- To procure One (1) each Universal Static Balance Fixture, Setup & Training, and Shipping & Crating.
- Solicitation number
- W912NW-17-T-0044
About this file
To procure One (1) each Universal Static Balance Fixture, Setup & Training, and Shipping & Crating.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W912NW-17-T-0044-0001.pdf | ||
| Redacted_SSJ.pdf | ||
| SNOTICE.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUM
(No Collect Calls)
W912NW-17-T-0044 01-May-2017
b. TELEPHONE NUMBER
361-961-6489
8. OFFER DUE DATE/LOCAL TIME
04:00 PM 12 May 2017
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA X ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
W912NW9. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
TERRY B. CLARK
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
1 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.X
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
SEE SCHEDULE
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED ORX
SMALL BUSINESS
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
CORPUS CHRISTI ARMY DEPOT
CONTRACTING OFFICE
10221 AVE E, BLDG 1770
CORPUS CHRISTI TX 78419-5211
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS AX
13b. RATING
DO-C9
CODE15. DELIVER TO CODE 16. ADMINISTERED BY
SEE SCHEDULE
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
FAX:
TEL: SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
SIZE STANDARD:
NAICS:
333997
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF48
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
Section SF 1449 - CONTINUATION SHEET
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Each
UNIVERSAL STATIC BALANCE FIXTURE
FFP
The contractor shall provide one (1) Universal Static Balance Fixture (USBF) Part number AV-001-002 to evaluate and statically balance helicopter rotor blades in accordance with the Statement of Work (SOW).
FOB: Destination
PURCHASE REQUEST NUMBER: W45N7V631202S4
NET AMT
0002 2 Each
SETUP AND TRAINING
FFP
The contractor shall deliver, set-up, operationally test the system, demonstrate repeatability and provide operator training in accordance with the Statement of Work (SOW).
PURCHASE REQUEST NUMBER: W45N7V631202SF
0003 1 Each
SHIPPING AND CRATING
FFP
The contractor shall crate the Universal Static Balance Fixture (USBF) and related equipment and provide shipping arrangements in accordance with the Statement of Work (SOW).
PURCHASE REQUEST NUMBER: W45N7V631202SA
0004 1 Each
IUID IDENTIFICATION NAMEPLATE
FFP
In accordance with DFARS 252.211-7003, the contractor is not required to price this line item.
CCAD FINANCE
Requisition No. AP22EP-0253-7207
STATEMENT OF WORK
STATEMENT OF WORK
1. SCOPE:
1.1. Purpose: Contractor shall provide Corpus Christi Army Depot (CCAD) with one (1) complete system of the Universal Static Balance Fixture (USBF) used to evaluate and statically balance helicopter rotor blades. Contractor shall coordinate delivery date of parts and date of commissioning with the Government Technical Point of Contact and Contracting Officer.
2. APPLICABLE DOCUMENTS:
o Letter from RDMR-AEB-G, Dated 26 April 2013, SUBJECT: Authorization to use the Avion Manufacturing, Inc. Universal Static Balance Fixture (TN 46831B) o National Fire Prevention, National Electric Code NFPA-70, www.nfpa.org o National Electrical Manufacturers Association, NEMA, www.nema.org
3. CONTRACTOR REQUIREMENTS:
3.1. The Contractor shall provide all parts and equipment for a turn-key fully operational system delivery of a USBF. Contractor shall deliver, set-up, operationally test the system, demonstrate repeatability, and provide operator training.
3.2. Parts and Equipment
o (1) USBF Part No. AV-001-002:
Comprised of the base fixture, load bar with load bar slide assembly, computer with printer, and touch screen monitor with speakers, calibrated load cells, custom nylon tarp for storage and protection, and a blade lift/dolly.
o Operation & Maintenance Manual (1 hardcopy, and 1 electronic digital CD) o Valid Calibration Certificates for each Load Cell and Load Bar o Acceptance Test Repeatability Demonstration o Training of 1st and 2nd Shift operators.
3.3. Contractor shall deliver and set-up one (1) USBF system, Part No. AV-001-002 at CCAD.
The system is designed to evaluate and balance main rotor blades. A turn-key system comprised of the base fixture, load bar with load bar slide assembly, computer with printer, touch screen monitor with speakers, calibrated load cells, custom nylon tarp for storage and protection, and a blade lift/dolly that allows blades to be moved and loaded onto the fixture by one person.
3.3.1. The contactor shall crate the USBF and related equipment and provide shipping arrangements and cost from their facilities to CCAD.
3.3.2 The contractor shall deliver valid calibration certificates for each load cell and load bars;
and the CCAD TMDE Branch shall calibrate the stand per CCAD Calibration Procedure 16SPL- 12757-A-0064 (current revision) prior to the release for production. CCAD Test Equipment Engineering Branch shall revise the calibration procedure to the next revision to incorporate the new USBF bar code, serial number, and load bar into the procedure. CCAD TMDE shall place the stand on a two-year calibration interval on form 3758-R after calibration per 16SPL-12757-A- 0064 (current revision) prior to release for production.
