National Gaurd Readiness Center-Davenport, Iowa
Solicitation number
W912LP-17-R-0001
Issued by

About this file

Amendment 0002 to W912LP-17-R-0001, National Guard Readiness Center, Davenport, Iowa.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

0011002221 190025

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Amendment 0002 to W912LP-17-R-0001, Readiness Center project -Davenport, Iow a is changed as follow s:

(Continued on Page 2)

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 05-Jul-2017

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912LP-17-R-0001

X 9B. DATED (SEE ITEM 11)

05-Jun-2017

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

05-Jul-2017

CODE

USPFO FOR IOWA

7105 NW 70TH AVE

CAMP DODGE

JOHNSTON IA 50131-1824

W912LP 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912LP-17-R-0001

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

AMENDMENT 0002

1. As a result of the Interim Interviews and questions recieved to date, the Project Requeirements Manual (PRM) for the National Guard Readiness Project-Davenport, Iowa, is hereby amended. Reference Attachment #1, dated June 30, 2017 for changes and/or clarifications.

2. Attachment #2, AF Form 66, Schedule of Material Submittals is hereby incorporated into this Request for Proposal (RFP).

3. Attachment #3, Wage Determination IA170144 has been modified effective 06/30/2017. The updated wage determination replaces Exhibit G of the phase 2 solicitation.

4. Reference the solicitation ‐ Subparagraph 13.4 in section 00100 is hereby deleted. There are no brand name requirements associated with the Fire Alarm System.

5. All other terms and conditions of the solicitation remain unchanged.

Readiness Center Amendment No. 02

Davenport, IA

FEH Project No. 2010207.18 Page 1 of 6

6 0 4 E A S T G R A N D A V E .

D E S M O I N E S , I O W A 5 0 3 09

5 1 5 . 2 8 8. 2 0 0 0

AMENDMENT NO. 02

GENERAL CONTRACT

Readiness Center

Iowa Army National Guard

Project Number: 190025

DATE ISSUED: June 30, 2017

TO ALL BIDDING DOCUMENT HOLDERS OF RECORD:

Acknowledge receipt of this Amendment in the space provided on the Bid Form. Failure to do so may subject

Bidder to disqualification. This Amendment forms a part of the Proposal Documents and modifies them as follows:

1) PROJECT REQUIREMENTS MANUAL ITEMS

a) See attached AF Form 66 – SCHEDULE OF MATERIAL SUBMITTALS for required submittals required by the Government.

b) Clarification / General Information: The following sections were out of order in the PRM CD PDF file, order shall be following table of Contents order:

i) B2

ii) B221

iii) B3

iv) B31 – Attachment A

v) C111

vi) C111 – Attachment A

vii) C121

viii) C121 – Attachment A

ix) C2

x) C221

xi) D – Attachment A

2) Part 2 - General Requirements

a) Clarification: Any reference in any of the Part 2 – General Requirements or Part 3 – 3.4 Performance

Requirements requiring the engineer, architect or designer of record to be registered or licensed in the “State of Iowa” shall be deleted. The professional requirement for the engineer, architect or

ATTACHMENT #1

FEH Project No. 2010207.18 Page 2 of 6

5 1 5 . 2 8 8. 2 0 0 0 designer of record to be registered or licensed shall be in accordance with Part 2 Section “Design

After Award”, paragraph 1.01-C.1.

b) Section 2, 017800 – Design-Build Project Closeout, Article 1.01.F.8.a: Add to article: “Framed

Instructions shall include step-by-step instructions for equipment restart following activation of an

HVAC Shutdown switch described in Section 3.4, D3 under “Emergency Air Distribution Shutoff”.

c) Section 2, 008300 - Design and Construction Procedures: Change Article 1.01.E.4 to read: “Where design analysis is specified to be performed by licensed design professional, provide a design professional registered in accordance with FAR clause as described in Section 2, 010120 - Design

After Award, Article 1.01.C.1.”

d) Section 2, 008300 - Design and Construction Procedures: Article 1.07.B.1.a: Clarification: "A-E

Designer of Record" shall be interpreted to mean "A-E Designer of Record(s) for each area of design discipline".

e) Section 2, 010120 - Design After Award: Article 1.03 - C.g.: Add the following after the first sentence

(after "…… in the review process".) "The Government will consolidate all of the comments and provide one consolidated listing of review comments to the Design Builder with within the

Government designated review period for each submission."

f) Section 2, 014255 - Reference Standards: Change Article 1.03.A to read: "Iowa Army National Guard

Standards: Design Details and Design Standards included throughout the Project Requirements

Manual".

g) Section 2, 014255 - Reference Standards: Clarification: Where "out of date" editions of Reference

Standards have been inadvertently listed, use editions adopted by the Authority Having Jurisdiction up to date of Design Builder’s RFP Initial Proposal.

3) Part 3, Section 3.1 Site & Exterior Facilities:

a) Section 3.1A F.5).b. – Add the following sentence:

“For the Design Builder’s proposal, include this shoulder widening for 400’ along the south side of

Kimberly Road (US HWY 6). Distance measured from your proposed access point to the site heading west. No traffic study is required from the proposer.”

b) Section 3.1-A - Site & Exterior Features, Article F.8).a.: Delete entire article.

c) Section 3.1-A - Site & Exterior Features, Article F.8).e.1.: Delete entire article.

FEH Project No. 2010207.18 Page 3 of 6

5 1 5 . 2 8 8. 2 0 0 0

d) Section 3.1-A - Site & Exterior Features, Article G.2): Clarification: Locking at access control barriers will be accomplished with Owner supplied padlocks. Keys for padlocks will be placed in the

Contractor furnished Knox Box for fire department access. (See Section 3.4, B23 - Exterior Doors).

e) Section 3.1-A, Site & Exterior Facilities, Article I.1).b: Change to read: "Flexible Asphalt Paving

(ACC)”. Clarification: ACC = Asphalt Cement Concrete. PCC = Portland Cement Concrete.

f) Section 3.1-A, Site & Exterior Facilities, Article I.2).a. – Table 1A & 1B: Clarification: Quantities (SY) in Table 1A and Table 1B shall be provided as listed without deviations.

g) Section 3.1-A, Site & Exterior Facilities, Article I.3).b. – Table 2: Clarification: Quantities (SY) in

Table 2 shall be provided as listed without deviations.

h) Section 3.1-A, Site & Exterior Facilities, Article I.4).-Table 3 & Table 4: Clarification: Quantities (SY) in Table 3 and Table 4 shall be provided as listed without deviations except that Table 3 Pavement

Area for Access & Entrance Roads can deviate as Design Builder’s site access road dictates.

i) Section 3.1-A, Site & Exterior Facilities, Article I.2, Table 1A: Clarification: "Trailers" indicates just trailers in lieu of "trucks and trailers".

j) Section 3.1-A, Site & Exterior Facilities, Article J.1).g.2.a: Change to read “Provide black vinyl coated fencing and gates at all fencing running along the south and east portion of the site (all fencing facing

Highway 6 (Kimberly Road) and Wisconsin Ave.)”

k) Section 3.1-A, Site & Exterior Facilities, Article J.1).: Add sentence to end of article). as follows:

“Design Builder shall provide some landscaping between parking that fronts Kimberly Road and

Wisconsin avenue to address City requirements, but quantity is undefined.”

l) Section 3.1-A, Site & Exterior Facilities, Article J.11).g.2.: Add sub-article J.1).g.2.b). as follows: “b)

Perimeter fencing can be set up to the property line (not required), but shall not extend past property line into street right of ways.”

m) Section 3.1-B, Site Relationship Diagram: Clarification: Fuel Truck Containment Area shall be located within the Military Vehicle Parking Compound.

n) Section 3.1-B, Site Relationship Diagram: Clarification: The quantity of "Military Vehicle Paving" indicated in the diagram will vary per the Design/Builders final solution and is part of the "Access &

Entrance Roads" quantity listed in Section 3.1-A, Site & Exterior Facilities, Article I.2, Table 3.

