DOCX document 47 KB Posted

Attached to
MOB AG Wash
Solicitation number
W912LA-27-Q-A003
Issued by

About this file

This is a Performance Work Statement (PWS) for agricultural wash and post-wash disinfection services to be performed for the 756th Transportation Company by the California Army National Guard.

The contractor shall wash, disinfect, inspect, and document completion of 30 M1088A1P2 tractors, 30 M967A2 fuel tanker trailers, and two 20-foot CONEX containers. Services will be performed onsite at either the RUBA wash racks (6000 S Loop Road, Fort Irwin, CA 92310) or the MATES wash rack (7727 S Loop Access Road, Fort Irwin, CA 92310), with the specific location to be identified in the solicitation. The period of performance runs from 29 March through 6 April 2027, with setup on 29 March, seven consecutive production days from 30 March through 5 April, and breakdown on 6 April 2027. Work hours are 0700–1700 local time, with weekend access available 3–4 April 2027. The contractor must achieve a production capacity of up to 16 vehicles or trailers per 10-hour shift and complete all base quantities within the seven-service-day window.

The contractor shall provide all personnel, supervision, quality control, equipment, tools, materials, and supplies except those specified as Government-furnished. Required deliverables include a Quality Control Plan (three business days before mobilization), work plan and production schedule (three business days before mobilization), chemical and safety package (three business days before mobilization), daily production reports (by 0900 the next workday), and a final completion package (two business days after breakdown). The contractor must hold a California pest control business license and car washing and polishing license, complete AT Level I awareness training and OPSEC Level I training within 30 calendar days of contract start, and ensure all employees complete iWATCH training within 30 calendar days of award. Surfaces must be visibly free of soil, vegetation, insects, and contaminants; post-wash disinfection shall use Virkon-S per product label specifications. The Government will provide the wash rack facility, containment equipment, wastewater handling and disposal, 20 Soldiers for equipment movement, vehicle operators, inspectors, and site-flow personnel. Contractor-caused deficiencies and recontamination must be corrected at no additional cost before final acceptance.

View the file

Other files

File Type Posted
Solicitation - W912LA27QA003.pdf PDF
QASP_Agricultural_Wash_and_Disinfection_Fort_Irwin.docx DOCX document
Solicitation - W912LA27QA003.pdf PDF
Wage Determination.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Performance Work Statement Agricultural Wash and Post Wash Disinfection Services 756th Transportation Company Coordination draft • 27 October 2026 • Complete the Government review items in Appendix A before solicitation. Appendix A is advisory and is not part of the PWS.

1.0 General

1.1 Scope The Contractor shall wash, disinfect, inspect, correct deficiencies, and document completion for the quantities below. The Contracting Officer may adjust quantities through written contract action. Only the Contracting Officer may authorize changes that affect price, schedule, or scope. The contractor shall provide all personnel, supervision, quality control, equipment, tools, materials, and supplies except those identified in Section 3.0. The required quantities are shown in paragraph 5.2.

1.1.1 Objectives The Contractor shall deliver equipment that is visibly free of soil and other agricultural contaminants, disinfected using Virkon-S in accordance with the product label, protected from recontamination, and ready for Government acceptance inspection. The Government will evaluate outcomes rather than direct the Contractor’s day-to-day methods.

1.2 Background The Government requires professional agricultural wash and post-wash disinfection services to remove soil, vegetation, grease, grime, organic matter, pests, and other surface contaminants from military equipment. The work must prepare the equipment for Government inspection and movement while preventing cross-contamination between dirty and cleaned items.

1.3 Period of Performance The onsite period of performance is 29 March through 6 April 2027, inclusive. Setup is scheduled for 29 March, seven consecutive service days run from 30 March through 5 April, and breakdown is scheduled for 6 April. No option periods are identified.

1.4 General Information The following requirements govern onsite performance and contract coordination.

1.4.1 Place and Performance of Services The Government will identify the designated wash rack in the solicitation. The two potential locations are the RUBA wash racks at 6000 S Loop Road, Fort Irwin, CA 92310, and the Maneuver Area Training Equipment Site (MATES) wash rack at 7727 S Loop Access Road, Fort Irwin, CA 92310. Onsite work hours are 0700–1700 local time each scheduled day. Weekend access will be available at the designated wash rack on 3 and 4 April 2027 from 0700 to 1700 local time. [GOVERNMENT TO COMPLETE: confirm utility specifications for the designated site before solicitation.] The contractor shall maintain sufficient personnel and serviceable equipment to meet paragraph 5.7.