3.4. The Windows-based system shall be delivered with the most current Avion software version that has been authorized for use by the US Government. If no newer software has been authorized by the government, the Avion Windows Version 1.02 shall be included. The system shall include static balance capability of all blade types in the standard Avion library that are required by CCAD as well as those listed in the authorization letter referenced in 2. Applicable Documents.
3.5. Contractor shall deliver an Operation & Maintenance Manual in hardcopy format and an electronic digital copy on compact disk (CD). Manual shall include system description, instructions on assembly and setup, operating procedures, maintenance, troubleshooting, calibration, and repair parts list and diagrams.
3.6. Contractor shall deliver valid calibration certificates for each load cell and load bar.
3.7. The contractor shall provide two (2), eight (8) hours on-site training for up to eight (8) CCAD USBF operators including the review of the Avion USBF operator/maintenance manual, Army tech data, and CCAD EP 16SPL-12757-A-0063 (current revision); and the balancing of UH-60 and AH-64 main rotor blades. CCAD Test Equipment Engineering Branch shall revise the engineering operator procedure to incorporate the new USBF bar code and serial number into the procedure.
3.8. The contractor shall provide a one (1) year warranty on the system, related components and all material, parts, hardware, due to manufacturing defects and/or improper installation. The contractor shall have ten (10) work days to resolve and correct any warranty issues after notification of deficiency.
3.9. Hours of Operation: The Contractor shall conduct work between the hours of 7:00 AM to 3:30 PM, Monday through Friday except on US Holidays or when the Government facility/installation is closed due to local or national emergencies, administrative closings, or similar Government-directed facility/installation closings. Contractor shall make accommodation to train 2nd Shift operators. The exact hours and days may change in instances of government furloughs.
3.10. INFORMATION TECHNOLOGY – INDUSTRIAL SYSTEM REQUIREMENTS
3.10.1 IT Industrial System Requirements
3.10.2 Physical Environment Specifications:
Any vendor provided equipment shall be able to operate in the environment it will be placed within. Temperature, humidity, and the use of harsh chemicals or liquids in designated installation areas may dictate the use of appropriate National Electrical Manufacturers Association (NEMA) rated enclosures and certified equipment. These same conditions will dictate the use of rugged peripheral equipment. Cabinets containing “industrial computer systems” shall meet the following specifications: they shall maintain an average maximum internal operating temperature of less than 95 degrees Fahrenheit with a sustained average external temperature of up to 115 degrees Fahrenheit. The cabinets shall also provide for a maximum internal average humidity of 80% when the external average humidity is 98%.
3.10.3 Computer Hardware Specifications:
All network capable Industrial computer systems installed at CCAD must be connected to and communicate through the CCAD Industrial Local Area Network (ILAN). Standard desktop Industrial computer systems will be provided by CCAD when available. When providing a custom computer solution, the contractor shall provide CCAD IT with a detailed list of required equipment specifications used to determine the feasibility of a standard CCAD system. When CCAD cannot provide the required hardware (e.g. rack mounted and integrated systems) the contractor shall provide it. The hardware must meet the following minimum requirements:
3.10.3.1 Intel Core i5-5675C or better
3.10.3.2 System clock speed must be 3.3 Ghz or better
3.10.3.3 Random Access Memory must be 8GB or better (1DIMM)
3.10.3.4 Windows Aero-capable graphics card with 1GB VRAM
3.10.3.5 500GB SATA drive with 16MB cache
3.10.3.6 DVD-RW/CD-RW
3.10.3.7 RJ-45 and Wireless capable Network Interface card (NIC)
3.10.4 Peripheral Equipment:
Any installed peripheral equipment shall be capable of generating data output onto a dedicated computer system through either a standard serial cable connection (e.g. USB, RS-232) or an Ethernet connection. If an Ethernet connection is used to interconnect a dedicated PC to peripheral equipment, the contractor shall supply an extra Network Interface Card (NIC). The NIC must have a RJ-45 port to allow an ANSI Standard 802.3, 100Base-T, or an IEEE 802.3ah, 1000Base-T Ethernet connection which supports the full TCP/IP stack implemented by firmware.
3.10.5 Programmable Logic Controllers (PLC)’s:
Any PLC installed at CCAD shall be manufactured by Allen Bradley and must provide an Ethernet connection to allow for connection to the Industrial Network. If an Ethernet connection is used to interconnect the PLC to peripheral equipment an additional Ethernet port must be provided.
3.10.6 Operating System (OS) Specifications:
If applicable, the systems’ OS must be Microsoft Windows 7, Windows Server 2012R2, or Red Hat Linux version 5. Any OS supplied with the system must contain all necessary service packs, updated patches, and hot fixes.
3.10.7 Army Gold Master:
The Army Golden Master (AGM) is a collection of security settings for Microsoft Operating systems that must be applied to all Army computer systems. CCAD will supply the AGM to the contractor, the contractor shall ensure their software functions as intended, when installed on top of the AGM.
