Bid Form Toledo Walkway Drainage FINAL.docx

DOCX document 23 KB Posted

Attached to
Toledo Walkway Replacement & Drainage Extension Federal contract opportunity
Solicitation number
W912P4-12-R-0011
Issued by
Department of the Army Corps of Engineers Engineering District Buffalo

About this file

Bid Form to be filled out and submitted with bid

View the file

Other files for this federal contract opportunity

Other files attached to Toledo Walkway Replacement & Drainage Extension, newest first.
File Type Posted
Amendment 1 Updated Drawings.pdf PDF
SOW Toledo Concrete Drainage Amendment 1.pdf PDF
UFGS 01 35 26 30Apr12.docx DOCX document
SoW TPO concrete walkway plan120316.pdf PDF
LRB-ContractorAbbreviatedAPPChecklist15Sep2008.xls XLS spreadsheet
LRB-ContractorMonthlyManhourExposureForm.xls XLS spreadsheet
LRB-BlankContractor-AHA-May06.xls XLS spreadsheet
USACE-SafetySpecGuide-TPO.doc DOC document
AccidentReport-ENGForm-3394.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BID SCHEDULE

TOLEDO WALKWAY & DRAINAGE EXTENSION

Item No. Description Unit Estimated Amount

1. Demolition Existing Walkway LS $_____________________

2. Installed drainage piping and stone LS $_____________________ Includes sub base preparation

3. Install New Concrete Walkway LS $_____________________

TOTAL ESTIMATED AMOUNT (Items 1-3) $____________________________

OPTION “1”

4. Install 60’ Site Drainage LS $_____________________

OPTION “1a”

4a. Install 100’ extended site drainage LS $_____________________

NOTE 1: BIDS MUST BE COMPLETE AS TO ALL THE ITEMS ON THE SCHEDULE. FAILURE TO COMPLETE ALL ITEMS ON THE BID SCHEDULE WILL RENDER THE BID NON-RESPONSIVE.

NOTE 2: FOR BID EVALUATION PURPOSES, THE TOTAL BID WILL BE BASED UPON THE TOTAL OF THE BASE BID AMOUNT SHOWN ABOVE (ITEMS 1 THROUGH 3).

NOTE 3: THE GOVERNMENT MAY ELECT TO AWARD OPTION 1 AND/OR OPTION 1a. IF THE OPTION IS AWARDED, IT WILL BE AWARDED AT THE TIME OF CONTRACT AWARD. IF AWARDED, THE GOVERNMENT RESERVES THE RIGHT TO LIMIT THE QUANTITY OF MATERIAL UP TO THE ESTIMATED QUANTITY OF THE OPTION ITEM.