W912L9-15-T-0016 Oil Water Separator Annual Maintenance
Solicitation number
W912L9-15-T-0016
Issued by

About this file

W912L9-15-T-0016 QASP OW Separator An Maint

View the file

Other files

File Type Posted
W912L9-15-T-0016_NOTICE_OF_CHANGES.docx DOCX document
W912L9-15-T-0016 _Response_Sheet.docx DOCX document
W912L9-15-T-0016 _SOW _OW_Separator_An_Maint.doc DOC document
122d_Background_Check_Release.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUALITY ASSURANCE

SURVEILLANCE PLAN (QASP)

FOR

Oil/Water Separator Annual Maintenance/Repair Project # 201504xxxx

FY15

23 April 2015

1. PURPOSE. This Quality Assurance Surveillance Plan (QASP) Contractor performs all requirements of the Contract, that the Government receives quality services, and that the Government pays only for services actually provided. The QASP provides a systematic method to evaluate the services the contractor is required to furnish. This QASP is a living document and should be updating accordingly throughout the life of the contract.

2. SCOPE.

2.1. The Contractor is responsible for management and use of a quality control program (QCP) necessary to perform the required services. The Contractor is responsible for management and quality control actions to meet the terms of the contract. The Contractor develops a Quality Control Program (QCP) in compliance with his contract deliverables.

2.2. The role of the Government is to ensure contract standards are achieved. The QASP is put in place to provide Government surveillance oversight of the Contractor’s quality control efforts to assure they are timely, effective and are delivering the results specified in the contract. The QASP is not a part of the contract nor is it intended to substitute for or duplicate the Contractor’s QCP.

2.3. The Government may provide the Contractor an information copy of the QASP as an attachment to the solicitation to support the Contractor’s efforts in developing a QCP that will interrelate with the Government’s QASP.

3. ROLES & RESPONSIBILITIES. The Government resources shall have responsibilities for the implementation of this QASP as follows:

3.1. Contracting Officer. The Contracting Officer ensures performance of all necessary actions for effective contracting, ensures compliance with the terms of the contract, and safeguards the interests of the United States in the contractual relationship.

3.2. Contracting Officer Representative (COR). The COR is responsible for oversight and assures proper performance of the contract by the contractor. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf. Any changes that the contractor deems may affect contract, price, terms, or conditions shall be referred to the Contracting Officer for action.

4. METHODS OF QA SURVEILLANCE.

4.1. The method of surveillance used for the administration of this QASP is 100 % surveillance, though some areas will not always be applicable and will be noted as such. The 100% evaluation method requires that a complete inspection of the quality of work is completed by the COR/inspector. 100% Inspections will involve work performed for the specific unit being surveillanced and as requiredbasis. 100% Inspection is used when the service is considered critical and/or the quantity of work is relatively small.

4.2. The methods of surveillance recognize that unforeseen and uncontrollable problems and issues do occur. The Contracting Officer’s Representatives (COR) are expected to be objective, fair, and consistent in evaluating Contractor performance against the standards.

5. IDENTIFIED COR SURVEILLANCE TASKS. The following performance requirements are identified within the Statement of Work and are to be monitored under this QASP.

Performance Requirements Matrix – Performance Standards

Performance Objective
SOW Reference
Yes
No
N/A
Performance

Threshold Method of Assessment

Performance Schedule provided
SOW 4.0
100% Compliance:
Scheduled: Prior to the start of work.
Contractor is qualified to complete the work.
SOW 5.0
100% Compliance:
Scheduled: Prior to the start of work.
Drain is clean, to include floor trench drains of sludge and debris.
SOW 6.0
100% Compliance
Scheduled
Contractor shall service Oil/Water Separators based on SOW 7.1, 7.2, &.3 & 7.4 for Bldg 356
SOW 7.5.1
100% Compliance
Scheduled
Contractor shall service Oil/Water Separators based on SOW 7.1, 7.2, &.3 & 7.4 for Bldg 730
SOW 7.5.2
100% Compliance
Scheduled
Contractor shall service Oil/Water Separators based on SOW 7.1, 7.2, &.3 & 7.4 for Bldg 732
SOW 7.5.3
100% Compliance
Scheduled
Contractor shall service Oil/Water Separators based on SOW 7.1, 7.2, &.3 & 7.4 for Bldg 734
SOW 7.5.4
100% Compliance
Scheduled
Contractor shall service Oil/Water Separators based on SOW 7.1, 7.2, &.3 & 7.4 for Bldg 756
SOW 7.5.5
100% Compliance
Scheduled
Contractor shall service Oil/Water Separators based on SOW 7.1, 7.2, &.3 & 7.4 for Bldg 764
SOW 7.5.6
100% Compliance
Scheduled
Contractor shall service Oil/Water Separators based on SOW 7.1, 7.2, &.3 & 7.4 for Bldg 768
SOW 7.5.7
100% Compliance
Scheduled
Contractor shall service Oil/Water Separators based on SOW 7.1, 7.2, &.3 & 7.4 for Bldg 770
SOW 7.5.8
100% Compliance
Scheduled
Performance Objective
SOW Reference
Yes
No
N/A
Performance

