W912LA19Q6050.pdf

PDF 1 MB Posted

Attached to
Main Gate (K4 Sliding Crash Gates) Federal contract opportunity
Solicitation number
W912LA-19-Q-6050
Issued by
Department of the Army California Army National Guard

About this file

Solicitation (SF 1442)

View the file

Other files for this federal contract opportunity

Other files attached to Main Gate (K4 Sliding Crash Gates), newest first.
File Type Posted
SF24_-_Bid_Bond.pdf PDF
W912LA19Q6050_0001.pdf PDF
Delta_sc3000_specs.pdf PDF
UFC_4-022-03_Security_Fences_and_Gates.pdf PDF
CEC-19981207-JL-135-HAYW909738-_3.pdf PDF
ufc_4_022_02_2009_c1.pdf PDF
CEC-19981207-JL-135-HAYW909738-_2.pdf PDF
CEC-19981207-JL-135-HAYW909738-_4.pdf PDF
UFGS_34_71_13.19.pdf PDF
CEC-19981207-JL-135-HAYW909738-_1.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

F6W3CE9134AW01

The 144th FW – Fresno Air National Guard Base is seeking the replacement of K12 crash rated sliding gates w ith K4 crash rated sliding gates.

This solicitation W912LA-19-Q-6050 is 100% set aside for small business IAW DFARS 219.502-2(a)(i). If there is an after hour point of contact, please include in the quote. The North American Industry Classif ication System (NAICS) code is 238290 and the small business size standard is $15.0M. The Disclosure of Magnitude for this project is betw een $100,000 and $250,000 IAW FAR 36.204(c).

An organized site visit w ill be offered to all interested parties. The details are provided w ith FAR provision 52.236-27 Alternate I Site Visit (Construction).

All questions concerning this solicitation must be directed to Staff Sergeant Adrian Ontiveros or Tech Sergeant Jarrod Sanchez at the below listed e-mail addresses: steven.a.ontiveros2.mil@mail.mil, jarrod.a.sanchez.mil@mail.mil.

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

26-Aug-2019

(RFP)

(IFB)

CALL:

Replace East (Main) Gate

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA

FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________90 calendar days after receiving aw ard, X notice to proceed. This performance period is mandatory, X negotiable. (See _________________________FAR 52.211-10

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________ copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time of fers are due.

B. An offer guarantee X is, is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______30 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

144 BASE CONTRACTING OFFICE

5323 E MCKINLEY AVE

FRESNO CA 93727-2197

W912LA

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

(hour)

Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

HAYW192100

8. ADDRESS OFFER TO (If Other Than Item 7)

559-454-5118FAX:TEL: 559-454-5129 TEL: FAX:

W912LA19Q6050 158

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

Section 00010 - Solicitation Contract Form

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Job Replace East (Main) Gate

FFP

Replace current K12 rated vehicle crash gates with K4 rated gates in accordance with the Statement of Work FOB: Destination

PURCHASE REQUEST NUMBER: F6W3CE9134AW01

SIGNAL CODE: A

PSC CD: J056

NET AMT

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

0001 Destination Government Destination Government

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

0001 90 dys. ANP 1 144 CIVIL ENGINEERING - F6W3CE

CAPT MAX MONTELLANO

5323 E. MCKINLEY AVE., BLDG. #125

FRESNO CA 93727

559-454-5138 FOB: Destination

F6W3CE

STATEMENT OF WORK

Replace East (Main) Gate

PROJECT NO.: HAYW192100

10 MAY 2019

144TH FIGHTER WING

CALIFORNIA AIR NATIONAL GUARD, FRESNO

TECHNICAL PROVISIONS

TABLE OF CONTENTS:

DESCRIPTION OF SERVICES

SITE OF WORK

STATEMENT OF WORK

CONTRACTOR LICENSE REQUIREMENTS

PROJECT SPECIFIC REQUIREMENTS

GENERAL REQUIREMENTS

TECHNICAL SPECIFICATIONS

CLOSEOUT DOCUMENTATION

DESCRIPTION OF SERVICES

This statement of work describes contractor requirements for the project titled “Replace East (Main) Gate”. All work will occur at the Fresno Air National Guard Station, Fresno, California.

The contractor is responsible to furnish and install all labor and materials to complete the items listed in this Statement of Work. The contractor shall provide the government a complete and usable product that will be inspected/accepted by the government at the completion of the project.

All information included in this document, along with the instructions and standards referenced in the document, shall be considered as part of the Statement of Work.