FEH Project No. 2010207.18 Page 4 of 6

4) Part 3, Section 3.2-A Project Book – Interior Spaces:

a) Space 1 – Drill Hall: Add Article 1.D.1). a.: “Per Section 3.4 Section 000111 Article 1.01 – A.2.i.1.:

Maximum occupant load for Plumbing fixture count is 15 SF Per person or 420 occupants for Public events held in the Drill Hall. This occupant load shall govern as it is higher than maximum number of soldiers drilling in the Drill Hall of 274.”

b) Space 2 - Tiered Classroom: Add Article 2.I.2): "Space to be free of interior columns."

c) Space 3 - Classroom #1: Add Article 3.I.2): "Space to be free of interior columns."

d) Space 4 - Classroom #2 Computer Classroom: Add Article 4.I.2): "Space to be free of interior columns."

e) Space 5 - Classroom #3: Add Article 5.I.2): "Space to be free of interior columns."

f) Space 6 - Secured Classroom: Add Article 6.I.3): "Space to be free of interior columns."

g) Space 7 - Multi-Purpose Training (Weapons Simulation) Room: Article 7.D: Clarification: The number of male and female soldiers utilizing the space as a Bunk Room for overnight accommodations shall be limited to the maximum number allowed by code for the space configuration and area provided.

h) Space 7 - Multi-Purpose Training (Weapons Simulation) Room: Delete "NSR" and Add Article 7.I.1): "24' x 56' Training Room to be free of interior columns (including when the operable partition is in open position)".

i) Space 10 – Toilets / Showers: Article 10.I. – Delete “NSR” and add sub-article1) as follows:

“10.I.1) Main female and male restrooms to have walls and overhead structure constructed as a rated storm shelter per the following. References: ICC 500 – 2014;

ICC/NSSA standard for the “Design & Construction of Storm Shelters”. The hardened structural overhead roof framing of the storm shelter component can be separate from the visible roof structural framing system. (Note: FEMA submittals are not required.)”

j) Space 27 Administration Support Room - Clarification: UFC 4-010-01 mail room requirements do not apply to this space or any other space within the Readiness Center.

5) Part 3, Section 3.2-B TEMPLATES – Interior Project Book Spaces:

a) At template drawing 3.2-B Template “J” Office Suite – Generic layout: Change “C.F.C.I.” (two locations) at open planning table & chairs to “G.F.G.I.”

FEH Project No. 2010207.18 Page 5 of 6

6) Part 3, Section 3.4 Performance Requirements:

a) Section 3.4, 000111 - Facility Performance: Article 1.01.C. – Add sub-article 101-C.6. as follows:

“6. There are no PRM requirements for tornado shelters constructed to FEMA standards; however, hardened spaces for shelter are required, by Design Builder at Main Toilet / Shower Space 10.

(See Amendment # 02 for additional Space 10 – Toilets / Showers requirements.)”

b) Section 3.4, 000111 - Facility Performance: Article 1.01.A.2: Clarification: The State Fire Marshal will be the Authority Having Jurisdiction. Submittals shall be made by the Design-Builder to the City of Davenport for communication purposes only. No building permits fees will be charged. City to require grading permit at no costs.

c) Section 3.4, 000111 - Facility Performance: Article 1.01.A.h. - Zoning: Add the Following: “The City of

Davenport zoning will be M-1 Light Industrial. The zoning has a 90’ height restriction, but the City is agreeable to work with the IA ARNG if the height is exceeded.”

d) Section 3.4, A - Substructure Criteria, Article 3.04.A.3: Change to read: "Minimal Wall Thickness: 8 in.

(8 in. nominal for masonry foundation walls where allowed)".

e) Section 3.4, B - Shell, Article 1.01.B.7.g: Add sub-article 1): "Exception: photovoltaic panels and / or solar water heating systems are not required to be concealed from street view".

f) Part 3, Section 3.4 B - Shell, 1.01- D. 1.e.: Delete entire article and replace with the following: "e.

Elements engineered by their manufacturer or fabricator, rather than by the engineer-of-record, are not acceptable for superstructure except that plant cast pre-cast structural concrete elements and open web steel roof joists (or girders) framing systems."

g) Part 3, Section 3.4 B1, 1.01- D. 4.a. 1): Change "Type IV" to "Type II". Add Sentence: "Does not eliminate requirement to meet Standard 19 - Equipment Bracing on page 82 of UFC 4-010-01)".

h) Part 3, Section 3.4 B1, 1.01- D. 4.f. 3): Change Article 1.01. 4.f. 3) last sentence to read: “Engineer to be licensed design professional in accordance with FAR clause as described in Section 2, 010120 -

Design After Award, Article 1.01.C.1.”

i) Section 3.4, B12 - Roofs, Article 1.02 - A.2.: Add sub-article 1.02 - A.2.b.: "Light Gauge Cold Formed

Metal Framing."

j) Section 3.4, B12 - Roofs, Article 1.02 - B.1.: Add sub-article 1.02 - B.1.b.: "Light Gauge Cold Formed

Metal Framing."

FEH Project No. 2010207.18 Page 6 of 6

k) Section 3.4, D22 - Plumbing Fixtures, Article 1.01.F.4.a: Change to read: "All flush valves and faucets to be manual". Delete Article 1.01.F.4.b

l) Section 3.4, D3 -HVAC - Heating, Ventilating, and Air Conditioning – Article 1.02-A.1.: Change to read

“The construction will use a geothermal well system as the primary energy source, augmented as required by other energy sources.”

m) Section 3.4, D3 -HVAC - Heating, Ventilating, and Air Conditioning – Article 1.02-A.2.: Change to read

“The construction will use one or more of the following systems in conjunction with the primary energy source or other energy sources to provide heated/conditioned air to various spaces:”

n) Section 3.4, D3 -HVAC - Heating, Ventilating, and Air Conditioning: Delete Article 1.01.B.3.b.