3.10.8 Security Technical Implementation Guides (STIGs):
STIGS are configuration standards for the Department of Defense and contain technical guidance to lock down information systems and software applications that might otherwise be vulnerable to malicious attacks. The contractor shall be responsible for ensuring all appropriate STIGs are implemented and their software runs acceptably.
3.10.9 System Software Specifications:
If network capable, industrial systems are required to interact with other network resources on the CCAD ILAN. These systems shall be capable of connecting to and communicating through a windows based network and must operate using domain-level user accounts through Active- Directory. All supplied software must be capable of operating in a multi-user environment and data which contains permissions information shall be hidden from view and inaccessible to those with less than administrator level access. Shared accounts shall not be used, and users shall only be authorized the minimum security rights to operate the application software. Users will not have access to system or software configuration items (e.g., Control Panel, software and hardware installation). Under no circumstances will the intended end user log in using the Administrator or Root account for routine operation of the equipment. The use of these accounts will be restricted to only administrative activities which will be carried out by CCAD Information Technology personnel. All software products shall employ a minimum of three permission based levels of access.
3.10.9.1 Administrator - Full control at root level, restricted to CCAD IT personnel and when required, the contractor or vendor.
3.10.9.2 Maintenance - Mid-level control required to perform maintenance and alter control parameters as needed.
3.10.9.3 Operator - Minimum control necessary to perform the routine operation of software. The Operator shall not be able to alter the programming of software, make changes to executable files, or modify control parameters.
3.10.10 Software Installations:
If installing application code at CCAD, the contractor shall install the code within a standard container (i.e., Program Files) and located in a volume separate from the standard System Files.
Interactive applications are required to run as services and daemons and any time WEB services are used, file types (e.g., XML, HTML) must be separated.
3.10.11 Software Licensing:
When installed, the licensing for computers, control units e.g., Programmable Logic Controllers, or other IT systems will be surrendered to the Information Technology Configuration Manager and will become the property of the Government upon acceptance of the system.
3.10.12 Application Incompatibility:
If an application will interfere with the operation of the industrial system, i.e., (McAfee Anti- Virus), the contractor shall provide a written statement to the CCAD IT Directorate explaining the technical restrictions placed upon them.
3.10.13 Special Hardware and Software:
If any special programming software or programming software interface devices (such as hardware "keys", dongles or "PIC" modules) were required to access software, these programs and devices shall be included along with necessary registration information. If custom application software was written and provided, a copy of the required compiler and compiler license shall be provided as well. At acceptance, all these items shall become property of the government.
Software and hardware purchased for this project shall be registered to Commander, Corpus Christi Army Depot, and Corpus Christi, Texas 78419.
3.10.14 Certificate of Net worthiness (CoN). Net worthiness certification ensures Automated Information Systems (AIS) utilizing the Army Network are developed in compliance with the Clinger Cohen Act and are secure, supportable, sustainable, and compatible with the Army Enterprise Infrastructure (AEI) (as defined in AR 25-1). All new AIS capabilities and all capability modifications and upgrades must be assessed to validate their net worthiness (network security, network impact, compatibility with the infrastructure, infrastructure requirements, spectrum support, security policy compliance, JTA-A standards compliance, communications and information manpower, training, logistics support, schedule, and funding). If software is installed within the system, the contractor shall work with CCAD IT Department personnel to check for CoN availability and when not available, ensure a CoN is requested and all documentation is submitted.
3.10.15 Software Acceptance:
If software has been customized for CCAD’s use or is any software other than Commercial Off The Shelf (COTS); the contractor shall provide copies of all source code, firmware and software used in the system, as well as one set of backup and configuration software for PLC’s, control and communication computers, and data acquisition. All programs shall have been tested and fully operational before acceptance.
3.10.16 Documentation Requirements:
A complete set of instruction manuals shall be provided that contain all the information necessary to operate, maintain, and reinstall all software and hardware in the system. Step by Step instructions shall be provided to facilitate the rebuilding of the system in the event of a fatal system crash. The vendor or contractor shall provide network design drawings to the Information Technology Directorate. These drawings should include complete directional data flow diagrams that include all ports and protocols in use. The vendor or contractor shall provide to Industrial Automation at least two electronic copies of all control unit programs. These copies should include description files of the ladder logic and any cabling required to connect to the control systems. No control units will be password protected and no other form of lockout measure shall be implemented by anyone other than CCAD IT employees. The vendor or contractor shall also provide electrical wiring diagrams for all installed control systems to the CCAD Industrial Automation group.
3.10.17 Proposals or specifications that deviate from those described herein shall be coordinated for specific approval or rejection by the CCAD Information Technology representatives prior to shipment, installation, or acceptance of the equipment.
