serial #71085001A86A;
Carnes humidifier, Model HBAD; A.O. Smith water heater, P/N BTC 365;
Circulating pumps (total 7); 10 Ton Drake chiller with remote air cooled condenser, Model ES120S2-T3-Z, Serial #D06H0425 (New 2006 compressor warranted for 4 years)
ii) Roof: American Energy recovery unit, Model MRA70-55; Roof exhaust fan at south end of building, east side of chimney.
iii) Basement: Baseboard fin tube heating with pneumatic bulb controls.
iv) First & Second Floors: Wall mounted Dunham Bush package fan coil heating and cooling units (16 each); and one (1) ceiling mounted unit in entrance area, wall mounted (2 each), and ceiling mounted (1 each) heating units in back stairway;
ventilation fan (1 each) in roof of back stairway; one (1) heating unit in each restroom on 1st floor; one (1) exhaust fan in men’s room on 1st floor. All broken, excessively worn, or questionable items found during these inspections shall be promptly replaced with items of equal or better quality.
c) Building #5:
i) Heaters, Airtherm Model HRW 55A, 6 total (three (3) in storehouse, two (2) in garage, one (1) in fitness center); heaters, Airtherm Model HRW 27A, two (2) total, located in Special Projects record storage room; fin tube radiator (2 each) with controller in front office area, Men’s restroom and Women’s restroom; Roof mounted restroom exhaust fans (2 each).
d) Building #6:
i) Heaters (Unit 2 and Unit 3), Trane Model XB two (2) total, with two (2) total Refrigerant Evaporator Model CC36A34-175L-036, located on the 2nd floor in the closet in the Conference Room on the northwest side of the building. Central Air Conditioner Trane Model 4TTX3036A1000AAAir Conditioning Units four (4) total, located outside on the west side of building 6 (near the slip)
10) SUMMER (DURING THE FIRST TWO WEEKS OF JUNE)
a) Building #1:
i) Boiler Room: Bryan gas fired boiler (Model 309-W); Bryan gas fired boiler (Model D-650-W-FDG); Air compressor and dryer; A.O. Smith water heater, P/N BT 80;
circulating pumps (total 5)
ii) Control System- Calibrate all controls & sensors. Run trends on all equipment including all temperature swings throughout the building and report to building supervisor. Confirm cooling is working properly.
iii) Janitor Closet, Second Floor: Carnes humidifier (Model HBHD)
iv) Roof: BOHN Air Handling Unit (Model RT-61-AR) with air cooled condensing unit (2 compressors, 35 & 45 Ton capacity, and 6 fans), condensing unit replaced in 2000;
Roof exhausts (total 3 – 2 restroom exhausts & 1 main stairwell exhaust); Air-Cooled Condenser/Dry Cooler (Model #DDO 112Y).
v) Under Main Stairwell: Yaskawa V1000 Vector Microdrive (2) (Model CIMRVU4A0038FAA) New May 2012.
vi) Computer Room: Liebert HVAC unit (Model #FE072G-CAM).
i) Boiler Room: (2) Triangle Tube Prestige natural gas fired boiler (Model Solo 399, Serial #PT0026660 & PT0026664); Bohn Air Handling Unit, Model VCS06ALF, Serial #BLB71; Dunham-Bush chiller, Model PCW008S, Serial #71085001A86A;
Carnes humidifier, Model HBAD; A.O. Smith water heater, P/N BTC 365;
Circulating pumps (total 7); 10 Ton Drake chiller with remote air cooled condenser, Model ES120S2-T3-Z, Serial #D06H0425 (New 2006 compressor warranted for 4 years)
ii) Roof: American Energy recovery unit, Model MRA70-55; Roof exhaust fan at south end of building, east side of chimney.
iii) Basement: Baseboard fin tube heating with pneumatic bulb controls.
iv) First & Second Floors: Wall mounted Dunham Bush package fan coil heating and cooling units (16 each); and one (1) ceiling mounted unit in entrance area, wall mounted (2 each), and ceiling mounted (1 each) heating units in back stairway;
ventilation fan (1 each) in roof of back stairway; one (1) heating unit in each restroom on 1st floor; one (1) exhaust fan in men’s room on 1st floor. All broken, excessively worn, or questionable items found during these inspections shall be promptly replaced with items of equal or better quality.
c) Building #5:
i) Heaters, Airtherm Model HRW 55A, 6 total (three (3) in storehouse, two (2) in garage, one (1) in fitness center); heaters, Airtherm Model HRW 27A, two (2) total, located in Special Projects record storage room; fin tube radiator (2 each) with controller in front office area, Men’s restroom and Women’s restroom; Roof mounted restroom exhaust fans (2 each). All broken, excessively worn, or questionable items found during these inspections shall be promptly replaced with items of equal or better quality.