(Computer (Telecommunications) Room maximum temperature to be per 3.2-A - Interior Space

Program).

o) D34 – Air Distribution, Article 1.01.B.5.e: Change to read: “Physical Fitness Area: 500 cfm (236 L/s)”.

p) D71 – Voice & Data, Delete Article R – Paging System and all sub-articles. This was inadvertently left in when revised paging spec (Article Q) was inserted.

q) D72 – Audio / Visual: Add Article 3.01.F.11: “Construction: Provide laminated 8 1/2” x 11” instructions with photos describing the proper operation of all A/V equipment. Provide one copy attached to each A/V cart.”

r) D92 – Electronic Security Systems, Article 3.01.Q.2.a.3): Change to read: “Door Stations: Model IX-

DA”.

s) D92 – Electronic Security Systems, Attachment B: Replace with revised attached (8 pages).

t) D93 – Special Grounding Systems, Article 1.01.A.1.a.1): Delete reference to radio antenna tower. No tower on this project.

SCHEDULE OF MATERIAL SUBMITTALS

PROJECT No: SOLICITATION/CONTRACT NO.

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

S

U

B

S

T

A

N

T

I

A

T

I

O

N

U

M

B

E

R

ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE,

TYPE OF SUBMITTAL

D e s ig n S u b m it ta l

D ra w in g s

D e s ig n S u b m it ta l

S p e c s

D e s ig n S u b m it ta l

C a lc s

C o d e C h e c k s

R e s p o n s e s

D e s ig n A n a ly s is

L E

E D

S U

B M

IT

T

A L I N

F O

R M

A T

IO

N

S H

O P

D R

A W

IN

G

S

S A

M P

L E

S

C O

L O

R S

E L E

C T

IO

N

M A

N U

F A

C T

U R

E R

'S R

E C

O M

M E

N D

A T

IO

N

S

M A

N U

F A

C T

U R

E R

'S W

A R

R A

N T

Y

C A

T A

L O

G /P

R O

D U

C T

D A

T A

C O

L O

R B

O A

R D

R E

P O

R T

S

C

E R

T

IF

IC

A

T

IO

N

F

C

M P

L

IA

N C

E

O P

E R

A T

IN

G

M

A

IN

T

IN

S T

R U

C T

IO

N

S

S C

H E

D U

L E

S

O T

H E

R A

S N

O T

E D

A S

-B U

IL

T

R E

C O

R D

D R

W G

S /I N

F O

/S P

E C

S

SUB-1

Supplement to the Project Requirements Manual, Article 4.6, Design Builder's Release of Claims X

SUB-2

Design-Builder, Designers, Contractors & Sub-

Contractor Contact List X

SUB-3

PRM Section 010120 Design After Award - Site

Preliminary Design Submittal (to NGB) X

SUB-4

PRM Section 010120 Design After Award / B shell /

D Sitework: SITE Preliminary Design Submittal -

ATFP Analysis Report & Site Plan

X X

SUB-5

PRM Section 010120 Design After Award / A - Site

Preliminary Design Submittal Soil Borings (to NGB) X

SUB-6

PRM Section D - Sitework; Soil Bearing Declaration

Form (Obtain Form from Owner) X

SUB-7

PRM Section 010120 Design After Award /B - Shell -

RC Preliminary Design Package #1 (Non Site) (to

NGB)

X

SUB-8

PRM Section 010120 Design After Award /B - Shell /

D Sitework - RC Preliminary Design Submittal -

RENDERING

X

SUB-9

PRM Section 010120 Design After Award /B - Shell -

RC Preliminary Design Submittal - ATFP Analysis

Report

X

SUB-10

PRM Section 010120 Design After Award /B - Shell -

RC Preliminary Design Submittal Package #2 (Non

Site) (to NGB)

X

SUB-11

PRM Section 010120 Design After Award /B - Shell -

RC Preliminary Design Submittal Package #3 (Non

Site) (to NGB)

X

SUB-12

PRM Section 010120 Design After Award /B - Shell -

RC Preliminary Design Submittal Package #XX

(Non Site) (to NGB)

X

SUB-13

PRM Section 010120 Design After Award /B - Shell -

RC Design Development Submittal Package #1

(Non Site) (to NGB)

X

SUB-14

PRM Section 010120 Design After Award /B - Shell /

D Sitework - RC Design Development Submittal -

RENDERING

X

SUB-15

PRM Section 010120 Design After Award /B - Shell -

RC Design Development Submittal - ATFP Analysis

Report

X

SUB-16

PRM Section 010120 Design After Award /B - Shell -

RC Design Development Submittal Package #2

(Non Site) (to NGB)

X

SUB-17

PRM Section 010120 Design After Award /B - Shell -

RC Design Development Submittal Package #3

(Non Site) (to NGB)

X

SUB-18

PRM Section 010120 Design After Award /B - Shell -

RC Design Development Submittal Package #XX

(Non Site) (to NGB)

X

SUB-19

PRM Section 010120 Design After Award - A/E

Designers of Record X

SUB-20

PRM Section 010120 Design After Award - Site

Preliminary Design Submittal Comments with

Responses

X

SUB-21

PRM Section 010120 Design After Award - RC

Design Development Submittal Package #1

Comments with RESPONSES (Non Site)

X

SUB-22

PRM Section 010120 Design After Award - RC

Design Development Submittal Package #2

Comments with RESPONSES (Non Site)

X

SUB-23

PRM Section 010120 Design After Award - RC

Design Development Submittal Package #3

Comments with RESPONSES (Non Site)

X

SUB-24

PRM Section 010120 Design After Award - RC

Design Development Submittal Package #xx

Comments with RESPONSES (Non Site)

X

SUB-25

PRM Section 010120 Design After Award / A /C-

Site Preliminary Design Submittal -CODE CHECK

& DESIGN ANALYSIS

X

SUB-26

PRM Section 010120 Design After Award / A / C-

RC Design Development Submittal Package #1

(Non Site) -CODE CHECK & DESIGN ANALYSIS X

SUB-27

PRM Section 010120 Design After Award - Site

Const. Doc. Submittal X X X

Provide for each discipline: Architectural, Structural, Mechanical, Plumbing, Electrical, Telecommunications, Fire Protection, Security, Civil, etcetera

Design Builder to Determine Number of Submittal Packages the "Construction Document"

Submittal will be sub-divided into

Provide Code Check as appropriate to each "Design Development" packages

PROJECT TITLE - RC Davenport

Remarks / Comments

Design Builder to Determine Number of Submittal Packages the "Design Development"

Submittal will be sub-divided into

Design Builder to Determine Number of Submittal Packages the "Design Development"

Submittal will be sub-divided into

Preliminary Design & Design Development SUBMITTALS (NOT ALL INCLUSIVE - SEE BELOW FOR OTHER COMPONENTS OF PRELIM. DESIGN SUBMITTALS)

Provide Code Check as appropriate to each "Design Development" packages. Provide systems analysis for each discipline: Architectural, Structural, Mechanical, Plumbing, Electrical, Telecommunications, Fire Protection, Security, Civil, etcetera.