1.4.1.1 Telework Physical washing, disinfection, inspection support, and site restoration require onsite performance. The contractor may perform administrative planning and reporting remotely when this does not delay onsite services or compromise information protection.

1.4.1.2 Access Delays Vehicles and personnel are subject to installation access controls and searches. The contractor shall record access delays under paragraph 5.10. Any entitlement to time or compensation is governed by the contract clauses and the Contracting Officer’s determination.

1.4.1.3 Installation Conduct The contractor shall comply with installation fire, traffic, safety, and security rules and enter restricted areas only with authorization. The Government reserves the right to remove an employee from Government property or revoke access for misconduct, security reasons, or overt evidence of communicable disease. Such removal does not relieve the contractor of performance obligations.

1.4.2 Recognized Holidays No production is planned on Federal holidays. Recognized holidays are New Year’s Day, Martin Luther King Jr.’s Birthday, Washington’s Birthday, Memorial Day, Juneteenth National Independence Day, Independence Day, Labor Day, Columbus Day, Veterans Day, Thanksgiving Day, and Christmas Day. The selected nine-day onsite schedule shall account for installation closures before solicitation.

1.4.3 Quality Control The contractor shall develop and maintain a Quality Control Plan (QCP) addressing the critical tasks in Technical Exhibit 1, inspection before Government presentation, deficiency correction, chemical application records, contamination prevention, and recurring-defect prevention. The contractor shall submit the QCP three business days before mobilization. The contractor shall obtain the Contracting Officer’s written acceptance before production and before implementing changes.

1.4.4 Quality Assurance The Government will evaluate performance using its Quality Assurance Surveillance Plan (QASP) and Technical Exhibit 1. The Contracting Officer Representative (COR), within written delegation, will document surveillance and coordinate inspections with the authorized agricultural inspector. Government inspection does not relieve the contractor of responsibility for conforming work.

1.4.5 Installation Access and Security Requirements. The MATES wash rack is on the installation in an unsecured area. The Government will confirm the access requirements for the designated wash rack. The contractor shall comply with installation entry requirements applicable to the route to the wash rack and with site safety, traffic, identification, and security rules furnished with the solicitation. The Government will identify any gate entry, screening, escort, or local training requirements before solicitation. The unsecured status of the MATES wash rack does not, by itself, establish whether installation entry screening is required.

1.4.5.1 Licensing. Must have California Pest control business license and car washing and polishing license.

1.4.5.2 Access Without a Common Access Card. No Common Access Card is required for the described services. Contractor employees shall meet the installation entry requirements identified in paragraph 1.4.5. Access to secured or restricted areas is outside the described work requirement.

1.4.5.3 Antiterrorism Level I Awareness Training. All contractor employees, including subcontractor employees, requiring access to Army installations, facilities, and controlled access areas shall complete AT Level 1 training within 30 calendar days after contract start date and within 30 calendar days of new employees commencing performance. The contractor shall submit certificates of completion for each affected contractor and subcontractor employee to the COR within 15 calendar days after completion of training by each employee or subcontractor personnel. AT Level 1 awareness training is available at the following website: https://jko.jten.mil/courses/atl1/launch.html.

1.4.5.4 iWATCH Training. The contractor and all associated subcontractors with an area of performance within an Army-controlled installation, facilities or area shall brief all employees on the local iWATCH program (training standards provided by the requiring activity Antiterrorism Officer (ATO)). This local developed training shall be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR or the KO. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance. The contractor shall report completion for each contractor employee and subcontractor employee to the COR, within 15 calendar days after completion of training.

