16-R-8001-01_Quad_Storm_Drain_Repair_Solicitation_Amendment_with_attachments.pdf
PDF 3 MB Posted
- Attached to
- QUAD STORM DRAIN REPAIR
- Solicitation number
- W912LA-16-R-8001
- Issued by
-
Department of the Army National Guard
About this file
Amended Solicitation with attached updated site plan. New site plan to replace old.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
163 BASE CONTRACTING OFFICE
1620 GRAEBER ST, SUITE 29, BLDG 2273
MARCH ARB CA 92518-1714
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
THE PURPOSE OF THIS AMENDMENT IS TO ADD APPROX 130' OF STORM DRAIN REPAIR AND THE MODIFICATION OF TWO ADDITIONAL CATCH BASINS TO THE SCOPE OF THE PROJECT PER THE UPDATED SITE PLAN DATED 11 FEB 2016 (ATTACHED).
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 22-Feb-2016
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912LA-16-R-8001
X 9B. DATED (SEE ITEM 11)
02-Feb-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
22-Feb-2016
CODE
163 BASE CONTRACTING OFFICE
1620 GRAEBER ST, STE 29
MARCH ARB CA 92518
W912LA 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE FA6042
FACILITY CODECODE
EMAIL:TEL:
W912LA-16-R-8001
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
RFI RESPONSES
2/17/2016
QUESTION
Will Hubzone contractors get preference or is the preference also for a small business? Its not clear in the specs.
It says 10% for Hubzone and I think also for small business.
ANSWER
Per the included clause 52.219-4, the added 10 percent factor will be added to the price of all offers except offers from HUBZone concerns and otherwise sucessful offers from small business concerns. In other words, yes the preference will be applied to all small business concerns that have not waived the evaluation preference.
(End of Summary of Changes) stmdr9 stmdr7stmdr6 stmdr5stmdr3 stmdr2 stmdr52 stmdr51stmdr50 stmdr49stmdr48 stmdr47 stmdr46 stmdr44 stmdr43stmdr42 stmdr41 stmdr40stmdr39 stmdr38 stmdr37 stmdr36stmdr35 stmdr34stmdr33 stmdr32stmdr31 stmdr30 stmdr29stmdr28 stmdr27stmdr26stmdr25stmdr24stmdr23stmdr22stmdr21stmdr20stmdr19 stmdr18 stmdr16 stmdr15stmdr14 stmdr13 stmdr12stmdr11 tony.alves Polygonal Line tony.alves Line tony.alves Line tony.alves Polygonal Line tony.alves Polygonal Line tony.alves Line tony.alves Oval tony.alves Oval tony.alves Oval tony.alves Oval tony.alves Oval tony.alves Line tony.alves Rectangle tony.alves Oval tony.alves Oval tony.alves Oval tony.alves Oval tony.alves Callout
CB6
TG 38.86
INV 37.20
tony.alves Callout
CB5
TG 38.51
INV 35.93
tony.alves Text Box
15" CMP
tony.alves Callout
NEW PIPE OVER 4" HV ELEC (TOP OF SLURRY 33.70)
tony.alves Callout
REMOVE (2) 12" INLETS & 10'D PVC LOOP
tony.alves Callout
CB1
CURB INLET
tony.alves Callout
TG 37.41
INV 31.91
tony.alves Callout
TG 37.62
INV 31.45
tony.alves Callout
INV 31.70
TG 36.78
INV 28.95
tony.alves Callout
INV 28.25
TG 36.75
INV 32.90
tony.alves Callout
CB2
TG 36.70
INV 32.20
tony.alves Callout
INV 32.63
tony.alves Callout
INV 32.97
tony.alves Callout
CB3
TG 37.74
INV 32.24
tony.alves Callout
CB4
TG 38.52
INV 35.27
tony.alves Callout
INV 31.60
tony.alves Line tony.alves Callout
12" PVC
tony.alves Callout REPLACE CMP W/ 10" HDPE PIPE. RAISE PIPE AS REQUIRED AT CB3 FOR CONT SLOPE TO CB1 tony.alves Callout
REPLACE CMP W/ 15" HD STORM PIPE TO CB1. RAISE AS REQUIRED FOR CONT SLOPE TO CB1
tony.alves Text Box
SITE PLAN
QUAD STORM DRAIN REPAIR
163 CES MARB PDPG162004 WO201600470
AMENDMENT 1 11 FEB 2016
tony.alves Polygonal Line tony.alves Text Box
12" PVC
tony.alves Text Box
15" CMP
tony.alves Text Box
32" RCP
tony.alves Text Box
10" CMP
tony.alves Text Box
8" PVC
tony.alves Text Box
8" CMP
tony.alves Text Box
8" CMP