SITE OF WORK

All work will occur at:

Fresno Air National Guard Station 5323 McKinley Ave, Fresno, CA. 93727

1. Objectives: The purpose of this project is to remove and replace the entry and exit K12 vehicle gates with lower crash rated K4 gates located on Falcon Drive. The requirement is to install a rail or slide mounted K4 rated entry gate under ASTM F 2656-07 that is applicable to Unified Facilities Criteria (UFC) 4-022-02. Contractors shall be well versed in the applicable 4-022- 03 – Security Fences and Gates Sec 3-3, Vehicular Gates. The gate shall be equipped with a variable speed Linear Induction Gate Operator, infrared safety beams, automatic obstruction detectors, flashing lights, sirens/horns, “Stay Clear” signage, automatic power latch(es) with back-up battery and manual overrides, exit and entry magnetic safety loops, aesthetically compatible materials of the existing fence line and gates to be seven (7) feet high. Gate controls shall be located at adjacent Guard Shack and at Bldg 122 BDOC (Remote). Control Panel(s) shall have controls for both entry and exit gates with touch pad buttons to “open,” “close,” and intermediate “stop.”

Note: Retrofit of new gate to use existing K12 rated columns and foundations is required. Welding new columns and brackets to existing steel columns is acceptable so that a “new” rail system can be installed. Any concrete work required at the gate threshold is acceptable up to 8 inches below subgrade.

2. Items of Work include, but are not limited to:

2.1. Remove existing K12 Gates and controllers.

2.2. Remove all signal and power wiring used by the old gates.

2.3. Salvage foundation and columns of old K12 gate to be utilized for new gate.

2.4. Retrofit new K4 gates (concrete work as required for v-rail or special foundation).

2.5. Install new operators.

2.6. Install new power latches.

2.7. Install new Gate controls in guard shack and Bldg 122 BDOC (remote).

2.8. Existing magnetic loops can be utilized if compatible with new gate system.

2.9. Install and integrate infrared safety beams and sensors to span across the entire length of gate travel to automatically stop gates if a pedestrian or obstacle is in the way.

2.10. Install automatic obstruction detector (obstacle sensor) strips on both ends of gates to automatically stop gates if a pedestrian or obstacle is in the way.

2.11. Install flashing lights and sirens/horns on both ends of gates to flash and sound when gates are moving.

2.12. Install “Stay Clear” safety signage around areas of gate movement.

2.13. Test ALL equipment for functionality.

3. Demolition Materials

3.1. Contractor shall remove all materials completely off 144th FW property. Contractor to provide weight tickets of either recycle or disposal to COR.

4. Finishing

4.1. All concrete cuts and joints shall be repaired with either epoxy or grout to make a seamless surface with surrounding pavement. All components shall be lubricated to manufacture’s specifications. Welds and all other exposed bare metal shall be painted with a proper exterior paint for steel metals.

CONTRACTOR LICENSE REQUIREMENTS

1. The contractor shall possess a current and valid California “Class B” Contractors license and be able to provide proof of competence.

2. All listed sub-contractors working for the contractor shall possess all applicable California Contractors licenses. Refer to the Project Specific Requirements section for additional requirements

PROJECT SPECIFIC REQUIREMENTS

1. All subcontractors shall possess applicable California Contractors licenses. For this project a contractor that holds a C-13 fencing license is most appropriate. However, some other trade certificates such as C-50 Reinforcing Steel and C-60 Welding can also qualify. A submittal to the COR for suitable subcontractor license review and approval needs to be made prior to workforce vetting.

2. The project shall be completed no later than 90 calendar days post Notice to Proceed (NTP).

The contractor and government will negotiate the final phasing and schedule (as applicable) during a review of the project at the pre-construction conference.

3. All materials shall be compliant with the Buy American Act. The following lists out minimum quality standard examples of materials required for this project. Contractor may request substitutes for approval during the pre-construction conference. All substitution requests shall be made in writing on the AF Form 3000 and shall document all salient characteristic differences between the specified material and the requested substitution.

Requests for material substitutions made after the pre-construction conference may not be granted by the Government.

a. Gates K4 Rated (ASTM F 2656-07, UFGS 34 71 13.19)

b. Linear Induction Gate Operator (UL 325, rate of 30 to 100 ft/minimum variable speed)

c. Concrete design (if applicable) (4000psi 3/4 in minus design with 15% fly ash cement replacement)

d. Ensure there is a minimum three foot access area around sliding gates for maintenance on every side (UFGS 34 71 13.19, UFC 4-022-02) Note: IF the gate comes as an assembly with all wanted accoutrements such as: infrared safety beams, automatic obstruction detectors, flashing lights, sirens/horns, “Stay Clear” signage, automatic power latch(es) with back-up battery and manual overrides, exit and entry magnetic safety loops then they can all be submitted with the Gate K4 Rated. If not, then they all require individual submittals.