1.4.5.5 Communications Security and Information Technology Security. All communications with DoD organizations are subject to COMSEC review. All telephone communications networks are continually subject to intercept by unfriendly intelligence organizations. DoD has authorized the military departments to conduct COMSEC monitoring and recording of telephone calls originating from, or terminating at, DoD organizations. Therefore, the contractor is advised that any time contractor personnel place or receive a call they are subject to COMSEC procedures. The contractor shall ensure wide and frequent dissemination of the above information to all employees dealing with DoD information. The contractor shall abide by all Government regulations concerning the authorized use of the Government's computer network, including the restriction against using the network to recruit Government personnel or advertise job openings.

1.4.5.6 Reserved. No corresponding access or function is identified in this requirement.

1.4.5.7 Reserved. No corresponding access or function is identified in this requirement.

1.4.5.8 Reserved. No corresponding access or function is identified in this requirement.

1.4.5.9 Reserved. No corresponding access or function is identified in this requirement.

1.4.5.10 Reserved. No corresponding access or function is identified in this requirement.

1.4.5.11 OPSEC Training: In accordance with AR 530-1, Operations Security, new contractor employees shall complete Level I OPSEC training within 30 calendar days of their reporting for duty and annually thereafter. The contractor shall submit certificates of completion for each contractor employee to the COR within 15 calendar days after completion of training. Level 1 OPSEC training is available at https://securityawareness.usalearning.gov/opsec/index.htm.

1.4.5.12 Reserved. No corresponding access or function is identified in this requirement.

1.4.5.13 Reserved. No corresponding access or function is identified in this requirement.

1.4.5.14 Reserved. No corresponding access or function is identified in this requirement.

1.4.5.15 Information Protection The contractor shall not photograph, record, or release Government equipment or movement information without written Government authorization. No classified information, Government network access, or Common Access Card issuance is required for the described work. The unsecured work-site designation does not authorize access to other installation areas.

1.4.6 Physical Security The contractor shall safeguard Government property provided for contractor use and secure Government facilities, equipment, and materials at the close of each work period.

1.4.6.1 Key Control Reserved. No keys or key cards are identified for issue.

1.4.6.2 Lock Combinations Reserved. No lock combinations are identified for issue.

1.4.7 Special Qualifications The contractor shall ensure personnel hold licenses and certifications legally required for the equipment and chemicals they use. No military-only experience or special military certification is prescribed.

1.4.8 Post Award Conference and Progress Meetings The contractor shall attend the pre-performance conference and daily production coordination meetings at no additional cost. Participants will review site readiness, Government support, inspections, production, deficiencies, and delays.

1.4.9 Contract Manager The contractor shall designate a contract manager and alternate in writing to the Contracting Officer and COR before mobilization. Either shall have authority over daily contractor operations and deficiency correction. The contractor shall supervise its employees. Only the Contracting Officer may change price, scope, or schedule.

1.4.10 Identification of Contractor Employees The contractor shall identify contractor status in correspondence and reports. Onsite employees shall wear visible identification displaying company name, employee name, and the word contractor.

1.4.10.1 Return of Identification Media The contractor shall recover Government-issued passes from departing employees and return them to the Contracting Officer within 14 calendar days after departure. Company badges remain contractor property.

1.4.11 Combating Trafficking in Persons The contractor shall comply with the applicable contract clause prohibiting trafficking in persons, procurement of commercial sex acts, and forced labor; inform employees of the policy; and take required corrective action for violations.

1.4.12 Contractor Travel Reserved. No separately reimbursable travel is identified. Mobilization and demobilization are part of the service price.

1.4.13 Data Rights Rights in deliverables are governed by the clauses incorporated in the contract. The contractor shall provide the production and completion records required by this PWS.

1.4.14 Organizational Conflicts of Interest The contractor shall immediately notify the Contracting Officer of an actual or potential organizational conflict of interest arising during performance and submit proposed mitigation when requested by the Contracting Officer.

1.4.15 Phase In and Phase Out Reserved. Setup and breakdown are addressed in paragraphs 1.3 and 5.9; no incumbent transition period is identified.

2.0 Definitions and Acronyms

2.1 Definitions Agricultural wash means cleaning to remove visible soil, seeds, vegetation, insects, grease buildup, and debris from required accessible surfaces. Defective service means an output that does not meet the applicable standard. A service day is one scheduled 10-hour production shift. A business day is Monday through Friday excluding Federal holidays. Acceptance means documented confirmation by the authorized Government representative that the applicable standard is met. An acceptable quality level is the permitted number of defects or missed occurrences used for surveillance; it does not waive required correction of rejected work.

