W912LP-17-R-0001-0002_Combined.pdf
PDF 836 KB Posted
- Attached to
- National Gaurd Readiness Center-Davenport, Iowa
- Solicitation number
- W912LP-17-R-0001
About this file
Amendment 0002 to W912LP-17-R-0001, National Guard Readiness Center, Davenport, Iowa.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W912LP-17-R-0001-0001-0004.pdf | ||
| W912LP-17-R-0001-0003.pdf | ||
| Phase_2_Solicitation_W912LP-17-R-0001_Final_Combined.pdf | ||
| RFP_W912LP-17-R-0001_QandA.docx | DOCX document | |
| Phase_1_Pre_Proposal_Conference_Davenport.ppt | PPT presentation | |
| Phase_1_Pre_Proposal_Sign_In_Sheet.pdf | ||
| EXHIBIT_A_-_Performance_Relevancy_Questionnaire.pdf | ||
| Brand_Name_J&A_17-009.pdf | ||
| EXHIBIT_B_-_Subcontractor_Information_and_Consent.doc | DOC document | |
| EXHIBIT_C_-_Performance_Evaluation_Package.doc | DOC document | |
| EXHIBIT_F_-_Pre-Proposal_Inquiry_Format.doc | DOC document | |
| W912LP-17-R-0001_7_APR_2017.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
0011002221 190025
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Amendment 0002 to W912LP-17-R-0001, Readiness Center project -Davenport, Iow a is changed as follow s:
(Continued on Page 2)
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 05-Jul-2017
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912LP-17-R-0001
X 9B. DATED (SEE ITEM 11)
05-Jun-2017
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
05-Jul-2017
CODE
USPFO FOR IOWA
7105 NW 70TH AVE
CAMP DODGE
JOHNSTON IA 50131-1824
W912LP 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912LP-17-R-0001
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
AMENDMENT 0002
1. As a result of the Interim Interviews and questions recieved to date, the Project Requeirements Manual (PRM) for the National Guard Readiness Project-Davenport, Iowa, is hereby amended. Reference Attachment #1, dated June 30, 2017 for changes and/or clarifications.
2. Attachment #2, AF Form 66, Schedule of Material Submittals is hereby incorporated into this Request for Proposal (RFP).
3. Attachment #3, Wage Determination IA170144 has been modified effective 06/30/2017. The updated wage determination replaces Exhibit G of the phase 2 solicitation.
4. Reference the solicitation ‐ Subparagraph 13.4 in section 00100 is hereby deleted. There are no brand name requirements associated with the Fire Alarm System.
5. All other terms and conditions of the solicitation remain unchanged.
Readiness Center Amendment No. 02
Davenport, IA
FEH Project No. 2010207.18 Page 1 of 6
6 0 4 E A S T G R A N D A V E .
D E S M O I N E S , I O W A 5 0 3 09
5 1 5 . 2 8 8. 2 0 0 0
AMENDMENT NO. 02
GENERAL CONTRACT
Readiness Center
Iowa Army National Guard
Project Number: 190025
DATE ISSUED: June 30, 2017
TO ALL BIDDING DOCUMENT HOLDERS OF RECORD:
Acknowledge receipt of this Amendment in the space provided on the Bid Form. Failure to do so may subject
Bidder to disqualification. This Amendment forms a part of the Proposal Documents and modifies them as follows:
1) PROJECT REQUIREMENTS MANUAL ITEMS
a) See attached AF Form 66 – SCHEDULE OF MATERIAL SUBMITTALS for required submittals required by the Government.
b) Clarification / General Information: The following sections were out of order in the PRM CD PDF file, order shall be following table of Contents order:
i) B2
ii) B221
iii) B3
iv) B31 – Attachment A
v) C111
vi) C111 – Attachment A
vii) C121
viii) C121 – Attachment A
ix) C2
x) C221
xi) D – Attachment A
2) Part 2 - General Requirements
a) Clarification: Any reference in any of the Part 2 – General Requirements or Part 3 – 3.4 Performance
Requirements requiring the engineer, architect or designer of record to be registered or licensed in the “State of Iowa” shall be deleted. The professional requirement for the engineer, architect or
ATTACHMENT #1
FEH Project No. 2010207.18 Page 2 of 6
5 1 5 . 2 8 8. 2 0 0 0 designer of record to be registered or licensed shall be in accordance with Part 2 Section “Design
After Award”, paragraph 1.01-C.1.
b) Section 2, 017800 – Design-Build Project Closeout, Article 1.01.F.8.a: Add to article: “Framed
Instructions shall include step-by-step instructions for equipment restart following activation of an
HVAC Shutdown switch described in Section 3.4, D3 under “Emergency Air Distribution Shutoff”.
c) Section 2, 008300 - Design and Construction Procedures: Change Article 1.01.E.4 to read: “Where design analysis is specified to be performed by licensed design professional, provide a design professional registered in accordance with FAR clause as described in Section 2, 010120 - Design
After Award, Article 1.01.C.1.”
d) Section 2, 008300 - Design and Construction Procedures: Article 1.07.B.1.a: Clarification: "A-E
Designer of Record" shall be interpreted to mean "A-E Designer of Record(s) for each area of design discipline".
e) Section 2, 010120 - Design After Award: Article 1.03 - C.g.: Add the following after the first sentence
(after "…… in the review process".) "The Government will consolidate all of the comments and provide one consolidated listing of review comments to the Design Builder with within the
Government designated review period for each submission."
f) Section 2, 014255 - Reference Standards: Change Article 1.03.A to read: "Iowa Army National Guard
Standards: Design Details and Design Standards included throughout the Project Requirements
Manual".
g) Section 2, 014255 - Reference Standards: Clarification: Where "out of date" editions of Reference
Standards have been inadvertently listed, use editions adopted by the Authority Having Jurisdiction up to date of Design Builder’s RFP Initial Proposal.
3) Part 3, Section 3.1 Site & Exterior Facilities:
a) Section 3.1A F.5).b. – Add the following sentence:
“For the Design Builder’s proposal, include this shoulder widening for 400’ along the south side of
Kimberly Road (US HWY 6). Distance measured from your proposed access point to the site heading west. No traffic study is required from the proposer.”
b) Section 3.1-A - Site & Exterior Features, Article F.8).a.: Delete entire article.
c) Section 3.1-A - Site & Exterior Features, Article F.8).e.1.: Delete entire article.