Minimum: Architect, Structural, Civil, Mechanical, Electrical, Plumbing

Number of Responses to Comments to match number of "Design Development" packages

Number of Responses to Comments to match number of "Design Development" packages

Number of Responses to Comments to match number of "Design Development" packages

CONSTRUCTION DOCUMENT SUBMITTALS (NOT ALL INCLUSIVE - SEE BELOW FOR OTHER COMPONENTS OF CONST. DOCUMENT SUBMITTALS)

Design Builder to Determine Number of Submittal Packages the "Design Development"

Submittal will be sub-divided into

Design Builder to Determine Number of Submittal Packages the "Design Development"

Submittal will be sub-divided into

Design Builder to Determine Number of Submittal Packages the "Design Development"

Submittal will be sub-divided into

Number of Responses to Comments to match number of "Design Development" packages

Miscellaneous

Design Builder to Determine Number of Submittal Packages the "Design Development"

Submittal will be sub-divided into

Provide for each discipline: Architectural, Structural, Mechanical, Plumbing, Electrical, Telecommunications, Fire Protection, Security, Civil, etcetera

Design Builder to Determine Number of Submittal Packages the "Design Development"

Submittal will be sub-divided into

Design Builder to Determine Number of Submittal Packages the "Design Development"

Submittal will be sub-divided into

ATTACHMENT #2

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

S

U

B

S

T

A

N

T

I

A

T

I

M

B

E

R

ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE,

TYPE OF SUBMITTAL

D e s ig n S u b m it ta l

D ra w in g s

D e s ig n S u b m it ta l

S p e c s

D e s ig n S u b m it ta l

C a lc s

C o d e C h e c k s p o n s e s

D e s ig n A n a ly s is

L E

E D

S U

B M

IT

T

A L I N

F O

R M

A T

IO

N

S H

O P

D R

A W

IN

G

S

S A

M P

L E

S

C O

L O

R S

E L E

C T

IO

N

M A

N U

F A

C T

U R

E R

'S R

E C

O M

M E

N D

A T

IO

N

S

M A

N U

F A

C T

U R

E R

'S W

A R

R A

N T

Y

C A

T A

L O

G /P

R O

D U

C T

D A

T A

C O

L O

R B

O A

R D

R E

P O

R T

S

C

E R

T

IF

IC

A

T

IO

N

M P

L

IA

N C

E

O P

E R

A T

IN

G

M

A

IN

T

IN

S T

R U

C T

IO

N

S

S C

H E

D U

L E

S

O T

H E

R A

S N

O T

E D

A S

-B U

IL

T

R E

C O

R D

D R

W G

S /I N

F O

/S P

E C

S

PROJECT TITLE - RC Davenport

Remarks / Comments

SUB-28

PRM Section 010120 Design After Award - Site

Preliminary Design Submittal -CODE CHECK &

DESIGN ANALYSIS

X

SUB-29

PRM Section 010120 Design After Award - Site

Const. Doc. Submittal Comments with Responses X

SUB-30

PRM Section 010120 Design After Award - RC

Const. Doc. Submittal X X X

SUB-31

PRM Section 010120 Design After Award / C1 - RC

Const. Doc. INTERIOR DESIGN Submittal X X X

SUB-32

PRM Section 010120 Design After Award - 1.03.F.4 -

Color Board Submittal X X X

SUB-33

PRM Section 010120 Design After Award / A / C /

C1 - RC Design Development Submittal Package #1

(Non Site) -CODE CHECK & DESIGN ANALYSIS X

SUB-34

PRM Section 010120 Design After Award - RC

Const. Doc. Submittal Comments with Responses X

SUB-35

PRM Section 010120 Design After Award /B - Shell -

RC Const. Doc. EXTERIOR DESIGN / Appearance

Submittal

X X X

SUB-36

PRM Section 010120 Design After Award - RC

Const. Doc. Submittal X X X

SUB-37

PRM Section 010120 Design After Award / C1 - RC

Const. Doc. INTERIOR DESIGN Submittal X X X

CONSTRUCTION DOCUMENT FINAL

SUBMITTALS

SUB-38

PRM Section 010120, 017800 - Site Const. Doc.

Final Submittal X X

SUB-39

PRM Section 010120, 017800 /B - Shell - RC Const.

Doc. Final Submittal X X

SUB-40

PRM Section 010120 Design After Award / A/B- RC

Construction Document Final Submittal Package #1

(Non Site) -CODE CHECK & DESIGN ANALYSIS

X

FINAL CONSTRUCTION DOCUMENT

SUBMITTALS - (RECORD DOCUMENTS)

SUB-41

PRM Section 010120, 017800 - Site Record

Document Submittal X X

SUB-42

PRM Section 017800 - Site Utility Locates for Owner to track w/ GPS X

SUB-43

PRM Section 010120, 017800 /B - Shell - RC

Record Document Submittal X X

SUB-44

PRM Section 010120 Design After Award / A/B- RC

Record Document Entire Facility Project (Non Site) X

SUB-45

PRM Section 010120, 017800 - Final Const. Doc. -

Electronic Submittal X X

SUB-46

PRM Section 010120, 017800 - Final Electronic

Website Electronic Document Submittal X X X X X X X

Other Requirements

SUB-47

PRM Section 013200 - Preliminary Project /

Construction Schedule X

SUB-48

PRM Section 013200 - Initial Progress Report

Breakdown for Approval X

SUB-49

PRM Section 013200 / 013300 - Substantiation

Submittal Schedule on AF Form 66 X

SUB-50

PRM Section 014510 - Contractor QC - Contractor

Quality Control (CQC) Plan & Organization X

SUB-51

PRM Section 014510 - Contractor QC - Testing

Agency / Inspection Agency Qualifications X

SUB-52

PRM Section 014510 - Contractor QC - DB's Pre-

Final Inspection (Punchlist) - SITE X

SUB-53

PRM Section 014510 - Contractor QC - DB's Final

Inspection (Punchlist) - SITE X

SUB-54

PRM Section 014510 - Contractor QC -DB's Pre-

Final Inspection (Punchlist) - RC X

SUB-55

PRM Section 014510 - Contractor QC - DB's Final

Inspection (Punchlist) - RC X

SUB-56

PRM Section 017419 - 1.06 -Waste Management

Plan X

SUB-57

PRM Section 017419 - 1.05 - A.1 - Waste Reduction

Progress Report X

SUB-58

PRM Section 017419 - 1.05 - A.2 - Waste Reduction

Final Report X

SUB-59

PRM Section 017800 / 000111 - DB Project

Closeout - Energy Rebate Forms / Financial

Incentives

X

SUB-60

PRM Section 017800 - DB Project Closeout - Real

Property Equipment List Information X

Provide Code Check as appropriate to each "Design Development" packages. Provide systems analysis for each discipline: Architectural, Structural, Mechanical, Plumbing, Electrical, Telecommunications, Fire Protection, Security, Civil, etcetera.