2.2 Acronyms AT—Antiterrorism; CAC—Common Access Card; CLIN—Contract Line Item Number; COMSEC—Communications Security; COR—Contracting Officer Representative; DoD—Department of Defense; EPA—Environmental Protection Agency; FAR—Federal Acquisition Regulation; HQDA—Headquarters Department of the Army; IT—Information Technology; KO—Contracting Officer; MATES—Maneuver Area Training Equipment Site; NCIC-III—National Crime Information Center Interstate Identification Index; OPSEC—Operations Security; PLS—Palletized Load System; PRS—Performance Requirements Summary; PWS—Performance Work Statement; QA—Quality Assurance; QASP—Quality Assurance Surveillance Plan; QC—Quality Control; QCP—Quality Control Plan; SDS—Safety Data Sheet; TSDB—Terrorist Screening Database.

3.0 Government Furnished Property Material Equipment and Services

3.1 Property The Government will provide an operational, accessible wash rack at the location designated under paragraph 1.4.1 and an agreed staging and disinfection area. The Government retains accountability for the facility and will provide facility maintenance and repair. The parties will document condition before setup and after breakdown. Contractor liability for damage is governed by applicable contract clauses.

3.2 Materials The Government will provide the equipment manifest at least three calendar days before contractor arrival and movement-specific acceptance criteria before performance. The solicitation shall contain the baseline manifest and inspection criteria so all offerors price the same work.

3.3 Equipment The Government will provide serviceable containment mats and berms. [GOVERNMENT TO COMPLETE: quantities, dimensions, condition, custody, maintenance responsibility, and required property attachment before solicitation.] No other Government equipment is promised.

3.4 Services The Government will provide vehicle operators, inspectors, site-flow personnel, required escorts, and authorized wastewater handling and disposal. The 756th Transportation Company will provide 20 Soldiers for equipment movement from the designated staging areas under paragraph 3.4.2. The contractor shall furnish personnel for contracted cleaning and disinfection. Government personnel remain under Government supervision. [GOVERNMENT TO COMPLETE: daily movement-team coverage, operator assignments, inspector coverage, and wastewater arrangements before solicitation.]

3.4.1 Equipment Preparation Label and stage accessories, removable components, and supplies in a pest-free area. Remove payloads, loose cargo, trash, personal gear, seats, cushions, detachable sideboards, canvas sides and tops, and other removable items; reinstall items after wash acceptance and before disinfection when directed. Sweep, compressed-air clean, or wet/dry vacuum cabs, floorboards, storage areas, and tool compartments after removing interior items. Pre-clean excessive accumulations of dirt, debris, oil, and fluids. Remove, clean, and safely reinstall batteries; clean battery boxes. Remove outside dual wheels and spare tires and stage them for cleaning. Remove locks and provide access to compartments, toolboxes, engine areas, vehicle beds, recesses, and inspection points. Disengage collapsible truck sides and expose recessed areas and ledges. Inspect each item after washing and before authorizing disinfection. Keep cleaned equipment and removable items separated from dirty equipment. Attend a daily coordination brief and update the Government-designated production tracker. Stage eight prepared vehicles or trailers at shift start and eight additional prepared items by the five-hour midpoint.

3.4.2 Production Flow The Government will stage eight prepared vehicles or trailers at shift start and eight additional prepared vehicles or trailers by the five-hour midpoint. The Government will coordinate container presentation to support the seven-service-day completion requirement. The 756th Transportation Company will provide the Palletized Load System (PLS) and unit operators to move and stage the two 20-foot containers for washing and inspection. The 20-Soldier unit movement team will handle equipment movement from the designated staging areas in coordination with the wash and inspection schedule.

3.5 Utilities The Government will provide water, electricity, and authorized agricultural-wash wastewater discharge at the wash rack. The contractor shall conserve utilities and close valves when not in use. [GOVERNMENT TO COMPLETE: water flow and pressure, connections, electrical voltage and amperage, and discharge limitations before solicitation.]

