01_SOW_REPLACE_OVERHEAD_DOORS_AND_OPERATORS_641_&_680_Rv1.docx

DOCX document 45 KB Posted

Attached to
Overhead Door Replacement Federal contract opportunity
Solicitation number
W912LM-17-T-8035
Issued by
Department of the Army Minnesota Army National Guard

About this file

Statement of Work Revision 1

View the file

Other files for this federal contract opportunity

Other files attached to Overhead Door Replacement, newest first.
File Type Posted
10._Vendor_Questions.docx DOCX document
01_Bldg_680_Pictures.docx DOCX document
01_Bldg_641_Pictures.docx DOCX document
01_SOW_REPLACE_OVERHEAD_DOORS_AND_OPERATORS_641_&_680.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MINNESOTA AIR NATIONAL GUARD

HEADQUARTERS 133RD AIRLIFT WING (AMC)

SAINT PAUL MINNESOTA

26 September 2017

STATEMENT OF WORK

1. Project Title: REPLACE OVERHEAD DOORS AND OPERATORS 641 & 680

2. Project Number: QJKL172006 (WO# 201501789)

3. Project Location:133d Airlift Wing
Minnesota Air National Guard Base

614 Militia Drive St Paul, MN 55111

4. Description of Work: This project involves the work as described herein to be accomplished at the above location, with all labor, equipment, supplies and materials to be provided by the contractor. All work shall be accomplished under environmental conditions appropriate to the nature of the project. Work will comply with all local, state, and federal regulations; to include NEC, EPA, OSHA, Minnesota State Building Codes, as well as USAF and Air National Guard regulations. The successful bidder may be required to furnish proof of liability insurance and workers compensation insurance coverage before the contract will be signed by the ANG. Work shall include but not necessarily limited to: Provide materials and installation of overhead doors, operators and required hardware & trim in buildings 641 and 680 at the Minnesota Air National Guard.

a) REMOVE AND INSTALL:

1. Bldg 641 – AES Squadron: Replace (x1) one commercial grade overhead door, seals, and trim. A polyurethane-coated, insulated, steel-panel doors (the "sandwich" type), w/ (6x) six 24” panels, and three 12” wide double pane windows. (Approx. dimension: w 12’-2” x h 12’-0”) to match existing. Must meet ANSI/DASMA102- 1996, uniform pressure (velocity pressure) of 20 lbf/sq. ft. with W-1 Wind Code Rating. Field verify all information prior to ordering new door.

i. Minimum ½ HP single phase shaft driven industrial door operator, with wired continuous hold to close. (Lift Master T501L5 or approved equal)

ii. Required hardware to install overhead door and operator supplied by vendor to included; but not limited to:

1. New torsion cable.

2. Anchor brackets; commercial grade.

3. Duplex lift torsion 100K cycle springs.

4. Commercial hinges, 3” rollers and track.

5. Components shall have a brown powder coat exterior with a white interior finish.

6. Exterior seals and trim. (Color to match door.)

2. Bldg 680 – North Hangar: Replace (x1) one commercial grade overhead door, seals, weather seals with existing header, bucks (if required) and trim.

i. A polyurethane-coated, insulated, steel-panel doors (the "sandwich" type) garage door (Approx. dimension: w 11’-4” x h 16’-0”). Must meet ANSI/DASMA102- 1996, uniform pressure (velocity pressure) of 20 lbf/sq. ft. wind load rating with W-1 Wind Code Rating and double end stiles. Field verify all information prior to ordering new door.

ii. Required hardware to install door operator supplied by vendor to included, but not limited to:

1. New 5/32” torsion cable.

2. Anchor brackets; (x2) 6”, commercial grade.

3. Commercial 11 gauge hinges, 3” rollers. (Existing track to be reused unless new door comes with track at no extra charge)

4. Components shall have a standard brown finish (not the current tan color) to match the 685 tail door

5. Exterior seals and trim. (Color to match door.)

6. 100K cycle springs

b) Low voltage wiring, 12/24 volt (labor and materials) will be the responsibility of the contractor.

c) Electrical connections will be run to the nearest junction box. Owner is responsible for final power tie-in after final inspection.

d) Any costs involved with lifting or hoisting (man, materials or equipment) will be the responsibility of the contractor.

e) Demolition material is to be hauled offsite by contractor and disposed of according to State of Minnesota and Federal laws. Disposal site and quantity (tonnage) will be provided to the 133rd Base Environmental Office prior to final walkthrough.

f) Contractor required to field verify all measurements prior to installation.

g) Installation timeframe: October; preferably Oct. 6,9, or 20 for B680.

5. Warranty: All materials shall be warranted to be in compliance with this statement of work and to the highest standards of the industry; 2 Year on the opener and 10 years garage door / 2 year components.

6. Work Hours: The Contractor shall provide services between the hours of 0700-1600 on Monday through Friday, except on recognized US holidays or when the Government facility/installation is closed due to local or national emergencies, administrative closings, or similar Government-directed facility/installation closings. Performance shall be at Building 641 and 680.

Refer technical questions and information to:

MSgt Mikkael R. Hahn Contract Specialist 610 Militia Drive St. Paul, MN 55111 612-713-2613 mikkael.r.hahn.mil@mail.mil

CITIZEN AIRMEN STRENGTHENING FREEDOM