FEH Project No. 2010207.18 Page 3 of 6
5 1 5 . 2 8 8. 2 0 0 0
d) Section 3.1-A - Site & Exterior Features, Article G.2): Clarification: Locking at access control barriers will be accomplished with Owner supplied padlocks. Keys for padlocks will be placed in the
Contractor furnished Knox Box for fire department access. (See Section 3.4, B23 - Exterior Doors).
e) Section 3.1-A, Site & Exterior Facilities, Article I.1).b: Change to read: "Flexible Asphalt Paving
(ACC)”. Clarification: ACC = Asphalt Cement Concrete. PCC = Portland Cement Concrete.
f) Section 3.1-A, Site & Exterior Facilities, Article I.2).a. – Table 1A & 1B: Clarification: Quantities (SY) in Table 1A and Table 1B shall be provided as listed without deviations.
g) Section 3.1-A, Site & Exterior Facilities, Article I.3).b. – Table 2: Clarification: Quantities (SY) in
Table 2 shall be provided as listed without deviations.
h) Section 3.1-A, Site & Exterior Facilities, Article I.4).-Table 3 & Table 4: Clarification: Quantities (SY) in Table 3 and Table 4 shall be provided as listed without deviations except that Table 3 Pavement
Area for Access & Entrance Roads can deviate as Design Builder’s site access road dictates.
i) Section 3.1-A, Site & Exterior Facilities, Article I.2, Table 1A: Clarification: "Trailers" indicates just trailers in lieu of "trucks and trailers".
j) Section 3.1-A, Site & Exterior Facilities, Article J.1).g.2.a: Change to read “Provide black vinyl coated fencing and gates at all fencing running along the south and east portion of the site (all fencing facing
Highway 6 (Kimberly Road) and Wisconsin Ave.)”
k) Section 3.1-A, Site & Exterior Facilities, Article J.1).: Add sentence to end of article). as follows:
“Design Builder shall provide some landscaping between parking that fronts Kimberly Road and
Wisconsin avenue to address City requirements, but quantity is undefined.”
l) Section 3.1-A, Site & Exterior Facilities, Article J.11).g.2.: Add sub-article J.1).g.2.b). as follows: “b)
Perimeter fencing can be set up to the property line (not required), but shall not extend past property line into street right of ways.”
m) Section 3.1-B, Site Relationship Diagram: Clarification: Fuel Truck Containment Area shall be located within the Military Vehicle Parking Compound.
n) Section 3.1-B, Site Relationship Diagram: Clarification: The quantity of "Military Vehicle Paving" indicated in the diagram will vary per the Design/Builders final solution and is part of the "Access &
Entrance Roads" quantity listed in Section 3.1-A, Site & Exterior Facilities, Article I.2, Table 3.
FEH Project No. 2010207.18 Page 4 of 6
4) Part 3, Section 3.2-A Project Book – Interior Spaces:
a) Space 1 – Drill Hall: Add Article 1.D.1). a.: “Per Section 3.4 Section 000111 Article 1.01 – A.2.i.1.:
Maximum occupant load for Plumbing fixture count is 15 SF Per person or 420 occupants for Public events held in the Drill Hall. This occupant load shall govern as it is higher than maximum number of soldiers drilling in the Drill Hall of 274.”
b) Space 2 - Tiered Classroom: Add Article 2.I.2): "Space to be free of interior columns."
c) Space 3 - Classroom #1: Add Article 3.I.2): "Space to be free of interior columns."
d) Space 4 - Classroom #2 Computer Classroom: Add Article 4.I.2): "Space to be free of interior columns."
e) Space 5 - Classroom #3: Add Article 5.I.2): "Space to be free of interior columns."
f) Space 6 - Secured Classroom: Add Article 6.I.3): "Space to be free of interior columns."
g) Space 7 - Multi-Purpose Training (Weapons Simulation) Room: Article 7.D: Clarification: The number of male and female soldiers utilizing the space as a Bunk Room for overnight accommodations shall be limited to the maximum number allowed by code for the space configuration and area provided.
h) Space 7 - Multi-Purpose Training (Weapons Simulation) Room: Delete "NSR" and Add Article 7.I.1): "24' x 56' Training Room to be free of interior columns (including when the operable partition is in open position)".
i) Space 10 – Toilets / Showers: Article 10.I. – Delete “NSR” and add sub-article1) as follows:
“10.I.1) Main female and male restrooms to have walls and overhead structure constructed as a rated storm shelter per the following. References: ICC 500 – 2014;
ICC/NSSA standard for the “Design & Construction of Storm Shelters”. The hardened structural overhead roof framing of the storm shelter component can be separate from the visible roof structural framing system. (Note: FEMA submittals are not required.)”
j) Space 27 Administration Support Room - Clarification: UFC 4-010-01 mail room requirements do not apply to this space or any other space within the Readiness Center.
5) Part 3, Section 3.2-B TEMPLATES – Interior Project Book Spaces:
a) At template drawing 3.2-B Template “J” Office Suite – Generic layout: Change “C.F.C.I.” (two locations) at open planning table & chairs to “G.F.G.I.”
FEH Project No. 2010207.18 Page 5 of 6
6) Part 3, Section 3.4 Performance Requirements:
a) Section 3.4, 000111 - Facility Performance: Article 1.01.C. – Add sub-article 101-C.6. as follows:
“6. There are no PRM requirements for tornado shelters constructed to FEMA standards; however, hardened spaces for shelter are required, by Design Builder at Main Toilet / Shower Space 10.
(See Amendment # 02 for additional Space 10 – Toilets / Showers requirements.)”
b) Section 3.4, 000111 - Facility Performance: Article 1.01.A.2: Clarification: The State Fire Marshal will be the Authority Having Jurisdiction. Submittals shall be made by the Design-Builder to the City of Davenport for communication purposes only. No building permits fees will be charged. City to require grading permit at no costs.
c) Section 3.4, 000111 - Facility Performance: Article 1.01.A.h. - Zoning: Add the Following: “The City of
Davenport zoning will be M-1 Light Industrial. The zoning has a 90’ height restriction, but the City is agreeable to work with the IA ARNG if the height is exceeded.”
d) Section 3.4, A - Substructure Criteria, Article 3.04.A.3: Change to read: "Minimal Wall Thickness: 8 in.
(8 in. nominal for masonry foundation walls where allowed)".
e) Section 3.4, B - Shell, Article 1.01.B.7.g: Add sub-article 1): "Exception: photovoltaic panels and / or solar water heating systems are not required to be concealed from street view".
f) Part 3, Section 3.4 B - Shell, 1.01- D. 1.e.: Delete entire article and replace with the following: "e.
Elements engineered by their manufacturer or fabricator, rather than by the engineer-of-record, are not acceptable for superstructure except that plant cast pre-cast structural concrete elements and open web steel roof joists (or girders) framing systems."
g) Part 3, Section 3.4 B1, 1.01- D. 4.a. 1): Change "Type IV" to "Type II". Add Sentence: "Does not eliminate requirement to meet Standard 19 - Equipment Bracing on page 82 of UFC 4-010-01)".
h) Part 3, Section 3.4 B1, 1.01- D. 4.f. 3): Change Article 1.01. 4.f. 3) last sentence to read: “Engineer to be licensed design professional in accordance with FAR clause as described in Section 2, 010120 -
Design After Award, Article 1.01.C.1.”
i) Section 3.4, B12 - Roofs, Article 1.02 - A.2.: Add sub-article 1.02 - A.2.b.: "Light Gauge Cold Formed
Metal Framing."
j) Section 3.4, B12 - Roofs, Article 1.02 - B.1.: Add sub-article 1.02 - B.1.b.: "Light Gauge Cold Formed
Metal Framing."