4.0. Quality Assurance Requirements (QAR)
4.1. Inspection and acceptance shall be performed at CCAD after TMDE calibration witnessed by the Contracting Officer’s Representative (COR) and an Engineer from the CCAD Test Equipment Engineering Branch. Acceptance testing shall be based upon the successful repeatability tests of the static balance condition and the actual static balancing of a AH-64, UH-60, UH-60M, and UH- 1 Main Rotor Blade by the contractor and CCAD operator(s) in accordance and compliance with the current DWMR, TM, AMCOM, NAVAIR and/or RDEC (MEC/MEO) technical requirements and specifications per the CCAD Operating Procedure 16SPL-12757-A-0063 (current revision).
4.2. Final acceptance of the services, equipment, materials, documentation and procedures called for in this Statement of Work (SOW) will be performed by the Contracting Officer based upon the inspection and recommendation of the COR.
4.3 Failure to comply with the safety, security and SOW requirements, specifications, provisions, tests and QAR’s set forth in the SOW shall be cause for contract rejection.
SECURITY REQUIREMENTS
CAO: April 2017
SECURITY REQUIREMENTS FOR ALL CONTRACTS PERFORMED AT CORPUS CHRISTI ARMY DEPOT
This document is a brief overview of rules and regulations of Naval Air Station Corpus Christi (NASCC) and Corpus Christi Army Depot (CCAD). It is not intended to be all-inclusive or cover all contingencies.
Direct specific security requirements questions to the following numbers:
CCAD: (361) 961-3313
NASCC: (361) 961-2480
Regulations:
Army Directive 2014–05 (or its successor) Policy and Implementation Procedures for Common Access Card Credentialing and Installation Access for Uncleared Contractors
AR 25-1, Army Knowledge Management and Information Technology AR 25-2, Information Assurance
AR 25-55, The Department of the Army Freedom of Information Act AR 70-31, Standards for Technical Reporting
AR 190-13, Department of the Army Physical Security Program AR 360-1, The Army Public Affairs Program
AR 380-5, Department of the Army Information Security Program
AR 380-10, Foreign Disclosure and Contact with Foreign Representatives AR 380-49, Industrial Security Program
AR 380-67, Personnel Security (PERSEC) AR 530-1, Operations Security (OPSEC)
AR 530-1, AMC Supp Operations Security (OPSEC) AR 530-1, CCAD Plan Operations Security (OPSEC) AMC-R 525-13, AMC Force Protection Program
DoD 5220.22-M National Industrial Security Program Operating Manual DoD Directives 5230.24, Distribution Statements on Technical Documents
DoD Directives 5230.25, Withholding of Unclassified Technical Data from Public Disclosure DoD Regulation 5200.2-R Personnel Security Program
DoD 5400.11-R, Department of Defense Privacy Program UFC 4-010-01 9 February 2012 Change 1, 1 October
DoD MINIMUM ANTITERRORISM STANDARDS FOR BUILDINGS UNIFIED FACILITIES CRITERIA
(UFC)
DoDI 1000.13, Identification (ID) Cards for Members of the Uniformed Services, Their Dependents, and other Eligible Individuals
DoDM 1000.13, Volume 1, DoD Identification (ID) Cards: ID Card Life-Cycle DoDI 5200.02 DoD Personnel Security Program
W912NW-17-T-0044
DoDM 5200.02 Procedures for the DoD Personnel Security Program
U.S. Office of Personnel Management Memorandum, "Final Credentialing Standards for Issuing Personal Identity Verification Cards under HSPD-12," July 31, 2008Federal Acquisition Regulation (FAR), March 2005
1. Conduct and Behavior: IAW DoD Directive 5200.8, “Security of DoD Installations and Resources”, the NAS commander has broad authority to remove or exclude any person or persons from the military installation to protect personnel and property, to maintain good order and discipline, and to ensure the uninterrupted and successful performance of the installations mission. In the exercise of this authority, the commander may refuse to grant entry or may bar Contractor employees. Refusal of entry or barment of any employee does not relieve the Contractor of the responsibility to continue performance under this contract.
1.1. All personnel entering and working at CCAD are subject to all rules, regulations and applicable laws. All personnel and their effects are subject to search, to include vehicles and company belongings.
1.2. No person shall willfully fail or refuse to comply with lawful orders or direction of any civilian or military security police officer.
1.3. The Contractor shall not employ persons for work on this contract if such employees are identified to the Contractor by the Government as a potential threat to the health, safety, security, general well-being or operational mission of the installation and its population. Disrespectful behavior, failure to obey orders or regulations, fighting, horseplay, stealing, illegal use of drugs (using/transporting/selling), consuming or being under the influence of alcohol, or being in the possession of illegal weapons are prohibited and subject to appropriate penalties. This may include being detained, banned from entering the Government facility, or remanded to civilian authorities.
1.4. All Contractor personnel will limit their travel on the installation only to specific areas required for performance of the contract, specified break and meal areas, or in travel directly to and from these locations. Employees found on the installation away from officially identified areas may be detained and/or debarred from the installation.