GENERAL REQUIREMENTS

1 At ANG discretion and determination, the Contractor shall attend a Pre-Construction Conference. The Pre-Construction Conference will generally be scheduled after award but prior to the NTP. At a minimum, the contractor shall have their project manager and site superintendent attend the meeting. The Contractor shall provide the following documents prior to or at the Pre-Construction Conference

a. Project Schedule

b. Contract Schedule of Values

c. Safety Plan

d. Quality Control Plan

e. Material Submittals

f. Safety Data Sheets 2 Government Furnished Property and Services. The government will provide water, sewer and electrical utility services and shall review and approve of all contractor designed and proposed connections to those services prior to connection. Unsecure outdoor storage area at the base is available and must be requested through the project manager prior to storage of materials. Secured or environmentally controlled storage is the responsibility of the contractor.

3 Quality Control. Contractor shall develop and maintain a quality program that ensures work is performed as described in this Statement of Work and in accordance with all applicable local, state and federal codes and standards of the industry.

4 Quality Assurance. The Government will maintain a Quality Assurance inspection Program for the sole benefit of the government to assure the contractor’s quality control program is working as described in this Statement of Work to ensure contract compliance and project quality in accordance with all local, state, and federal codes and standards of the industry. The Government Construction Inspector is the government’s day-to-day Quality Assurance Evaluator.

5 Hours of Operation. The hours of work shall typically fall between 7:00 a.m. and 5:00 p.m. Monday through Friday, 144th Fighter Wing works a 9/9/8/80 work shift. This work shift effectively provides the base populous every other Monday off. This work shift shall be honored by the contractor except as follows: Unless otherwise requested and approved, work shall not be performed on Weekends, State and Federal Holidays, or on base regular days off which occur on one Monday every two weeks.

6 Base Access. All personnel entering the installation must be cleared for access or escorted.

The contractor shall provide first name, last name, driver’s license number and applicable vehicle data for all personnel requesting access to the base. The contractor shall submit this information to the base Contracting Office NLT two working days prior to the date of required access. Business and personal vehicle drivers must maintain a valid driver’s license, vehicle registration and proof of insurance at all time while on the base.

7 Technical Competence and Ability. Upon request by the Government, the Contractor shall provide proof of technical competence and experience in the professional and technical fields of construction required by this Statement of Work. The contractor shall be prepared to submit documents providing proof of successful competence such as training certificates or accreditations from recognized industry leaders. Contractors shall also be prepared to provide proof of successful project experience through references of former clients in related project types.

8 Dimensions and Quantity. All dimensions and quantities provided in the Statement of Work are estimates only. They are provided as a courtesy for contractors to identify the magnitude of work or materials necessary to complete the project. They are not intended to be final measurements or to support material take-offs or materials ordering. The Contractor is responsible for verifying all dimensions and quantities in the field prior to starting work.

9 Submittals. All submittals shall be transmitted with an AF Form 3000. When submitting on aesthetic finishes, textures, colors or other material characteristics, the Contractor shall, upon request, provide a sample of the material for review and approval along with the product cut-sheet.

10 Warranty. The contractor shall guarantee all workmanship and materials covered under this statement of work for a period of no less than one (1) year from the date of project acceptance. This contractor’s warranty shall be included with any manufacturer’s warranties that accompany materials or systems installed as part of this statement of work.

TECHNICAL SPECIFICATIONS

UFGS and UFC federal documents have been provided for this specific project. The specifications in the UFGS shall be used and not be deviated from. If there is a manufacturer’s specification that is contradicting the UFGS then the COR must be alerted.

CLOSEOUT DOCUMENTATION

10% Retainage will be released upon receipt of the following items:

Contractor workmanship letter of warranty up to one year.

Certificates of no debts to subcontractors, suppliers and vendors.

Electronic pictures showing the area before and after construction.

Recycling or Landfill proof of disposition document.

All applicable O&M manuals As-Built Drawings

"Contractor Manpower Reporting” The Contractor shall report all contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the Air Force collection site. The Contractor is required to completely fill in all required data fields using the following web address: http://www.ecmra.mil/.

Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data should be reported no later than October 31 of each calendar year. Contractors may direct questions to the help desk at http://www.ecmra.mil/.

Unit Identification Code (UIC) for the Requiring Activity: FFTQR0 Issuing Office DoDAAC:

W912LA"

NOTES

1. Instructions for the preparation of quotes are located in Sections 00100, 00110 and 00120.

2. Offeror’s attention is invited to the insurance requirement contained in this solicitation (FAR Clause 52.228-5

Insurance – Work on a Government Installation). Certification of the required coverage for the prime contractor shall be furnished prior to beginning work on this contract, and the Contracting Officer may request evidence of the required insurance at any time during the life the contract.