FEH Project No. 2010207.18 Page 6 of 6
k) Section 3.4, D22 - Plumbing Fixtures, Article 1.01.F.4.a: Change to read: "All flush valves and faucets to be manual". Delete Article 1.01.F.4.b
l) Section 3.4, D3 -HVAC - Heating, Ventilating, and Air Conditioning – Article 1.02-A.1.: Change to read
“The construction will use a geothermal well system as the primary energy source, augmented as required by other energy sources.”
m) Section 3.4, D3 -HVAC - Heating, Ventilating, and Air Conditioning – Article 1.02-A.2.: Change to read
“The construction will use one or more of the following systems in conjunction with the primary energy source or other energy sources to provide heated/conditioned air to various spaces:”
n) Section 3.4, D3 -HVAC - Heating, Ventilating, and Air Conditioning: Delete Article 1.01.B.3.b.
(Computer (Telecommunications) Room maximum temperature to be per 3.2-A - Interior Space
Program).
o) D34 – Air Distribution, Article 1.01.B.5.e: Change to read: “Physical Fitness Area: 500 cfm (236 L/s)”.
p) D71 – Voice & Data, Delete Article R – Paging System and all sub-articles. This was inadvertently left in when revised paging spec (Article Q) was inserted.
q) D72 – Audio / Visual: Add Article 3.01.F.11: “Construction: Provide laminated 8 1/2” x 11” instructions with photos describing the proper operation of all A/V equipment. Provide one copy attached to each A/V cart.”
r) D92 – Electronic Security Systems, Article 3.01.Q.2.a.3): Change to read: “Door Stations: Model IX-
DA”.
s) D92 – Electronic Security Systems, Attachment B: Replace with revised attached (8 pages).
t) D93 – Special Grounding Systems, Article 1.01.A.1.a.1): Delete reference to radio antenna tower. No tower on this project.
SCHEDULE OF MATERIAL SUBMITTALS
PROJECT No: SOLICITATION/CONTRACT NO.
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
S
U
B
S
T
A
N
T
I
A
T
I
O
N
U
M
B
E
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE,
TYPE OF SUBMITTAL
D e s ig n S u b m it ta l
D ra w in g s
D e s ig n S u b m it ta l
S p e c s
D e s ig n S u b m it ta l
C a lc s
C o d e C h e c k s
R e s p o n s e s
D e s ig n A n a ly s is
L E
E D
S U
B M
IT
T
A L I N
F O
R M
A T
IO
N
S H
O P
D R
A W
IN
G
S
S A
M P
L E
S
C O
L O
R S
E L E
C T
IO
N
M A
N U
F A
C T
U R
E R
'S R
E C
O M
M E
N D
A T
IO
N
S
M A
N U
F A
C T
U R
E R
'S W
A R
R A
N T
Y
C A
T A
L O
G /P
R O
D U
C T
D A
T A
C O
L O
R B
O A
R D
R E
P O
R T
S
C
E R
T
IF
IC
A
T
IO
N
F
C
M P
L
IA
N C
E
O P
E R
A T
IN
G
M
A
IN
T
IN
S T
R U
C T
IO
N
S
S C
H E
D U
L E
S
O T
H E
R A
S N
O T
E D
A S
-B U
IL
T
R E
C O
R D
D R
W G
S /I N
F O
/S P
E C
S
SUB-1
Supplement to the Project Requirements Manual, Article 4.6, Design Builder's Release of Claims X
SUB-2
Design-Builder, Designers, Contractors & Sub-
Contractor Contact List X
SUB-3
PRM Section 010120 Design After Award - Site
Preliminary Design Submittal (to NGB) X
SUB-4
PRM Section 010120 Design After Award / B shell /
D Sitework: SITE Preliminary Design Submittal -
ATFP Analysis Report & Site Plan
X X
SUB-5
PRM Section 010120 Design After Award / A - Site
Preliminary Design Submittal Soil Borings (to NGB) X
SUB-6
PRM Section D - Sitework; Soil Bearing Declaration
Form (Obtain Form from Owner) X
SUB-7
PRM Section 010120 Design After Award /B - Shell -
RC Preliminary Design Package #1 (Non Site) (to
NGB)
X
SUB-8
PRM Section 010120 Design After Award /B - Shell /
D Sitework - RC Preliminary Design Submittal -
RENDERING
X
SUB-9
PRM Section 010120 Design After Award /B - Shell -
RC Preliminary Design Submittal - ATFP Analysis
Report
X
SUB-10
PRM Section 010120 Design After Award /B - Shell -
RC Preliminary Design Submittal Package #2 (Non
Site) (to NGB)
X
SUB-11
PRM Section 010120 Design After Award /B - Shell -
RC Preliminary Design Submittal Package #3 (Non
Site) (to NGB)
X
SUB-12
PRM Section 010120 Design After Award /B - Shell -
RC Preliminary Design Submittal Package #XX
(Non Site) (to NGB)
X
SUB-13
PRM Section 010120 Design After Award /B - Shell -
RC Design Development Submittal Package #1
(Non Site) (to NGB)
X
SUB-14
PRM Section 010120 Design After Award /B - Shell /
D Sitework - RC Design Development Submittal -
RENDERING
X
SUB-15
PRM Section 010120 Design After Award /B - Shell -
RC Design Development Submittal - ATFP Analysis
Report
X
SUB-16
PRM Section 010120 Design After Award /B - Shell -
RC Design Development Submittal Package #2
(Non Site) (to NGB)
X
SUB-17
PRM Section 010120 Design After Award /B - Shell -
RC Design Development Submittal Package #3
(Non Site) (to NGB)
X
SUB-18
PRM Section 010120 Design After Award /B - Shell -
RC Design Development Submittal Package #XX
(Non Site) (to NGB)
X
SUB-19
PRM Section 010120 Design After Award - A/E
Designers of Record X
SUB-20
PRM Section 010120 Design After Award - Site
Preliminary Design Submittal Comments with
Responses
X
SUB-21
PRM Section 010120 Design After Award - RC
Design Development Submittal Package #1
Comments with RESPONSES (Non Site)
X
SUB-22
PRM Section 010120 Design After Award - RC
Design Development Submittal Package #2
Comments with RESPONSES (Non Site)
X
SUB-23
PRM Section 010120 Design After Award - RC
Design Development Submittal Package #3
Comments with RESPONSES (Non Site)
X
SUB-24
PRM Section 010120 Design After Award - RC
Design Development Submittal Package #xx
Comments with RESPONSES (Non Site)
X
SUB-25
PRM Section 010120 Design After Award / A /C-
Site Preliminary Design Submittal -CODE CHECK
& DESIGN ANALYSIS
X
SUB-26
PRM Section 010120 Design After Award / A / C-
RC Design Development Submittal Package #1
(Non Site) -CODE CHECK & DESIGN ANALYSIS X
SUB-27
PRM Section 010120 Design After Award - Site
Const. Doc. Submittal X X X
Provide for each discipline: Architectural, Structural, Mechanical, Plumbing, Electrical, Telecommunications, Fire Protection, Security, Civil, etcetera
Design Builder to Determine Number of Submittal Packages the "Construction Document"
Submittal will be sub-divided into
Provide Code Check as appropriate to each "Design Development" packages
PROJECT TITLE - RC Davenport
Remarks / Comments
Design Builder to Determine Number of Submittal Packages the "Design Development"
Submittal will be sub-divided into
Design Builder to Determine Number of Submittal Packages the "Design Development"
Submittal will be sub-divided into
Preliminary Design & Design Development SUBMITTALS (NOT ALL INCLUSIVE - SEE BELOW FOR OTHER COMPONENTS OF PRELIM. DESIGN SUBMITTALS)
Provide Code Check as appropriate to each "Design Development" packages. Provide systems analysis for each discipline: Architectural, Structural, Mechanical, Plumbing, Electrical, Telecommunications, Fire Protection, Security, Civil, etcetera.
