Accident Prevention Plan

View the file

Other files for this federal contract opportunity

Other files attached to Toledo Walkway Replacement & Drainage Extension, newest first.
File Type Posted
Amendment 1 Updated Drawings.pdf PDF
SOW Toledo Concrete Drainage Amendment 1.pdf PDF
UFGS 01 35 26 30Apr12.docx DOCX document
USACE-SafetySpecGuide-TPO.doc DOC document
AccidentReport-ENGForm-3394.pdf PDF
SoW TPO concrete walkway plan120316.pdf PDF
LRB-ContractorMonthlyManhourExposureForm.xls XLS spreadsheet
LRB-BlankContractor-AHA-May06.xls XLS spreadsheet
Bid Form Toledo Walkway Drainage FINAL.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

APP Checklist

CONTRACTOR ABBREVIATED ACCIDENT PREVENTION PLAN (APP) CHECKLIST (EM 385-1-1, Appendix - A, dated; 15 Sept. 08)
Minimum Basic Outline for Accident Prevention Plan
The APP is the Contractor Safety and Health Program Document. The following Site Specific Areas will be addressed:
NOTE: 1. Contractor will complete Checklist and Submit with their APP.
NOTE: 2. Contractor APP WILL be submitted in format below.
NOTE: 3. Safety Office will review Contractor APP and return to PM / COR.
NOTE: 4. Contractor APP's ARE NOT APPROVED by the USACE, only found as Acceptable or Non-Acceptable.
Safety Office Review Status: ACCEPTED BY/DATE: ________________ NOT ACCEPTED BY/DATE:________________
Contractor Name: Contract No:
Project Title & Location:Included ?
YesNoN/APage(s)
ALL CHECKLIST ITEMS WILL BE COMPLETED!
11. ABBREVIATED APP for LIMITED-SCOPE SERVICE, SUPPLY AND R&D CONTRACTS. If service, supply and R&D contracts with limited scopes are awarded, the contractor may submit an abbreviated Accident Prevention Plan. This APP shall address the following areas at a minimum. If other areas of the EM 385-1-1 are pertinent to the contract, the contractor must assure these areas are addressed as well.
a. Title, signature, and phone number of the plan preparer.
b. Background Information to include: Contractor; Contract number; Project name; Brief project description, description of work to be performed, and location (map); The project description shall provide a means to evaluate the work being done (see AHA requirements in 01.A.13) and associated hazards involved. Contractor’s APP shall address the identified hazards involved and the control measures to be taken.
c. Statement of Safety and Health Policy detailing their commitment to providing a safe and healthful workplace for all employees.
d. Responsibilities and Lines of Authorities – to include a statement of the employer’s ultimate responsibility for the implementation of his SOH program; Identification and accountability of personnel responsible for safety at all levels to include designated site safety and health officer (SSHO) and associated qualifications. The District SOHO will review the qualifications for acceptance.
e. Training - new hire SOH orientation training at the time of initial hire of each new employee and any periodic retraining/recertification requirements.
f. Procedures for job site inspections - assignment of responsibilities and frequency.
g. Procedures for reporting man-hours worked and reporting and investigating any accidents as soon as possible but not more than 24 hours afterwards to the Contracting Officer/Representative (CO/COR). An accident that results in a fatal injury, permanent partial or permanent total disability shall be immediately reported to the Contracting Officer.
h. Emergency Planning. Employees working alone shall be provided an effective means of emergency communication. This may be cellular phone, two-way radio or other acceptable means. The selected means of communication must be readily available and must be in working condition.
i. Drinking Water provisions, toilet and washing facilities.
j. First Aid and CPR training (at least two employees on each shift shall be qualified/certified to administer first aid and CPR) and provision of first aid kit (types/size).
k. Personal Protective Equipment.
(1) WORK CLOTHING - Minimum Requirements. Employees shall wear clothing suitable for the weather however minimum requirements for work shall be short-sleeve shirt, long pants (excessively long or baggy pants are prohibited) and leather work shoes. If analysis determines that safety-toed (or other protective) footwear is necessary (i.e., mowing, weedeating, chain saw use, etc), they shall be worn.
(2) Eye and Face Protection. Eye and face protection shall be worn as determined by an analysis of the operations being performed HOWEVER, all involved in chain saw use, chipping, stump grinding, pruning operations, grass mowing, weedeating and blowing operations shall be provided safety eyewear (Z87.1) as a minimum.
(3) Hearing Protection. Hearing protection must be worn by all those exposed to high noise activities (to include grass mowing and trimming, chainsaw operations, tree chipping, stump grinding and pruning).
(4) Head Protection. Hard hats shall comply with ANSI Z89.1 and shall be worn by all workers when a head hazard exists. At a minimum, hard hats shall be worn when performing activities identified in (2) above.
(5) High Visibility Apparel shall comply with ANSI/ISEA 107, Class 2 requirements at a minimum and shall be worn by all workers exposed to vehicular or equipment traffic.
(6) Protective Leg chaps shall be worn by all chainsaw operators.
(7) Gloves of the proper type shall be worn by persons involved in activities that expose the hands to cuts, abrasions, punctures, burns and chemical irritants.
(8) If work is being performed around water and drowning is a hazard, PFDs must be provided and worn as appropriate.
l. Machine Guards and safety devices. Lawn maintenance equipment must have appropriate guards and safety devices in place and operational.
m. Hazardous Substances. When any hazardous substances are procured, used, stored or disposed, a hazard communication program must be in effect and MSDSs shall be available at the worksite. Employees shall have received training in hazardous substances being used. When the eyes or body of any person may be exposed to corrosives, irritants or toxic chemicals, suitable facilities for quick drenching or flushing of the eyes and body shall be provided within 10 seconds of the worksite.
n. Traffic control shall be accomplished in accordance with DOT’s MUTCD.
o. Control of Hazardous Energy (Lockout/Tagout). Before an employee performs any servicing or maintenance on any equipment where the unexpected energizing or startup of the equipment could occur, procedures must be in place to ensure adequate control of this energy.
p. Driving, working on (i.e., working with equipment/mowers) while on slopes, working from/in boats/skiffs, etc shall also be considered and dealt with accordingly.

&C&"Times New Roman,Bold"&26U. S. Army Corps of Engineers &24Safety and Occupational Health Office &L

POC: Keith Hall/Safety Office USACE Buffalo NY. District Ph:716-879-4406 &CPage &P&RLast Updated 20 Jan 2009