PERFORMANCE WORK STATEMENT 278th Shower Trailer.pdf

PDF 156 KB Posted

Attached to
Shower Trailer Rental Service
Solicitation number
W912L724Q1404
Issued by

About this file

This document is a Performance Work Statement (PWS) for providing shower trailer services to support a Soldier Readiness Processing Event for the Tennessee Army National Guard's 278th Armored Cavalry Regiment in Smyrna, TN from July 15-22, 2024.

The contractor shall provide at least two shower trailers, one for males and one for females, capable of supporting 80 personnel with a minimum of six shower heads, one sink, and climate control per trailer. The contractor is responsible for set-up, servicing, gray/black water removal, and breakdown of the shower trailer facilities. The PWS details specific service and quality requirements, as well as access, security, and training requirements for contractor personnel. A related federal contract opportunity, Solicitation Number W912L724Q1404, is also provided for the shower trailer rental services during the same period of performance.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Ver. June 2023

PERFORMANCE WORK STATEMENT

(PWS) FOR

SHOWER TRAILER SERVICES FOR THE TENNESSEE ARMY NATIONAL GUARD

(TNARNG)

278TH ACR SOLDIER READINESS PROCESSING EVENT

1.0 General: The Tennessee Army National Guard’s 278th Armored Cavalry Regiment is participating in a Soldier Readiness Processing Event in Smyrna, TN in preparation for an overseas mission in calendar year 2024. Based on the unit’s analysis of the mission and capabilities of organic military units, it has been determined that shower trailers must be contracted to ensure the safety, welfare, and mission success of the operation and the personnel involved.

1.1 Scope: The contractor shall provide all personnel, equipment, tools, materials, supervision, and quality control necessary, except as specified in Paragraph 3.0 as Government Furnished, to perform Life Support Services in support of the 278TH’s Soldier Readiness Processing Event, as defined in this PWS.

1.1.1 Objective: To provide shower trailer services to eighty (80) Tennessee Army National Guard (TNARNG) Soldiers at Smyrna, TN.

1.2 Background: The mission of the 278th Armored Cavalry Regiment (ACR) is to conduct Soldier Readiness Processing to prepare its Task Force for overseas missions.

The Government does not have sufficient organic assets to provide shower trailer services during this event.

1.3 Period of Performance (PoP): The Period of Performance is from 15 July 2024 through 22 July 2024.

1.4 General Information:

1.4.1 Place and Performance of Services: The contractor shall provide services between the hours of 7:00 AM CDT through 3:00 PM CDT on 15 July 2024 through 22 July 2024, except when the Government facility/installation is closed due to local or national emergencies, administrative closings, or similar Government-directed facility/installation closings. Performance shall be at 680 Fitzhugh Blvd. Smyrna, TN 37167. The contractor shall at all times maintain an adequate work force for the uninterrupted performance of all tasks defined within this PWS when the Government facility/installation is not closed for the above reasons. When hiring personnel, the contractor shall keep in mind that the stability and continuity of the work force are essential.

1.4.1.1Telework: The Government will not permit the contractor to telework in support of this requirement. In furtherance of Continuity of Operations Planning (COOP), a telework program may be enacted to ensure that the Government's mission-critical operations stay operational during times of national emergency or incidents of national significance.

Telework shall be at no additional cost to the Government.

1.4.1.2 Unscheduled gate closures by the Security Police may occur at any time causing all personnel entering or exiting a closed installation to experience a delay. This cannot be predicted or prevented. Contractors are not compensated for unexpected closures or delays. Vehicles operated by contractor personnel are subject to search pursuant to applicable regulations. Any moving violation of any applicable motor vehicle regulation may result in the termination of the contractor employee’s installation driving privileges.

1.4.1.3 The contractor’s employees shall become familiar with and obey the regulations of the installation, including fire, traffic, safety, and security regulations while on the installation.

Contractor employees should only enter restricted areas when required to do so and only upon prior approval. All contractor employees shall always carry proper identification with them and shall be subject to such checks as may be deemed necessary. The contractor shall ensure compliance with all regulations and orders of the installation, which may affect performance. The Government reserves the right to direct the removal of an employee from Government property or revoke access to Government systems for misconduct, security reasons, or any overt evidence of communicable disease. Removal of contractor employees for reasons stated above does not relieve the Contractor from responsibility for total performance of this contract.

1.4.1.4 Installation Access Requirements: All contractor employees shall provide valid government issued identification in order to be granted access to the installation.

