STATEMENT OF OBJECIVES
FOR
INSTALL CCTV, LOCKS, AIPHONE SYSTEM
AT
BUILDING 820, ENGLAND AIR PARK, ALEXANDRIA, LA
1.1 DESCRIPTION: The Contractor shall provide all necessary materials to install at Building 820: Install, also vendor shall meet or exceed the manufacturer specifications listed below:
(1) Speco NVR 16 Channel 8TB HDD. NVR will allow IP cameras. Motion Activated and/or Continuous recording options. Remote location viewing through remote computer, smart phone or pad. (parentheses number refers to amount)
(5) Speco IP 4K Bullet Cameras Day/Night High Resolution, 2.7-12mm zoom
(1) Uninterrupted Power Supply/Back up Battery and Power Supply
(1) 16 Port Switch and (2) Wireless transmitter/receivers for cameras.
(1) Wall Mount Cabinet
(1) 19” 4K viewing monitor
(13) Simplex cipher locks provided and installed
(2) Aiphone stainless steel face plate door stations with camera
(2) Aiphone video master stations with door release for offices
(2) Surface mount strike door locks
(1) Access Power Supply and relays.
And, complete installation to include but not limited to wiring, conduit, piping, fasteners, etc.
The Contractor shall provide all equipment necessary for delivery and installation. Below shall be done in accordance with all relevant codes, regulations and manufacturer requirements and be compliant with: Technical Specifications for Construction and Management of Sensitive Compartmented Information Facilities, Version 1.4, IC Tech Spec – for ICD/ICS 705, dated 28 September 2017 or latest version.
1.2 LOCATION; All work on this project is to be performed at 259th ATC for Louisiana Air National Guard (LA ANG) located at England Airpark, 1611 Arnold Dr., Alexandria, LA 71301- 5636 which is accessible from I-49 North or US 165 South, via LA 496.
1.3 WARRANTY: All work including workmanship, material, and equipment (other than Government furnished equipment) shall be warranted for the full period of standard manufacturer’s warranty, but in no case shall be under warranty for a period of less than one (1) year (upon notice from the Contracting Officer of any failure during this warranty period). The part or parts shall be replaced promptly with new parts by and at the expense of the Contractor for workmanship related issue or defects. Whenever the manufacturer of a piece of equipment supplied by the Contractor customarily provides a warranty covering the equipment, the Contractor shall promptly turn over such to the Contracting Officer. All necessary warranty registration shall be filed by the Contractor in the Government’s name. All warranties shall be identified by product with a listing of the name and address of the company and the expiration date of the guarantee or warranty. Copies of Warranties shall be provided to the Facility Manager and Contracting Officer upon completion of installation. The Contractor shall provide verification as to the actual start date of the guarantee or warranty and the points of contact to fulfill warranty concerns. (e.g., date of purchase, date of installation or final acceptance date) for all items being installed that have a guarantee or manufacturer’s warranty.
WRITTEN WARRANTY: The Contractor shall provide specific guarantees required by the specifications for certain portions of the work to be performed under this Contract, the Contractor shall furnish a written warranty for all of the work to be performed under this Contract, against defects in materials based on workmanship for a period of one (1) year from the date of final acceptance of the completed work by the Government.
1.4 SUBMITTAL OF MANUALS & TECHNICAL SPECIFICATIONS: The Contractor shall provide all user and instruction manuals to the Facility Manager and Contracting and Civil Engineering after completion of installation. Turn over all manuals and literature relating to all purchased equipment and other chemicals or other substances tracked by OSHA or EPA. The O&M manuals shall include any specific warranties required by other sections of the technical specifications and other warranties normally provided with the particular piece of equipment or system.