Minimum: Architect, Structural, Civil, Mechanical, Electrical, Plumbing
Number of Responses to Comments to match number of "Design Development" packages
Number of Responses to Comments to match number of "Design Development" packages
Number of Responses to Comments to match number of "Design Development" packages
CONSTRUCTION DOCUMENT SUBMITTALS (NOT ALL INCLUSIVE - SEE BELOW FOR OTHER COMPONENTS OF CONST. DOCUMENT SUBMITTALS)
Design Builder to Determine Number of Submittal Packages the "Design Development"
Submittal will be sub-divided into
Design Builder to Determine Number of Submittal Packages the "Design Development"
Submittal will be sub-divided into
Design Builder to Determine Number of Submittal Packages the "Design Development"
Submittal will be sub-divided into
Number of Responses to Comments to match number of "Design Development" packages
Miscellaneous
Design Builder to Determine Number of Submittal Packages the "Design Development"
Submittal will be sub-divided into
Provide for each discipline: Architectural, Structural, Mechanical, Plumbing, Electrical, Telecommunications, Fire Protection, Security, Civil, etcetera
Design Builder to Determine Number of Submittal Packages the "Design Development"
Submittal will be sub-divided into
Design Builder to Determine Number of Submittal Packages the "Design Development"
Submittal will be sub-divided into
ATTACHMENT #2
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
S
U
B
S
T
A
N
T
I
A
T
I
M
B
E
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE,
TYPE OF SUBMITTAL
D e s ig n S u b m it ta l
D ra w in g s
D e s ig n S u b m it ta l
S p e c s
D e s ig n S u b m it ta l
C a lc s
C o d e C h e c k s p o n s e s
D e s ig n A n a ly s is
L E
E D
S U
B M
IT
T
A L I N
F O
R M
A T
IO
N
S H
O P
D R
A W
IN
G
S
S A
M P
L E
S
C O
L O
R S
E L E
C T
IO
N
M A
N U
F A
C T
U R
E R
'S R
E C
O M
M E
N D
A T
IO
N
S
M A
N U
F A
C T
U R
E R
'S W
A R
R A
N T
Y
C A
T A
L O
G /P
R O
D U
C T
D A
T A
C O
L O
R B
O A
R D
R E
P O
R T
S
C
E R
T
IF
IC
A
T
IO
N
M P
L
IA
N C
E
O P
E R
A T
IN
G
M
A
IN
T
IN
S T
R U
C T
IO
N
S
S C
H E
D U
L E
S
O T
H E
R A
S N
O T
E D
A S
-B U
IL
T
R E
C O
R D
D R
W G
S /I N
F O
/S P
E C
S
PROJECT TITLE - RC Davenport
Remarks / Comments
SUB-28
PRM Section 010120 Design After Award - Site
Preliminary Design Submittal -CODE CHECK &
DESIGN ANALYSIS
X
SUB-29
PRM Section 010120 Design After Award - Site
Const. Doc. Submittal Comments with Responses X
SUB-30
PRM Section 010120 Design After Award - RC
Const. Doc. Submittal X X X
SUB-31
PRM Section 010120 Design After Award / C1 - RC
Const. Doc. INTERIOR DESIGN Submittal X X X
SUB-32
PRM Section 010120 Design After Award - 1.03.F.4 -
Color Board Submittal X X X
SUB-33
PRM Section 010120 Design After Award / A / C /
C1 - RC Design Development Submittal Package #1
(Non Site) -CODE CHECK & DESIGN ANALYSIS X
SUB-34
PRM Section 010120 Design After Award - RC
Const. Doc. Submittal Comments with Responses X
SUB-35
PRM Section 010120 Design After Award /B - Shell -
RC Const. Doc. EXTERIOR DESIGN / Appearance
Submittal
X X X
SUB-36
PRM Section 010120 Design After Award - RC
Const. Doc. Submittal X X X
SUB-37
PRM Section 010120 Design After Award / C1 - RC
Const. Doc. INTERIOR DESIGN Submittal X X X
CONSTRUCTION DOCUMENT FINAL
SUBMITTALS
SUB-38
PRM Section 010120, 017800 - Site Const. Doc.
Final Submittal X X
SUB-39
PRM Section 010120, 017800 /B - Shell - RC Const.
Doc. Final Submittal X X
SUB-40
PRM Section 010120 Design After Award / A/B- RC
Construction Document Final Submittal Package #1
(Non Site) -CODE CHECK & DESIGN ANALYSIS
X
FINAL CONSTRUCTION DOCUMENT
SUBMITTALS - (RECORD DOCUMENTS)
SUB-41
PRM Section 010120, 017800 - Site Record
Document Submittal X X
SUB-42
PRM Section 017800 - Site Utility Locates for Owner to track w/ GPS X
SUB-43
PRM Section 010120, 017800 /B - Shell - RC
Record Document Submittal X X
SUB-44
PRM Section 010120 Design After Award / A/B- RC
Record Document Entire Facility Project (Non Site) X
SUB-45
PRM Section 010120, 017800 - Final Const. Doc. -
Electronic Submittal X X
SUB-46
PRM Section 010120, 017800 - Final Electronic
Website Electronic Document Submittal X X X X X X X
Other Requirements
SUB-47
PRM Section 013200 - Preliminary Project /
Construction Schedule X
SUB-48
PRM Section 013200 - Initial Progress Report
Breakdown for Approval X
SUB-49
PRM Section 013200 / 013300 - Substantiation
Submittal Schedule on AF Form 66 X
SUB-50
PRM Section 014510 - Contractor QC - Contractor
Quality Control (CQC) Plan & Organization X
SUB-51
PRM Section 014510 - Contractor QC - Testing
Agency / Inspection Agency Qualifications X
SUB-52
PRM Section 014510 - Contractor QC - DB's Pre-
Final Inspection (Punchlist) - SITE X
SUB-53
PRM Section 014510 - Contractor QC - DB's Final
Inspection (Punchlist) - SITE X
SUB-54
PRM Section 014510 - Contractor QC -DB's Pre-
Final Inspection (Punchlist) - RC X
SUB-55
PRM Section 014510 - Contractor QC - DB's Final
Inspection (Punchlist) - RC X
SUB-56
PRM Section 017419 - 1.06 -Waste Management
Plan X
SUB-57
PRM Section 017419 - 1.05 - A.1 - Waste Reduction
Progress Report X
SUB-58
PRM Section 017419 - 1.05 - A.2 - Waste Reduction
Final Report X
SUB-59
PRM Section 017800 / 000111 - DB Project
Closeout - Energy Rebate Forms / Financial
Incentives
X
SUB-60
PRM Section 017800 - DB Project Closeout - Real
Property Equipment List Information X
Provide Code Check as appropriate to each "Design Development" packages. Provide systems analysis for each discipline: Architectural, Structural, Mechanical, Plumbing, Electrical, Telecommunications, Fire Protection, Security, Civil, etcetera.