1.4.2 Recognized Holidays: The are no recognized United States (US) holidays during this period of performance.

1.4.3 Quality Control (QC): The contractor shall develop and maintain an effective QC Plan (QCP) to ensure services are performed in accordance with this PWS. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The contractor’s QCP is how it assures itself that its work complies with the requirements of the contract. As a minimum, the contractor shall develop QC procedures that address the areas identified in Technical Exhibit 1, Performance Requirements Summary (PRS). A final QCP shall be submitted to the Contracting Officer Representative (COR) NLT 10 days after contract award. After acceptance of the QCP, the contractor shall obtain the Contracting Officer’s (KO’s) acceptance in writing of any proposed changes to its QCP.

1.4.4 Quality Assurance (QA): The Government will evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP).

This plan is primarily focused on what the Government will do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and acceptable quality level(s) or defect rate(s).

1.4.4.1 Delivery Inspections: Contractor and COR will inspect all equipment upon delivery.

COR will record any damages to leased equipment prior to Contractor leaving Volunteer

Training Site Smyrna.

1.4.5 Installation Access and Security Requirements. The contractor shall comply with all applicable installation/facility access and local security policies and procedures, which may be obtained from the COR. The contractor and all associated subcontractor employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services, or Security Office. The contractor shall ensure compliance with all personal identity verification requirements as directed by Department of Defense (DoD), Headquarters Department of Army (HQDA) and/or local policy (see PWS 6.0). Should the Force Protection Condition (FPCON) change, the Government may require changes in contractor security matters or processes.

1.4.5.1 RESERVED

1.4.5.2 For contractors that do not require a CAC, but require access to a DoD facility or installation: Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05), and applicable installation, facility and area commander installation/ facility access, and local security policies and procedures (provided by a Government representative).

1.4.5.3 Awareness Training (AT) Level 1: All contractor employees, including subcontractor employees, requiring access to Army installations, facilities, and controlled access areas shall complete AT Level 1 training within five (5) calendar days after contract start date and within five (5) calendar days of new employees commencing performance. The contractor shall submit certificates of completion for each affected contractor and subcontractor employee to the COR prior to contract start date or within five (5) calendar days after completion of training by each employee or subcontractor personnel. AT Level 1 awareness training is available at the following website:

https://jko.jten.mil/courses/atl1/launch.html .

1.4.5.4 iWATCH Training: iWATCH Training: The contractor and all associated subcontractors with an area of performance within an Army-controlled installation, facilities or area shall brief all employees on the local iWATCH program (training standards provided by the requiring activity Antiterrorism Officer (ATO)). This local developed training shall be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR or the KO. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance. The contractor shall report completion for each contractor employee and subcontractor employee to the COR, within 15 calendar days after completion of training.

1.4.5.5 Communications Security/Information Technology (COMSEC/IT) Security. All communications with DoD organizations are subject to COMSEC review. All telephone communications networks are continually subject to intercept by unfriendly intelligence https://jko.jten.mil/courses/atl1/launch.html organizations. DoD has authorized the military departments to conduct COMSEC monitoring and recording of telephone calls originating from, or terminating at, DoD organizations. Therefore, the contractor is advised that any time contractor personnel place or receive a call they are subject to COMSEC procedures. The contractor shall ensure wide and frequent dissemination of the above information to all employees dealing with DoD information. The contractor shall abide by all Government regulations concerning the authorized use of the Government's computer network, including the restriction against using the network to recruit Government personnel or advertise job openings.

1.4.5.6 through 1.4.5.10 RESERVED

1.4.5.11 OPSEC Training: In accordance with AR 530-1, Operations Security, new contractor employees shall complete Level I OPSEC training within 30 calendar days of their reporting for duty and annually thereafter. The contractor shall submit certificates of completion for each contractor employee to the COR within 15 calendar days after completion of training. Level 1 OPSEC training is available at https://securityawareness.usalearning.gov/opsec/index.htm .

1.4.6 Physical Security. The contractor shall safeguard all Government property provided for contractor use. At the close of each work period, Government facilities, equipment and materials shall be secured.

1.4.7 Special Qualifications: The contractor shall ensure all employees possess all required licenses for operating equipment used in the performance of this contract. This does not include education or other qualifications for the position in which the contractor employee is performing, dress codes, or other information. (NOTE: The Government does not provide training to contractors. Contractors must ensure that any personnel performing under a contract are fully trained, licensed, certified, and otherwise qualified to provide services.)

