Braddock Bay Barrier Beach Breakwater and Wetland Restoration
Solicitation number
W912P4-15-B-0009
Issued by

About this file

Please see attached amendment for details. Pre-bid sign-in sheet is included in the amendment.

View the file

Other files

File Type Posted
Bid_Abstract_Braddock_Bay_25Sep2015.xls XLS spreadsheet
Amendment_3_21Sep2015.pdf PDF
Amendment_2_17Sep2015.pdf PDF
Solicitation_25Aug2015.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

This amendment is adding insurance information and removing clause 52.236-16. Contractor questions are also answ ered in this amendment. Please see attachment w ith all changes included w ith this amendment.

1. CONTRACT ID CODE PAGE OF PAGES

1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 16-Sep-2015

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912P4-15-B-0009

X 9B. DATED (SEE ITEM 11)

25-Aug-2015

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

16-Sep-2015

CODE

DEPARTMENT OF THE ARMY

USACE, BUFFALO

1776 NIAGARA STREET

BUFFALO NY 14207-3199

W912P4 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912P4-15-B-0009

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00700 - CONTRACT CLAUSES

The following have been modified:

31.105-101 EQUIPMENT OWNERSHIP

31.105-101 Equipment Ownership and Operating Expense Schedule (MAR 1995)

(a) This special contract requirement does not apply to terminations. See 52.249-5000, Basis for Settlement of Proposals, and FAR Part 49.

(b) Allowable cost for construction and marine plant and equipment in sound workable condition owned or controlled and furnished by a contractor or subcontractor at any tier must be based on actual cost data for each piece of equipment or groups of similar serial and series for which the Government can determine both ownership and operating costs from the contractor's accounting records. When both ownership and operating costs cannot be determined for any piece of equipment or groups of similar serial or series equipment from the contractor's accounting records, costs for that equipment must be based upon the applicable provisions of EP 1110-1-8, Construction Equipment Ownership and Operating Expense Schedule, Region II. Working conditions must be considered to be average for determining equipment rates using the schedule unless specified otherwise by the contracting officer.

For equipment not included in the schedule, rates for comparable pieces of equipment may be used or a rate may be developed using the formula provided in the schedule. For forward pricing, the schedule in effect at the time of negotiations must apply. For retroactive pricing, the schedule in effect at the time the work was performed must apply.

(c) Equipment rental costs are allowable, subject to the provisions of FAR 31.105(d)(ii) and FAR 31.205-36, Rental Costs. Rates for equipment rented from an organization under common control, lease-purchase arrangements, and sale-leaseback arrangements, will be determined using the schedule, except that actual rates will be used for equipment leased from an organization under common control that has an established practice of leasing the same or similar equipment to unaffiliated lessees.

(d) When actual equipment costs are proposed and the total amount of the pricing action exceeds the SAT, the contracting officer may request the contractor to submit either certified cost or pricing data, or partial/limited data, as appropriate. The data must be submitted on Standard Form 1411, Contract Pricing Proposal Cover Sheet.

SUBMISSION OF CONTRACT DOC

SUBMISSION OF CONTRACT DOCUMENTATION

Provide contract documentation in an electronic format to the greatest extent practicable.

Contract documentation to be submitted electronically includes, but is not limited to, the following:

• Submittals, including ENG 4025 transmittal form

• Meeting Minutes

• Construction Photographs

• Correspondence

• Requests for Information

• Payroll Documents

• Statement and Acknowledgement Forms (SF 1413)

• Request for Additional Classification (SF 1444)

• Progress Payment Requests and Supporting Documentation

• Contract Modification Documentation, including SF 30, Contractor’s Offer, Cost/Pricing Audit Report, and Certificate of Current Cost or Pricing Data

• Contractor Quality Control Reports (with attachments)

• Accident Reports

• Schedules and Schedule Updates

• Closeout Documentation, including Release of Claims

Electronic files must be of sufficient quality that all information is legible. Electronic format must be in Adobe.PDF format, unless otherwise specified or directed by the Contracting Officer’s Representative (COR). Whenever possible, PDF files must be generated from original documents so that the text included in the PDF file is both searchable and can be copied. If documents are scanned, Optical Character Resolution (OCR) routines are required. Files exceeding 30 pages must be indexed and bookmarked to allow efficient navigation of the file. When required, the electronic file must include a valid electronic signature, or scan of a signature.