Design Builder to Determine Number of Submittal Packages the "Construction Document"
Submittal will be sub-divided into
Design Builder to Determine Number of Submittal Packages the "Construction Document"
Submittal will be sub-divided into
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
S
U
B
S
T
A
N
T
I
A
T
I
M
B
E
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE,
TYPE OF SUBMITTAL
D e s ig n S u b m it ta l
D ra w in g s
D e s ig n S u b m it ta l
S p e c s
D e s ig n S u b m it ta l
C a lc s
C o d e C h e c k s p o n s e s
D e s ig n A n a ly s is
L E
E D
S U
B M
IT
T
A L I N
F O
R M
A T
IO
N
S H
O P
D R
A W
IN
G
S
S A
M P
L E
S
C O
L O
R S
E L E
C T
IO
N
M A
N U
F A
C T
U R
E R
'S R
E C
O M
M E
N D
A T
IO
N
S
M A
N U
F A
C T
U R
E R
'S W
A R
R A
N T
Y
C A
T A
L O
G /P
R O
D U
C T
D A
T A
C O
L O
R B
O A
R D
R E
P O
R T
S
C
E R
T
IF
IC
A
T
IO
N
M P
L
IA
N C
E
O P
E R
A T
IN
G
M
A
IN
T
IN
S T
R U
C T
IO
N
S
S C
H E
D U
L E
S
O T
H E
R A
S N
O T
E D
A S
-B U
IL
T
R E
C O
R D
D R
W G
S /I N
F O
/S P
E C
S
PROJECT TITLE - RC Davenport
Remarks / Comments
SUB-61
PRM Section B3 Roofing - RC - Roof Manufacture
Report: Project Closeout X
SUB-62
PRM Section 017800 - DB Project Closeout - HVAC
Testing & Balance Report X
SUB-63
PRM Section 017800 - DB Project Closeout -
Operation & Maintenance Manuals X
SUB-64
PRM Section 017800 - DB Project Closeout -Field
Training Instructions X
SUB-65
PRM Section 017800 - DB Project Closeout -Field
Training Instruction Video Recording X
SUB-66
PRM Section 017800 - DB Project Closeout -
1.01.B.1.C.2 - Photos X
SUB-67
PRM Section 017800 - DB Project Closeout -
Attachment A - Project Closeout Checklist X
SUB-68
PRM Section 017800 - DB Project Closeout -List of
Extra Materials X
SUB-69
PRM Section 017800 - DB Project Closeout -
Attachment B - Backflow Test Report X
SUB-70
PRM Section 017800 - DB Project Closeout -
Attachment C & D - Water Dist. Service Form "A" &
Form "B" X
SUB-71
PRM Section 017800 - DB Project Closeout -
Attachment E - High Potential Test X
SUB-72
PRM Section 017800 - DB Project Closeout -
Attachment F -Notice of Final Stabilization X
SUB-73
PRM Section 017800 - DB Project Closeout -
Attachment G -Kitchen Equip . Sched. Of Values X
SUB-74
PRM Section 000111 - Facility Performance - LEED
Checklist - Design Development X
SUB-75
PRM Section 000111 - Facility Performance - LEED
Checklist - Construction Document Submittal X
SUB-76
PRM Section 000111 - Facility Performance - LEED
Certification - SILVER X
SUB-77
PRM Section 000111 - Facility Performance - LEED
Certification Plaque - SILVER X
SUB-78
PRM Section 000111 - Facility Performance / E 12
Equip - RC Design Development: Kitchen Equip
Layout and workflow X
SUB-79
PRM Section 000111 - Facility Performance / E 12
Equip - RC Construction Documents: Kitchen Equip
Specs
X
SUB-80
PRM Section 000111 - Facility Performance / A / B
Shell / C Interiors - RC Construction Documents:
Sealed Structural Calculations X
SUB-81
PRM Section 000111 - Facility Performance - RC
Design Development: Electrical Lightning Hazard
Analysis X X
SUB-82
PRM Section 000111 - Facility Performance - RC
Construction Documents: Sealed Electrical Lightning
Hazard Calculations & Drawings / Details X X
SUB-83
PRM Section 000111 - Facility Performance -
Commissioning: Electrical Lightning Hazard
Continuity tests X
SUB-84
PRM Section 000111 - Facility Performance -
Commissioning: Electrical Lightning Hazard
Certification of Compliance X
SUB-85
PRM Section 000111 - Facility Performance -
Closeout: Electrical Lightning Hazard O&M and
Record Drwgs
X X
SUB-86
PRM Section 000111 - Facility Performance / B
Shell - Life Cycle Cost of Project (70 YRS) Design
Development
X
SUB-87
PRM Section 000111 - Facility Performance - RC -
Space Area Calculations Gross To Net Efficiencies
Design Development Submittal X
SUB-88
PRM Section 000111 - Facility Performance - RC -
Energy Efficiency Criteria & Costs / Mech. Eng
Sealed: - Design Development Submittal X
SUB-89
PRM Section 000111 - Facility Performance - RC -
Energy Efficiency Criteria & Costs / Mech. Eng
Sealed: - Construction Document Submittal X
SUB-90
PRM Section 000111 - Facility Performance - Ease of Operation: Construction Documents X
SUB-91
PRM Section 000111 - Facility Performance - Fire
Marshal Building Code Inspections: Construction
Closeout
X
- Updated impact analysis based on actual products
70 Year Life Cycle / Durability
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
S
U
B
S
T
A
N
T
I
A
T
I
M
B
E
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE,
TYPE OF SUBMITTAL
D e s ig n S u b m it ta l
D ra w in g s
D e s ig n S u b m it ta l
S p e c s
D e s ig n S u b m it ta l
C a lc s
C o d e C h e c k s p o n s e s
D e s ig n A n a ly s is
L E
E D
S U
B M
IT
T
A L I N
F O
R M
A T
IO
N
S H
O P
D R
A W
IN
G
S
S A
M P
L E
S
C O
L O
R S
E L E
C T
IO
N
M A
N U
F A
C T
U R
E R
'S R
E C
O M
M E
N D
A T
IO
N
S
M A
N U
F A
C T
U R
E R
'S W
A R
R A
N T
Y
C A
T A
L O
G /P
R O
D U
C T
D A
T A
C O
L O
R B
O A
R D
R E
P O
R T
S
C
E R
T
IF
IC
A
T
IO
N
M P
L
IA
N C
E
O P
E R
A T
IN
G
M
A
IN
T
IN
S T
R U
C T
IO
N
S
S C
H E
D U
L E
S
O T
H E
R A
S N
O T
E D
A S
-B U
IL
T
R E
C O
R D
D R
W G
S /I N
F O
/S P
E C
S
PROJECT TITLE - RC Davenport
Remarks / Comments
SUB-92
PRM Section 000111 - Facility Performance - Fire
Marshal Electrical Code Inspections: Construction
Closeout
X
SUB-93
PRM Section 000111 - Facility Performance - Fire
Marshal Boiler Code Inspections: Construction
Closeout
X
SUB-94
PRM Section 000111 - Facility Performance - Fire
Marshal Elevator Code Inspections: Construction
Closeout
X
SUB-95
PRM Section A - Sub-Structure / B - Shell: Thermal
Performance/ Cont. Insulation- Construction
Document Submittal X
SUB-96
PRM Section A - Sub-Structure: Radon Filed Testing
Report - Record Document Submittal X
SUB-97
PRM Section A/B : Water Penetration System
Identification - Preliminary Design Submittal X
SUB-98
PRM Section A Sub-Structure / B Shell: Water
Penetration System Details - Construction
Document Submittal
X
SUB-99
PRM Section A Floors On grade - RC - Energy
Efficiency Edge of Slab / Mech. Eng Sealed: -
Design Development Submittal
X
SUB-100
PRM Section B - Shell: Thermal Performance -
Design Development Submittal X
SUB-101 PRM Section B Shell - RC- Accidental Injury: X
SUB-102