1.4.8 Post Award Conference/Periodic Progress Meetings: The contractor agrees to attend any post award conference convened by the KO in accordance with FAR 42.5. The KO, COR and other Government personnel, as appropriate, may meet periodically with the contractor to review the contactor’s performance. At these meetings, the KO will apprise the contractor of how the Government views the contractor’s performance and the contractor shall apprise the Government of problems, if any, being experienced. The contractor shall resolve outstanding issues raised by the Government. Contractor attendance at these meetings shall be at no additional cost to the Government.

1.4.9 Contract Manager (CM): The contactor shall designate a CM who shall ensure performance under this contract. The name of this person, and an alternate who shall act for the contractor when the CM is absent, shall be designated in writing to the KO. The CM or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract. The CM shall work through the COR (if no COR is assigned, delete through the COR and replace with through the KO), to resolve issues, receive technical instructions, and ensure adequate performance of services. The CM shall ensure that contractor employees do not perform any services outside the scope of the https://securityawareness.usalearning.gov/opsec/index.htm contract without an official modification issued by the KO. The CM shall ensure contractor employees understand that services performed outside the scope of the contract are performed wholly at the expense of the contractor.

1.4.10 Identification of Contractor Employees: All contractor personnel attending meetings, answering Government telephones and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression that they are Government employees. The contractor shall ensure that all documents or reports produced by contractor personnel are suitably marked as contractor products or that contractor participation is appropriately disclosed. The contractor’s status as a “contractor” shall be predominantly displayed in all correspondence types (to include signature blocks on e- mail) and dealings with Government or non- Government entities. Contractor personnel shall wear identification badges distinguishing themselves as such. The badges shall have the company name, employee name and the word “contractor” displayed.

1.4.10.1 The contractor shall retrieve all identification media (including vehicle passes) from its employees who depart employment for any reason. The contractor shall return all identification media (i.e., badges and vehicles pass) to the KO within 14 days of an employee’s departure.

1.4.11. Combating Trafficking in Persons: The United States Government has adopted a zero-tolerance policy regarding trafficking in persons. Contractors and contractor employees shall not engage in any form of trafficking in persons during the period of performance of the contract; procure commercial sex acts during the period of performance of the contract; or use forced labor in the performance of the contract. The Contractor shall notify its employees of the United States Government’s zero tolerance policy, the actions that will be taken against employees for violations of this policy. The contractor shall take appropriate action, up to and including termination, against employees or subcontractors that violate the US Government policy as described at FAR 22.17.

1.4.12 Through 1.4.13 RESERVED

1.4.14 Organizational Conflicts of Interest (OCI): The contractor and subcontractor personnel performing services under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.)

or perform evaluation services which may create a current or subsequent OCIs, as defined in FAR Subpart 9.5. The contractor shall notify the KO immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the KO to avoid or mitigate any such OCI. The contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the KO. In the event the KO unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the KO may impose other remedies as he or she deems necessary, including prohibiting the contractor from participation in subsequent contracted requirements which may be affected by the OCI.

2.0 Definitions and Acronyms:

2.1 Definitions:

2.1.1 Contractor: A supplier or Contractor awarded a contract to provide specific supplies or service to the Government. The term used in this contract refers to the prime.

2.1.2 Defective Service: A service output that does not meet the standard of performance associated with the PWS.

2.1.3 Deliverable: Anything that can be physically delivered and includes non- manufactured things such as meeting minutes or reports.

2.1.4 Key Personnel: Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.

2.1.5 Physical Security: Actions that prevent the loss or damage of Government property.

2.1.6 Quality Assurance: The Government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.

2.1.7 Quality Assurance Surveillance Plan (QASP): An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.

2.1.8 Quality Control: All necessary measures taken by the Contractor to ensure that the quality of an end product or service shall meet contract requirements.