End of Section 00010

Section 00100 - Bidding Schedule/Instructions to Bidders

CLAUSES INCORPORATED BY REFERENCE

52.204-7 System for Award Management OCT 2018 52.204-16 Commercial and Government Entity Code Reporting JUL 2016 52.204-22 Alternative Line Item Proposal JAN 2017 52.222-5 Construction Wage Rate Requirements--Secondary Site of the

Work

MAY 2014

52.222-23 Notice of Requirement for Affirmative Action to Ensure Equal Employment Opportunity for Construction

FEB 1999

52.225-10 Notice of Buy American Requirement--Construction Materials

MAY 2014

52.228-1 Bid Guarantee SEP 1996

CLAUSES INCORPORATED BY FULL TEXT

52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) – ALTERNATE I (FEB 1995)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) An organized site visit has been scheduled for-- Wednesday, September 4 at 9:00am

(c) Participants will meet at-- West Gate at the Fresno Air National Guard Base 5323 E McKinley Ave Fresno, CA 93727

(End of provision)

52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)

This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):

http://farsite.hill.af.mil/ https://www.acq.osd.mil/dpap/index.html

(End of provision)

INSTRUCTIONS AND NOTICES

1. SCOPE

1.1. You are invited to submit a offer in response to our Request for Quotes W912LA-19-Q-6050 for Project No. HAYW192100 at the 144 Fighter Wing, Fresno Air National Guard Base, California. As a result of this solicitation, the Government intends to award a single Firm Fixed Price (FFP) contract to the responsible offeror whose proposal represents the best value after evaluation in accordance with the factors and subfactors in the solicitation.

1.2. This solicitation is set-aside 100% for small businesses.

2. NOTICE OF ORGANIZED SITE VISIT

2.1. A site visit will be conducted on Wednesday, September 4 at 9:00AM for the purposes of briefing on the proposal requirements and answering questions regarding this solicitation. This will be held at the Fresno Air National Guard Base. Interested Contractors are highly encouraged to attend the site visit.

2.2. Due to security conditions, all offerors must RSVP to attend this conference and site visit. Email the following information for all attendees to: steven.a.ontiveros2.mil@mail.mil and jarrod.a.sanchez.mil@mail.mil

Visitor Name(s) Company Name Phone Number(s) Email Address(es)

2.3. This information must be provided in advance, not later than two (2) business days prior to the meeting, in order to ensure access to the military base and conference site. Even if you have access to the base, you must RSVP to ensure adequate supervision is present.

2.4. You may be required to present the following information upon arrival: (1) Vehicle Registration, (2) Valid Driver’s License, (3) Proof of Insurance for Vehicle, and/or (4) Safety Inspection and Car Rental agreement if applicable. Any of the above information furnished by you is protected under the Privacy Act and shall not be released unless permitted by law and/or you have consented to such.

2.5. Information provided at this conference or site visit shall not qualify the terms and conditions of the solicitation and specifications. Terms of the solicitation and specifications remain unchanged unless the solicitation is amended in writing. If an amendment is issued, normal procedures relating to the acknowledgment and receipt of solicitation amendments shall apply.

3. FORMAL COMMUNICATION, OFFEROR EXPLANATIONS

3.1. Submit all questions via email to the contracting office at the address(es) shown below. Do NOT contact the A-E or Engineering personnel directly. Doing so will only delay the response to your question.

Subject Line: Reference No. W912LA-19-Q-6050 Email: steven.a.ontiveros2.mil@mail.mil, jarrod.a.sanchez.mil@mail.mil

INQUIRIES SHALL BE SUBMITTED VIA EMAIL AND INCLUDE THE FOLLOWING INFORMATION:

Date of Inquiry:

From: ______________________________

Company Name: ___________________________

Phone Number: ____________________________

Email address: _____________________________

Inquiry: Be specific as to which part of solicitation you are questioning.

3.2. Any explanation desired by an offeror regarding the meaning or interpretation of the solicitation, or proposals, drawings, specifications, etc. must be requested in writing and with sufficient time allowed for a reply to reach offerors before the submission of their offer.

3.3. The Contracting Officer reserves the right to address questions received after the fifth day prior to solicitation closing with those offers deemed compliant and/or in the competitive range after closing. All questions and requests for information (RFI) must be received NOT LATER THAN the fifth working day prior to closing and will be posted not later than two working days prior to closing. OFFERORS ARE STRONGLY ENCOURAGED

TO SUBMIT QUESTIONS EARLY IN THIS PROCESS.

3.4. Any interpretations made will be in the form of an amendment of the solicitation, drawings, specifications, etc., and will be furnished to all prospective offerors via posting to www.fbo.gov.

3.4.1. Receipt by the offeror must be acknowledged in the space provided on the SF 1442 or by returning a signed copy of the amendment by the time set for receipt of proposals. Explanations or instructions given in a form other than an amendment to the solicitation shall not be binding. Questions (on a non-attribution basis) and answers shall be furnished to all prospective offerors via the web site.