4.0 Contractor Furnished Property Materials and Equipment

4.1 General Except for the support identified in Part 3, the Contractor shall provide all resources necessary for performance, including qualified supervision and labor; pressure-washing and cleaning equipment; hoses, fittings, tools, ladders, personal protective equipment, cleaning agents, approved disinfectant, spill-control materials, and consumable supplies; and quality-control and production records. Contractor equipment shall be safe, serviceable, and suitable for the installation utilities and containment system. Contractor-furnished equipment remains contractor property. The service price shall include the contractor-furnished resources; no separate equipment purchase reimbursement is identified. The Contractor shall provide lifting equipment suitable for the size and weight of the 20-foot containers and qualified operators to provide safe underside access for cleaning and inspection. The Contractor shall include this equipment and labor in the service price.

4.2 Secret Facility Clearance Reserved. Classified work is not required.

4.3 Contractor Security Clearance Reserved. Personnel security clearances are not required for the described services.

5.0 Requirements

5.1 Mobilization and Planning The contractor shall attend the pre-performance meeting and verify site readiness, utility compatibility, staging, equipment flow, inspection sequence, safety controls, and contacts. The contractor shall submit a work plan and production schedule three business days before mobilization identifying staffing, equipment, sequence, daily capacity, chemical controls, contingency resources, and Government support dependencies.

5.2 Required Quantities The contractor shall wash and subsequently disinfect 30 M1088A1P2 tractors, 30 M967A2 fuel tanker trailers, and two 20-foot CONEX containers. Wash and disinfection apply to the same inventory; they are not separate equipment quantities. Proposed CLIN numbering below is subject to the solicitation schedule.

Proposed CLIN
Equipment
Quantity
Service
0001
M1088A1P2 tractor
30
Agricultural wash
0002
M967A2 fuel tanker trailer
30
Agricultural wash exterior and undercarriage
0003
20-foot container
2
Agricultural wash of interior, exterior, and underside
0005
M1088A1P2 tractor
30
Post-wash disinfection
0006
M967A2 fuel tanker trailer
30
Post-wash disinfection exterior and undercarriage
0007
20-foot container
2
Post-wash disinfection

5.2.1 CONEX Containers [GOVERNMENT TO COMPLETE BEFORE SOLICITATION: container type and any access limitations.] The final manifest shall reconcile identifiers against the awarded baseline. Quantity or scope changes require written Contracting Officer action. The Contractor shall clean the interior, exterior, and underside of both 20-foot CONEX containers. Interior cleaning includes accessible walls, ceilings, floors, floorboard joints, corners, door thresholds, and recesses. The solicitation manifest shall identify any access limitations. The unit will move and stage the containers by PLS under paragraph 3.4.2. The Contractor shall provide onsite lifting for underside access under paragraph 4.1. Apply Technical Exhibit 5 to the surfaces identified for service.

5.3 Agricultural Wash The contractor shall remove dirt, mud, grease, grime, seeds, vegetation, insects, and other surface particles from all accessible exterior surfaces, undercarriages, wheel wells, frames, suspension areas, ledges, recesses, compartments, and removable items presented for service. Each required surface shall be visibly free of the listed contaminants before Government wash acceptance. The contractor shall protect sensitive components from water and chemical damage using the equipment manufacturer’s handling limitations provided with the solicitation. Apply the equipment-specific cleaning points in Technical Exhibits 4 and 5 to the surfaces presented for service. Government equipment preparation and access responsibilities are in paragraph 3.4.1.

5.3.1 Fuel Tanker Limitations The contractor shall clean the exterior and undercarriage of M967A2 trailers. Tank entry, purging, internal tank cleaning, residual-product removal, spill response, and hazardous-material remediation are outside scope unless separately authorized in writing.

5.4 Post Wash Disinfection The contractor shall, after Government wash inspection and acceptance, apply Virkon-S as the required post-wash disinfectant in accordance with the product label, including concentration, coverage, contact time, and safety requirements. The contractor shall not rinse after application unless the product label or Contracting Officer requires it. The contractor shall record item identifier, product name and EPA registration number, dilution or concentration, application date and time, contact time, and applicator. [GOVERNMENT TO COMPLETE: destination-required treatment criteria and compatibility with the Virkon-S label before solicitation.] Government acceptance does not authorize use inconsistent with the product label.