tony.alves Text Box
8" CMP
tony.alves Text Box
8" CMP
tony.alves Text Box
8" PVC
tony.alves Text Box
8" PVC
tony.alves Polygonal Line tony.alves Text Box 100' tony.alves Rectangle tony.alves Callout
CONNECT 4" PVC TO NEW PIPE
tony.alves Callout
DEMO 20'H 18" DIA TREE. CHIP ROOTS 6" BELOW FG
tony.alves Callout REPLACE CMP W/ 15" HD STORM PIPE. RAISE AS REQUIRED TO CLR ELEC SLURRY & FOR CONT SLOPE TO CB2 tony.alves Text Box
NOTES
1. ELEVATIONS INDICATED ARE EXISTING, CONTRACTOR TO VERIFY
2. PIPE SLOPE SHALL BE .5% MIN
3. MOD OR REPLACE CATCH BASINS AS REQD TO ACCOMODATE NEW PIPE ELEVATIONS
4. CB MOD INCLUDES DEMO CMP OR PVC & PATCH HOLE, CORE & GROUT NEW PIPE, & FILL CONC TO INVERT
5. REGRADE ~15'x15' AROUND CB (TYP OF 15) FROM 2" BELOW TG STRAIGHT GRADE TO MEET EXISTING
6. REPAIR DAMAGED SPRINKLER LINES FROM CONSTRUCTION
7. GRADE LEVEL BUT DO NOT REPLACE LANDSCAPE
8. PCC WALK SHALL BE 4" THICK W/ 6X6X10 GA WWM REINFORCING
tony.alves Oval tony.alves Text Box
12" PVC
tony.alves Callout
CIPP LINING FROM CB6 TO CB6
tony.alves Line tony.alves Callout
REPLACE CMP W/ 8" HDPE PIPE TO POC AT EXISTING INVERTS
tony.alves Text Box
10" PVC
tony.alves Callout
CAP ABANDONED 8" CMP W/ CONC
tony.alves Callout 12x12 DECK DRAINS W/ 4" PVC DOWN TO CMP (TYP OF 3) tony.alves Callout RAISE PAVERS on sand AREA APPOX 3'X3' AROUND 12x12 DECK DRAINS TO FS AND REPLACE PLASTIC GRATES W/ SS (TYP OF 5) tony.alves Text Box
GRASS
tony.alves Text Box
GRASS
tony.alves Text Box
GRASS
tony.alves Text Box
GRASS
tony.alves Text Box
GRASS
tony.alves Text Box
GRASS
tony.alves Callout REMOVE (2) 12" INLETS & 10'D PVC LOOP. RAISE GRADE TO SURFACE DRAIN OVER SIDEWALK tony.alves Callout
CB12 THRU CB15 NOT SHOWN
tony.alves Rectangle tony.alves Callout 10'Lx1'Dx~2'W CONC INLET STOP W/ (2) #4 T&B & #4 LOOPS @2' OC TO CLOSE OFF INLET & ALIGN TO SIDEWALK tony.alves Callout
CONC SWALE
tony.alves Callout
CB7
tony.alves Callout
CB8
tony.alves Callout
CB9
tony.alves Rectangle tony.alves Line tony.alves Line tony.alves Line tony.alves Line tony.alves Line tony.alves Line tony.alves Line tony.alves Callout
REGRADE AREA TO CHANGE SURFACE FLOW FROM CB1 TO CB2
tony.alves Callout
DEMO 30'H 18" DIA TREE. CHIP ROOTS 6" BELOW FG
tony.alves Text Box
PAVERS
tony.alves Line tony.alves Line tony.alves Line tony.alves Callout
GRADE TO SURFACE DRAIN AREA TO CB2
tony.alves Callout
REPAIR PCC WALK
tony.alves Callout
REPLACE ~15' OF CRACKED PCC WALK. RAISE TO ALIGN W/ WALK
tony.alves Rectangle tony.alves Polygon tony.alves Rectangle tony.alves Callout
ENCLOSURE
tony.alves Oval tony.alves Oval tony.alves Callout REGRADE ~20'x20' - 4" BELOW TOP OF MANHOLE LIDS tony.alves Line tony.alves Line tony.alves Rectangle tony.alves Text Box
TOILETS
tony.alves Oval tony.alves Oval tony.alves Oval tony.alves Oval tony.alves Oval tony.alves Text Box 0' tony.alves Line tony.alves Line tony.alves Line tony.alves Line tony.alves Line tony.alves Line tony.alves Line tony.alves Line tony.alves Line tony.alves Text Box N tony.alves Polygon tony.alves Oval tony.alves Oval tony.alves Oval tony.alves Oval tony.alves Oval tony.alves Callout
CB11
TG 37.66
tony.alves Callout
CB10
TG 37.25
tony.alves Callout
INV 32.57
tony.alves Callout
INV 33.59
tony.alves Callout
INV 34.79
tony.alves Callout
INV 34.76
tony.alves Callout
REPLACE PVC W/ 12" HD STORM PIPE. RAISE AS REQUIRED FOR CONT SLOPE TO CB3 & CB2
tony.alves Line tony.alves Polygonal Line tony.alves Line tony.alves Line tony.alves Line tony.alves Polygon tony.alves Callout
REPAIR PCC WALK
| 16-R-8001-01 Quad Storm Drain Repair Solicitation |
| Amend 1 - Quad SD Repair Site Plan PDPG162004 |
File details come from the government source that posted it. Updated .