CTE_Tent_layouts_10APR19.pptx
PPTX presentation 6 MB Posted
- Attached to
- Tent Rental with additional services
- Solicitation number
- W912L919U0014
About this file
Additional tent location / layout information
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Questions_with_Answers_-_4_12_2019.pdf | ||
| W912L9-19-U-0014_-_Modification_1.pdf | ||
| CTE_Tent_layouts_23MAY19.pptx | PPTX presentation | |
| W912L9-19-U-0014.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Area of Operations Training site is the corner lot located at N 22nd ST and Headquarters Ave, North Fort Hood, TX.
Note: The training lot is an empty compound with 7 power poles running down the center of the compound.
Power poles may be utilized to provide shore power to leased tents and HVAC systems.
North Here
North Fiber Pedestal Fiber to/from EXCON (WARSIM)
34ID
Training site is the corner lot located at N 22nd ST and Headquarters Ave, North Fort Hood, TX.
Note: The training lot is an empty compound with 7 power poles running down the center of the compound.
Power poles may be utilized to provide shore power to leased tents and HVAC systems.
38th ID OSS CTE – Tent Layouts
UNCLASSIFIED//FOUO
v 2.0, as of 18 JUL 18
SNAP Terminals
Zone 2 tent 506 Annex TIP-C (G2 Intel Tent) MCP G6 Server Tent TCP G6 NETOPS Tent Entry Control Point
Parking
Layout for Signal Tents Signal tents layout TIP-C tent layout
| Location/Building | Square Feet |
| ANNEX Tent | 70 x 120 (8,400 sq ft) |
| Zone 2, Tent 506 MCP+COIC | 90 x 150 (13,500 sq ft) |
| Signal Tent (MCP) | 20 x 30 (600 sq ft) |
| Signal Tent (TCP) | 20 x 30 (600 sq ft) |
| TIP-C (G2 INTEL) | 30 x 40 (1200 sq ft) |
| TOTAL Sq Ft | 24,300 sq ft |
Tent size overview
| TENT | SIZE | QTY | APPROXIMATE OFFICE SIZE | OFFICE QTY | Power Outlets | SPECIAL REQUIREMENTS | |
| Annex Tent | 120’ by 70’ | ||||||
| (8,400 SQ FT) | 1 | 120’ by 60’ | |||||
| (6,844 SQ FT) | 1 | 1 per work stations (96 outlets) | 12 wall dividers (20’ in length). 4 power outlets on each side of dividers. | ||||
| 24’ by 10’ | |||||||
| (2400 SQ FT) | 1 | 2 per office | Hardened door required. | ||||
| 10’ by 10’ | |||||||
| (100 SQ FT) | 8 | 2 per office | Hardened door required. | ||||
| 6’ by 10’ | |||||||
| (80 SQ FT) | 1 | 12 outlets | IT Room must be able to be cooled below 70º F. | ||||
| Signal Tent (MCP) | 20’ by 30’ | ||||||
| (600 SQ FT) | 1 | 1 outlet per workstation (4) and 12 additional outlets. | Server Room. Room must be able to be cooled below 70º F. | ||||
| Signal Tent (TCP) | 20’ by 30’ | ||||||
| (600 SQ FT) | 1 | 1 outlet per workstation (4) and 12 additional outlets. | Server Room. Room must be able to be cooled below 70º F. | ||||
| TIP-C (G2 TSCIF) | 30’ by 40’ | ||||||
| (1200 SQ FT) | 1 | 1,080 SQ FT | 1 | 1 outlet per workstation (20) and 5 additional power outlets (25) | |||
| 12’ by 10’ (120 SQ FT) | 1 | 12 power outlets | IFS Server Room. Room must be able to be cooled below 70º F. |
38th ID OSS CTE – Tent Size
| Zone 2 Tent | 150’ by 90’ | |
| (13,500 SQ FT) | 1 | CMD Room: |
55’ by 40’
| (2,200 SQ FT) | 1 | 50 outlets (one per workstation and additional outlets for printers and C2 equipment). | Room must be fully sectioned off from floor to ceiling with hardened access door. Room partitioned by dividers per attached layout. | |
| G Staff Support Operations: |
46’ by 40’
| (1840 SQ FT) | 1 | 1 per workstation and 6 per wood shed room (48 workstations, 6 additional= 54 outlets) | Room must be sub-divided/ partitioned by attached layout. Wood shed as IT room and must be cooled below 70º F. | |
| Honor and Safety: |
27’ by 35’
| (1200 SQ FT) | 1 | 1 per workstation, 6 outlets in the Honor Room, 10 outlets open area (23 total) | Room partitioned per layouts. | |
| Smith Room |
20’ by 40’
| (80 SQ FT) | 1 | 12 outlets | |
| JOPES Office |
14’ by 10’
(1400 SQ FT)
| 1 | 6 outlets (one per workstation and 2 additional) | Room can be partitioned by dividers. | |
| G Staff Offices |
20’ by 101’
| 1 | 1 per workstation (59 outlets) | Room partitioned by dividers per attached layout. | |
| G Staff Offices |
20’ by 94’ 1 1 per workstation, (20 outlets) 2 additional power outlets per DCGO and DCG office (24 total outlets). Room partitioned by dividers per attached layout.