5.5 Inspection and Correction The contractor shall conduct contractor quality-control inspection before presenting each item to the Government. The contractor shall correct contractor-caused deficiencies at no additional cost. The contractor shall obtain Government wash acceptance before disinfection and final acceptance after disinfection. The authorized Government inspector will inspect each item for wash acceptance. The COR will document final acceptance after disinfection records and applicable inspection results demonstrate conformity. Rejected work shall be corrected before the item is presented again for acceptance. Before requesting Government wash inspection, the Contractor shall complete the applicable cleaning checks in Technical Exhibit 4 or 5 and record the results by equipment identifier. The Contractor shall identify any required surface that could not be accessed and notify the COR before requesting acceptance. Correct cleaning deficiencies and resubmit rejected items for wash inspection before applying Virkon-S.

5.6 Contamination Control The contractor shall maintain separation between dirty, washed, disinfected, and accepted equipment. The contractor shall use clean tools and procedures in post-wash areas and prevent runoff, splash, foot traffic, or handling from recontaminating completed items. Contractor-caused recontamination shall be corrected at no additional cost before final acceptance. Other causes of recontamination shall be documented and referred to the Contracting Officer.

5.7 Production Capability The contractor shall plan staffing and equipment to process up to 16 vehicles or trailers per scheduled 10-hour production shift when the Government provides the required equipment flow and support. The contractor shall complete the base quantity within seven consecutive service days, excluding one setup day and one breakdown day, unless the award states otherwise. The production schedule shall account for 60 tractors and trailers plus two 20-foot CONEX containers. The 16-item planning capacity is for vehicles and trailers and does not count wash and disinfection as two completed items.

5.8 Safety and Environmental Protection The contractor shall comply with product labels, Safety Data Sheets, installation safety rules, and applicable occupational safety requirements. The contractor shall provide SDS documentation for each chemical before bringing it onsite. The contractor shall conduct daily safety briefings and maintain an accessible hazard-communication file. The contractor shall prevent unauthorized releases to soil, storm drains, or areas outside the approved wastewater system. The contractor shall immediately contain and report spills or releases to the Government point of contact. The contractor shall stop work and notify the Contracting Officer when an unsafe condition, suspected hazardous material, or environmental noncompliance could affect performance. The contractor shall submit the chemical and safety package, with product labels, SDS, application instructions, spill procedures, and equipment protection controls, three business days before mobilization. The contractor shall contain and report spills caused by its work; tanker residual-product removal and hazardous-material remediation remain outside scope under paragraph 5.3.1.

5.9 Site Restoration At completion, the contractor shall remove Contractor-furnished equipment, materials, trash, and unused chemicals; clean the immediate work area; and return the site to the condition existing before performance, reasonable wear excepted.

5.10 Delays Incidents and Changes The Contractor shall notify the Contracting Officer promptly when a condition may change cost, schedule, sequence, or scope. The Contractor shall document the affected date and time, equipment and Government resources available, personnel notified, work completed, and anticipated effect. Direction from inspectors, escorts, operators, unit representatives, or other personnel does not authorize additional cost or time. The Contractor shall not perform out-of-scope or extra-cost work without a written modification or other written authorization issued by the Contracting Officer. The Contractor is not entitled to additional compensation for delays, rework, standby, remobilization, or added service days caused by the Contractor, its personnel, subcontractors, equipment, scheduling, or deficient performance. Any Government-caused delay remedy or schedule adjustment will be handled under the contract’s applicable clauses and a written Contracting Officer determination; vendor-proposed delay charges are not incorporated into this PWS unless expressly included in the award. The contractor shall immediately notify the COR and Contracting Officer of a delay or incident and submit the written record within one business day. No PWS provision overrides the contract’s changes, suspension, inspection, or disputes clauses.

5.11 Daily Production Report The contractor shall submit a report by 0900 the next workday showing identifiers and quantities received, washed, wash-accepted, disinfected, finally accepted, rejected, corrected, and delayed; chemical application records; Government support available; and issues requiring Government action. The report shall distinguish each physical item from its service events.