PRM Section B Shell - RC - Ventilation of Special
Spaces: Design Development X X
SUB-103
PRM Section B Shell - RC - Impact resistance:
Design Development X
SUB-104
PRM Section B Shell - RCS - Moisture Vapor Barrier transmission: Design Development X X
SUB-105
PRM Section B Shell - RC - Wear resistance:
Design Development X X
SUB-106
PRM Section B Shell - RC - ATFP Window System
& Window Frame Anchorages: Design Development X X X
SUB-107
PRM Section B22 WNDWS& Openings - RC -
Window / Louver / Intake System Water Resistance
/ Air leakage: Construction Documents
X
SUB-108
PRM Section B15 Bridge Crane - Crane Load Tests:
Construction Closeout X
SUB-109
PRM Section B22 WNDWS& Openings - RC -
Window / Louver / Intake System Water Resistance
/ Air leakage: Construction Documents
X
SUB-110
PRM Section B23 Exterior Doors - RC - Door hardware: Construction Documents X X X
SUB-111
PRM Section B23 Exterior Doors - 1.01-C.3.b.3).(f) -
Door hardware - Interchangeable core Biting List w/
Set-Up Chart
X
SUB-112
PRM Section B23 Exterior Doors - RC - Doors &
Frames: Construction Documents X X X
SUB-113
PRM Section B23 Exterior Doors - RC- Hardware
Consultant Installation Report: Project Closeout X
SUB-114
PRM Section B3 Roofing - RC - Roof Assemblies
Construction: Design Development X X
SUB-115
PRM Section B3 Roofing - RC - Roof Warranties -
Each system: Project Closeout X
SUB-116
PRM Section B31 Roof Covering - RC - Gutter /
Downspout & Roof Drain Capacity Calculations:
Design Development X
SUB-117
PRM Section B32 Roof Openings - RC - Roof
Openings / Skylight System Water Resistance / Air leakage: Construction Documents X X
SUB-118
PRM Section C Interiors - RC - Natural Light
Calculations: Design Development Submittal X
SUB-119
PRM Section C Interiors - RC - Natural Light
Updated Calculations & details: Construction
Documents X X
SUB-120
PRM Section C Interiors - RC - Acoustical
Calculations / Modeling: Design Development X
By licensed mechanical engineer
Pedestrian Vehicle Protection / Ice & Snow Protection for Pedestrian/ Occupants / vehicles
Materials, moisture barriers, air barriers, warranties
- Tiered Classroom, Drill hall. Secured Classroom
Identification of building elements to resist impacts and materials used
Identification of moisture barrier and materials used
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
S
U
B
S
T
A
N
T
I
A
T
I
M
B
E
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE,
TYPE OF SUBMITTAL
D e s ig n S u b m it ta l
D ra w in g s
D e s ig n S u b m it ta l
S p e c s
D e s ig n S u b m it ta l
C a lc s
C o d e C h e c k s p o n s e s
D e s ig n A n a ly s is
L E
E D
S U
B M
IT
T
A L I N
F O
R M
A T
IO
N
S H
O P
D R
A W
IN
G
S
S A
M P
L E
S
C O
L O
R S
E L E
C T
IO
N
M A
N U
F A
C T
U R
E R
'S R
E C
O M
M E
N D
A T
IO
N
S
M A
N U
F A
C T
U R
E R
'S W
A R
R A
N T
Y
C A
T A
L O
G /P
R O
D U
C T
D A
T A
C O
L O
R B
O A
R D
R E
P O
R T
S
C
E R
T
IF
IC
A
T
IO
N
M P
L
IA
N C
E
O P
E R
A T
IN
G
M
A
IN
T
IN
S T
R U
C T
IO
N
S
S C
H E
D U
L E
S
O T
H E
R A
S N
O T
E D
A S
-B U
IL
T
R E
C O
R D
D R
W G
S /I N
F O
/S P
E C
S
PROJECT TITLE - RC Davenport
Remarks / Comments
SUB-121
PRM Section C Interiors - RC - Acoustical Sealed
Engineering Calculations: Construction Documents X
SUB-122
PRM Section C Interiors - RC - Acoustical Test reports: Construction Documents X
SUB-123
PRM Section C Interiors - Warranty for all Interior
Products: Closeout X
SUB-124
PRM Section C1 Interior Construction; STC Values for major building elements: Design Development X
SUB-125
PRM Section C1 Interior Construction; STC Values
Proven in use STC Values for wall details: Design
Development X
SUB-126
PRM Section C1 Interior Construction; STC Values
Field test: Construction Closeout X
SUB-127
PRM Section C1 Interior Construction; Operations and Maintenance - material resistance to chemical cleaning: Design Development X
SUB-128
PRM Section C12 Interior Doors - RC - Door hardware: Construction Documents X X X
SUB-129
PRM Section C12 Interior Doors - RC - Doors &
Frames: Construction Documents X X X
SUB-130
PRM Section C12 Interior Doors - RC- Hardware
Consultant Installation Report: Project Closeout X
SUB-131
PRM Section C2 Interior Fixtures - RC - Product data on interior fixture hardware & movable components: Design Development X
SUB-132
PRM Section C2 Interior Fixtures - RC - Details of interior fixture hardware & movable components:
construction Documents X X
SUB-133
PRM Section C23 Window Treatment - RC -
Product data on window treatments: construction
Documents
X X
SUB-134
PRM Section C24 Accessory Fixtures - RC - A/V
Equipment layout / space layouts: Design
Development
X
SUB-135
PRM Section C24 Accessory Fixtures - RC - A/V
Projection Screen / Surfaces Suitability Certification:
Construction Documents
X
SUB-136
PRM Section D Services - RC - Overall Lighting
Scheme & lamps: Design Development X X
SUB-137
PRM Section D Services - RC - Lighting
Calculations - Sealed by Engineer: Construction
Documents
X
SUB-138
PRM Section D Services - RC - Vibration Isolation detail methods: Construction Documents X X
SUB-139
PRM Section D Services - RC - Fire rated Wall penetrations details & UL Labels: Construction
Documents
X X
SUB-140
PRM Section D Services - RC - Mechanical, Plumbing and Electrical system Structural Support details & Engineering as Req'd: Construction
Documents
X X X
SUB-141
PRM Section D Services - RC - Mechanical, Plumbing and Electrical system Engineering
Calculations: Design Development
X
SUB-142
PRM Section D Services - RC - Mechanical, Plumbing and Electrical system Complete Details:
Construction Documents
X
SUB-143
PRM Section D Services / D3 HVAC - RC -
Mechanical, Plumbing and Electrical Functional
Performance testing: Construction Closeout
X
SUB-144
PRM Section D Services - RC - Mechanical, Plumbing and Electrical - Identification of Systems to be Commissioned: Design Development
X
SUB-145
PRM Section D Services - RC - Mechanical, Plumbing and Electrical - Training & Demonstration
Schedule: Construction
X
- Tiered Classroom, Drill hall. Secured Classroom
- Tiered Classroom, Drill hall. Secured Classroom
Water and Drainage, HVAC, Fire Suppression, Electrical, Telecommunications
Wood Doors - Lifetime, Ceilings 15yrs - Humidity, Flooring 10 years functional warranty, other interiors - 15 years functional warranty.