d) Building #6:
i) Heaters (Unit 2 and Unit 3), Trane Model XB two (2) total, with two (2) total Refrigerant Evaporator Model CC36A34-175L-036, located on the 2nd floor in the closet in the Conference Room on the northwest side of the building. Central Air Conditioner Trane Model 4TTX3036A1000AAAir Conditioning Units four (4) total, located outside on the west side of building 6 (near the slip)
11) MINIMUM REQUIREMENTS
The minimum required tests and work items to be performed during each service visit are as follows:
a) QUARTERLY VISUAL INSPECTIONS
i) Visual inspections of all equipment; Inspect and replace all wall mounted Dunham Bush package fan coil heating and cooling units air filters and all AHU air filters;
Inspect and adjust or replace drive belts as required; Inspect and replace refrigerant dryer elements as required; Inspect and lubricate bearings, shafts, linkages, etc. as required.
b) CONTRACTOR QUALITY CONTROL PLAN (QCP)
i) The contractor shall develop and maintain a Quality Control Plan to ensure HVAC services are performed in accordance with commonly accepted commercial practices.
The contractor shall develop and implement procedures to identify, prevent, and ensure non-occurrences of defective services. An inspection plan tailored to the specific HVAC maintenance tasks required shall be developed. The inspection plan will detail how services at the work site will be inspected to ensure that the outcome of the work meets all the quality standards of the PWS. Writing and monitoring the QCP is the responsibility of the contractor. The Governments’ interest in the plan is to ensure that the outcome and results of the work being accomplished meets all requirements in this Performance Work Statement. The Government will review the Contractor’s QCP and either accept it, or return the plan to the contractor for improvement until it is acceptable to the government. However, the Government neither approves nor disapproves the Contractor’s QCP. The QCP must be kept current at all times. The system must reflect all contract modifications, changes to the building(s), and physical updates to reflect those changes. A copy of the revised QCP shall be provided to the COR within 10 days of the changes. The Contractor shall review the QCP with the COR and the Contractor’s employees once annually so parties have agreement and understanding of what performance is expected under this contract.
12) CONTRACTOR PERSONNEL REQUIRMENTS:
i) On-Site Supervisor: The Contractors On-Site Supervisor shall be identified in writing as an employee of the prime or sub-contractor. The supervisor is required to have knowledge of the equipment being used, the contents of the work statement.
13) QUOTE SUBMITTALS AND BASIS FOR AWARD:
a) The USACE shall award the contract to the offeror who provides the lowest priced offer.
See Price Breakout Schedule attached to the Performance Work Statement and the Solicitation must be completed to be considered a complete proposal.
14) QUALITY ASSURANCE
a) The government will periodically evaluate the contractor’s performance in accordance with the attached Quality Assurance Surveillance Plan (QASP).
b) The contractor shall provide for the safe, careful and efficient operations of all tools and equipment. All tools and equipment shall be in good operating condition and be calibrated, when required.
c) Employee(s) shall be “Certified HVAC Technicians” and will submit paperwork as required by federal, state, and local authorities (license/certification) to that effect to the COR (Mr. Jim Wesolowski) of this contract before starting work.
d) At no expense to the Government, the contractor shall protect all government facilities, grounds, structures, equipment, and employees. If the Contractor and/or the Contractors crew cause any damages to these items, they shall be repaired and/or replaced at no expense to the Government.
15) LIQUIDATED DAMAGES:
a) If the Contractor fails to complete the work within the time specified in this work statement, they shall be assessed liquidated damages in the amount of $100 for each calendar day of delay until the work is completed. In the event of any default by the contractor. According to the Termination for Cause terms in FAR 52.212-4. USACE may solicit other contractors to complete the work. Liquidated damages will continue to accrue against the Contractor originally awarded the contract until the contract is fulfilled. Liquidated damages include the costs of re-advertising the contract and issuing a new contract.
16) SUBCONTRACTING
a) By submission of an offer and execution of a contract, the Offeror/Contractor agrees that in performance of the contract in the case of a contract for (1) Services. At least 50 percent of the cost of contract performance incurred for personnel shall be expended for employees of the concern.
17) SAFETY AND HEALTH PLAN:
a) General: The project shall not proceed until all safety submittals have been reviewed and accepted by the USACE. Questions regarding project Safety and Health requirements shall be addressed to the USACE Contracting Officer.