Threshold Method of Assessment

Contractor shall service Oil/Water Separators based on SOW 7.1, 7.2, &.3 & 7.4 for Bldg 771
SOW 7.5.9
100% Compliance
Scheduled
Contractor shall service Oil/Water Separators based on SOW 7.1, 7.2, &.3 & 7.4 for Bldg 781
SOW 7.5.10
100% Compliance
Scheduled
Contractor shall service Oil/Water Separators based on SOW 7.1, 7.2, &.3 & 7.4 for Bldg 782
SOW 7.5.11
100% Compliance
Scheduled
Contractor shall service Oil/Water Separators based on SOW 7.1, 7.2, &.3 & 7.4 for Bldg 784
SOW 7.5.12
100% Compliance
Scheduled
Contractor shall service Oil/Water Separators based on SOW 7.1, 7.2, &.3 & 7.4 for Bldg 788
SOW 7.5.13
100% Compliance
Scheduled
Contractor shall service Oil/Water Separators based on SOW 7.1, 7.2, &.3 & 7.4 for Bldg 798
SOW 7.5.14
100% Compliance
Scheduled
Contractor shall pressure clean Highland Tanks in Blg 356
SOW 7.6.1
100% Compliance
Scheduled
Contractor shall pressure clean Highland Tanks in Blg 734
SOW 7.6.2
100% Compliance
Scheduled
Contractor shall pressure clean Highland Tanks in Blg 756
SOW 7.6.3
100% Compliance
Scheduled
Contractor shall pressure clean Highland Tanks in Blg 764
SOW 7.6.4
100% Compliance
Scheduled
Contractor shall pressure clean Highland Tanks in Blg 768
SOW 7.6.5
100% Compliance
Scheduled
Contractor shall pressure clean Highland Tanks in Blg 798
SOW 7.6.6
100% Compliance
Scheduled
Contractor provided confined space entry training and certification of each entrant and attendant.
SOW 10.0
100% Compliance
Random and Scheduled
Contractor to provide fire protection and complete any burn permits as necessary.
SOW 11.0
100% Compliance
Scheduled
Contractor has provided necessary documentation for all removal of wastes for all trips made.
SOW 12.0
100% Compliance
Random
Performance Objective
SOW Reference
Yes
No
N/A
Performance

Threshold Method of Assessment

OSHA Requirements Proper PPE is worn and safety procedures are followed.
SOW 13.0
100% Compliance
Random and scheduled
EPA Requirements: Provide list of all proposed hazardous materials to be used on site.
SOW 14.0
100% Compliance
Scheduled: Prior to the start of work.
Job site cleanup. Ensure that area is clean of debris and all tools and equipment have been removed to include, but not limited to: packing materials, wires, papers, parts, etc.
SOW 20.0

100% Compliance

Random and scheduled

Restoration of Sites completed as needed.
SOW 21.0
100% compliance
Random and scheduled.

6. DOCUMENTATION. The COR will, The COR must forward all records they maintained to the Contracting Officer after accepting the Contractor’s services for use in the event of a future contract claim/dispute. All such records will be retained for the life of this contract. The COR shall forward these records to the Contracting Officer at termination or completion of the contract.

7. UNACCEPTABLE PERFORMANCE.

7.1. If performance is deemed unacceptable, the COR will report any noted contractual deficiencies to the Contractor and the KO, to include date, specific contract requirement, deficiency, request for contractor corrective action and suspense date. Disputes should be referred to the Contracting Officer for resolution.

7.2. If any services do not conform to contract requirements, the Government may require the Contractor to re-perform the services to conform with contract requirements at no increased cost to the government. When sub-par performance cannot be corrected by re-performance, the Government may:

7.2.1. Require the contractor to take action necessary to ensure future performance conforms to contract requirements.

7.2.2. By separate contract or otherwise, perform the services and charge to the Contractor any cost incurred by the Government that is directly related to the performance of such service or:

7.2.3. Initiate termination procedures if service is not adequate performance or default service agreement.

END QASP.