3.4.2. For security reasons, all technical and engineering data related to this solicitation will be distributed using the Federal Business Opportunities (www.FedBizOpps.gov or www.fbo.gov) system. FedBizOpps is a web-based dissemination tool designed to safeguard acquisition-related information for all Federal agencies. Interested bidders/offerors must register with FedBizOpps before accessing the system. Registration instructions can be found on the FedBizOpps website at https://www.fbo.gov/?s=getstart. (Please note the registration for access to the secure site takes approximately 15 business days, so plan accordingly.)

3.4.2.2. Interested offerors must be registered in the System for Award Management (SAM). To register go to:

www.sam.gov. You will need your DUNS number to register. Instructions for registering are on the web page.

4. AMENDMENTS PRIOR TO DATE SET FOR RECEIPT OF OFFERS

4.1. The right is reserved, as the interest of the Government may require, to revise or amend, the specifications or drawings or both prior to and/or after the date set for receipt of proposals as necessary. Such amendments, if any, will be announced by an amendment or amendments to this Request for Quotes. All information relating to this RFQ, including pertinent changes/amendments and information prior to the date set for receipt of offers, will be posted at www.fbo.gov.

4.2. Offerors are strongly cautioned to check this site frequently and to “refresh” their web page to ensure they have the latest information.

5. RESERVED

6. Bid Bonds

An Original Bid bond is required with submission of the offer. The bid bond is due on the date as stated on the SF1442 block 13. The bid bond must be on a SF24 form. Rejection of a bid bond shall be in accordance with FAR 28.101-4 Noncompliance with bid guarantee requirements.

7. WAGE DETERMINATION

7.1. The Construction Wage Rate Requirements, formerly known as Davis Bacon Wage Rates, are applicable to this project. Current prevailing wage determination(s) at time of issuance of solicitation are for Fresno County, California.

In the event the current prevailing Wage Determination is changed by the Department of Labor prior to the closing date of the solicitation, the most current wage determination is in effect. Should the wage rate change after closing, but prior to award, the updated Wage Determination will be incorporated by amendment and issued to all offerors that have not been eliminated from the competition. If applicable, these offerors/contractors will be given a reasonable opportunity to provide revised offers solely to amend offers due to Wage Determination changes. If the wage determination modification does not change any affected wage rates, then the provisions of FAR 22.404- 5(c)(4) will apply.

7.2. Applicable wage rates can be found at http://wdol.gov/dba.aspx.

8. OFFER EXPENSES AND PRE-CONTRACT COSTS

This RFQ does not commit the Government to pay costs incurred in preparation and submission of initial and subsequent offers or for other costs incurred prior to award of a formal contract.

9. REMOVAL OF SECTIONS AT TIME OF AWARD

Sections 00100, 00110, 00120, 00600 and all exhibits will be physically removed as a result of an award, but will be deemed to be incorporated by reference in that award.

10. DISPOSITION OF UNSUCCESSFUL OFFERS

In compliance with FAR Subpart 4.8, the Government will retain one copy of all unsuccessful offers.

11. INFORMATION REGARDING AVAILABILITY OF UTILITY SERVICES

It has been determined that all reasonable amounts of water, sewer and electrical utility services, where/if physically available, used in connection with this project will be furnished to contractor without cost. The offerors will take this into consideration when computing its offer. (FAR Clause 52.236-14, Availability and Use of Utility Services)

12. EXCEPTIONS

If the offeror takes exception to any of the requirements specified in this solicitation, the offeror shall clearly identify each such exception and include a complete explanation of why the exception was taken and what benefit accrues to the Government. All exceptions to the solicitation requirements (Sections 00010 through 00800) and supporting rationale shall be included in an addendum to the offer and clearly labeled "Exceptions". An addendum is only required if the offeror takes exception to any requirement in the solicitation. (The Addendum does not have a page limitation, but shall only include information relevant to exceptions taken to the solicitation requirements.) The Government will assume an offeror takes no exceptions to any solicitation requirement if the offeror does not submit an Addendum identifying exceptions. Offerors are advised that solicitation requirements are not necessarily negotiable and such exceptions may render an offeror's quote unacceptable and ineligible for award.

13. CLAUSES

13.1. Clauses and provisions from the Federal Acquisition Regulation (FAR) and supplements thereto are incorporated in this document by reference and in full text. Those incorporated by reference have the same force and effect as if they were given in full text.

13.2. Clauses and provisions in this document may not appear in consecutive order.

SECTION 00120

1. GENERAL INFORMATION

1.1. This solicitation is for a Firm Fixed Price Contract. The Government intends to award a single contract to a qualified Small Business Offeror deemed responsible in accordance with the Federal Acquisition Regulation (FAR), whose offer conforms to all the RFQ's requirements, and is judged to represent the Best Value to the Government in accordance with the evaluation scheme set out in this solicitation. The award will be made based on the lowest price, technically acceptable offer IAW the FAR 15.101-2. Best value is expected to result from selection of the technically acceptable proposal with the lowest evaluated price, with appropriate consideration given to the three (3) evaluation factors: Technical, Price, and Past Performance.