Toilet rooms , janitorial rooms, kitchens, etcetera
Water and Drainage, HVAC, Fire Suppression, Electrical, Telecommunications
In-put and Out-Put: Water and Drainage, HVAC, Fire Suppression, Electrical, Telecommunications
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
S
U
B
S
T
A
N
T
I
A
T
I
M
B
E
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE,
TYPE OF SUBMITTAL
D e s ig n S u b m it ta l
D ra w in g s
D e s ig n S u b m it ta l
S p e c s
D e s ig n S u b m it ta l
C a lc s
C o d e C h e c k s p o n s e s
D e s ig n A n a ly s is
L E
E D
S U
B M
IT
T
A L I N
F O
R M
A T
IO
N
S H
O P
D R
A W
IN
G
S
S A
M P
L E
S
C O
L O
R S
E L E
C T
IO
N
M A
N U
F A
C T
U R
E R
'S R
E C
O M
M E
N D
A T
IO
N
S
M A
N U
F A
C T
U R
E R
'S W
A R
R A
N T
Y
C A
T A
L O
G /P
R O
D U
C T
D A
T A
C O
L O
R B
O A
R D
R E
P O
R T
S
C
E R
T
IF
IC
A
T
IO
N
M P
L
IA
N C
E
O P
E R
A T
IN
G
M
A
IN
T
IN
S T
R U
C T
IO
N
S
S C
H E
D U
L E
S
O T
H E
R A
S N
O T
E D
A S
-B U
IL
T
R E
C O
R D
D R
W G
S /I N
F O
/S P
E C
S
PROJECT TITLE - RC Davenport
Remarks / Comments
SUB-146
PRM Section D Services - RC- Mechanical, Plumbing and Electrical - Equipment Service
Schedule / List: Closeout
X
SUB-147
PRM Section D2 Water & Drainage - Site - Pressure
& Flow Tests Reports: Design Development X
SUB-148
PRM Section D2 Water & Drainage - Site - Pump
Equipment Pump Curves: Construction Documents X
SUB-149
PRM Section D2 Water & Drainage - Site - Pressure
& Flow Tests Reports: Construction X
SUB-150
PRM Section D2 Water & Drainage / G3 Site
Services - Site - Piping Design Calculations: Design
Development
X
SUB-151
PRM Section D2 Water & Drainage -Water Flow -
Field Water tight Pressure Test Reports of Piping:
Construction Documents
X
SUB-152
PRM Section D2 Water & Drainage - Site - Water
Flow - Functional Fixtures / Equip. Tests Reports:
Construction
X
SUB-153
PRM Section D2 Water & Drainage - Waste Piping -
Drainage Piping Design Calculations: Design
Development
X
SUB-154
PRM Section D2 Water & Drainage / G3 Site
Services - Site - Waste Piping Flow - Functional
Fixtures / Equip. Tests Reports: Construction
X
SUB-155
PRM Section D2 Water & Drainage - Rain Water
Piping - Drainage Piping Design Calculations:
Design Development
X
SUB-156
PRM Section D2 Water & Drainage / G3 Site
Services - Site - Rain Water Piping Flow -
Functional Fixtures / Equip. Tests Reports:
Construction
X
SUB-157
PRM Section D2 Water & Drainage / G3 Site
Services - Site - Piping Design Layout & Details:
Construction Documents
X X X
SUB-158
PRM Section D21 Water Supply - RC - ARNG
Backflow Device Tests Reports: Construction X
SUB-159
PRM Section D22 Plumbing Fixtures -
Manufacturers Warranty - Flush Valves (20 yrs) &
Faucet Valves (20 yrs):Construction Closeout
X
SUB-160
PRM Section D24 Sanitary Waste - Interceptors, Maint Cleanout Schedule ( 3months min.) and
Location: Design Development
X X X
SUB-161
PRM Section D3 HVAC / D34 - Measure and
Correction of Spaces with Unacceptable
Temp/Humidity/Air Distribution: Construction
Closeout
X
SUB-162
PRM Section D3 HVAC - Identification of Equip that
Requires Redundancy: Design Development X
SUB-163
PRM Section D3 HVAC - Geothermal Project
Record Documents: Construction Closeout X
SUB-164
PRM Section D31 Energy Supply - Identify Equip using Fuel & fuel distribution system: Design
Development
X X
SUB-165
PRM Section D31 Energy Supply - Functional
Performance testing of proper fuel, ventilation and combustion: Construction Closeout
X
SUB-166
PRM Section D33 Refrigeration / D34 Air Dist. / D35
Hydronic - Acoustical Performance, Cooling Loads, Energy Efficiency (EER), Design Criteria, Design
Calculations: Design Development
X
SUB-167
PRM Section D33 Refrigeration - Refrigeration
Equip Product Data - Certified: Construction X
SUB-168
PRM Section D36 HVAC Controls - Occupancy types, Zones, Equip for each zone; Product Data:
Design Development
X X X
SUB-169
PRM Section D36 HVAC Controls - Testing &
Balancing Report: Construction Closeout X
SUB-170
PRM Section D4 Fire Protection - Fire Protection
Areas Identification & Risers, Equipment and
Product Data: Design Development
X X
SUB-171
PRM Section D4 Fire Protection - Functional
Performance Test Reports per Code: Construction
Closeout
X
SUB-172
PRM Section D41 Fire Sprinkler/Extinguishing -
Sprinkler System Type, Water Supply/Routing for
Sprinklers: Design Development
X
SUB-173
PRM Section D41 Fire Sprinkler/Extinguishing -
Sprinkler Test Reports: Construction Closeout X
SUB-174
PRM Section D41 Fire Sprinkler/Extinguishing -
Plans submitted Reviewing Authority: Construction
Closeout
X
2 hour test at 110% design pressure submit to Fire Marshal's Office submit to Fire Marshal's Office
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
S
U
B
S
T
A
N
T
I
A
T
I
M
B
E
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE,
TYPE OF SUBMITTAL
D e s ig n S u b m it ta l
D ra w in g s
D e s ig n S u b m it ta l
S p e c s
D e s ig n S u b m it ta l
C a lc s
C o d e C h e c k s p o n s e s
D e s ig n A n a ly s is
L E
E D
S U
B M
IT
T
A L I N
F O
R M
A T
IO
N
S H
O P
D R
A W
IN
G
S
S A
M P
L E
S
C O
L O
R S
E L E
C T
IO
N
M A
N U
F A
C T
U R
E R
'S R
E C
O M
M E
N D
A T
IO
N
S
M A
N U
F A
C T
U R
E R
'S W
A R
R A
N T
Y
C A
T A
L O
G /P
R O
D U
C T
D A
T A
C O
L O
R B
O A
R D
R E
P O
R T
S
C
E R
T
IF
IC
A
T
IO
N
M P
L
IA
N C
E
O P
E R
A T
IN
G
M
A
IN
T
IN
S T
R U
C T
IO
N
S
S C
H E
D U
L E
S
O T
H E
R A
S N
O T
E D
A S
-B U
IL
T
R E
C O
R D
D R
W G
S /I N
F O
/S P
E C
S
PROJECT TITLE - RC Davenport
Remarks / Comments
SUB-175
PRM Section D43 Fire Detection/Alarm - System