(End of Section)

The following have been deleted:

52.236-16 Quantity Surveys APR 1984

(End of Summary of Changes)

AMENDMENT NO. 1

GLFER

BRADDOCK BAY RESTORATION

GREECE, NEW YORK

BIDDERS QUESTIONS,

GOVERNMENT RESPONSES,

AMENDED PLANS &

SPECIFICATIONS

16 SEPTEMBER 2015

This document contains the following information:

1. Verbal questions recorded on-site at the pre-bid meeting held on 10 September 2015 and Government responses.

2. Questions submitted via email and Government responses.

3. Revisions to the plans and specifications.

Braddock Bay Pre-Bid Meeting

Questions asked during site visit.

Sept 3, 2015.

1. Is bathymetry available for the bay? When was the bathymetry collected?

Yes. This data is included as attachments to specifications titled “Survey 2013” and “Survey 2015”.

2. What times of years can work in these areas be completed?

Env. windows are provided in the specifications (Section 01 35 13 Special Project Procedures part 1.2.2).

3. How does the Corp anticipate bringing stone to the location of the low-crested sill and new emergent wetland.

See Note 12 on contract drawing C-103 which requires access only by water. .

4. Does the water elevation change much?

Records of past water surface elevations may be found at the following websites:

http://www.glerl.noaa.gov/data/dashboard/GLWLD.html http://www.lre.usace.army.mil/Missions/GreatLakesInformation/GreatLakesWaterLevels/WaterLevelForecast.aspx

5. Is there a limitation to the size of the equipment that can be brought out on breakwater?

Yes. This is laid out in the specifications (Section 31 32 23 part 3.1.5.1) and in the notes on contract drawing C- 502.

6. How do you access the breakwater from the existing spit?

The Contractor is responsible for designing and constructing access roads in offshore areas as specified in Paragraph 2.4.1.2 of Section 01 50 00 of the contract specifications. .

7. How do you access the dredge area?

Access is by water.

8. Is the stone paid for by the ton?

Yes

9. What is the timing related to excavation of the navigation channel?

http://www.glerl.noaa.gov/data/dashboard/GLWLD.html http://www.lre.usace.army.mil/Missions/GreatLakesInformation/GreatLakesWaterLevels/WaterLevelForecast.aspx h5cosklm Highlight

The navigation channel needs to be provided as specified in Note 4 on contract drawing.

10. Does damage to the road need to be repaired?

Yes – Section 01 50 00, paragraph 3.13 states: “Restore access routes, storage and staging areas to the original or better condition. For areas that require seeding, scheduled watering may be required for a duration to be determined by the contracting officer. For paved portions, this may require resurfacing or additional work for restoration”.

Questions (submitted via email) from bidders with Government responses:

11. Question: Bid items H, I, J, & K are for Turbidity Curtain. What will be the specific location for each of these bid items?

Answer: Reference Section 31 32 23 BREAKWATERS AND LOW STONE SILL CONSTRUCTION, Paragraph 3.2 TURBIDITY CURTAINS: the first two sentences are as follows:

“Install turbidity curtains as directed by the COR. The COR will decide as work progresses if the curtains are needed.”

12. Question: The Reinforced Geotextile, Section 31 05 19, is to be sewn throughout the project.

The Geotextile used as Filters and Biodegradable Stabilization Fabric are to have a minimum of 18” overlap. Can the specification for the Reinforced Geotextile be amended to allow a 5ft overlap at unsown joints?

Answer: No, all seams for Geotextile (Reinforcement) required in Section 31 05 19 must be sewn.

*****Please note following change to specifications: Section 31 60 00, Paragraph 2.5.2 has been amended to give the option of using crushed stone instead of bedding stone. If a contractor decides to use crushed stone, they must install a second layer of geotextile. The second layer of geotextile does NOT have to be sewn. The amended version of paragraph 2.5.2 is as follows:

“NYS DOT Section 700 MATERIALS AND MANUFACTURING, Section 703‐02 COARSE AGGREGATES, paragraph C. Screen Gravel, Size Designation 5 (Material Designation 703‐ 0203). Instead of screen gravel, the Contractor may use NYS DOT Section 700 MATERIALS AND MANUFACTURING, Section 703‐02 COARSE AGGREGATES, paragraph A. Crushed Stone, Size Designation 5 (Material Designation 703‐0201). If crushed stone is used for bedding stone, the Contractor must then place a second layer of geotextile reinforcement 40 feet in width directly over the first layer of geotextile reinforcement shown on the contract drawings and centered over the spine breakwater, headland breakwater and groin centerlines for the entire length of these structures. The second layer of geotextile reinforcement is also required in all other areas where the Contractor will be operating dump trucks on the placed bedding stone. Panels comprising the second layer of geotextile reinforcement must be overlapped a minimum of 18 inches with appropriate measures taken to ensure the required overlap exists after bedding stone placement. The use of the second layer of geotextile will be at no cost to the Governement. Dumping of crushed stone outside the footprint of the second layer of geotextile reinforcement is prohibited.”

13. Question: The Armor Stone tolerances are exceedingly tight given the range of the armor stone.

The cross section on page c‐501 shows a single layer of armor stone. The lower range of the armor stone is 1.4 tons. Using 170 lb./cf the average stone is roughly 2.6ft. A single 1.4 ton armor stone on bedding stone at grade is 0.4ft below grade. The tolerance is +/‐.25ft. Please consider revising the tolerance for the armor stone.

Answer: Reference section 31 32 23, Paragraph 3.1.8 Tolerances: the table will be updated to read as follows:

Stone Above Neatline (Inches)

Below Neatline (Inches)

Bedding 2 2 Low Stone Sill 4 MAY NOT BE

BELOW GRADE

Thickness

Tolerance (Inches)

Armor – Stability Berm

+6 ‐9

Armor ‐ Crest +6 MAY NOT BE

BELOW GRADE

14. Question: Please clarify the sequence of work for the detached berms. Are they to be completed before the groins and spine breakwall?

Answer: No

15. Question: To place the type 2 beach fill can equipment run on top of the type 2 beach fill in areas where armor stone has been previously placed?

Answer: Note 5 and 8 (shown below) on contract drawing C‐502 indicates vehicle requirements

5. STAGE 1 BEDDING STONE MUST BE PLACED TO THE ENTIRE WIDTH SHOWN ON THE STAGE 1

TYPICAL BREAKWATER/GROIN CROSS‐SECTION A MINIMUM OF 25 FEET IN ADVANCE OF ANY

DUMP TRUCK TRAFFIC. DUMP TRUCK TRAFFIC MUST BE RESTRICTED TO 15 FEET FROM THE

CENTERLINE EXCEPT WHERE ACCESS ROADS ENTER THE BREAKWATER/GROIN FOOTPRINT.

8. OUTSIDE THE FOOTPRINT OF BREAKWATERS AND GROINS AND WITHIN 50 FEET OF THE

FOOTPRINT, ALL OFFSHORE EQUIPMENT TRAFFIC MUST BE RESTRICTED TO ACCESS ROADS

DESIGNED AND CONSTRUCTED BY 1 HE CONTRACTOR. ACCESS ROAD MATERIALS MUST BE

REMOVED PRIOR TO PROJECT COMPLETION. ACCESS ROADS CONSTRUCTED ON THE EXISTING

LAKEBED MUST UTILIZE GEOTEXTILE REINFORCEMENT UNDER THE FULL FOOTPRINT OF ACCESS

ROAD FILL. THE GEOTEXTILE REINFORCEMENT STRENGTH AND SEAM STRENGTH MUST MEET OR

EXCEED AS THOSE SPECIFIED FOR CONSTRUCTION OF BREAKWATERS AND GROINS. THE CREST

ELEVATION OF ACCESS ROADS CONSTRUCTED ON THE EXISTING LAKEBED MUST NOT EXCEED

THE ELEVATION OF THE TOP OF THE BEDDING STONE SHOWN ON THE STAGE 1 TYPICAL

BREAKWATER/GROIN CROSS‐SECTION. ACCESS ROADS CONSTRUCTED ON BEACH FILL MUST BE

A MINIMUM DISTANCE OF 80 FEET FROM THE CENTERLINE OF ANY BREAKWATER OR GROIN,

AND MUST HAVE A MAXIMUM CREST ELEVATION OF +6.0 LWD. VEHICLES HAVING A MAXIMUM

GROSS OPERATING WEIGHT OF 15,000 LB MAY OPERATE ON BEACH FILL WITHIN 80 FEET OF THE

CENTERLINE OF BREAKWATERS AND GROINS.

