Building 100:
1. Exterior hollow metal door. Do we have to consider replacement of door and frame, or just the door?
RESPONSE: REPLACE DOOR, FRAME, HINGES, ALSO PAINT SHALL BE INCLUDED. REUSE
DOOR LOCK AND KICK PLATES.
2. Does the door closer needs to be considered in that change, or can we use the existing one?
RESPONSE: REPLACE DOOR CLOSER.
Building 110:
1. The scope or work only mention the installation of one (1) downspout. During the site visit we noticed that there was another downspout missing. Shall we include it?
RESPONSE: YES.
Site:
1. Is the replacement of the flag pole included in this scope of work?
If yes, does the footing need to be demolished to construct a new one?
RESPOSE: FLAG POLE SHALL BE INCLUDED, CONSIDER NEW FOUNDATION ONLY IF
EXISTING CAN'T BE REUSED.
2. Item 5 of “Light Poles” section vii, (Install 2 flood lights per pole on new poles, install lights on existing poles). All 11-lighting post are going to have new lighting fixtures or just the damaged bulbs?
RESPONSE: REPLACE LIGHT BULBS IN ALL 11 EXISTING POLES.
3. Item 6 of “Light Poles” section vii, (Install corrosion resistant light mount and brackets for 2 flood lights, aircraft warning light, and security camera per pole). All 11-lighting post are going to have this brackets replaced?
RESPONSE: REPLACE BRACKETS IN 2 LIGHTING POLES ONLY.
4. The aircraft warning light will be installed on all 11 posts or just in the North East Hill Post?
RESPONSE: WARNING LIGHT WILL BE INSTALLED NORTH EAST POLES ONLY.
5. Exhaust fan to be replaced **Exhaust fan will be approved via written submittal after contract award.**
6. Steel Exterior Door, building 100 **Specifications for existing door are unavailable. Door hardware, door panel, and door color will be approved via written submittal after contract award.**
7. The door closer of the exterior door in building 100 will be replaced?
**Replace all hardware on this door to include closer.**
8. The contractor has to provide on office, tool room or portable restroom or the site provides all this facilities? **Contractor to provide modular office space if required & secure tool storage area & portable restroom facilities.**
9. -Should we have to submit a Bid Bond with the proposal and then a payment and Performance Bond? **Payment / Performance Bonds only as required.**
10. St. Croix government request any kind of permit, taxes, etc. to perform jobs in the island? **No additional permits or taxes required for this scope of work.**