REMOVE AND REPLACE FLOOR COATING BLDG 12
Solicitation number
W912MM17T0077
Issued by

About this file

AMENDMENT 1

View the file

Other files

File Type Posted
QuoteSheet-Bldg12.docx DOCX document
Bldg_12_Floor_Plan.pdf PDF
RFQ-Bldg12.pdf PDF
DeliveryInstall-Bldg12FloorCoating.pdf PDF
Concrete_Moisture_Tests.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT 1

Request for Quote

BLDG 12 FLOOR COATING

W912MM17T0077

1) CLOSING DATE CHANGED: Quotes are now due by 5:00pm CST, Tuesday, October 3rd, 2017.

2) Site Visit: All interested parties are invited to contact Kurt Lunstra at kurtis.lunstra@us.af.mil or 605-988-5933 to schedule and coordinate a site visit. Information discussed at any site visits shall not change/qualify the terms and conditions of the solicitation and specifications; all terms and conditions remain unchanged unless amended in writing.

All site visit information will be released to all eligible offerors on a non-attribution basis. Offerors or quoters are urged and expected to inspect the site where services are to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of contract performance, to the extent that the information is reasonably obtainable. In no event shall failure to inspect the site constitute grounds for a claim after contract award.

3) It is the Government’s intent that the Contractor propose the products and system that or appropriate for the Bldg 12 Floor. The Contractor is responsible for all manufacturer instructions and recommendations for storage, handling, testing, surface preparation, mixing and application instructions.

4) Alternate Proposals: The Government will accept and evaluate alternate proposals (or contractor proposed options) if available; however offerors must also price the project as specified. Alternate proposals should include enough detail for the Government to understand the alternate as well as its benefits.

5) In regards to item 2.6 of “DeliveryInstall-Bldg12FloorCoating”, Media (Shot) blasting may be used as appropriate and Contractor shall be responsible for thorough clean-up due to “FOD hazard” concerns.

//END//