Attachment_5__Blank_Activity_Hazard_Analysis_(AHA).docx

DOCX document 16 KB Posted

Attached to
Snagging and Clearing Black Rock Channel, Bird Island Pier, Buffalo River and Harbor
Solicitation number
W912P4-17-T-0025
Issued by

About this file

AHA

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 5 – Blank Activity Hazard Analysis (AHA)

EM 385-1-1

30 Nov 14 Activity Hazard Analysis (AHA)

Activity/Work Task:
Overall Risk Assessment Code (RAC) (Use highest code)
Project Location:
Risk Assessment Code (RAC) Matrix
Contract Number:
Severity

Probability

Date Prepared:

Frequent
Likely
Occasional
Seldom
Unlikely

Prepared by (Name/Title):

Catastrophic
E
E
H
H
M
Critical
E
H
H
M
L

Reviewed by (Name/Title):

Marginal
H
M
M
L
L
Negligible
M
L
L
L
L
Notes: (Field Notes, Review Comments, etc.)
Step 1: Review each “Hazard” with identified safety “Controls”. Determine RAC (See above)

Probability: likelihood the activity will cause a Mishap (near miss, incident or accident). Identify as Frequent, Likely, Occasional, Seldom or Unlikely.

RAC Chart

Severity: the outcome if a mishap occurred. Identify as Catastrophic, Critical, Marginal, or Negligible
E = Extremely High Risk

H = High Risk

Step 2: Identify the RAC (probability vs. severity) as E, H, M, or L for each “Hazard” on AHA. Annotate the overall highest RAC at the top of AHA.
M = Moderate Risk

L = Low Risk

Job Steps
Hazards
Controls
RAC

1.

2.

1.

2.

1.

2.

1.

2.

Equipment to be Used
Training Requirements & Competent or Qualified Personnel name(s)
Inspection Requirements

Involved Personnel

Official Forms can be found:

http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385-1-1.pdf

File details come from the government source that posted it. Updated .