RFI_(Questions_and_Answers).docx

DOCX document 12 KB Posted

Attached to
Flooring Removal & Install Bldg. 135 Federal contract opportunity
Solicitation number
W912LA-18-T-6033
Issued by
Department of the Army California Army National Guard

View the file

Other files for this federal contract opportunity

Other files attached to Flooring Removal & Install Bldg. 135, newest first.
File Type Posted
Flooring_Plan(Update_4)_CE-Fac00135-Bldg135-.pdf PDF
SOW_Flooring_135_(Update_2).rtf RTF text file
Solicitation_(Update_2).pdf PDF
Bldg135-Flooring_Plan_(Update_2_&_3).pdf PDF
CE-Fac00135-A2.2.pdf PDF
Tandus_Carpet_Spec_Page.pdf PDF
Tandus_Centiva_Spec_page.pdf PDF
CE-Fac00135-A2.3.pdf PDF
[DRAWINGS]_CE-Fac00135-Bldg135-Flooring.pdf PDF
W912LA18T6033_[SF1442].pdf PDF
SOW_Flooring_135.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFI (Questions and Answers):

1) Can you please provide a scale drawing of the building so we can determine accurate quantities of material needed?

Government Response: Drawings are attached.

2) What specific Tandus carpet, and Centiva Vinyl flooring do you want to use.

Government Response: For the Centiva Vinyl use the Contour Series. The carpet specs are attached.

3) How many Phases do you want this project done in. (If multiple phase are to be done 45 days may not be enough time to complete the project.)

Government Response: 3 phases for 30 days each phase.

4) Is there any asbestos on the floors or walls we need to worry about?

Government Response: No.

5) Are we to layout the carpet and vinyl tile's in the same direction as shown on the floor plan provided or can we determine the best way to layout the flooring.

Government Response: Contractor can determine the layout

6) Is this project to be paid per the State of California Prevailing Wages?

Government Response: Yes

7) Do you want to put carpet in the boiler room as it is shown on the floor plan provided?

Government Response: No

8) Do you want any carpet, vinyl tile, or rubber base attic stock to be provide at the end of the project? If so how much of each material do you want?

Government Response: 5%

9) Will another job walk be done to allow for Furniture movers to look at the project?

Government Response: Yes to be set up through Contracting

10) How many coats of floor polish do?

Government Response: After rereading the specs we will not have the Centiva waxed.

11) Will you require moisture testing to be done on the concrete slab or will the Air Guard take the responsibility for high moisture levels in the concrete that may cause adhesive failure.

Government Response: Government will take responsibility.