AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

This amendment: 1) provides page changes to previously provided draw ings, 2) posts a copy of the pre-bid site visit sign-in sheet, and 3) posts discussion notes taken during the pre-bid site visit.

All other terms and conditions remain the same.

The due date for questions concerning the solicitation is extended to 19 April 2019.

The response date is not extended.

1. CONTRACT ID CODE PAGE OF PAGES

1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912P419B0018

X 9B. DATED (SEE ITEM 11)

10-Apr-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO.

5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

23-Apr-2019

CODE

U.S. ARMY ENGINEER DISTRICT, BUFFALO

1776 NIAGARA STREET

BUFFALO NY 14207-3199

W912P4 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912P419B0018

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00 21 00 - INSTRUCTIONS

The following have been added by full text:

INSTRUCTIONS - AMENDMENT 0002

W912P419B0018 Amendment 0002

Drawing Page Changes This amendment directs page changes to the drawings provided in the original solicitation. The following drawing pages are replaced: 1, 3, 9, 11, 17, 18, 19, 20, 21, 26, 27, and 28. The remaining drawing pages are not changed.

Questions concerning the solicitation The due date for questions to be submitted in writing (email) is extended to 26 April 2019.

(End of Summary of Changes)

SITE VISIT - Discussion Notes

Katherine St. Linde Restoration Project – Solicitation W912P419B0018

Pre-Bid Site Visit -- 04/17/2019

Location: Masser Group site, Katherine Street

USACE Employees present:

Casimir (Casey) Brzozowiec; Josh Unghire; Katie Lewis; Sue Garand; Tim Noon

Visitors present:

See accompanying sign-in sheet

Notes Topics:

All visitors were reminded that any questions concerning the solicitation must to be formally submitted in writing in an email to Casimir.Brzozowiec@usace.army.mil.

The following are notes of topics that were discussed during the site visit.

Topic-1 Solicitation material referenced a component of contaminated soil or “tar like substance”. Have there been additional sampling completed to determine what the material is and where is it located?

USACE Response No additional testing or sampling has been completed; the material was only identified visually according to E&E designers. Location is off the corner of the property industrial site near beginning of Area 4.

Topic -2 Are there trees on site that need to remain?

USACE Response Contract has specifications for which trees are to be removed. In general, native trees are to remain and reasonable limbing will be acceptable when discussed with the COR. However, a contractor must submit a formal request if a native tree “designated to remain” needs to be removed. There are no other agencies that need to approve a tree’s removal, but USACE still requires their standard review period of at least 2 weeks. Therefore please plan accordingly and do not make sudden field decisions.

Topic -3 When is high water conditions on the river and what does that look like?

USACE Response Water level during the site visit was 573 ft IGLD. Average summer water levels over the past three years have been have peaked at approximately 573.8. This does not include the short term high water level increases due to Seiche events.

Topic -4 Do reaches 1-3 require grading and excavation?

USACE Response Some excavation and grading can be found in the southern part of Reach 3, but is primarily associated with Reach 4 work. Please note that areas of fill throughout the whole project will also have to be graded properly so the new fill areas look presentable.

Topic -5 Can the NY State Discharge sign be moved in Area 3?

USACE Response Moving any sign on the property should be coordinated with Messer/Linde property management.

Topic -6 Clarification question on staging area location, specifically where is it?

USACE Response See the Key Plan, Sheet 3. However, the access road off the staging area may be changed with the future amendment of plan sheets due to the electrical wires that are currently in the way. Refer to those sheets when an amendment is issued.

Topic -7 During clearing and grubbing, does all woody material including trees need to be removed off-site?

USACE Response See section 3.1.2 and section 3.3. Invasive species need to be removed from the site.

Topic -8 Is the road at the south end of Area 4 available for access?

USACE Response Yes, this is a city road and is available for access. However, this should be coordinated with the City.

Topic -9 Are there any special requirements associated with the National Grid power lines

USACE Response Refer to section 01 35 00.011 and the notes on the amended plan sheets.

Additional Field notes:

Safety was reviewed at the beginning of the site walk, specifically asking visitors to watch where they step due to uneven terrain and to stay away from the water or cliffs edge since PFDs were not worn.

COR highlighted that contractor’s must fill out both bid schedules to be considered and the contracting officer will decide what schedule to award. Award will go to the lowest bidder on the longer schedule or the lowest bidder on the shorter schedule.

The tree of heaven was pointed out a few times which is one of the invasive species that needs to be removed from the project site.

The barrier trench was discussed. It is a design feature in Reach 3 and 4 that is required to prohibit invasive vegetation species which are outside our project limits from invading this space in the future.

COR stressed the need for on time submittals; specifically for any materials that may have a longer lead time since one of the bid schedules has a very short construction window. The minimum review period of 2 weeks was highlighted.

USACE explained the reason for two bid schedules was because the EPA would prefer completing all components except planting and invasive work before the end of our fiscal year, which may require expedited efforts.

F:\Buffalo River Design 2010\2018\Revised Final for review\G-1.dwg, 11/14/2018 1:05:15 PM, KrajewskiK

W912P419B0018 - AMENDMENT NO. 2

h5cosklm Highlight

F:\Buffalo River Design 2010\2018\Revised Final for review\G-3.DWG, 11/14/2018 4:31:52 PM, KrajewskiK h5cosklm Highlight h5cosklm Polygon

MeissnerR Cloudy

F:\Buffalo River Design 2010\2018\Revised Final for review\C-2-6-4-18.dwg, 11/15/2018 2:27:10 PM, KrajewskiK h5cosklm Highlight h5cosklm Polygon

Polygon

F:\Buffalo River Design 2010\2018\Revised Final for review\C-2-6-4-18.dwg, 11/15/2018 2:26:12 PM, KrajewskiK h5cosklm Highlight h5cosklm Polygon

F:\Buffalo River Design 2010\2018\Revised Final for review\C-2-6-4-18.dwg, 11/15/2018 2:27:59 PM, KrajewskiK h5cosklm Highlight h5cosklm Polygon h5cosklm Polygon

F:\Buffalo River Design 2010\2018\Revised Final for review\C-2-6-4-18.dwg, 11/15/2018 2:27:35 PM, KrajewskiK h5cosklm Highlight

F:\Buffalo River Design 2010\2018\Revised Final for review\C-2-6-4-18.dwg, 11/15/2018 2:26:50 PM, KrajewskiK h5cosklm Highlight

F:\Buffalo River Design 2010\2018\Revised Final for review\C-2-6-4-18.dwg, 11/15/2018 2:25:49 PM, KrajewskiK h5cosklm Highlight

F:\Buffalo River Design 2010\2018\Revised Final for review\C-2-6-4-18.dwg, 11/15/2018 2:25:25 PM, KrajewskiK h5cosklm Highlight

F:\Buffalo River Design 2010\2018\Revised Final for review\P-1.dwg, 11/14/2018 1:07:08 PM, KrajewskiK

W912P419B0018 - AMENDMENT NO. 2

h5cosklm Highlight

F:\Buffalo River Design 2010\2018\Revised Final for review\P-1.dwg, 11/14/2018 4:00:49 PM, KrajewskiK

W912P419B0018 - AMENDMENT NO. 2

h5cosklm Highlight

F:\Buffalo River Design 2010\2018\Revised Final for review\P-1.dwg, 11/14/2018 1:06:52 PM, KrajewskiK h5cosklm Highlight