1.5. Subcontracts; if the Contractor enters into a Subcontractor arrangement with another Contractor, the prime Contractor is responsible for Subcontractor performance and compliance. The prime Contractor must provide a copy of the security requirements to the subcontractor. The contracting officer must ensure any questions of adequacy of the Subcontractor are resolved to the mutual satisfaction of the prime Contractor, Subcontractor, security, and CCAD commander.
1.6. All prospective government and contractor employees are subject to a check of their criminal history prior to being granted access to CCAD. Adverse or derogatory information revealed by these checks, or failure to provide full disclosure, may result in denial of access.
2. Support:
2.1 Security support provided by CCAD to the Contractor includes (if applicable) storage containers for classified information/material, use of base destruction facilities, classified reproduction facilities, use of base classified mail services, security badging, investigation of security incidents, base traffic regulations, use of security forms, and conducting inspections required by DoD 5220.22-R “Industrial Security Regulation”, Army Instruction 380-49 “Industrial Security Program”, AR 380-5 “Department of Army Information Security Program”, and AR 25-2 “Information Assurance” and others as required or deemed necessary by the Government.
2.2 Security support requiring joint Army and Contractor coordination includes packaging classified information, mailing and receiving classified materials, implementing emergency procedures for protection of classified information, security checks, and internal security controls for protection of classified material, sensitive material, and high value pilfer able property.
3. Security Investigation Requirements:
3.1. Investigation requirements including IT level and CAC requirements should be clearly indicated in the contract and Performance Work Statement (PWS) as prescribed in paragraph 4.1303, of the FAR:
Personal Identity Verification of Contractor Personnel
(a) The Contractor shall comply with agency personal identity verification procedures identified in the contract that implement Homeland Security Presidential Directive-12 (HSPD-12), Office of Management and Budget (OMB) guidance M-05-24 and Federal Information Processing Standards Publication (FIPS PUB) Number 201.
(b) The Contractor shall account for all forms of Government-provided identification issued to the Contractor employees in connection with performance under this contract. The Contractor shall return such identification to the issuing agency at the earliest of any of the following, unless otherwise determined by the Government:
(1) When no longer needed for contract performance.
(2) Upon completion of the Contractor employee’s employment.
(3) Upon contract completion or termination.
(c) The Contracting Officer may delay final payment under a contract if the Contractor fails to comply with these requirements.
(d) The Contractor shall insert the substance of this clause, including this paragraph (d), in all subcontracts when the subcontractor’s employees are required to have routine physical access to a Federally-controlled facility and/or routine access to a Federally-controlled information system. It shall be the responsibility of the prime Contractor to return such identification to the issuing agency in accordance with the terms set forth in paragraph (b) of this section, unless otherwise approved in writing by the Contracting Officer.
3.2. Subcontracts; if the Contractor enters into a Subcontractor arrangement with another Contractor, subcontractors must be clearly identified in the contract agreement.
3.3. Contractors must maintain the same level investigation or higher as their civilian counterparts. In the absence of a civilian counterpart, CCAD Security will determine the level of investigation based on a position sensitivity review. Close coordination with the COR and company are required. All documentation required for access to CCAD for classified contracts or IT Level I & II shall be processed through the CCAD Security Personnel Security Office prior to entering CCAD facilities.
3.4. Classified Contracts: An interim clearance must be in place prior to entering CCAD facilities. All documentation (i.e. SF 86, etc.) required for security clearance shall be processed through the Contractor Facility Security Office (FSO).
3.4.1. For all contracts involving employees who require a security clearance for performance of their duties or access to classified material, the Contractor must possess or obtain a facility security clearance prior to performing contract work. If the Contractor does not possess a facility clearance, the Government (Contracting Office) may request one from the Defense Security Service (DSS).
3.4.2. Contractor employees without a clearance level or background check properly indicated in the Joint Personnel Adjudication System (JPAS) or its successor, will not be assigned to this task directly or indirectly. Contractor employee(s) will not be authorized access, regardless of personal clearance, without the facility first being cleared to the appropriate level by Defense Security Service (DSS).
3.4. The Contractor shall request security clearances for personnel requiring access to classified information or IT Level I or II within 15 days after receiving a facility clearance. If the Contractor is already cleared, they shall request security clearances for the personnel within 15 days after contract award. Due to costs involved with security investigations, requests for Contractor employee security clearances shall be kept to an absolute minimum necessary to perform contract requirements.
3.4.1. IT Level I positions; Contractor employees shall have one of the following prior to commencing work: A current, valid Tier 5 investigation or equivalent or “Interim” Top Secret eligibility by Defense Industrial Security Clearance Office (DISCO) indicated in JPAS.
3.4.2. IT Level II positions; Contractor employees shall have one of the following prior to commencing work: A favorably completed Tier 3 investigation or equivalent or “Interim” Secret eligibility by DISCO indicated in JPAS.
3.4.3. IT Level III positions: Contractor employees shall have one of the following prior to commencing work: A favorably completed Tier 3 investigation or equivalent or “Interim” Secret eligibility by DISCO indicated in JPAS.