1.2. To arrive at a Best Value decision this acquisition will utilize the FAR Part 15.101-2 lowest price, technically acceptable process (LPTA) process. While the Government and the Source Selection Authority will strive for maximum objectivity, the evaluation process, by its nature, is subjective, and therefore, professional judgment is implicit throughout the entire evaluation process.

1.3. The source selection process will be conducted in accordance with FAR Subpart 13.106-2, Evaluation of Quotations or Offers. Offers will be evaluated using the criteria listed in “Evaluation Factors for Award.”

Noncompliance with the RFQ requirements may raise serious questions regarding an offeror’s technical ability, past performance and/or pricing and may be grounds to eliminate the offer from consideration for contract award.

Failure to include all information requested may adversely affect the evaluation. An offer that merely reiterates or promises to accomplish the requirements of the RFQ may be considered unacceptable. An offer that is orderly and sufficiently documented will be easy for the Government to understand and will enable the Government to perform a thorough and fair evaluation.

1.4. The Contracting Officer will begin the evaluation process by conducting a compliance review for all timely-received offer for determination of basic adequacy prior to providing the offers to the evaluators. Failure to provide a complete offer may result in the offer being removed from further consideration for award. Failure to address any factor Technical, Past Performance and Price or any technical subfactor shall be grounds for elimination from evaluation and consideration for award.

1.5. Reserved

1.6. Although the assessment of Past Performance as a specific evaluation factor is separate and distinct from the Determination of Responsibility required by FAR Part 9, Past Performance information obtained herein will be used during the Government’s responsibility determination. The Government also reserves the right to obtain additional information solely for the purpose of making a responsibility determination from all offerors after receipt of quotes.

Requests for responsibility information do not constitute discussions.

1.7. The Government intends to evaluate quotes and award a contract without discussions with offerors (except clarifications as described in FAR 15.306(a)). The Government reserves the right to conduct discussions if the Contracting Officer, in his/her sole discretion, later determines them to be necessary or appropriate. Further, the Government reserves the right to create or not to create a competitive range.

1.8. ENFORCEABILITY OF THE OFFER: The offer must set forth full, accurate and complete information as required by this solicitation. By submission of the offer, the Offeror agrees that all items proposed (if applicable e.g., key personnel, subcontractors, etc.) will be utilized for the duration of the contract and any substitutions shall require prior Contracting Officer's approval.

2. EVALUATION FACTORS FOR AWARD

2.1. The following evaluation factors and subfactors will be used to evaluate each quote. Award will be made to the offeror whose offer is most advantageous to the Government based upon an integrated assessment of the evaluation factors and subfactors described below.

Factor 1: The Technical factor is further divided into the following subfactors:

a. Experience and Capability

b. Construction Schedule

c. Quality Control

Evaluation of the offeror’s quote shall address the acceptability of the response to each subfactor as it applies to the Plans and Specifications. A detailed explanation of the criteria for the evaluation is set forth in the “Evaluation Approach”, Paragraph C of this section. During evaluations of each offer, the Government will assign each subfactor a rating of “Acceptable” or “Unacceptable” and write a narrative evaluation reflecting the identified findings. An offer which fails to provide information in any of the specified areas may be deemed Unacceptable, and eliminated from the competition and ineligible for further consideration.

Factor 2. Past Performance: Each offeror’s past performance will be reviewed to determine relevancy and acceptability

Factor 3. Cost/Price. The resulting award will be a firm fixed price contract type. Price Reasonableness will be utilized in the evaluation of the Firm-Fixed price effort.

All quotes shall be subject to evaluation by the Source Selection Evaluation Board (SSEB). The overarching evaluation approach for all factors and subfactors is to determine the acceptability of the response. The offer will be evaluated to determine whether each requirement has been addressed in the offer in order to meet the acceptability standards described in the RFQ.

2.2. TECHNICAL OFFER: TECHNICAL EVALUATION FACTOR RATINGS:

2.2.1. Technical Rating: Technical Capability will be evaluated on an Acceptable/Unacceptable basis. An offeror shall obtain an “Acceptable” rating to continue further in the competition. Offerors who are deemed to merit an “Unacceptable” rating in the Technical Capability Factor will be removed from further consideration for award.

Once the minimum requirements are established, the team shall evaluate the offeror's quote against these requirements to determine whether the offer is acceptable or unacceptable, using the ratings and descriptions outlined in Table below. Quotes are evaluated for acceptability, but not ranked using the non-price factors/subfactors. In order to be considered awardable, there must be an "acceptable" rating in every non-price factor/subfactor.

Adjectival Rating Description

Acceptable Proposal meets the requirements of the solicitation.