16. Question: The settlement plate detail shows a pvc pipe resting on a steel plate. How is this to be attached?

Answer: The detail on drawing C‐502 indicates a 3" steel pipe welded to the steel plate. The PVC pipe slides freely over the steel pipe and rests on the steel plate.

17. Question: Another question regarding the bedding stone specification. The specification refers to the NY DOT spec for a screened gravel product. The NY spec is attached. The screened gravel means the material will be a gravel based product and not a blasted and crushed material. Our material suppliers have stated that the product will be very difficult to supply as a screened gravel. We ask that the specification be revised to allow for a blasted product. This will be much more commercially available and a great benefit to the project.

Answer: Crushed stone is allowed. See answer to Question 12 above.

Changes to specifications

18. Clause 52.236‐16 QUANTITY SURVEYS is removed.

19. Clause SUBMISSION OF CONTRACT DOC is removed,

20. Section 01 35 13

a. Deleted the words “(Not Applicable)” at the start of Part 2.

b. Inserted the following paragraph at the start of Part 2

2.1 Stone Sources

For each type of stone material it proposes to furnish, the Contractor shall, within 10 days after receipt of the "Notice to Proceed," designate in writing one source or one (1) combination of sources. Submit information including: (1) areas and lifts of the quarry or pit to be worked, (2) the specific geological strata or stratas to be utilized, (3) available laboratory testing records, (4) bulk specific gravity range, and (5) previous use records. If a proposed source is disapproved, submit the required data for a replacement source. The following listed stone sources have been inspected and tested and/or have previously furnished materials that meet the quality requirements stipulated in the specifications. Each source shown contained, at the time of inspection and testing and/or previous use, suitable in‐place stone from which the specified material quality and type could be or was produced. More detailed information for each of the listed stone sources is available for inspection by the Contractor in the Coastal/Geotechnical Section, Department of the Army, United States Army Engineer District, Buffalo, 1776 Niagara Street, Buffalo, New York 14207‐3199.

1. Blades Construction Products, Inc., Stuben Crushed Stone Division, RD 4, Bath, N.Y. 14810; (607) 776‐3357; quarry at Bath, NY; rock formation, Wiscoy graywacke and sandstone; Specific gravity:

2.56; Inspected in 1991 and tested in 1976 by the Buffalo District.

2. Buffalo Crushed Stone, Main Office at 2544 Clinton Street, Buffalo, N.Y. 14004; (716) 826‐7310;

Quarry at Wehrle Drive, Clarence and Como Park quarry in Cheektowaga, NY; rock formation, Onondaga limestone; Specific gravity: 2.67. Inspected by the Buffalo District in 1991 and tested suitable for stone use by ORD in 1983.

3. County Line Stone Co., County Line Road, Akron, N.Y. 14001, (716) 542‐5435; quarry at Akron, NY, rock formation, Onondaga limestone; Specific gravity: 2.67. Inspected by the Buffalo District in 1991 and tested suitable for stone use by ORD in 1984.

4. Dolomite Products, 1150 Penfield Rd., Rochester, N.Y., 14625, (585) 381‐7010; quarry at Penfield, NY; rock formation, Lockport dolomite; Specific gravity: 2.64. Inspected by the Buffalo District in 1995 and tested suitable for stone use by ORD in 1995.

5. LaFarge Corp, previously called Frontier Stone Products, 400 Hinman Road, Lockport, N.Y., 14094;

1 (800) 244‐4174; quarry at Lockport, N.Y.; rock formation is Lockport dolomite; Specific gravity: 2.67.

Inspected by the Buffalo District in 1995 and tested suitable for stone use by ORD in 1995.

6. Hanson Aggregates, 6896 Ellicott St., Pavillion, N.Y., 14525 (585) 343‐1787; quarry at Stafford, N.Y., rock formation Onondaga limestone first and second lifts for riprap; Specific gravity: 2.64.

7. Hanson Aggregates, (previously named; General Crushed Stone), P.O. Box , Lecona, N.Y. 13083;

(585)387‐3014; quarry at Lecona, NY; rock formation is Onondaga limestone; Specific gravity: 2.65.

8. Hanson Aggregates, (previously named; General Crushed Stone), P.O. Box 310, Jamesville, N.Y.

13078; (716) 469‐3251 or 469‐5501; quarry at Jamesville, NY; rock formation is Onondaga limestone;

Specific gravity: 2.65. Inspected by the Buffalo District in 1986 and tested suitable for stone use by ORD in 1986.

9. Hanson Aggregates, (previously named; General Crushed Stone), P.O. Box 151, Honeoye Falls, N.Y.

14472; (585) 624‐1200; quarry at Honeoye Falls, NY; rock formation is Onondaga limestone; Specific gravity: 2.66. Inspected by the Buffalo District in 1991.

10. Hanson Aggregates, (previously named; General Crushed Stone), Oak Corners, N.Y., (585) 789‐ 6202; quarry at Oak Corners, NY; rock formation is Onondaga limestone; Specific gravity: 2.67.

nspected by the Buffalo District in December 1994 and tested in 1976.

11. Hanson Aggregates, (previously named; General Crushed Stone), Skaneateles, N.Y., 13152; (585) 685‐3321 quarry at Skaneateles, N.Y.; rock formation is Onondaga limestone; Specific gravity: 2.70.

Inspected by the Buffalo District in 1982 and tested suitable for stone use by ORD in 1971.

12. Hanson Aggregates, (previously named; General Crushed Stone), R.D. #2, Quarry Road, Sodus, N.Y., 14551 (585) 483‐9193; quarry at Sodus, N.Y.; rock formation is Lockport dolomite; Specific gravity: 2.65, last inspected by the Buffalo District in 1976 and tested suitable for stone use by ORD in 1978.

13. Hanson Aggregates, (previously named; Genesee LeRoy Stone Corp.), 6896 Ellicott St., Pavillion, N.Y.,(716) 584‐8840 rock formation Grimsby Sandstone formation; Specific Gravity: 2.55, last inspected by the Buffalo District in 1995 and tested suitable for stone use by ORD in 1995.

14. Hanson Aggregates, PO Box 363, Batavia, N.Y., 14020, (585) 343‐1868; quarry at Stafford, N.Y., rock formation, Onondaga limestone first and second lifts; Inspected 9/79 and tested in 1/80 by the Buffalo District.

15. Togemco, Inc. 615 S. Main Street, Athens, Pa. 18810, Todd Kent Campbell (570) 888‐5734, specific gravity 2.50 at the Medina quarry. Specific gravity at the PA. quarry unknown at this time., Medina quarry inspected in 2002, PA. quarry not inspected at this time and tested by ORD in 1995.

16. Seneca Stone Corporation, Fayette, N.Y. (315) 549‐8253 or (607) 737‐6200; quarry at Fayette, N.Y.; rock is Onondaga limestone; Specific gravity: 2.67; Inspected by the Buffalo District in December 1994 and tested in 1986.

17. Shelby Quarry, 10830 Blair Rd., Medina, N.Y. 14104; (716) 798‐4501; quarry at Shelby, N.Y.; rock is Lockport dolomite; pecific gravity: 2.62. Inspected by the Buffalo District in 1995.

18. Gernatt Asphalt Products, Inc., Collins, NY 14034; (716) 532‐3372; quarry at Springville, NY.;

Inspected by the Buffalo District in 1988.

19. Niagara Stone Corp., 8875 Quarry Rd., Niagara Falls, NY,

(716) 694‐8292; quarry at Pletchers Corners, NY, rock formation, Lockport dolomite, Inspected by the Buffalo District in 1992 and tested 5/83.

20. Pine Hill Concrete Mix Corp., 324 Pavement Rd., Lancaster, NY, (716) 683‐6200; Sand pit is a glacio‐fluvial deposit; Inspected Frontier Stone Products, 400 Hinman Road, Lockport, N.Y., 14094; 1

(800) 244‐4174; quarry at Lockport, N.Y.; rock formation is Lockport dolomite; Specific gravity: 2.67.

c. Corrected spelling in paragraph 1.2.1 Order of Work, item “e” from: “betweent he” to “between the”.

d. Updated paragraph 1.2.1 Order of Work, item ‘k’, to read as follows:

k. Invasive Species treatment must occur as follows:.

(1) Mechanical methods: 10 January 2016 to 31 March 2016, 16 July 2016 to 7 August 2016, and 16 July 2017 to 7 August 2017.

(2) Chemical methods: Late August 2016 to early September 2016, and late August 2017 to early September 2017.

See section 32 92 20 INVASIVE SPECIES TREATMENT for additional requirements.

e. Added the following paragraph:

1.5 INSURANCE

a. The Contractor must, at his own expense, procure and maintain during the entire performance period of this contract, insurance of at least the kinds and minimum amounts set forth below:

Type Bodily Amount Property Injury Damage Comprehensive General $500,000 Per $100,000 Liability Occurence

Automobile Liability $200,000 Each Person ‐‐ $500,000 Per Occurrence $ 20,000

Workmen's Compensation $100,000 (PA) or And Employer's Liability as Legally Required by the State (NY)

b. Prior to the commencement of work hereunder, the Contractor must furnish to the Contracting Officer a certificate or written statement of the above required insurance. The policies evidencing required insurance must contain an endorsement to the effect that cancellation or any material change in the policies adversely affecting the interest of the Government in such insurance must not be effective for such period as may be prescribed by the laws of the State in which this contract is to be performed and in no event less than thirty (30) days after written notice thereof to the Contracting Officer.

c. The Contractor must also require all first tier subcontractors who will perform work on a Government installation to procure and maintain the insurance required as stated above during the performance of this contract. The Contractor must furnish a current Certificate of Insurance, for each first tier subcontractor, to the Contracting Officer, at least five (5) days prior to entry of each such subcontractor's personnel to the Government installation.

21. Section 01 50 00 – Paragraph 3.13 RESTORATION: paragraph referenced is changed from

“2.2.1.1” to “2.4.1.1”

22. Section 32 92 20

a. Additional submittal added in paragraph 1.3

SD‐07 submittal Article 15 Permit

b. Paragraphs 3.1 and 3.2 have been updated to read as follows:

3.1 MECHANICAL TREATMENT

Mechanically treat (mow) the entire area within the limits as indicated on the contract drawings.

NOTE: It is possible, that unforeseen higher water levels, during the required periods for mechanical treatments, may make the use of tractor‐type equipment impractical. The contractor may use hand‐held equipment to perform the work. This may require the use of extra personnel, equipment, and require more time to complete the work. The contractor must plan the work so that it will be completed within the time periods shown on the Treatment Schedule table in paragraph 1.2 of this section. Time extensions for performing the work will not be granted. Any additional costs for extra personnel and equipment must be included in the "Invasive Species Treatment" line item on the bid form. Any Activity Hazard Analysis (AHA) and plans (which are required submittals for acceptance) that refer to mechanical treatment must include the use of hand‐held equipment. If the work is performed during higher water conditions, the treatment must be down to the height of the high water, at the time of the treatment.

3.2 CHEMICAL TREATMENT

Extreme care and caution must be used when transporting the herbicide to the treatment areas. Open containers are not permitted. Once a treatment area has begun to have the herbicide applied, the entire area must be treated in the same day so that the warning signs required may be posted that same day.

All persons applying the herbicide must wear all PPE required by the manufacturer of the herbicide.

NOTE: Within 4 weeks of contract award, the contractor must apply for an Article 15 Aquatic Pesticide permit and submit a letter to modify the existing Article 24 wetland permit. This permit is required if high lake levels result in standing water within treatment areas during the period of herbicide application. Obtaining the permit does not change the limits for treatment shown on the contract drawings and the contractor must perform the work in accordance with the permit.

To apply for an Article 15 Aquatic Pesticide Permit, complete the application (http://www.dec.ny.gov/chemical/8530.html) and submit to

Attn: Gail Mortimer NYSDEC ‐ Pesticides 6274 East Avon‐Lima Road Avon, NY 14414

The cost will be $100.00 for the Article 15 permit. To modify the existing Article 24 wetland permit, submit a letter requesting the change to the wetland permit and include the necessary Article 15 Aquatic Pesticide permit application forms, fee and supporting information to: thomas.haley@dec.ny.gov.

Any additional costs for obtaining the permit, additional personnel, and additional equipment required for complying with the permit, must be included in the "Invasive Species Treatment" line item on the bid form. Any Activity Hazard Analysis (AHA) and plans (which are required submittals for acceptance) that refer to chemical treatment must include the application of herbicide over standing water.

23. Section 35 20 23, Paragraph 1.1: The following sentence has been added to the end of the paragraph:

“Excavation outside the borrow area limits shown on drawing C‐101 is not permitted.”

24. Drawings G‐003 and C‐103 have been updated – Potholes, Channels, and Mounds have been revised.