Rev 16 NOVEMBER 2017

SCOPE OF WORK

STEEL FOR BARGE DECK ENCLOSURES

Solicitation W912P418T0003

1) GENERAL

a) Location of Delivery: The USACE Cleveland Reservation is located at 1035 East 9th Street, Cleveland, OH 44114. The supplier shall be responsible for delivery of all items to the USACE Cleveland Reservation.

b) Requirements

i) Provide separate prices for each line item, FOB the delivery location.

ii) Required bid items are as follows:

(1) Steel stiffeners, fabricated as shown on the attached drawings.

(2) Steel wall segments, Type A, fabricated as shown on the attached drawings,15 ft long

(3) Steel wall segments, Type A, fabricated as shown on the attached drawings, 20 ft long

(4) Steel wall segments, Type B, fabricated as shown on the attached drawings, 9 ft long

(5) Steel wall segments, Type B, fabricated as shown on the attached drawings, 20 ft long

(6) Steel wall segments, Type C, fabricated as shown on the attached drawings, 9 ft long

(7) Steel wall segments, Type C, fabricated as shown on the attached drawings, 20 ft long

c) Supplier’s Qualifications. With the bid, the supplier shall provide copies of certificates showing that the facility in which the items will be fabricated is certified by the American Institute for Steel Construction in one of the following categories: Building Fabricator (BU), Simple Bridge Fabricator (SBR), Bridge Component Fabricator (CPT), or Hydraulic Fabricator (HYD).

d) Performance Required. The items will meet or exceed all requirements issued in this contract.

e) Warranty. Provide products with a parts and labor warranty from the manufacturer or covering defects in material and workmanship under normal operating conditions and proper application for 12 months after government acceptance. All replacement parts provided under the warranty shall assume the identity, for warranty purposes, of the part replaced, and the warranty on such replacement parts shall expire when the warranty on the original part would have expired.

f) Completion of Work. Completion of work shall include submittal and approval of product data (if required), and delivery and government acceptance of the specified items. Delivery of all items shall be made within 28 calendar days of the award of contract.

g) Final Inspection. The products shall be inspected for conformance to this scope of work and the attached drawings. Any materials that were delivered damaged by handling, hoisting or otherwise shall be immediately removed from the site and replaced at no additional cost to the government.

Rev 16 NOVEMBER 2017

h) E-Verify Program. The Contractor must pre-screen Candidates using the E-verify Program (http://www.uscis.gov/e-verify) website to meet the established employment eligibility requirements. The Vendor must ensure that the Candidate has two valid forms of Government issued identification prior to enrollment to ensure the correct information is entered into the E-verify system. An initial list of verified/eligible Candidates must be provided to the government no later than 3 business days after the contract award.

2) QUALITY OF MATERIALS

a) All materials, supplies, or articles required for work shall be standard products of reputable manufacturers and entirely suitable for the intended purposes.

b) All materials incorporated into the products shall be new and unused and are subject to the approval of the Contracting Officer.

c) All steel shall conform to the requirements of ASTM A36.

3) RISKS AND LIABILITIES

a) The supplier shall assume all risks in connection with performance and delivery of the work and shall be liable for and hold the Government harmless from any and all damages to persons and properties.

4) DELIVERY HOURS

a) Delivery shall be made within the hours of 0700 to 1530 on Monday through Friday.

5) BID FORM

Item Description Quantity Unit Unit Price

Extended Price

1 Steel Stiffeners 150 Each

2 Steel Wall Segments, Type A, 15 ft Long

6 Each

3 Steel Wall Segments, Type A, 20 ft

4 Steel Wall Segments, Type B, 9 ft

5 Steel Wall Segments, Type B, 20 ft

6 Steel Wall Segments, Type C, 9 ft

7 Steel Wall Segments, Type C, 20 ft

Total Bid

K:\LRB-FP-SR\Floating Plant\Equipment Maint-Repair-Repl-New-Rental\FY18 Barge Pigpens\SOW and Drawings\SOW - Steel for Barge Deck Enclosures 2017.11.15.docx

SCOPE OF WORK