Unacceptable Proposal does not meet the requirements of the solicitation.

2.2.2. Subfactor 1 - Experience and Capability: Using the information in Technical Offer, and the projects/contracts discussed and listed in the Exhibit As, the Government will evaluate the extent of related experience. To be deemed “Acceptable” the submittal must demonstrate experience and capability to perform a project of this magnitude and complexity.

2.2.2.2. The Government will evaluate the offeror’s understanding of the contract requirements, and determine to what degree their technical and administrative capabilities, proposed organization and management plan are acceptable to meet contract requirements. To be considered acceptable, the Experience and Capability submittal will address the full spectrum of activities involved in the management of a resulting contract in a manner that gives the Government confidence that the offeror understands all of the requirements. An acceptable submittal will include the information necessary to give the Government confidence of the offeror’s ability to successfully perform complete project management of the scope requirements.

2.2.2.3. Offer demonstrates, as a minimum, that the following key personnel: Project Manager, Site Superintendent(s), Quality Control Manager (on site), and Safety Representative have experience in managing projects/contracts of the same/similar dollar magnitude, size, complexity and scope, in the capacity in which they are proposed for this project.

2.2.4. Subfactor 2 - Construction Schedule. To be considered acceptable, the schedule and narrative demonstrates an offeror’s understanding of the requirements. The Construction Schedule is an integrated and networked multi-layered schedule of program/project tasks. It identifies project events, accomplishment, and criteria and the expected dates of each. These dates are based on the calendar dates provided as the starting point and the logical flow of dates provided by calculating the addition of duration of all tasks using typical schedule networking tools. Each major task will be directly traceable to the requirements of the project. The NTP date for the schedule is for the purpose of evaluation only.

2.2.5. Subfactor 3 - Quality Control: The proposal narrative demonstrates that the quality control staff, with lines of authority, is acceptable to meet the contract’s requirements. Proposal demonstrates acceptable quality control processes to give the government confidence of the offeror’s ability to successfully manage the material submittal process, and ensure subcontractor compliance with contract documents. The proposed Quality Control answers should provide a detailed explanation of how quality issues are dealt with on various types of construction projects and as a minimum, meetings, inspections, submittal reviews, correction of non-compliant work and how you intend to ensure non-reoccurrence and reporting of quality problems to Government officials.

2.3. PAST/PRESENT PERFORMANCE EVALUATION

2.3.1. The Government will evaluate the offeror’s record of past and current performance to ascertain the probability of successfully performing the required efforts of the Plans and Specifications.

2.3.2. The past performance evaluation is an assessment of the offeror's probability of meeting the minimum past performance solicitation requirements. This assessment is based on the offeror's record of relevant and recent past performance information that pertain to the products and/or services outlined in the solicitation requirements. The Past/Present Performance evaluation will consider such things as an offeror's business practices, customer relationship, ability to successfully perform as proposed, and other considerations as described in Past/Present Performance Sub-factors, elements and other considerations. Past/Present Performance includes current/on-going (present) performance complete to 70% percent. Projects currently in progress for the National Guard will also be considered regardless of percentage complete. In assessing performance confidence, the evaluator may: (1) evaluate present and past performance information through the use of questionnaires completed by the offeror's references; (2) use data independently obtained from other Government or commercial sources; from any other sources available to the Government, to include, but not limited to, the Past Performance Information Retrieval System (PPIRS), Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), or other databases; (3) interviews with Program/Project Managers, Contracting Officers or rely upon personal business experience with the offeror; (4) the information provided in the Offeror’s Past Performance Relevancy Questionnaire; and (5) consider any information the offeror submits which explains any problems encountered on the identified contract and the offeror's corrective actions. The Government reserves the rights to obtain and evaluate past performance information from any source it deems appropriate.

2.3.3. The evaluation may take into account Past/Present Performance information regarding predecessor companies, key personnel who have relevant experience or subcontractors that will perform major or critical aspects of the requirement when such information is relevant to this acquisition. The evaluation will also consider information provided relative to corrective actions taken to resolve problems on past or existing, contracts.

2.3.4. An offeror with no relevant Past/Present Performance may receive a rating based on the evaluation of its predecessor companies, key personnel, and/or subcontractors provided the offeror clearly states in the offer that the information provided about predecessor companies, key personnel, and/or subcontractors is for the purposes of enhancing the offerors past performance submittal. These ratings may not have the same weight as the ratings of the proposing company. The weight that will be afforded for this type of past performance is within the sole discretion of the Government. If such information is not applicable (i.e., the offeror does not have a predecessor company, key personnel or subcontractors with relevant experience), the offeror shall be evaluated as Neutral.

However, the quote of an offeror with no relevant Past/Present Performance history, while rated Neutral in Past Performance, may not represent the most advantageous offer to the Government and thus, may be an unsuccessful offer when compared to the quote of other offerors.