5.12 Final Completion Package The contractor shall submit the final manifest, wash inspection and disinfection records, final acceptance status by item, unresolved issues, and site-restoration confirmation within two business days after breakdown. The contractor shall correct identified report errors within one business day after notification. Include completed vehicle and container cleaning checklists in the final package.

5.13 Service Contract Reporting Reserved pending the Contracting Officer’s determination of applicable reporting clauses and acquisition value. Any required reporting shall be stated in the solicitation and award before performance.

6.0 Applicable Publications

The following sources apply only to the listed subject matter. The Government will identify and attach installation and movement-specific documents before solicitation. Contract clauses govern contractual remedies and payment; this list does not incorporate every provision of a publication.

Publication and applicable portion
Date or edition
Status and source
Product labels and SDS for proposed cleaning and disinfecting chemicals; application and safety sections
Product-specific revision submitted under 5.8
Mandatory for chemicals used; contractor provides copies
29 CFR 1910.1200 Hazard Communication; 1910.132 General Requirements for Personal Protective Equipment
Electronic CFR text as of solicitation issuance; KO to record date
Mandatory for applicable work; https://www.ecfr.gov/current/title-29/subtitle-B/chapter-XVII/part-1910
40 CFR 156.10 Labeling Requirements, including directions for use
Electronic CFR text as of solicitation issuance; KO to record date
Mandatory for applicable pesticide labeling; https://www.ecfr.gov/current/title-40/chapter-I/subchapter-E/part-156/section-156.10
Fort Irwin access, AT and OPSEC instructions; wash-rack operating and wastewater requirements
Government to identify title, date, sections and attach before solicitation
Mandatory when incorporated; Government-furnished attachment
Movement or destination agricultural inspection and disinfection checklist
Government to identify title, date, sections and attach before solicitation
Mandatory acceptance basis when incorporated; Government-furnished attachment

6.1 Applicable Forms The Government will provide the baseline equipment manifest and wash inspection or acceptance form before solicitation. The contractor shall provide the reports and application records identified in Technical Exhibit 2. No DD Form 250 or credential application form is prescribed by this PWS; any required form will be identified in the award. Technical Exhibits 4 and 5 contain the equipment-specific cleaning checklists adapted from AFPMB Technical Guide 31 and the Agricultural Cleaning Inspection Problem Areas guide. The Government will furnish any additional movement-specific inspection criteria with the solicitation.

Technical Exhibit 1 Performance Requirements Summary All rejected work requires correction. Because agricultural clearance is essential to movement, wash acceptance and disinfection require inspection or record verification for each item. The COR will record surveillance; the agricultural inspector performs the technical wash inspection. Other objectives use occurrence-based thresholds rather than a blanket 100 percent rating.

PWS reference and objective
Performance standard
Acceptable quality level
Surveillance and responsibility
5.3 and 5.5 Agricultural wash
Required surfaces visibly free of listed contaminants and applicable cleaning checks documented per Technical Exhibits 4 and 5 before acceptance
Zero nonconforming items accepted; correction before acceptance
Each-item visual inspection by authorized inspector; COR records results
5.4 Disinfection
Apply Virkon-S after wash acceptance at label concentration, coverage and contact time; record each item
Zero items accepted without conforming treatment and records
Each-item application record review by COR; observe first application and after product or dilution changes
5.6 Contamination control
Maintain separation and correct contractor-caused recontamination before acceptance
Zero unresolved contractor-caused recontamination events at final acceptance
Daily inspection by COR; reinspect affected items
5.7 Schedule
Complete base quantities within seven service days when identified Government support is provided
Zero contractor-caused missed completion milestones
Daily progress review by COR; KO determines delay responsibility
5.11 and 5.12 Reports
Submit accurate daily reports and final package by specified deadlines; correct errors within one business day
No more than one late or inaccurate daily report during onsite effort; zero overdue final packages
Review each report and final package by COR

