RFI_(Questions_and_Answers).docx
DOCX document 12 KB Posted
- Attached to
- Flooring Removal & Install Bldg. 135 Federal contract opportunity
- Solicitation number
- W912LA-18-T-6033
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Flooring_Plan(Update_4)_CE-Fac00135-Bldg135-.pdf | ||
| SOW_Flooring_135_(Update_2).rtf | RTF text file | |
| Solicitation_(Update_2).pdf | ||
| Bldg135-Flooring_Plan_(Update_2_&_3).pdf | ||
| CE-Fac00135-A2.2.pdf | ||
| Tandus_Carpet_Spec_Page.pdf | ||
| Tandus_Centiva_Spec_page.pdf | ||
| CE-Fac00135-A2.3.pdf | ||
| [DRAWINGS]_CE-Fac00135-Bldg135-Flooring.pdf | ||
| W912LA18T6033_[SF1442].pdf | ||
| SOW_Flooring_135.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFI (Questions and Answers):
1) Can you please provide a scale drawing of the building so we can determine accurate quantities of material needed?
Government Response: Drawings are attached.
2) What specific Tandus carpet, and Centiva Vinyl flooring do you want to use.
Government Response: For the Centiva Vinyl use the Contour Series. The carpet specs are attached.
3) How many Phases do you want this project done in. (If multiple phase are to be done 45 days may not be enough time to complete the project.)
Government Response: 3 phases for 30 days each phase.
4) Is there any asbestos on the floors or walls we need to worry about?
Government Response: No.
5) Are we to layout the carpet and vinyl tile's in the same direction as shown on the floor plan provided or can we determine the best way to layout the flooring.
Government Response: Contractor can determine the layout
6) Is this project to be paid per the State of California Prevailing Wages?
Government Response: Yes
7) Do you want to put carpet in the boiler room as it is shown on the floor plan provided?
Government Response: No
8) Do you want any carpet, vinyl tile, or rubber base attic stock to be provide at the end of the project? If so how much of each material do you want?
Government Response: 5%
9) Will another job walk be done to allow for Furniture movers to look at the project?
Government Response: Yes to be set up through Contracting
10) How many coats of floor polish do?
Government Response: After rereading the specs we will not have the Centiva waxed.
11) Will you require moisture testing to be done on the concrete slab or will the Air Guard take the responsibility for high moisture levels in the concrete that may cause adhesive failure.
Government Response: Government will take responsibility.