NOTE: In the case of an offeror without a record of relevant past performance or for whom information on past performance is not available or so sparse that no meaningful past performance rating can be reasonably assigned, the offeror may not be evaluated favorably or unfavorably on past performance (see FAR 15.305 (a)(2)(iv)). Therefore, the offeror shall be determined to have unknown (or "neutral") past performance. In the context of acceptability/unacceptability, a neutral rating shall be considered acceptable.

2.3.5. In accordance with FAR 15.306(a)(2), if award will be made without conducting discussions, offerors may be given the opportunity to clarify certain aspects of their qotes, e.g., the relevance of an offeror's past/present performance information and adverse past/present performance information to which the offeror has not previously had an opportunity to respond or to resolve minor clerical errors.

The past performance evaluation is an assessment of the offeror’s probability of meeting the minimum past performance solicitation requirements. This assessment is based on the offeror’s record of relevant and recent past performance information that pertain to the products and/or services outlined in the solicitation requirements.

2.3.6 “Current” means performance occurring within the last five (5) years for the period beginning five years prior to the solicitation release date. Within this period, performance occurring later in the period may have greater significance than work occurring earlier in the period.

2.3.6.1. The Government may also consider similarity of the client type (e.g. federal government) and/or the projects sustainability requirements. The Government will consider United States Green Building Council (USGBC) LEED® certification achievements. The location at which work was performed to the location(s) at which work will be performed will also be considered. Relevancy will affect an offeror’s overall Past Performance rating.

2.3.6.2. In assessing “relevancy” of an offeror’s previous contracts the Government may evaluate an offeror’s past performance for similarity of the construction methods, size, project scope, cost magnitude and complexity of work performed to those required for the proposed effort. The Government may also consider similarity of the client type (e.g. federal government) and/or the projects sustainability requirements. ANG projects will consider United States Green Building Council (USGBC) LEED®. The location at which work was performed may also be considered.

Relevancy weight will affect offeror’s overall Past Performance Confidence rating. The more relevant the project is weighted the greater confidence there will be in the past performance assessment as a predictor of future performance.

2.3.7. The following apply to weighting relevancy considering all the elements listed above;

Past Performance Relevancy Ratings Rating Definition

Very Relevant Present/past performance effort involved essentially the same scope and magnitude of effort and complexities this solicitation requires.

Relevant Present/past performance effort involved similar scope and magnitude of effort and complexities this solicitation requires.

Somewhat Relevant Present/past performance effort involved some of the scope and magnitude of effort and complexities this solicitation requires.

Not Relevant Present/past performance effort involved little or none of the scope and magnitude of effort and complexities this solicitation requires.

Offerors who otherwise have satisfactory performance on previous construction projects may be rated “Unknown Confidence” (Neutral) if those projects are not considered relevant to the proposed acquisition and relevancy cannot be obtained through the evaluation of key personnel and/or subcontractors. Projects that are not current will not be considered in the evaluation.

2.3.8. Past Performance Sub-factors. There are six (6) sub-factors as listed below. An overall evaluation for Past Performance will be at the factor level.

Quality Control

Timely Performance

Management Effectiveness

Compliance with Safety Standards

Compliance with Federal laws and regulations

2.3.9. The elements that may be considered under each subfactor are described below:

2.3.9.1. Quality Control (QC): Evaluators may consider such things as: Quality of Workmanship; Adequacy of the Contractor QC; Identification/correction of deficient work in a timely manner; Suggested solutions and displayed initiative to implement solutions; Adequacy of Materials; Use of specified materials; Adequacy of Submittals and Adequacy of "As-Builts”.

2.3.9.2. Timely Performance: Evaluators may consider such things as: Met established progress schedule;

Timely submission of updated and revised progress schedules; Resolved delays in an expeditious manner;

Identification/correction of deficient work in a timely manner; Provided submittals in a timely manner; Completed all contract work prior to requesting final inspection; Timely completion of punch-list items; Left no major discrepancies; Timely submission of close out documents, i.e., “as builts”, “red lines”; Contractor provided timely and satisfactory response to warranty issues after project completion.

2.3.9.3. Management Effectiveness: Evaluators may consider such things as:

2.3.9.3.1. General Business Practices, including, but not limited to: Contractor provided experienced managers, and supervisors with the ability needed to meet contract requirements; Hired experienced subcontractors;

Paid subcontractors/suppliers in a timely manner; The contractor cooperated to resolve problems, attending meetings (as applicable) and maintained communication to assure satisfactory resolution; Overall customer satisfaction and willingness to foster a spirit of partnership with owner. This is a critical element in this subfactor.

2.3.9.3.2 Pricing, including, but not limited to: The contractor submitted offers that accurately represented the work required; The contractor's supporting price/cost information for modifications were accurate, complete and reasonable (not over inflated or…