3.5. Unclassified Contracts requiring IT access: All documentation (i.e. SF 85*, etc.) required for their initial security appointment for unclassified contracts to IT Level III shall be processed through the CCAD Security Personnel Security Office prior to entering CCAD facilities.
3.6. IT Level III positions; Contractor employees requiring access to CCAD Local Area Network (LAN) shall have background investigation processed through CCAD Personnel Security Office. If the Contractor employee does not possess the proper investigation, the Government (Contracting Officer Representative) will request one. The Government assumes costs and initiates non-clearance investigation by submitting the appropriate Personnel Security Investigation request to the Army Center of Excellence. Minimum requirements for CAC issuance and access to the LAN is an initiated investigation with favorable FBI fingerprint check. Due to costs and the inherent delays involved with security investigations, requests for Contractor LAN access shall be kept to an absolute minimum necessary to perform contract requirements.
3.6.1. Fitness Issues: CCAD Security will be notify the Contracting Officer Representative (COR) when discovery of adverse information indicates potentially actionable issues that may disqualify the Contractor employee from access.
3.6.2. OPM Memorandum, Final Credentialing Standards for Issuing Personal Identity Verification Cards under HSPD-12 provides government-wide credentialing standards to be used by all Federal departments and agencies in determining whether to issue or revoke personal identity verification (PIV) cards to employees and contractor personnel.
3.6.3. Whether or not to grant access is the sole discretion of the Government. The decision not to grant access will not be grounds for contract modification and shall not constitute an excuse for Contractor performance failure.
3.7. System Authorization Access Request (SAAR): Prior to system access, a SAAR, DD Form 2875, shall be completed by the Contractor employee. The Contractor employee shall complete Part I, the COR shall complete Part II, and CCAD Personnel Security shall complete Part III.
3.8. Unclassified Contracts NOT requiring IT access: Contracts not requiring access to CCAD LAN shall be subject to installation access requirements that include the Defense Biometric Identification System (DBIDS) and/or guest sponsorship. The COR shall provide the appropriate details and contact information.
4. IT/IA Requirements:
4.1. All contract employees with access to the CCAD network must be registered in the Army Training Certification Tracking System (ATCTS) at commencement of services. Contractors and associated subcontractor employees must also complete DoD IA Awareness Training before they can be granted access to the CCAD network and complete the training annually thereafter.
4.2. All contractors working IA/IT functions must comply with DoD and Army training requirements in DoDD 8570.01, DoD 8570.01-M, and AR 25-2 within 6 months of employment.
4.3. Per DoD 8570.01-M, DFARS 252.239.7001, and AR 25-2, the contractor employees’ supporting IA/IT functions shall be appropriately certified upon contract award. The baseline certification, as stipulated in DoD 8570.01-M, must be completed upon contract award.
5. Foreign Nationals:
5.1. Official Visits: All official foreign visits (visits sponsored by a foreign government) must be based on a legitimate need, be sanctioned by the appropriate foreign attaché or embassy, and approved through Department of Army channels. Access will be coordinated through the CCAD Foreign Disclosure Officer (FDO), COR, and respective NASCC/CCAD security offices.
5.2. Unofficial Visits: These are visits by foreign nationals that are not endorsed by a foreign government. The Contractor will submit a request for employee access, based on a legitimate need, to the appropriate COR. The COR will in turn notify the FDO of the request. Due to security considerations, requests for these types of visits should be kept to a minimum. Foreign nationals will require a government escort at all times while on CCAD property. The COR will ensure the foreign contractor employee provides a copy of their passport to NASCC and CCAD security offices, to ensure the appropriate background checks are completed. NOTE: Properly validated permanent resident alien registration card holders are exempt from this requirement.
6. Notifications: The following information will be submitted to the COR and the CCAD Security Manager on company letterhead, signed by the Contractor Facility Security Officer (FSO) within 15 days of awarding the contract. An updated listing shall be provided quarterly or when the company or an employee’s status or information changes. Electronic equivalents are acceptable. The notification shall include:
a. Name, address, and telephone number of company representatives.
b. Employee's name, last four of social security number, shift.
c. The contract number and contracting agency.
d. The highest level of classified information to which Contractor employees require access.
e. The location(s) of contract performance.
f. The date contract performance begins and terminates.
7. Security Point of Contact: At no cost to the Government, the Contractor shall appoint a senior Contractor employee to serve as an on-site point of contact for any security concerns at the CCAD location. This may be a full time position or an additional duty position.
8. Security Training:
8.1. All contractor employees, including subcontractor employees, requiring access to Army installations, facilities, or controlled access areas shall complete AT Level I awareness training within 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever applies. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee to the COR (or to the contracting officer, if a COR is not assigned) within 30 calendar days after completion of training by all employees and subcontractor personnel. AT Level I awareness training is available at https://atlevel1.dtic.mil/at.
