This is a Quality Assurance Surveillance Plan (QASP) for agricultural wash and post-wash disinfection services to be performed for the 756th Transportation Company at Fort Irwin, California, from March 29 through April 6, 2027. The QASP outlines the government's quality standards and surveillance methods for monitoring contractor performance throughout the service period. The plan establishes performance metrics, inspection procedures, and acceptance criteria for wash operations and disinfection treatments applied to agricultural equipment and vehicles. It defines the roles and responsibilities of the contracting officer's representative (COR) in conducting surveillance activities, documenting performance data, and ensuring compliance with contractual requirements. The QASP includes specific quality standards for equipment cleanliness, disinfection effectiveness, and timeliness of service delivery.

The surveillance plan incorporates defect identification procedures, corrective action protocols, and performance rating methodologies to assess contractor compliance. It addresses documentation requirements, inspection scheduling, and reporting mechanisms to maintain accountability throughout the service execution period. The plan specifies performance-based measurements that tie contractor payment or rating to demonstrated quality outcomes rather than input-based metrics alone, ensuring the government receives adequate service delivery standards for the agricultural wash and disinfection operations.

View the file

Other files

File Type Posted
Solicitation - W912LA27QA003.pdf PDF
AgriculturalWash_PWS_20261119.docx DOCX document
Solicitation - W912LA27QA003.pdf PDF
Wage Determination.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)

Agricultural Wash and Post-Wash Disinfection Services 756th Transportation Company and 1836th Transportation Company Fort Irwin MATES Wash Rack, Fort Irwin, California

Period of Performance
29 March 2027 – 6 April 2027

Solicitation/Contract Number

Requiring Activity
756th TC and 1836th TC Unit Supply
Prepared For
Contracting Officer / Contracting Officer's Representative

1. Purpose This Quality Assurance Surveillance Plan establishes the Government's surveillance approach for monitoring contractor performance under the Performance Work Statement (PWS) for agricultural wash and post-wash disinfection services. It is intended to help the Contracting Officer (KO), Contracting Officer's Representative (COR), and authorized Government inspectors determine whether the contractor meets the required performance outcomes. This QASP does not change the contract or PWS and does not authorize Government personnel to direct contractor methods or perform actions reserved for the KO.

2. Scope of Surveillance Government surveillance will cover agricultural washing, post-wash disinfection, contamination control, production schedule and flow, records and deliverables, safety/environmental compliance, and site restoration. Surveillance will focus on measurable outcomes and acceptance standards established in the PWS.

3. Roles and Responsibilities Contracting Officer (KO). Retains contractual authority, addresses matters affecting price, schedule, or scope, and issues written modifications or other authorized contractual direction.

Contracting Officer's Representative (COR). Performs surveillance within delegated authority; documents performance; reviews required deliverables; coordinates inspections; reports deficiencies, delays, and trends to the KO; and maintains QASP records.

Authorized Government Inspector/Unit Representative. Conducts or supports technical inspections as designated, records acceptance or rejection in the production tracker or other designated record, and promptly informs the COR of deficiencies. Government inspectors do not authorize additional cost, time, or out-of-scope work.

Contractor. Maintains its own quality-control process, corrects contractor-caused deficiencies at no additional cost, provides required records and deliverables, and presents conforming work for Government inspection.

4. Surveillance Methods Because the PWS establishes a 100 percent Acceptance Quality Level (AQL) for the primary performance objectives, the Government will use 100 percent inspection or review where specified. Surveillance methods include visual inspection of each item, direct observation, record/document review, daily surveillance of contamination controls, production tracker review, and verification of required deliverables.