38th ID OSS CTE – Tent Size Cont’d
Layout for ANNEX Tent 38th ID OSS CTE – DHHB (D) Tent Layouts (DHHB & G8, DIV CH) (May be staffed by Division staff as DHHB will have other accomodations) v 1.0, as of 21 MAR19
Front Rear
B Co
CDR / 1SG
C Co
CDR / 1SG
A Co
CDR/1SG
HSC
CDR / 1SG
HHBn
XO
HHBn
CDR
HHBn
CSM
Conference RM
Open Workspace
PAO
HHBn S2/ S3
S4/
PBO
S1
MAINT
DIV
CH
MEDICAL
_____________________70’____________________
B Co
G1
G8
A Co
SJA
DIV SURG
DIV Safety
CA
21 SIPR
47 NIPR
4 VOIP
2 Printers 1 Projector 1 Shedder
D# Tent/Room Number
D1 D2 D3 D4 D5 D6 D7 D8 D9 D10 D11 D12 D13 D14 D15
D16 D17 D18 D19 D20
Layout Overview for Zone 2, Tent 506 55’ 150’ 90’ 46’ 5’ 17’ 27’ 13’ 18’ 35’ 10’ 25’ 5’ 10’ 40’ 5’ 5’ 40’ 20’ 20’ 20’ 16’ 20’
DOOR
DOOR
DOOR
DOOR
CMD ROOM
55X40
G STAFF SUPPORT OPERATIONS
46X40
HONOR AND SAFETY
27X35
SMITH ROOM
20X40
JOPES OFFICE
20X10 G-Staff Offices 20x101 G-Staff Offices 20X94
5’ 16’
Detailed Layout for Zone 2, Tent 506 55’ 150’ 90’ 46’ 5’ 17’ 27’ 13’ 18’ 35’ 10’ 25’ 10’ 20’ 25’ 5’ 5’ 40’ 20’ 20’ 20’ 20’ 20’ 23’ 16’ 10’ 12’ 20’
DOOR
16’ 20’ 20’ 15’ 23’ 14’ 20’ 12’ M10
SURG
PROT
M16
FUOPS
M17
M3 M7
G6 HD
KM
G6 M4 M2 G4
EW
Plotter
DCG-S
M5
GEO-SPACE
ENG
DCGS-A
M11
G37
AMDWS
TAIS
AVN
AMD
FIRES
CONF RM
SVTC
CoS
SGS
AIDES
CG
M20
DCGS
ADSI
AMDWS
TAIS
AMPS
JOPES OFFICE
20X10
M9
JOPES
AMPS
M8
SAFETY
AMR
SPACE
SCREENS
18’
HONOR
ROOM
13’ G1
G2
WOOD SHED – CONFERENCE ROOM
12’ 10’ 10’ 10’
CSM
13’
CG -AIDE
CSM-AIDE
CoS AIDE
CG - XO
DOOR
DOOR
DCG-O
DCG-O
AID
DCG-S
AID
PSD
ARCENT GO
(NOT USED)
G3
DG3
30’
PLANS
OPS SGM
12’ 10’
ORSA
8’ 8’
20’ 14’
TRX
G7 G9
27’ image14.png image15.png image16.png image17.png image18.png image19.png image20.png image21.png image22.png image23.png image13.png image24.emf image25.png image26.png image27.png image28.png image29.png image33.png image30.png image31.png image32.png image2.png image1.png oleObject1.bin image3.wmf image4.jpeg image6.jpeg image7.png image12.jpeg
File details come from the government source that posted it.