Design Builder to Determine Number of Submittal Packages the "Construction Document"

Submittal will be sub-divided into

Design Builder to Determine Number of Submittal Packages the "Construction Document"

Submittal will be sub-divided into

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

S

U

B

S

T

A

N

T

I

A

T

I

M

B

E

R

ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE,

TYPE OF SUBMITTAL

D e s ig n S u b m it ta l

D ra w in g s

D e s ig n S u b m it ta l

S p e c s

D e s ig n S u b m it ta l

C a lc s

C o d e C h e c k s p o n s e s

D e s ig n A n a ly s is

L E

E D

S U

B M

IT

T

A L I N

F O

R M

A T

IO

N

S H

O P

D R

A W

IN

G

S

S A

M P

L E

S

C O

L O

R S

E L E

C T

IO

N

M A

N U

F A

C T

U R

E R

'S R

E C

O M

M E

N D

A T

IO

N

S

M A

N U

F A

C T

U R

E R

'S W

A R

R A

N T

Y

C A

T A

L O

G /P

R O

D U

C T

D A

T A

C O

L O

R B

O A

R D

R E

P O

R T

S

C

E R

T

IF

IC

A

T

IO

N

M P

L

IA

N C

E

O P

E R

A T

IN

G

M

A

IN

T

IN

S T

R U

C T

IO

N

S

S C

H E

D U

L E

S

O T

H E

R A

S N

O T

E D

A S

-B U

IL

T

R E

C O

R D

D R

W G

S /I N

F O

/S P

E C

S

PROJECT TITLE - RC Davenport

Remarks / Comments

SUB-61

PRM Section B3 Roofing - RC - Roof Manufacture

Report: Project Closeout X

SUB-62

PRM Section 017800 - DB Project Closeout - HVAC

Testing & Balance Report X

SUB-63

PRM Section 017800 - DB Project Closeout -

Operation & Maintenance Manuals X

SUB-64

PRM Section 017800 - DB Project Closeout -Field

Training Instructions X

SUB-65

PRM Section 017800 - DB Project Closeout -Field

Training Instruction Video Recording X

SUB-66

PRM Section 017800 - DB Project Closeout -

1.01.B.1.C.2 - Photos X

SUB-67

PRM Section 017800 - DB Project Closeout -

Attachment A - Project Closeout Checklist X

SUB-68

PRM Section 017800 - DB Project Closeout -List of

Extra Materials X

SUB-69

PRM Section 017800 - DB Project Closeout -

Attachment B - Backflow Test Report X

SUB-70

PRM Section 017800 - DB Project Closeout -

Attachment C & D - Water Dist. Service Form "A" &

Form "B" X

SUB-71

PRM Section 017800 - DB Project Closeout -

Attachment E - High Potential Test X

SUB-72

PRM Section 017800 - DB Project Closeout -

Attachment F -Notice of Final Stabilization X

SUB-73

PRM Section 017800 - DB Project Closeout -

Attachment G -Kitchen Equip . Sched. Of Values X

SUB-74

PRM Section 000111 - Facility Performance - LEED

Checklist - Design Development X

SUB-75

PRM Section 000111 - Facility Performance - LEED

Checklist - Construction Document Submittal X

SUB-76

PRM Section 000111 - Facility Performance - LEED

Certification - SILVER X

SUB-77

PRM Section 000111 - Facility Performance - LEED

Certification Plaque - SILVER X

SUB-78

PRM Section 000111 - Facility Performance / E 12

Equip - RC Design Development: Kitchen Equip

Layout and workflow X

SUB-79

PRM Section 000111 - Facility Performance / E 12

Equip - RC Construction Documents: Kitchen Equip

Specs

X

SUB-80

PRM Section 000111 - Facility Performance / A / B

Shell / C Interiors - RC Construction Documents:

Sealed Structural Calculations X

SUB-81

PRM Section 000111 - Facility Performance - RC

Design Development: Electrical Lightning Hazard

Analysis X X

SUB-82

PRM Section 000111 - Facility Performance - RC

Construction Documents: Sealed Electrical Lightning

Hazard Calculations & Drawings / Details X X

SUB-83

PRM Section 000111 - Facility Performance -

Commissioning: Electrical Lightning Hazard

Continuity tests X

SUB-84

PRM Section 000111 - Facility Performance -

Commissioning: Electrical Lightning Hazard

Certification of Compliance X

SUB-85

PRM Section 000111 - Facility Performance -

Closeout: Electrical Lightning Hazard O&M and

Record Drwgs

X X

SUB-86

PRM Section 000111 - Facility Performance / B

Shell - Life Cycle Cost of Project (70 YRS) Design

Development

X

SUB-87

PRM Section 000111 - Facility Performance - RC -

Space Area Calculations Gross To Net Efficiencies

Design Development Submittal X

SUB-88

PRM Section 000111 - Facility Performance - RC -

Energy Efficiency Criteria & Costs / Mech. Eng

Sealed: - Design Development Submittal X

SUB-89

PRM Section 000111 - Facility Performance - RC -

Energy Efficiency Criteria & Costs / Mech. Eng

Sealed: - Construction Document Submittal X

SUB-90

PRM Section 000111 - Facility Performance - Ease of Operation: Construction Documents X

SUB-91

PRM Section 000111 - Facility Performance - Fire

Marshal Building Code Inspections: Construction

Closeout

X

- Updated impact analysis based on actual products

70 Year Life Cycle / Durability

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

S

U

B

S

T

A

N

T

I

A

T

I

M

B

E

R

ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE,

TYPE OF SUBMITTAL

D e s ig n S u b m it ta l

D ra w in g s

D e s ig n S u b m it ta l

S p e c s

D e s ig n S u b m it ta l

C a lc s

C o d e C h e c k s p o n s e s

D e s ig n A n a ly s is

L E

E D

S U

B M

IT

T

A L I N

F O

R M

A T

IO

N

S H

O P

D R

A W

IN

G

S

S A

M P

L E

S

C O

L O

R S

E L E

C T

IO

N

M A

N U

F A

C T

U R

E R

'S R

E C

O M

M E

N D

A T

IO

N

S

M A

N U

F A

C T

U R

E R

'S W

A R

R A

N T

Y

C A

T A

L O

G /P

R O

D U

C T

D A

T A

C O

L O

R B

O A

R D

R E

P O

R T

S

C

E R

T

IF

IC

A

T

IO

N

M P

L

IA

N C

E

O P

E R

A T

IN

G

M

A

IN

T

IN

S T

R U

C T

IO

N

S

S C

H E

D U

L E

S

O T

H E

R A

S N

O T

E D

A S

-B U

IL

T

R E

C O

R D

D R

W G

S /I N

F O

/S P

E C

S

PROJECT TITLE - RC Davenport

Remarks / Comments

SUB-92

PRM Section 000111 - Facility Performance - Fire

Marshal Electrical Code Inspections: Construction

Closeout

X

SUB-93

PRM Section 000111 - Facility Performance - Fire

Marshal Boiler Code Inspections: Construction

Closeout

X

SUB-94

PRM Section 000111 - Facility Performance - Fire

Marshal Elevator Code Inspections: Construction

Closeout

X

SUB-95

PRM Section A - Sub-Structure / B - Shell: Thermal

Performance/ Cont. Insulation- Construction

Document Submittal X

SUB-96

PRM Section A - Sub-Structure: Radon Filed Testing

Report - Record Document Submittal X

SUB-97

PRM Section A/B : Water Penetration System

Identification - Preliminary Design Submittal X

SUB-98

PRM Section A Sub-Structure / B Shell: Water

Penetration System Details - Construction

Document Submittal

X

SUB-99

PRM Section A Floors On grade - RC - Energy

Efficiency Edge of Slab / Mech. Eng Sealed: -

Design Development Submittal

X

SUB-100

PRM Section B - Shell: Thermal Performance -

Design Development Submittal X

SUB-101 PRM Section B Shell - RC- Accidental Injury: X

SUB-102

PRM Section B Shell - RC - Ventilation of Special

Spaces: Design Development X X

SUB-103

PRM Section B Shell - RC - Impact resistance:

Design Development X

SUB-104

PRM Section B Shell - RCS - Moisture Vapor Barrier transmission: Design Development X X

SUB-105

PRM Section B Shell - RC - Wear resistance:

Design Development X X

SUB-106

PRM Section B Shell - RC - ATFP Window System

& Window Frame Anchorages: Design Development X X X

SUB-107

PRM Section B22 WNDWS& Openings - RC -

Window / Louver / Intake System Water Resistance

/ Air leakage: Construction Documents

X

SUB-108

PRM Section B15 Bridge Crane - Crane Load Tests:

Construction Closeout X

SUB-109

PRM Section B22 WNDWS& Openings - RC -

Window / Louver / Intake System Water Resistance

/ Air leakage: Construction Documents

X

SUB-110

PRM Section B23 Exterior Doors - RC - Door hardware: Construction Documents X X X

SUB-111

PRM Section B23 Exterior Doors - 1.01-C.3.b.3).(f) -

Door hardware - Interchangeable core Biting List w/

Set-Up Chart

X

SUB-112

PRM Section B23 Exterior Doors - RC - Doors &

Frames: Construction Documents X X X

SUB-113

PRM Section B23 Exterior Doors - RC- Hardware

Consultant Installation Report: Project Closeout X

SUB-114

PRM Section B3 Roofing - RC - Roof Assemblies

Construction: Design Development X X

SUB-115

PRM Section B3 Roofing - RC - Roof Warranties -

Each system: Project Closeout X

SUB-116

PRM Section B31 Roof Covering - RC - Gutter /

Downspout & Roof Drain Capacity Calculations:

Design Development X

SUB-117

PRM Section B32 Roof Openings - RC - Roof

Openings / Skylight System Water Resistance / Air leakage: Construction Documents X X

SUB-118

PRM Section C Interiors - RC - Natural Light

Calculations: Design Development Submittal X

SUB-119

PRM Section C Interiors - RC - Natural Light

Updated Calculations & details: Construction

Documents X X

SUB-120

PRM Section C Interiors - RC - Acoustical

Calculations / Modeling: Design Development X

By licensed mechanical engineer

Pedestrian Vehicle Protection / Ice & Snow Protection for Pedestrian/ Occupants / vehicles

Materials, moisture barriers, air barriers, warranties

- Tiered Classroom, Drill hall. Secured Classroom

Identification of building elements to resist impacts and materials used

Identification of moisture barrier and materials used

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

S

U

B

S

T

A

N

T

I

A

T

I

M

B

E

R

ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE,

TYPE OF SUBMITTAL

D e s ig n S u b m it ta l

D ra w in g s

D e s ig n S u b m it ta l

S p e c s

D e s ig n S u b m it ta l

C a lc s

C o d e C h e c k s p o n s e s

D e s ig n A n a ly s is

L E

E D

S U

B M

IT

T

A L I N

F O

R M

A T

IO

N

S H

O P

D R

A W

IN

G

S

S A

M P

L E

S

C O

L O

R S

E L E

C T

IO

N

M A

N U

F A

C T

U R

E R

'S R

E C

O M

M E

N D

A T

IO

N

S

M A

N U

F A

C T

U R

E R

'S W

A R

R A

N T

Y

C A

T A

L O

G /P

R O

D U

C T

D A

T A

C O

L O

R B

O A

R D

R E

P O

R T

S

C

E R

T

IF

IC

A

T

IO

N

M P

L

IA

N C

E

O P

E R

A T

IN

G

M

A

IN

T

IN

S T

R U

C T

IO

N

S

S C

H E

D U

L E

S

O T

H E

R A

S N

O T

E D

A S

-B U

IL

T

R E

C O

R D

D R

W G

S /I N

F O

/S P

E C

S

PROJECT TITLE - RC Davenport

Remarks / Comments

SUB-121

PRM Section C Interiors - RC - Acoustical Sealed

Engineering Calculations: Construction Documents X

SUB-122

PRM Section C Interiors - RC - Acoustical Test reports: Construction Documents X

SUB-123

PRM Section C Interiors - Warranty for all Interior

Products: Closeout X

SUB-124

PRM Section C1 Interior Construction; STC Values for major building elements: Design Development X

SUB-125

PRM Section C1 Interior Construction; STC Values

Proven in use STC Values for wall details: Design

Development X

SUB-126

PRM Section C1 Interior Construction; STC Values

Field test: Construction Closeout X

SUB-127

PRM Section C1 Interior Construction; Operations and Maintenance - material resistance to chemical cleaning: Design Development X

SUB-128

PRM Section C12 Interior Doors - RC - Door hardware: Construction Documents X X X

SUB-129

PRM Section C12 Interior Doors - RC - Doors &

Frames: Construction Documents X X X

SUB-130

PRM Section C12 Interior Doors - RC- Hardware

Consultant Installation Report: Project Closeout X

SUB-131

PRM Section C2 Interior Fixtures - RC - Product data on interior fixture hardware & movable components: Design Development X

SUB-132

PRM Section C2 Interior Fixtures - RC - Details of interior fixture hardware & movable components:

construction Documents X X

SUB-133

PRM Section C23 Window Treatment - RC -

Product data on window treatments: construction

Documents

X X

SUB-134

PRM Section C24 Accessory Fixtures - RC - A/V

Equipment layout / space layouts: Design

Development

X

SUB-135

PRM Section C24 Accessory Fixtures - RC - A/V

Projection Screen / Surfaces Suitability Certification:

Construction Documents

X

SUB-136

PRM Section D Services - RC - Overall Lighting

Scheme & lamps: Design Development X X

SUB-137

PRM Section D Services - RC - Lighting

Calculations - Sealed by Engineer: Construction

Documents

X

SUB-138

PRM Section D Services - RC - Vibration Isolation detail methods: Construction Documents X X

SUB-139

PRM Section D Services - RC - Fire rated Wall penetrations details & UL Labels: Construction

Documents

X X

SUB-140

PRM Section D Services - RC - Mechanical, Plumbing and Electrical system Structural Support details & Engineering as Req'd: Construction

Documents

X X X

SUB-141

PRM Section D Services - RC - Mechanical, Plumbing and Electrical system Engineering

Calculations: Design Development

X

SUB-142

PRM Section D Services - RC - Mechanical, Plumbing and Electrical system Complete Details:

Construction Documents

X

SUB-143

PRM Section D Services / D3 HVAC - RC -

Mechanical, Plumbing and Electrical Functional

Performance testing: Construction Closeout

X

SUB-144

PRM Section D Services - RC - Mechanical, Plumbing and Electrical - Identification of Systems to be Commissioned: Design Development

X

SUB-145

PRM Section D Services - RC - Mechanical, Plumbing and Electrical - Training & Demonstration

Schedule: Construction

X

- Tiered Classroom, Drill hall. Secured Classroom

- Tiered Classroom, Drill hall. Secured Classroom

Water and Drainage, HVAC, Fire Suppression, Electrical, Telecommunications

Wood Doors - Lifetime, Ceilings 15yrs - Humidity, Flooring 10 years functional warranty, other interiors - 15 years functional warranty.