Technical Exhibit 2 Deliverables Schedule

PWS reference and deliverable
Frequency or due date
Copies and medium
Submit to
1.4.3 QCP
3 business days before mobilization; accepted before production
1 electronic copy; original passes for identification media
COR and KO
1.4.9 Manager and alternate designation
Before mobilization
1 electronic copy; original passes for identification media
COR and KO
5.1 Work plan and production schedule
3 business days before mobilization
1 electronic copy; original passes for identification media
COR and KO
5.8 Chemical and safety package
3 business days before mobilization
1 electronic copy; original passes for identification media
COR
5.10 Delay or incident notice
Immediate notice; written record within 1 business day
1 electronic copy; original passes for identification media
COR and KO
5.11 Daily production report and treatment records
By 0900 next workday
1 electronic copy; original passes for identification media
COR
5.12 Final completion package and completed inspection checklists
2 business days after breakdown
1 electronic copy; original passes for identification media
COR and KO
1.4.5.3 AT Level I certificates
Training within 30 calendar days of contract start or new employee start; certificates within 15 calendar days after training
1 electronic copy; original passes for identification media
COR
1.4.5.4 iWATCH completion report
Training within 30 calendar days of award or new employee start; report within 15 calendar days after training
1 electronic copy; original passes for identification media
COR
1.4.5.11 OPSEC Level I certificates
Training within 30 calendar days of reporting for duty and annually thereafter; certificates within 15 calendar days after training
1 electronic copy; original passes for identification media
COR
1.4.10.1 Government identification media
Within 14 calendar days after employee departure
1 electronic copy; original passes for identification media
KO

If award timing leaves fewer than three business days before mobilization, the Contracting Officer shall establish revised pre-mobilization deliverable dates in the award. The Government shall resolve training deadlines for this short onsite effort before solicitation; the stated template deadlines may extend beyond onsite completion.

Technical Exhibit 3 Estimated Workload Data Reserved. No historical workload data was supplied. The current required quantities are in paragraph 5.2 and are not represented as historical estimates.

Technical Exhibit 4 Wheeled Vehicle Cleaning Checklist Use for M1088A1P2 tractors and M967A2 fuel tanker trailers. Record pass, fail, or not applicable for each check. Explain any failed check, inapplicable item, or required area that could not be accessed.

Equipment ID ____________________ Inspection date __________ Inspector ____________________

Area
Cleaning check
Result and remarks
Exterior and recessed areas
Check around lighting, steps, ledges, brackets, access panels, grilles, and exposed recesses for soil and organic debris.
Wheels and undercarriage
Check wheel wells, accessible wheel and rim surfaces, suspension, frame, crossmembers, and undercarriage for trapped soil and debris.
Accessible compartments and removable items
Check Government-opened compartments, presented screens or plates, and accessible areas around grilles, battery boxes, and equipment storage. Apply equipment protection requirements in paragraph 5.3.
Cab and interior items
Check floor panels, under mats, storage areas, and other accessible interior surfaces when the solicitation identifies them for contractor cleaning.
M967A2 tanker exterior
Check exterior recesses on both sides, behind accessible brackets, around rear doors and grates, and in accessible exterior service or storage compartments presented for cleaning. Apply paragraph 5.3.1 to tanker interior and residual product.

Refer equipment leaks, repairs, load-plan validation, and movement documentation to the Government. Record corrective cleaning and reinspection results in the remarks.

Technical Exhibit 5 Container Cleaning Checklist Use for the two 20-foot CONEX containers. Inspect the interior, exterior, and underside of each container. Record pass, fail, or not applicable for each check. Explain any failed check, inapplicable item, or required area that could not be accessed.

Equipment ID ____________________ Inspection date __________ Inspector ____________________

Area
Cleaning check
Result and remarks
Exterior
Check exterior walls, corners, fittings, and other required accessible surfaces for soil and organic debris.
Doors and hardware
Check door hinges, knuckles, latches, and recesses for trapped soil, grass, and other debris.
Underside
Check required lower surfaces and recesses after the Contractor provides safe lifting access under paragraph 4.1. Notify the COR of areas that could not be accessed.
Interior
Check accessible walls, ceilings, floors, floorboard joints, corners, door thresholds, and recesses for visible soil and organic debris.

Refer holes, loose floorboards, damaged surfaces, and missing dunnage markings to the Government. Record corrective cleaning and reinspection results in the remarks.

Agricultural Wash PWS | 1

File details come from the government source that posted it. Updated .