8.2. US-based contractor and subcontractor employees who are required to travel overseas in performance of their duties must receive government provided AT awareness training that is specific to the area of responsibility (AOR), as directed by AR 525-13. Specific AOR training content will be directed by the combatant commander and the unit ATO will ensure an applicable AT foreign travel briefing is provided to the contractor.
8.3. The contractor and all associated subcontractors shall brief all employees on the local iWATCH program. This is a locally developed training is provided by CCAD security and will be used to inform employees of the types of suspicious behavior to watch for and instruct employees to report suspicious activity to the COR. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees’ commencing performance, with the results reported to the COR no later than 30 days after training completion.
8.3.1 Contracts with a scope of work that call for the use of CCAD specific information or equipment at off base locations and facilities must develop an OPSEC Standard Operating Procedure (SOP)/Plan within 90 days of contract award which will be reviewed by the CCAD OPSEC Officer for approval IAW AR 530-1, Operations Security. The SOP/Plan must identify CCAD's critical information, why it needs to be protected, where it is located, who is responsible, and how the contractor intends to protect it. This plan is “For Official Use Only” and must contain appropriate document controls in accordance with AR 25-55, Chapter 4. The plan must be stored in a secure location such as a lockable container and must be properly destroyed when no longer needed in accordance with local CCAD policy CCADR 25-92, Chapter 1, Section 1-6(j).
8.4. IAW AR 530-1, new contractors and associated subcontractors who require a CAC Card and access to the CCAD network must complete Level I OPSEC training within 30 calendar days of reporting for duty and annual OPSEC contractor refresher training, thereafter.
8.5. Threat Awareness Reporting Program Training: Per AR 381-12 Threat Awareness and Reporting Program (TARP), contractor employees must receive annual TARP training presented by a Counterintelligence Special Agent.
9. Pass and Identification Items: The Contractor shall obtain the pass and identification items for employees and Contractor owned vehicles required for contract performance.
10. Retrieving Identification Media: The Contractor shall retrieve all identification media, including vehicle passes from employees who depart for any reason before the contract expires; e.g. terminated for cause, retirement, etc. and surrender to CCAD security through the COR.
11. Weapons, Firearms, and Ammunition: Contractor employees are prohibited from possessing weapons, firearms, or ammunition, on themselves or within their Contractor-owned vehicle or privately- owned vehicle while on
CCAD.
12. Safeguarding Classified or Sensitive Information: Any material marked as Top Secret, Secret, Confidential, For Official Use Only (FOUO) Freedom of Information Act (FOIA), Privacy Act Information, or any other restrictively marked material discovered by the Contractor or Contractor employees will be surrendered at the earliest opportunity to any military or DoD employee of the installation. Under no circumstances will the Contractor retain such material. The Contractor and all Contractor employees will execute a SF 312, Classified Information Non- Disclosure Agreement or equivalent CCAD Non-Disclosure Agreement as directed or required.
12.1. Classified: Visitor Groups will safeguard classified information IAW DoD 5200.1-R, DoD Information Security Program, AR 380-5, Department of the Army Information Security Program, AR 380- 49, Industrial Security Program, and other directives deemed necessary by the Servicing Security Activity (SSA). The contractor shall comply with FAR 52.204-2, Security Requirements. This clause involves access to information classified “Confidential,” “Secret,” or “Top Secret” and requires contractors to comply with—(1) The Security Agreement (DD Form 441), including the National Industrial Security Program Operating Manual (DoD 5220.22-M); any revisions to DOD 5220.22-M, notice of which has been furnished to the contractor.
12.2. Information Systems (IS): All Contractor personnel will protect and restrict access to all documentation (i.e.
maps, test and evaluation results, vulnerability assessments, audits, results, or findings) describing operational IS architectures, designs, configurations, vulnerabilities, address listings, or user information.
12.3. FOR OFFICIAL USE ONLY (FOUO): The Contractor shall comply with DoD 5400.7-R, Chapter 4, DoD Freedom of Information Act (FOIA) Program requirements and AR 25-55, Chapter III and Chapter IV, The Department of the Army Freedom of Information Act Program. These regulations set forth policy and procedures for the disclosure of records to the public and for marking, handling, transmitting, and safeguarding FOUO material.
12.4. Privacy Act: All data associated with this task is covered by the Privacy Act of 1974, Title 5 of the
U.S. Code, Section 552a and applicable CCAD rules and regulations. Violation of the Act may involve the imposition of criminal penalties. Therefore, all Contractor personnel assigned shall take appropriate actions to prevent unauthorized disclosure of Privacy Act information.
12.5. Operations Security (OPSEC): Contractor personnel must protect information that has been designated as critical to the CCAD mission from disclosure. Critical information will only be disseminated on a “need-to-know” basis and not be discussed in public areas such as hallways, bathrooms, eateries, smoke shacks, or any off-base gathering locations. Contractor employees will not pass critical information over unsecured telephones, facsimiles, and/or e-mail outside of the CCAD firewall. All critical/sensitive information being electronically transmitted will be encrypted. Contractor employees will not post critical information on the web, personal “blogs,” or where it is visible to visitors or the public. All information, to include photos, web posts, and captions, must be reviewed by the CCAD Public Affairs Officer (PAO) and the CCAD Operations Security Officer prior to public dissemination.