18) ACCIDENT PREVENTION PLAN (APP):
a) An accident prevention plan shall be prepared for this project. Work cannot begin until the APP has been approved by the USACE Safety Officer. (Attachment #5)
19) SITE SAFETY AND HEALTH OFFICER (SSHO):
a) The contractor shall appoint a SSHO in writing. The SSHO will be responsible for enforcement of all work related health and safety requirements. The SSHO will possess a minimum of five (5) years’ experience with overseeing construction equipment operations. The appointment of the SSHO will be provided as attachment to the APP. The SSHO may serve in a dual role at the project site. The SSHO will be required to be on-site at all times during the execution of work. If the appointed SSHO leaves the project site, another qualified person will serve in their absence. The appointment letter for the SSHO will be an attachment to the APP. The qualifications for the SSHO are provided in EM385-1-1, Section 1, Sub-Section 01.A.17. (Attachment #4)
20) ACCIDENT REPORTING:
a) All contractor accidents, involving injuries or property damage, occurring during the execution of this contract shall be reported to USACE personnel at USACE Chicago District immediately. The reporting individual will provide their name, who they work for and a telephone number where they can be contacted. The below information is required for initial reporting.
b) The date, time and location of the mishap.
c) The names of personnel injured and extent of their injuries if any.
d) Treatment given to injured personnel. If personnel were transferred to a medical facility provide information on how and where they were transferred to
e) Extent of property damage if any
f) Brief statement on how the mishap occurred
g) Names of all personnel on scene at the time of the mishap
h) All accidents shall be reported on USACE Eng. Form 3394. Instruction for completing the man-hour reporting form can be obtained from the USACE PM or District Safety Officer. Accident reporting requirements will be addressed in the APP.
http://www.poa.usace.army.mil/Portals/34/docs/safety/engform33941999Mar.pdf
i) First-Aid/CPR Requirements: A medical facility is not accessible within five (5) minutes of the work site to respond to an injury occurring to contractor employees or other persons who may be present during the execution of work.
(1) The contractor shall have at least one employees on- site at all times during the execution of work who will serve as the First Aid Attendant and possess current certification in 1st Aid and CPR.
(2) Acceptable certification is from the American Red Cross (ARC), the American Heart Association (AHA), or from an organization whose training adheres to the standards of the International Liaison Committee on Resuscitation or from a Licensed Physician.
(3) All training must have included a hands-on component. Certificates given for on-line training by itself is not acceptable. The validity of the Certificate is for two years after date of issue. Certificates shall be an attachment or appendix to the
APP.
j) Medical Facilities: The Contractor will maintain a listing of Physician’s and or Urgent Care office, medical facilities and trauma care facilities in the local area of East Chicago, IN at the project site. The listing will contain the name of the medical facilities, telephone numbers and directions. The listing shall be kept on site and its existence shall be made known to all contractor personnel and USACE personnel. The list of medical facilities shall be an attachment or appendix to the APP.
k) First Aid kits: The contractor shall have a first Aid kit on-site. The requirements for a basic first aid kit are provided in EM385-1-1, Page 3-6, Table 3-1. The kit shall be readily accessible for use within 1-3 minutes in the event of an injury occurrence.
l) Man Hours Reporting: USACE requires that contractors (prime and sub) report all man hours worked as well as all lost time for on-the-job accident and illness. This report shall be documented on the Buffalo District Man hour Exposure Report. The reporting time period begins following the award of the contract and continues until completion of contractual work. The report shall be provided as a project completion submittals.
21) SAFETY CONTROLS:
a) PERSONNEL PROTECTIVE EQUIPMENT (PPE): The APP shall address the use of
Personal Protective Equipment for all personnel who will be working at the project site.
The selection of PPE will be based on hazard evaluations conducted by the Contractor on the work environment and the activities. EM385-1-1, 23. OPERATIONS SECURITY provides guidance on the identification of personnel who will require PPE and the selection of PPE for those affected persons. The contractor will communicate the PPE decisions to each affected employee. Employees will be required to don PPE during the execution of project work.
b) Project Safety Briefings: A pre-work safety briefing will be held on-site at USACE Buffalo on the first day of executable work. The meeting will be jointly conducted by the contractor, the USACE Project Manager. All contractor personnel are expected to be present and attendance will be taken. The agenda for the meeting includes a review of the project scope of work, the project APP, accident & mishap reporting, location of sanitary facilities, weather conditions. Additional safety briefings will be conducted as deemed necessary.
c) Environmental Considerations: The contractor and the USACE PM will be knowledgeable of the Environmental considerations. Guidance is provided in EM385-1-
1, Section 16.I.01 “Environmental Considerations”. Environmental considerations will be addressed the APP.
d) Sanitary Facilities: Sanitary facilities are available.
22) REFERENCE DOCUMENTS
a) U.S Army Corps of Engineers Safety and Health Requirements Manual, EM 385-1-1, USACE, November, 2014.
b) Federal Acquisition Regulation, F.A.R. Clause 52.236-13: Accident Prevention.
c) Contractor Guidelines for:
i) The preparation of the Accident Prevention Proposal (Safety Plan); and
ii) The preparation of the Activity Hazard Analysis, ORNP 385-1-2, USACE, May
1986.
d) Activity Hazard Analysis (AHA) The Contractor shall identify each major phase of work that will be performed on this contract. Within each major phase, all activities, tasks or Definable Features of Work (DFOWs) shall be identified that will require an Activity Hazard Analysis (AHA). > See Section 01.A.14 and Appendix A, paragraph 3.j.