US Army Corps of Engineers

BUILDING STRONG®

LORAIN DETACHED BREAKWATER

REHABILITATION - 2017

Dustin Tellinghuisen, PE Civil/Structural Design

USACE – Buffalo District

23 August 2017

Introduction

Current Condition Work Completed in Spring 2017 Proposed New Work

Current Condition Detached Breakwater Limited Funding for

Maintenance Aging Sheet Pile

Cellular Structure ► Corrosion ► Cracking ► Cell 22 Failure &

Removal in 2016

Repairs Completed in 2017

Proposed Work Grouting Fill within Cell (Government

Option to award additional cells) ►Detailed Grouting Plan ►Demonstration using fill from the Breakwater

Bolting Existing Piles to Existing Caps Install Ladder and Government Furnished

Signs Government Option to award Installation of Flowable Fill beneath existing caps

Questions?

Notes:

• 23 August 2017 Pre-Bid Meeting held at 1000hrs

• Solicitation W912P417B0006 – Lorain Detached Breakwater Rehabilitation

Attendees

In attendance at the USACE Ohio Area Office, Cleveland, OH 44114:

• Russ Brandenburg - USACE

• Joe Kolat - USACE

• Matt Snyder – USACE

• Travis Lake - Kokosing Construction

• Doug McCrae - CJ Mahan

In attendance via teleconference and AT&T Webmeeting

• Vito Melilli – USACE

• Dustin Tellinghuisen – USACE

• Gregory Lee – USACE

• Casimir Brzozowiec - USACE

• Tom Morrish – Ryba

• Peter Bowman – AGT Group

• Kurt Luedtke – Luedtke Engineering

• Daniel Stare – Gannett Fleming Inc

LORAIN DETACHED BREAKWATER REHABILITATION - 2017
Introduction
Current Condition
Repairs Completed in 2017
Proposed Work
Slide Number 6
Slide Number 7
Slide Number 8
Slide Number 9
Slide Number 10
Questions?