Toilet rooms , janitorial rooms, kitchens, etcetera

Water and Drainage, HVAC, Fire Suppression, Electrical, Telecommunications

In-put and Out-Put: Water and Drainage, HVAC, Fire Suppression, Electrical, Telecommunications

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

S

U

B

S

T

A

N

T

I

A

T

I

M

B

E

R

ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE,

TYPE OF SUBMITTAL

D e s ig n S u b m it ta l

D ra w in g s

D e s ig n S u b m it ta l

S p e c s

D e s ig n S u b m it ta l

C a lc s

C o d e C h e c k s p o n s e s

D e s ig n A n a ly s is

L E

E D

S U

B M

IT

T

A L I N

F O

R M

A T

IO

N

S H

O P

D R

A W

IN

G

S

S A

M P

L E

S

C O

L O

R S

E L E

C T

IO

N

M A

N U

F A

C T

U R

E R

'S R

E C

O M

M E

N D

A T

IO

N

S

M A

N U

F A

C T

U R

E R

'S W

A R

R A

N T

Y

C A

T A

L O

G /P

R O

D U

C T

D A

T A

C O

L O

R B

O A

R D

R E

P O

R T

S

C

E R

T

IF

IC

A

T

IO

N

M P

L

IA

N C

E

O P

E R

A T

IN

G

M

A

IN

T

IN

S T

R U

C T

IO

N

S

S C

H E

D U

L E

S

O T

H E

R A

S N

O T

E D

A S

-B U

IL

T

R E

C O

R D

D R

W G

S /I N

F O

/S P

E C

S

PROJECT TITLE - RC Davenport

Remarks / Comments

SUB-146

PRM Section D Services - RC- Mechanical, Plumbing and Electrical - Equipment Service

Schedule / List: Closeout

X

SUB-147

PRM Section D2 Water & Drainage - Site - Pressure

& Flow Tests Reports: Design Development X

SUB-148

PRM Section D2 Water & Drainage - Site - Pump

Equipment Pump Curves: Construction Documents X

SUB-149

PRM Section D2 Water & Drainage - Site - Pressure

& Flow Tests Reports: Construction X

SUB-150

PRM Section D2 Water & Drainage / G3 Site

Services - Site - Piping Design Calculations: Design

Development

X

SUB-151

PRM Section D2 Water & Drainage -Water Flow -

Field Water tight Pressure Test Reports of Piping:

Construction Documents

X

SUB-152

PRM Section D2 Water & Drainage - Site - Water

Flow - Functional Fixtures / Equip. Tests Reports:

Construction

X

SUB-153

PRM Section D2 Water & Drainage - Waste Piping -

Drainage Piping Design Calculations: Design

Development

X

SUB-154

PRM Section D2 Water & Drainage / G3 Site

Services - Site - Waste Piping Flow - Functional

Fixtures / Equip. Tests Reports: Construction

X

SUB-155

PRM Section D2 Water & Drainage - Rain Water

Piping - Drainage Piping Design Calculations:

Design Development

X

SUB-156

PRM Section D2 Water & Drainage / G3 Site

Services - Site - Rain Water Piping Flow -

Functional Fixtures / Equip. Tests Reports:

Construction

X

SUB-157

PRM Section D2 Water & Drainage / G3 Site

Services - Site - Piping Design Layout & Details:

Construction Documents

X X X

SUB-158

PRM Section D21 Water Supply - RC - ARNG

Backflow Device Tests Reports: Construction X

SUB-159

PRM Section D22 Plumbing Fixtures -

Manufacturers Warranty - Flush Valves (20 yrs) &

Faucet Valves (20 yrs):Construction Closeout

X

SUB-160

PRM Section D24 Sanitary Waste - Interceptors, Maint Cleanout Schedule ( 3months min.) and

Location: Design Development

X X X

SUB-161

PRM Section D3 HVAC / D34 - Measure and

Correction of Spaces with Unacceptable

Temp/Humidity/Air Distribution: Construction

Closeout

X

SUB-162

PRM Section D3 HVAC - Identification of Equip that

Requires Redundancy: Design Development X

SUB-163

PRM Section D3 HVAC - Geothermal Project

Record Documents: Construction Closeout X

SUB-164

PRM Section D31 Energy Supply - Identify Equip using Fuel & fuel distribution system: Design

Development

X X

SUB-165

PRM Section D31 Energy Supply - Functional

Performance testing of proper fuel, ventilation and combustion: Construction Closeout

X

SUB-166

PRM Section D33 Refrigeration / D34 Air Dist. / D35

Hydronic - Acoustical Performance, Cooling Loads, Energy Efficiency (EER), Design Criteria, Design

Calculations: Design Development

X

SUB-167

PRM Section D33 Refrigeration - Refrigeration

Equip Product Data - Certified: Construction X

SUB-168

PRM Section D36 HVAC Controls - Occupancy types, Zones, Equip for each zone; Product Data:

Design Development

X X X

SUB-169

PRM Section D36 HVAC Controls - Testing &

Balancing Report: Construction Closeout X

SUB-170

PRM Section D4 Fire Protection - Fire Protection

Areas Identification & Risers, Equipment and

Product Data: Design Development

X X

SUB-171

PRM Section D4 Fire Protection - Functional

Performance Test Reports per Code: Construction

Closeout

X

SUB-172

PRM Section D41 Fire Sprinkler/Extinguishing -

Sprinkler System Type, Water Supply/Routing for

Sprinklers: Design Development

X

SUB-173

PRM Section D41 Fire Sprinkler/Extinguishing -

Sprinkler Test Reports: Construction Closeout X

SUB-174

PRM Section D41 Fire Sprinkler/Extinguishing -

Plans submitted Reviewing Authority: Construction

Closeout

X

2 hour test at 110% design pressure submit to Fire Marshal's Office submit to Fire Marshal's Office

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

S

U

B

S

T

A

N

T

I

A

T

I

M

B

E

R

ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE,

TYPE OF SUBMITTAL

D e s ig n S u b m it ta l

D ra w in g s

D e s ig n S u b m it ta l

S p e c s

D e s ig n S u b m it ta l

C a lc s

C o d e C h e c k s p o n s e s

D e s ig n A n a ly s is

L E

E D

S U

B M

IT

T

A L I N

F O

R M

A T

IO

N

S H

O P

D R

A W

IN

G

S

S A

M P

L E

S

C O

L O

R S

E L E

C T

IO

N

M A

N U

F A

C T

U R

E R

'S R

E C

O M

M E

N D

A T

IO

N

S

M A

N U

F A

C T

U R

E R

'S W

A R

R A

N T

Y

C A

T A

L O

G /P

R O

D U

C T

D A

T A

C O

L O

R B

O A

R D

R E

P O

R T

S

C

E R

T

IF

IC

A

T

IO

N

M P

L

IA

N C

E

O P

E R

A T

IN

G

M

A

IN

T

IN

S T

R U

C T

IO

N

S

S C

H E

D U

L E

S

O T

H E

R A

S N

O T

E D

A S

-B U

IL

T

R E

C O

R D

D R

W G

S /I N

F O

/S P

E C

S

PROJECT TITLE - RC Davenport

Remarks / Comments

SUB-175

PRM Section D43 Fire Detection/Alarm - System

Description Outline, interfaces, functions, details of input & output devices, capacities, manufacturer:

Design Development

X X

SUB-176

PRM Section D43 Fire Detection/Alarm - Plan layout of devices / system: Design Development X

SUB-177

PRM Section D43 Fire Detection/Alarm - FINAL

Plan layout of devices / system: Construction

Closeout X

SUB-178

PRM Section D43 Fire Detection/Alarm - Complete

Functional Performance Testing: Construction

Closeout X

SUB-179

PRM Section D5 Electrical Power - Complete

Functional Performance Testing: Construction

Closeout

X

SUB-180

PRM Section D5 Electrical Power - Circuit

Identification / Dedicated Circuits / Noise Protection

Circuits / Surge Protection: Design Development X X

SUB-181

PRM Section D5 Electrical Power - Correction of

Spaces with Unacceptable Elect Distribution / disturbances: Construction Closeout X

SUB-182

PRM Section D5 Electrical Power - ARC Flash

Analysis Report: Construction Closeout X

SUB-183

PRM Section D51 Generator - Generator Load

Tests: Construction Closeout X

SUB-184

PRM Section D52 Power Distribution - Identification of voltages, amps, major equip. , spare capacity, single line diagrams: Design Development X X

SUB-185

PRM Section D52 Power Distribution - Riser diagram Calculations / Equip. characteristics:

Construction Closeout X X X

SUB-186

PRM Section D61 Interior Lighting - Lighting

Calculations: Construction Documents X

SUB-187

PRM Section D62 Exterior Lighting - Lighting

Schemes and fixture / lamp types: Design

Development

X X

SUB-188

PRM Section D62 Exterior Lighting - Lighting

Calculations: Construction Documents X

SUB-189

PRM Section D62 Exterior Lighting - Lighting Levels

Field Measurement Verification: Construction

Closeout

X

SUB-190

PRM Section D62 Exterior Lighting - Pole Mounted

Lights Structural Support details & Engineering as

Req'd: Construction Documents

X X

SUB-191

PRM Section D7 Telecommunications - Complete

Continuity Testing and Functional Performance

Testing: Construction Closeout

X

SUB-192

PRM Section D71 Telecommunications - As-Built

Voice & Data Plans at each Patch Panel : Record

Documents X

SUB-193

PRM Section D72 A/V Equipment - Laminated

Instructions for A/V Equipment : Record Documents X

SUB-194

PRM Section D92 ESS Equipment - Laminated ESS

Drawing Sheets : Record Documents X

SUB-195

PRM Section D94 Cathodic Protection - Identify

Elements requiring Protection & Commissioning

Tests to verify achievement of protection: Design

Development

X

SUB-196

PRM Section E / E1 / E11 - Equipment &

Furnishings - Product Data Submittals: Construction

Documents

X

SUB-197

PRM Section E / E1 / E11 - Equipment &

Furnishings - Product Data Submittals: Construction

Documents

X

SUB-198

PRM Section E4 Fire Protection Specialties -

Extinguisher type & locations, Travel distances:

Design Development

X X

SUB-199

PRM Section G - Sitework; Landscaping / Plants

Maintenance Program: Construction Closeout X

SUB-200

PRM Section G - Sitework;Low Impact Development

Report X

SUB-201

PRM Section G2 / G23 - Site Improvements;

Landscaping / Plant Types Schedule: Design

Development

X

Includes loading dock equipment, equipment layout, (Surge Protection for servers, fire alarm panel, telephone system, security equipment & others as indicated)

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

S

U

B

S

T

A

N

T

I

A

T

I

M

B

E

R

ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE,

TYPE OF SUBMITTAL

D e s ig n S u b m it ta l

D ra w in g s

D e s ig n S u b m it ta l

S p e c s

D e s ig n S u b m it ta l

C a lc s

C o d e C h e c k s p o n s e s

D e s ig n A n a ly s is

L E

E D

S U

B M

IT

T

A L I N

F O

R M

A T

IO

N

S H

O P

D R

A W

IN

G

S

S A

M P

L E

S

C O

L O

R S

E L E

C T

IO

N

M A

N U

F A

C T

U R

E R

'S R

E C

O M

M E

N D

A T

IO

N

S

M A

N U

F A

C T

U R

E R

'S W

A R

R A

N T

Y

C A

T A

L O

G /P

R O

D U

C T

D A

T A

C O

L O

R B

O A

R D

R E

P O

R T

S

C

E R

T

IF

IC

A

T

IO

N

M P

L

IA

N C

E

O P

E R

A T

IN

G

M

A

IN

T

IN

S T

R U

C T

IO

N

S

S C

H E

D U

L E

S

O T

H E

R A

S N

O T

E D

A S

-B U

IL

T

R E

C O

R D

D R

W G

S /I N

F O

/S P

E C

S

PROJECT TITLE - RC Davenport

Remarks / Comments

SUB-202

PRM Section G - Sitework; Paving Design and

Recommendations & Calculations: Design

Development

X X

SUB-203

PRM Section G - Sitework; Paving Design and

Recommendations & Calculations: Construction

Documents

X X

SUB-204

PRM Section G - Sitework; Site Drainage

Recommendations & Calculations: Design

Development

X X

SUB-205

PRM Section G21 - Pavements & Surfacing;

Pavement Durability for 20Years, thickness, strength

& Structural Calculations: Construction Documents X X

SUB-206

PRM Section G22 - Site Fixtures / G22A Fencing;

Security Barriers / Fences: Design Development X X

SUB-207

PRM Section G3 - Site Services; Tracer Wire

Details: Construction Documents X

SUB-208

PRM Section G3 - Site Services; Tracer Wire

Continuity Tests & GPS Locates: Construction

Closeout

X X Locate tracer wires / Utilities for Owner to input into Owner GPS coordinate systems.

IA144-Wage Determination, Scott County 6-30-2017 General Decision Number: IA170144 06/30/2017 IA144

Superseded General Decision Number: IA20160144

State: Iowa

Construction Type: Building

County: Scott County in Iowa.

BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.20 for calendar year 2017 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.20 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2017.

The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/06/2017 1 01/13/2017 2 02/03/2017 3 05/12/2017 4 05/19/2017 5 06/30/2017

ASBE0081-001 06/01/2016

Rates Fringes

ASBESTOS WORKER/HEAT & FROST

INSULATOR........................$ 30.41 20.00

BOIL0083-009 01/01/2017

Rates Fringes

BOI…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .