Attachment_1_Bid_Form_Modified_by_Reed_April_2014.pdf

PDF 27 KB Posted

Attached to
Geotechnical Drilling Services Federal contract opportunity
Solicitation number
W912P4-14-R-0019
Issued by
Department of the Army Corps of Engineers Engineering District Buffalo

About this file

Bid Form

View the file

Other files for this federal contract opportunity

Other files attached to Geotechnical Drilling Services, newest first.
File Type Posted
Contractor_Questions_15Sep2014.docx DOCX document
Attachment_2_Past_Performance_Questionnaire.docx DOCX document
Finalized_Solicitation_15Sep2014.doc DOC document
W912P4-14-R-0019_FINAL.pdf PDF
Attachment_2_Past_Performance_Questionnaire.docx DOCX document
Attachment_3_Safety_Requirements.pdf PDF
W912P4-14-R-0019_FINAL.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base Year Item # Description Unit of

Measure Bid Quantities (F1a through F1c filled in by Contractor)

Not-to-Exceed Unit- Price (Filled in by Contractor)

Bid Cost

F1a Drilling mobilization/demobilization from Contractor's location to Toledo, OH - Contractor enter Contractor's location in this cell here:

mile Enter total mileage for two round-trips below:

F1b Drilling mobilization/demobilization from Contractor's location to Cleveland, OH - Contractor enter Contractor's location in this cell here:

mile Enter total mileage for two round-trips below:

F1c Drilling mobilization/demobilization from Contractor's location to Watertown, NY - Contractor enter Contractor's location in this cell here:

mile Enter total mileage for two round-trips below:

F2a Borehole advancement using hollow-stem augers (ASTM D 6151) feet 2000

F2b Borehole advancement without hollow-stem augers feet 1000

F3 Borehole advancement through obstructions using rock drilling or coring feet 10

F4a Standard Penetration Testing (ASTM D 1586) - sampling depths less than 40 feet below the ground surface or barge deck each 700

F4b Standard Penetration Testing (ASTM D 1586) - sampling depths greater than 40 feet but less than 80 feet below the ground surface or barge deck each 250

F4c Standard Penetration Testing (ASTM D 1586) - sampling depths greater than 80 feet but less than 120 feet below the ground surface or barge deck each 50

F5 Undisturbed sampling (ASTM D 1587) each 100

F6a 2-inch nominal diameter rock core drilling using double tube, swivel type core barrel (ASTM D 2113) feet 50

F6b 2-inch nominal diameter wireline rock core drilling (ASTM D 2113) feet 50

F7a Sealing borings with neat cement/bentonite grout feet 1500

F7b Sealing borings with bentonite chips feet 1500

F8 Drilling inspector day 30

F9 Combined daily rate for drilling inspector, drilling crew chief, and driller's helper for standby due to weather delays day 6

F10 Combined lump sum rate for preparation of safety and quality control submittal package for a task order each 10

F11 Preparation of boring logs in gINT each 60

F12 Floating plant mobilization/demobilization each 0 to be provided with task order bids when needed

F13 Floating plant daily rate day 0 to be provided with task order bids when needed

F14 Floating plant standby rate due to weather delays day 0 to be provided with task order bids when needed

F15 Per Diem day 0 to be provided with task order bids when needed

L1 Extrusion/logging of undisturbed samples each 100

L2 Laboratory water content (ASTM D 2216) each 50

L3 Laboratory liquid and plastic limits (ASTM D 4318) each 20

L4 Laboratory sieve analysis without hydrometer(ASTM D 422) each 20

L5 Laboratory sieve and hydrometer analyses (ASTM D 422) each 4

L6 Laboratory organic matter determination (ASTM D 2974) each 20

L7 Laboratory unconfined compressive strength of single undisturbed cohesive soil sample (ASTM D 2166) (includes ASTM D 4318, ASTM D 2216, and dry density each 20

L8 Laboratory unconsolidated, undrained triaxial compressive strength of single undisturbed sample (ASTM D 2850) (includes ASTM D 4318, ASTM D 2216, and dry density each 30

L9 Laboratory consolidated, undrained triaxial compressive strength with pore pressure measurements of three undisturbed samples (ASTM D 4767) (includes ASTM D 4318, ASTM D 2216, and dry density determination) each 8

L10 Laboratory miniature vane shear test (ASTM D 4648) each 40

L11 Laboratory one-dimensional consolidation (ASTM D 2435) (includes ASTM D 4318, ASTM D 2216, ASTM D 854, dry density determination, and one unload/reload cycle) each 6

L12 Sample delivery to USACE Buffalo District to be determined for each task order when needed

0 to be provided with task order bids when needed

TOTAL

YEAR TWO

Item # Description Unit of Measure

Bid Quantities (F1a through F1c filled in by Contractor)

Not-to-Exceed Unit- Price (Filled in by Contractor)

Bid Cost

F1a Drilling mobilization/demobilization from Contractor's location to Toledo, OH - Contractor enter Contractor's location in this cell below:

mile Enter total mileage for two round-trips below:

F1b Drilling mobilization/demobilization from Contractor's location to Cleveland, OH - Contractor enter Contractor's location in this cell below:

mile Enter total mileage for two round-trips below:

F1c Drilling mobilization/demobilization from Contractor's location to Watertown, NY - Contractor enter Contractor's location in this cell below:

mile Enter total mileage for two round-trips below:

F2a Borehole advancement using hollow-stem augers (ASTM D 6151) feet 2000

F2b Borehole advancement without hollow-stem augers feet 1000

F3 Borehole advancement through obstructions using rock drilling or coring feet 10

F4a Standard Penetration Testing (ASTM D 1586) - sampling depths less than 40 feet below the ground surface or barge deck each 700

F4b Standard Penetration Testing (ASTM D 1586) - sampling depths greater than 40 feet but less than 80 feet below the ground surface or barge deck each 250

F4c Standard Penetration Testing (ASTM D 1586) - sampling depths greater than 80 feet but less than 120 feet below the ground surface or barge deck each 50

F5 Undisturbed sampling (ASTM D 1587) each 100

F6a 2-inch nominal diameter rock core drilling using double tube, swivel type core barrel (ASTM D 2113) feet 50

F6b 2-inch nominal diameter wireline rock core drilling (ASTM D 2113) feet 50

F7a Sealing borings with neat cement/bentonite grout feet 1500

F7b Sealing borings with bentonite chips feet 1500

F8 Drilling inspector day 30

F9 Combined daily rate for drilling inspector, drilling crew chief, and driller's helper for standby due to weather delays day 6

F10 Combined lump sum rate for preparation of safety and quality control submittal package for a task order each 10

F11 Preparation of boring logs in gINT each 60

F12 Floating plant mobilization/demobilization each 0 to be provided with task order bids when needed

F13 Floating plant daily rate day 0 to be provided with task order bids when needed

F14 Floating plant standby rate due to weather delays day 0 to be provided with task order bids when needed

F15 Per Diem day 0 to be provided with task order bids when needed

L1 Extrusion/logging of undisturbed samples each 100

L2 Laboratory water content (ASTM D 2216) each 50

L3 Laboratory liquid and plastic limits (ASTM D 4318) each 20

L4 Laboratory sieve analysis without hydrometer(ASTM D 422) each 20

L5 Laboratory sieve and hydrometer analyses (ASTM D 422) each 4

L6 Laboratory organic matter determination (ASTM D 2974) each 20

L7 Laboratory unconfined compressive strength of single undisturbed cohesive soil sample (ASTM D 2166) (includes ASTM D 4318, ASTM D 2216, and dry density each 20

L8 Laboratory unconsolidated, undrained triaxial compressive strength of single undisturbed sample (ASTM D 2850) (includes ASTM D 4318, ASTM D 2216, and dry density each 30

L9 Laboratory consolidated, undrained triaxial compressive strength with pore pressure measurements of three undisturbed samples (ASTM D 4767) (includes ASTM D 4318, ASTM D 2216, and dry density determination) each 8

L10 Laboratory miniature vane shear test (ASTM D 4648) each 40

L11 Laboratory one-dimensional consolidation (ASTM D 2435) (includes ASTM D 4318, ASTM D 2216, ASTM D 854, dry density determination, and one unload/reload cycle) each 6

L12 Sample delivery to USACE Buffalo District to be determined for each task order when needed

0 to be provided with task order bids when needed

TOTAL

YEAR THREE

Item # Description Unit of Measure

Bid Quantities (F1a through F1c filled in by Contractor)

Not-to-Exceed Unit- Price (Filled in by Contractor)

Bid Cost

F1a Drilling mobilization/demobilization from Contractor's location to Toledo, OH - Contractor enter Contractor's location in this cell below:

mile Enter total mileage for two round-trips below:

F1b Drilling mobilization/demobilization from Contractor's location to Cleveland, OH - Contractor enter Contractor's location in this cell below:

mile Enter total mileage for two round-trips below:

F1c Drilling mobilization/demobilization from Contractor's location to Watertown, NY - Contractor enter Contractor's location in this cell below:

mile Enter total mileage for two round-trips below:

F2a Borehole advancement using hollow-stem augers (ASTM D 6151) feet 2000

F2b Borehole advancement without hollow-stem augers feet 1000

F3 Borehole advancement through obstructions using rock drilling or coring feet 10

F4a Standard Penetration Testing (ASTM D 1586) - sampling depths less than 40 feet below the ground surface or barge deck each 700

F4b Standard Penetration Testing (ASTM D 1586) - sampling depths greater than 40 feet but less than 80 feet below the ground surface or barge deck each 250

F4c Standard Penetration Testing (ASTM D 1586) - sampling depths greater than 80 feet but less than 120 feet below the ground surface or barge deck each 50

F5 Undisturbed sampling (ASTM D 1587) each 100

F6a 2-inch nominal diameter rock core drilling using double tube, swivel type core barrel (ASTM D 2113) feet 50

F6b 2-inch nominal diameter wireline rock core drilling (ASTM D 2113) feet 50

F7a Sealing borings with neat cement/bentonite grout feet 1500

F8 Drilling inspector day 30

F9 Combined daily rate for drilling inspector, drilling crew chief, and driller's helper for standby due to weather delays day 6

F10 Combined lump sum rate for preparation of safety and quality control submittal package for a task order each 10

F11 Preparation of boring logs in gINT each 60

F12 Floating plant mobilization/demobilization each 0 to be provided with task order bids when needed

F13 Floating plant daily rate day 0 to be provided with task order bids when needed

F14 Floating plant standby rate due to weather delays day 0 to be provided with task order bids when needed

F15 Per Diem day 0 to be provided with task order bids when needed

L1 Extrusion/logging of undisturbed samples each 100

L2 Laboratory water content (ASTM D 2216) each 50

L3 Laboratory liquid and plastic limits (ASTM D 4318) each 20

L4 Laboratory sieve analysis without hydrometer(ASTM D 422) each 20

L5 Laboratory sieve and hydrometer analyses (ASTM D 422) each 4

L6 Laboratory organic matter determination (ASTM D 2974) each 20

L7 Laboratory unconfined compressive strength of single undisturbed cohesive soil sample (ASTM D 2166) (includes ASTM D 4318, ASTM D 2216, and dry density each 20

L8 Laboratory unconsolidated, undrained triaxial compressive strength of single undisturbed sample (ASTM D 2850) (includes ASTM D 4318, ASTM D 2216, and dry density each 30

L9 Laboratory consolidated, undrained triaxial compressive strength with pore pressure measurements of three undisturbed samples (ASTM D 4767) (includes ASTM D 4318, ASTM D 2216, and dry density determination) each 8