Description Outline, interfaces, functions, details of input & output devices, capacities, manufacturer:
Design Development
X X
SUB-176
PRM Section D43 Fire Detection/Alarm - Plan layout of devices / system: Design Development X
SUB-177
PRM Section D43 Fire Detection/Alarm - FINAL
Plan layout of devices / system: Construction
Closeout X
SUB-178
PRM Section D43 Fire Detection/Alarm - Complete
Functional Performance Testing: Construction
Closeout X
SUB-179
PRM Section D5 Electrical Power - Complete
Functional Performance Testing: Construction
Closeout
X
SUB-180
PRM Section D5 Electrical Power - Circuit
Identification / Dedicated Circuits / Noise Protection
Circuits / Surge Protection: Design Development X X
SUB-181
PRM Section D5 Electrical Power - Correction of
Spaces with Unacceptable Elect Distribution / disturbances: Construction Closeout X
SUB-182
PRM Section D5 Electrical Power - ARC Flash
Analysis Report: Construction Closeout X
SUB-183
PRM Section D51 Generator - Generator Load
Tests: Construction Closeout X
SUB-184
PRM Section D52 Power Distribution - Identification of voltages, amps, major equip. , spare capacity, single line diagrams: Design Development X X
SUB-185
PRM Section D52 Power Distribution - Riser diagram Calculations / Equip. characteristics:
Construction Closeout X X X
SUB-186
PRM Section D61 Interior Lighting - Lighting
Calculations: Construction Documents X
SUB-187
PRM Section D62 Exterior Lighting - Lighting
Schemes and fixture / lamp types: Design
Development
X X
SUB-188
PRM Section D62 Exterior Lighting - Lighting
Calculations: Construction Documents X
SUB-189
PRM Section D62 Exterior Lighting - Lighting Levels
Field Measurement Verification: Construction
Closeout
X
SUB-190
PRM Section D62 Exterior Lighting - Pole Mounted
Lights Structural Support details & Engineering as
Req'd: Construction Documents
X X
SUB-191
PRM Section D7 Telecommunications - Complete
Continuity Testing and Functional Performance
Testing: Construction Closeout
X
SUB-192
PRM Section D71 Telecommunications - As-Built
Voice & Data Plans at each Patch Panel : Record
Documents X
SUB-193
PRM Section D72 A/V Equipment - Laminated
Instructions for A/V Equipment : Record Documents X
SUB-194
PRM Section D92 ESS Equipment - Laminated ESS
Drawing Sheets : Record Documents X
SUB-195
PRM Section D94 Cathodic Protection - Identify
Elements requiring Protection & Commissioning
Tests to verify achievement of protection: Design
Development
X
SUB-196
PRM Section E / E1 / E11 - Equipment &
Furnishings - Product Data Submittals: Construction
Documents
X
SUB-197
PRM Section E / E1 / E11 - Equipment &
Furnishings - Product Data Submittals: Construction
Documents
X
SUB-198
PRM Section E4 Fire Protection Specialties -
Extinguisher type & locations, Travel distances:
Design Development
X X
SUB-199
PRM Section G - Sitework; Landscaping / Plants
Maintenance Program: Construction Closeout X
SUB-200
PRM Section G - Sitework;Low Impact Development
Report X
SUB-201
PRM Section G2 / G23 - Site Improvements;
Landscaping / Plant Types Schedule: Design
Development
X
Includes loading dock equipment, equipment layout, (Surge Protection for servers, fire alarm panel, telephone system, security equipment & others as indicated)
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
S
U
B
S
T
A
N
T
I
A
T
I
M
B
E
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE,
TYPE OF SUBMITTAL
D e s ig n S u b m it ta l
D ra w in g s
D e s ig n S u b m it ta l
S p e c s
D e s ig n S u b m it ta l
C a lc s
C o d e C h e c k s p o n s e s
D e s ig n A n a ly s is
L E
E D
S U
B M
IT
T
A L I N
F O
R M
A T
IO
N
S H
O P
D R
A W
IN
G
S
S A
M P
L E
S
C O
L O
R S
E L E
C T
IO
N
M A
N U
F A
C T
U R
E R
'S R
E C
O M
M E
N D
A T
IO
N
S
M A
N U
F A
C T
U R
E R
'S W
A R
R A
N T
Y
C A
T A
L O
G /P
R O
D U
C T
D A
T A
C O
L O
R B
O A
R D
R E
P O
R T
S
C
E R
T
IF
IC
A
T
IO
N
M P
L
IA
N C
E
O P
E R
A T
IN
G
M
A
IN
T
IN
S T
R U
C T
IO
N
S
S C
H E
D U
L E
S
O T
H E
R A
S N
O T
E D
A S
-B U
IL
T
R E
C O
R D
D R
W G
S /I N
F O
/S P
E C
S
PROJECT TITLE - RC Davenport
Remarks / Comments
SUB-202
PRM Section G - Sitework; Paving Design and
Recommendations & Calculations: Design
Development
X X
SUB-203
PRM Section G - Sitework; Paving Design and
Recommendations & Calculations: Construction
Documents
X X
SUB-204
PRM Section G - Sitework; Site Drainage
Recommendations & Calculations: Design
Development
X X
SUB-205
PRM Section G21 - Pavements & Surfacing;
Pavement Durability for 20Years, thickness, strength
& Structural Calculations: Construction Documents X X
SUB-206
PRM Section G22 - Site Fixtures / G22A Fencing;
Security Barriers / Fences: Design Development X X
SUB-207
PRM Section G3 - Site Services; Tracer Wire
Details: Construction Documents X
SUB-208
PRM Section G3 - Site Services; Tracer Wire
Continuity Tests & GPS Locates: Construction
Closeout
X X Locate tracer wires / Utilities for Owner to input into Owner GPS coordinate systems.
IA144-Wage Determination, Scott County 6-30-2017 General Decision Number: IA170144 06/30/2017 IA144
Superseded General Decision Number: IA20160144
State: Iowa
Construction Type: Building
County: Scott County in Iowa.
BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.20 for calendar year 2017 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.20 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2017.
The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/06/2017 1 01/13/2017 2 02/03/2017 3 05/12/2017 4 05/19/2017 5 06/30/2017
ASBE0081-001 06/01/2016
Rates Fringes
ASBESTOS WORKER/HEAT & FROST
INSULATOR........................$ 30.41 20.00
BOIL0083-009 01/01/2017
Rates Fringes
BOI…