5. Performance Requirements Summary

Performance Objective
Performance Standard / AQL
Surveillance Method
Frequency
Government Action for Deficiency
Agricultural wash
No visible soil, vegetation, seeds, insects, grease buildup, or debris on accessible required surfaces. AQL: 100%.
Visual inspection of each item.
Each item before wash acceptance.
Reject; contractor recleans and re-presents at no additional cost.
Post-wash disinfection
Government-approved EPA-registered disinfectant applied only after wash acceptance and at required concentration, coverage, contact time, and safety requirements. AQL: 100%.
Observation and record review.
Each item / application.
Reject or withhold final acceptance; contractor reapplies and documents at no additional cost.
Contamination control
Dirty, washed, disinfected, and accepted equipment remain separated; accepted items remain free of recontamination. AQL: 100%.
Daily surveillance and observation.
Continuous/daily during production.
Require correction of controls; affected items rewashed or redisinfected as necessary.
Schedule and flow
Contractor meets awarded completion date when required Government support and staging are available. PWS planning standard is up to 16 vehicles/trailers per scheduled 10-hour production shift and base quantity within seven consecutive service days, unless award states otherwise. AQL: 100%.
Production tracker and schedule review.
Daily.
Document variance; require recovery plan/corrective action and elevate contractual impacts to KO.
Records
Daily tracker and final completion package are accurate and complete. AQL: 100%.
Document review.
Daily and at closeout.
Return for correction and resubmission.
Safety/environmental protection
Compliance with product labels, SDS, installation safety rules, applicable occupational safety requirements, and authorized wastewater controls.
Observation and document review.
Daily and when conditions warrant.
Document issue; stop/notify as required by PWS; elevate contractual or safety concerns.
Site restoration
Contractor-furnished equipment, materials, trash, and unused chemicals removed and immediate work area returned to pre-performance condition, reasonable wear excepted.
Final visual inspection.
At completion/breakdown.
Document deficiencies and require correction before closeout.

6. Inspection and Acceptance Procedures Contractor performs its quality-control inspection before presenting an item to the Government.

Government inspector visually inspects washed equipment against the agricultural-wash standard.

Items failing wash inspection are rejected and returned for contractor correction at no additional cost.

Government wash acceptance must be recorded before post-wash disinfection begins.

Government observes and/or reviews records to verify the approved disinfectant was applied at the required concentration, coverage, contact time, and safety requirements.

Final acceptance occurs only when the authorized Government inspector confirms the applicable standard is met and records acceptance in the production tracker or other designated record.

Government inspection does not relieve the contractor of responsibility for conforming performance.

7. Deliverable Surveillance

Deliverable
Minimum Content
Due
Recipient
COR Verification
Work plan and production schedule
Staffing, equipment, sequence, daily capacity, safety controls, contamination controls, and points of contact.
3 business days before mobilization
COR and KO
Verify completeness and consistency with awarded requirements.
Chemical and safety package
Product labels, SDS, disinfectant application instructions, and spill response procedures.
3 business days before mobilization
COR
Verify documents are complete and available before chemicals are brought onsite.
Daily production report
Items received, washed, accepted, disinfected, completed, rejected, corrected, and delayed; issues requiring Government action.
By 0900 next workday
COR
Compare report with production tracker and inspection records.
Delay or incident notice
Date, time, duration, affected resources, cause, actions taken, and expected effect.
Immediately; written record within 1 business day
COR and KO
Document notification and elevate cost/schedule/scope impacts to KO.
Final completion package
Final manifest, inspection and disinfection records, unresolved issues, and site-restoration confirmation.
2 business days after completion
COR and KO
Verify completeness before recommending closeout/acceptance actions.

8. Deficiency Documentation and Corrective Action When surveillance identifies a deficiency, the Government inspector or COR will document the affected item, date/time, requirement, observed condition, disposition, and corrective action. Contractor-caused deficiencies will be corrected at no additional cost. Rejected work will not be accepted until the applicable performance standard is met. Recurring, systemic, schedule-related, safety-related, or potentially contractual deficiencies will be elevated to the KO. Only the KO may authorize changes affecting price, schedule, or scope.

9. Government Surveillance Checklist

Inspection Item
Accept
Reject/N/A
Remarks
Pre-performance coordination completed; access, wash-rack readiness, staging, utilities, flow, inspection sequence, safety controls, and points of contact verified.
☐
☐
Required work plan/production schedule received.
☐
☐
Chemical/SDS/disinfectant package received and reviewed.
☐
☐
Government-furnished wash rack/support required by the PWS available or any limitations documented.
☐
☐
Equipment properly prepared and staged by Government.
☐
☐
Contractor quality-control inspection completed before Government inspection.
☐
☐
Washed item meets 100% visual cleanliness standard.
☐
☐
Wash acceptance recorded before disinfection.
☐
☐
Disinfectant application verified for approved product, concentration, coverage, and contact time.
☐
☐
Dirty, washed, disinfected, and accepted equipment remain segregated.
☐
☐
Daily production tracker/report reconciled.
☐
☐
Deficiencies, delays, incidents, and corrective actions documented.
☐
☐
Final manifest and inspection/disinfection records complete.
☐
☐
Site restoration verified.
☐
☐

10. Surveillance Record Date/Shift

Inspector/COR

Equipment/CLIN

Requirement Inspected

Result (Accept/Reject)

Deficiency/Observation

Corrective Action/Disposition

Follow-up/Closure Date

11. Approval

Role
Name/Signature
Date

Contracting Officer

Contracting Officer's Representative