12.6. Proprietary Information: Information and materials developed at CCAD are considered business sensitive and must be protected from unauthorized disclosure. This information is the sole property of CCAD and must not be revealed or used except in contract performance. Distribution is limited to authorized US Government agencies and identified Contractors. Contractor personnel must receive prior authorization from the CCAD Public Affairs Officer (PAO) and the CCAD Operations Security Officer to disseminate CCAD information.
13. Reporting Requirements: Contractor personnel shall report to an appropriate authority any information or circumstances of which they are aware may pose a threat to the security of personnel, resources, and classified or unclassified defense information. Contractor employees shall be briefed by their immediate supervisor upon initial on-base assignment.
14. Physical Security: The Contractor shall be responsible for safeguarding all Government property and controlled forms provided for Contractor use. At the end of each work period, all Government facilities, equipment, and materials shall be secured.
15. Key Control: The Contractor shall establish and implement methods of making sure all keys issued to the Contractor by the Government are not lost or misplaced and are not used by unauthorized persons. The Contractor shall not duplicate any keys issued by the Government.
15.1. The Contractor shall coordinate with security for the receiving of keys needed to access necessary work spaces.
15.2. The Contractor shall immediately report to security, the Quality Assurance Evaluator (QAE), and Program Manager any occurrences of lost or duplicated keys.
15.3. In the event keys, other than master keys, are lost or duplicated, the Contractor may be required, upon written direction of the contracting officer, to re-key or replace the affected lock or locks at no cost to the Government. The Government may, however, at its option, replace the affected lock or locks or perform re-keying and deduct the cost of such assistance from payment due the Contractor. In the event a master key is lost or duplicated, all locks and keys for that system shall be replaced by the Government and the total cost deducted from payment due the Contractor.
15.4. The contractor shall prohibit the use of any door obstruction and/or the removal of hardware that would prevent a door from securing properly.
15.5. The Contractor shall prohibit the use of keys, issued by the Government, by any persons other than the Contractor’s employees and the opening of locked areas by Contractor employees to permit entrance of persons other than Contractor employees engaged in performance of contract work requirements in those areas.
16. Lock Combinations: The Contractor shall control access to all Government provided lock combinations to preclude unauthorized entry. The Contractor is not authorized to change lock combinations without written approval by the Government Program Manager. Records with written combinations to authorized secure storage containers, secure storage rooms, or certified vaults, shall be marked and safeguarded at the highest classification level as the classified or sensitive material maintained inside the approved containers or room.
17. Other Responsibilities:
17.1. Traffic Rules and Regulations: All personnel will abide by all traffic and parking rules and regulations. Failure to abide may result in issuance of Government citations.
17.1.2. Permission to park company support vehicles within the perimeters of the job must be approved in advance by the COR and Security. Company support vehicles must have company identification.
17.2. Identification: CCAD requires Contractor personnel wear a Government issued identification badge provided by CCAD, NAS, or their representatives. Safety restrictions may require the pass to be removed while working, but it must be worn in plain view, above the waist, when away from the job site. Failure to do so is a violation of security regulations and may result in disciplinary action.
17.3. Visitors: Contractor personnel must clear all visitors in advance through the COR. This includes Contractor personnel and personal guests. All foreign national visitors will be identified to the appropriate authorities, be based on a legitimate need, and are only allowed at the discretion of the installation commander.
17.4. Photography: All photographic or video equipment must be acquired through the COR who will notify PAO prior to purchase for recommendations and acquisition guidelines. The Property Book Officer will be notified upon receipt of the equipment for inventory and bar tagging. Government purchased photographic and video equipment are accountable items and must be added to a property book account. Under no circumstance will contractors, to include subcontractors, use their own electronic devices to take photographic or video images while at CCAD without prior approval from CCAD’s Security Department and/or Public Affairs Office.
17.4.1. Photographs, video, drawings, blueprints, or any other type of rendering or measurements unrelated to contract performance of sensitive areas, such as critical resources, controlled or restricted areas, or other areas deemed sensitive by the Government is strictly prohibited. The Government reserves the right to seize equipment used for unauthorized purposes and the employee and/or Contractor may be debarred from the base, detained, reported and/or remanded to civilian authorities, or have other sanctions placed against them.
17.4.2. Transfer of digitized or electronic photographs, video, drawings, blueprints, or any other type of rendering or measurements must be coordinated/requested through the CCAD information assurance office.
17.5. Weekends /After Duty Hours: Notice of weekend/after duty hours scheduled work must be submitted to Security through the COR. Personnel working weekend or after duty hours must check in and out with Security Building access support to job sites must be arranged with the COR. Keys to areas are obtained by the COR.
Requesting areas to be unlocked by personnel other than contract representatives is not authorized.