L10 Laboratory miniature vane shear test (ASTM D 4648) each 40

L11 Laboratory one-dimensional consolidation (ASTM D 2435) (includes ASTM D 4318, ASTM D 2216, ASTM D 854, dry density determination, and one unload/reload cycle) each 6

L12 Sample delivery to USACE Buffalo District to be determined for each task order when needed

0 to be provided with task order bids when needed

TOTAL

YEAR FOUR

Item # Description Unit of Measure

Bid Quantities (F1a through F1c filled in by Contractor)

Not-to-Exceed Unit- Price (Filled in by Contractor)

Bid Cost

F1a Drilling mobilization/demobilization from Contractor's location to Toledo, OH - Contractor enter Contractor's location in this cell below:

mile Enter total mileage for two round-trips below:

F1b Drilling mobilization/demobilization from Contractor's location to Cleveland, OH - Contractor enter Contractor's location in this cell below:

F1c Drilling mobilization/demobilization from Contractor's location to Watertown, NY - Contractor enter Contractor's location in this cell below:

mile Enter total mileage for two round-trips below:

F2a Borehole advancement using hollow-stem augers (ASTM D 6151) feet 2000

F2b Borehole advancement without hollow-stem augers feet 1000

F3 Borehole advancement through obstructions using rock drilling or coring feet 10

F4a Standard Penetration Testing (ASTM D 1586) - sampling depths less than 40 feet below the ground surface or barge deck each 700

F4b Standard Penetration Testing (ASTM D 1586) - sampling depths greater than 40 feet but less than 80 feet below the ground surface or barge deck each 250

F4c Standard Penetration Testing (ASTM D 1586) - sampling depths greater than 80 feet but less than 120 feet below the ground surface or barge deck each 50

F5 Undisturbed sampling (ASTM D 1587) each 100

F6a 2-inch nominal diameter rock core drilling using double tube, swivel type core barrel (ASTM D 2113) feet 50

F6b 2-inch nominal diameter wireline rock core drilling (ASTM D 2113) feet 50

F7a Sealing borings with neat cement/bentonite grout feet 1500

F8 Drilling inspector day 30

F9 Combined daily rate for drilling inspector, drilling crew chief, and driller's helper for standby due to weather delays day 6

F10 Combined lump sum rate for preparation of safety and quality control submittal package for a task order each 10

F11 Preparation of boring logs in gINT each 60

F12 Floating plant mobilization/demobilization each 0 to be provided with task order bids when needed

F13 Floating plant daily rate day 0 to be provided with task order bids when needed

F14 Floating plant standby rate due to weather delays day 0 to be provided with task order bids when needed

F15 Per Diem day 0 to be provided with task order bids when needed

L1 Extrusion/logging of undisturbed samples each 100

L2 Laboratory water content (ASTM D 2216) each 50

L3 Laboratory liquid and plastic limits (ASTM D 4318) each 20

L4 Laboratory sieve analysis without hydrometer(ASTM D 422) each 20

L5 Laboratory sieve and hydrometer analyses (ASTM D 422) each 4

L6 Laboratory organic matter determination (ASTM D 2974) each 20

L7 Laboratory unconfined compressive strength of single undisturbed cohesive soil sample (ASTM D 2166) (includes ASTM D 4318, ASTM D 2216, and dry density each 20

L8 Laboratory unconsolidated, undrained triaxial compressive strength of single undisturbed sample (ASTM D 2850) (includes ASTM D 4318, ASTM D 2216, and dry density each 30

L9 Laboratory consolidated, undrained triaxial compressive strength with pore pressure measurements of three undisturbed samples (ASTM D 4767) (includes ASTM D 4318, ASTM D 2216, and dry density determination) each 8

L10 Laboratory miniature vane shear test (ASTM D 4648) each 40

L11 Laboratory one-dimensional consolidation (ASTM D 2435) (includes ASTM D 4318, ASTM D 2216, ASTM D 854, dry density determination, and one unload/reload cycle) each 6

L12 Sample delivery to USACE Buffalo District to be determined for each task order when needed

0 to be provided with task order bids when needed

TOTAL

YEAR FIVE

Item # Description Unit of Measure

Bid Quantities (F1a through F1c filled in by Contractor)

Not-to-Exceed Unit- Price (Filled in by Contractor)

Bid Cost

F1a Drilling mobilization/demobilization from Contractor's location to Toledo, OH - Contractor enter Contractor's location in this cell below:

mile Enter total mileage for two round-trips below:

F1b Drilling mobilization/demobilization from Contractor's location to Cleveland, OH - Contractor enter Contractor's location in this cell below:

mile Enter total mileage for two round-trips below:

F1c Drilling mobilization/demobilization from Contractor's location to Watertown, NY - Contractor enter Contractor's location in this cell below:

F2a Borehole advancement using hollow-stem augers (ASTM D 6151) feet 2000

F2b Borehole advancement without hollow-stem augers feet 1000

F3 Borehole advancement through obstructions using rock drilling or coring feet 10

F4a Standard Penetration Testing (ASTM D 1586) - sampling depths less than 40 feet below the ground surface or barge deck each 700

F4b Standard Penetration Testing (ASTM D 1586) - sampling depths greater than 40 feet but less than 80 feet below the ground surface or barge deck each 250

F4c Standard Penetration Testing (ASTM D 1586) - sampling depths greater than 80 feet but less than 120 feet below the ground surface or barge deck each 50

F5 Undisturbed sampling (ASTM D 1587) each 100

F6a 2-inch nominal diameter rock core drilling using double tube, swivel type core barrel (ASTM D 2113) feet 50

F6b 2-inch nominal diameter wireline rock core drilling (ASTM D 2113) feet 50

F7a Sealing borings with neat cement/bentonite grout feet 1500

F7b Sealing borings with bentonite chips feet 1500

F8 Drilling inspector day 30

F9 Combined daily rate for drilling inspector, drilling crew chief, and driller's helper for standby due to weather delays day 6

F10 Combined lump sum rate for preparation of safety and quality control submittal package for a task order each 10

F11 Preparation of boring logs in gINT each 60

F12 Floating plant mobilization/demobilization each 0 to be provided with task order bids when needed

F13 Floating plant daily rate day 0 to be provided with task order bids when needed

F14 Floating plant standby rate due to weather delays day 0 to be provided with task order bids when needed

F15 Per Diem day 0 to be provided with task order bids when needed

L1 Extrusion/logging of undisturbed samples each 100

L2 Laboratory water content (ASTM D 2216) each 50

L3 Laboratory liquid and plastic limits (ASTM D 4318) each 20

L4 Laboratory sieve analysis without hydrometer(ASTM D 422) each 20

L5 Laboratory sieve and hydrometer analyses (ASTM D 422) each 4

L6 Laboratory organic matter determination (ASTM D 2974) each 20

L7 Laboratory unconfined compressive strength of single undisturbed cohesive soil sample (ASTM D 2166) (includes ASTM D 4318, ASTM D 2216, and dry density each 20

L8 Laboratory unconsolidated, undrained triaxial compressive strength of single undisturbed sample (ASTM D 2850) (includes ASTM D 4318, ASTM D 2216, and dry density each 30

L9 Laboratory consolidated, undrained triaxial compressive strength with pore pressure measurements of three undisturbed samples (ASTM D 4767) (includes ASTM D 4318, ASTM D 2216, and dry density determination) each 8

L10 Laboratory miniature vane shear test (ASTM D 4648) each 40

L11 Laboratory one-dimensional consolidation (ASTM D 2435) (includes ASTM D 4318, ASTM D 2216, ASTM D 854, dry density determination, and one unload/reload cycle) each 6

L12 Sample delivery to USACE Buffalo District to be determined for each task order when needed

0 to be provided with task order bids when needed

TOTAL

COMBINED TOTAL

File details come from the government source that posted it. Updated .