2.1.9 Subcontractor: One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.

2.2 Acronymns: AEI Army Enterprise Infostructure

AR Army Regulation AT/OPSEC Antiterrorism/Operational Security BI Background Investigation CM Contract Manager COR Contracting Officer Representative DA Department of the Army DD254 Department of Defense Contract Security Classification Specification DFARS Defense Federal Acquisition Regulation Supplement DoD Department of Defense DSCA Defense Counterintelligence and Security Agency

FAR Federal Acquisition Regulation GFP/M/E/S Government Furnished Property/Material/Equipment/Services HQDA Headquarters, Department of the Army HSPD Homeland Security Presidential Directive IA Information Assurance IS Information System(s) KO Contracting Officer NGB National Guard Bureau OCI Organizational Conflict of Interest PII Personally Identifiable Information POC Point of Contact PRS Performance Requirements Summary PWS Performance Work Statement QA Quality Assurance QASP Quality Assurance Surveillance Plan QC Quality Control QCP Quality Control Program SSN Social Security Number TE Technical Exhibit USD(I) Under Secretary of Defense for Intelligence

3.0 Government Furnished Property, Material, Equipment and Services (GFP/M/E/S): The Government will provide the property, material, equipment, and/or services listed below solely for the purpose of performance under this contract: Contractor vehicle parking and equipment staging area locations will be provided by the Government.

3.1 Property. None

3.2 Materials. None

3.3 Equipment. None

3.4 Services. None

3.5 Utilities. The Government will provide electricity to power the shower trailers, and clean running water, pumped into the shower trailer through a garden hose.

4.0 Contractor Furnished Property, Materials, and Equipment (CFP/M/E):

4.1 General: Except for those items specifically stated to be Government- Furnished in Paragraph 3.0, the contractor shall furnish everything required to perform these services as indicated in Paragraph 1.1.

5.0 Requirements: The contractor shall:

5.1 Provide Shower Trailers. Contractor shall provide at least two (2) shower trailers (one for male, one for female) capable of supporting eighty (80) personnel. Each Shower trailer shall have a minimum of six (6) shower heads, one (1) sink, and climate control. Each shower trailer shall come with a power source maintained from initial set up to the end of the period of performance. Each shower stall will include privacy curtains at a minimum suitable for both males and females to use the facilities. The contractor shall ensure each shower trailer is set up and fully operational by no later than July 15, 2024. Set up includes the hook up of all utilities and the stocking of paper products and hand soap for all shower trailers. Recovery shall include the disconnection of all utilities. Shower trailers shall come equipped with flooring with non-slip rubberized material, with operational ceiling vents, with floor drains and with operational lighting. Electrical cords used in shower trailers shall have waterproof boxes covering the inlet and outlet plugs of the extension cord IAW DA PAM 385-26, chapters 2-5; 5-5, 5-6; and 6-1.

5.1.1 Contractor shall provide backflow and check valves which shall have current inspection tags. Contractor shall be responsible for plumbing/wiring all connections to existing infrastructure and restoration to their original state upon completion of the contract.

Contractor shall not be required to provide bath towels.

5.1.2 Servicing of Shower Trailers: The contractor shall service shower trailers at a frequency that ensures units remain fully functional. The contractor shall respond to requests for servicing within 24 hours of notification in the event a unit is found to not be functional. Service of a shower trailer shall include removal and disposal of gray water. Each shower trailer shall come with a service plan for maintenance. The contractor shall empty the wastewater tank as needed without overflowing. It’s the contractor’s responsibility to ensure there’s no overflow.

5.2 Gray and Black Water Removal. The Contractor shall provide removal of all gray and black water generated from the operation of the shower trailer, stored in contractor provided collection tanks. Collection from holding systems shall be provided with sufficient capacity to prevent any overflow, leakage or spillage. Any occurrence of overflow, leakage or spillage must be corrected within two hours of notification. The contractor shall dispose of all gray and black water at approval disposal sites in accordance with all local, state and federal laws and regulations.

5.3 Set Up and Break Down. Contractor shall be responsible for the erection, maintenance, and clearance of all facilities, to include wiring and hookup. Contractor shall be responsible for removal of all debris, trash, and materials from each worksite where contract equipment was placed. Upon completion of the exercise, the contractor shall be responsible for the return of all sites to their original state. The contractor will be provided 5 days to setup and 5 days to breakdown.

5.4 Service Contract Reporting: Not Applicable

6.0 Applicable Publications: Publications applicable to this PWS are listed below:

Publication (Chapter/Page)

Date of Publication

Mandatory or Advisory

Website

Federal Acquisition Regulation https://www.acquisition.gov/?q=bro wsefar

Defense Federal Acquisition Regulation Supplement http://www.acq.osd.mil/dpap/dars/ dfarspgi/c urrent/index.html or https://www.acquisition.gov/dfars Joint Travel Regulation (JTR) https://www.defensetravel.dod.

mil/site/trave lreg.cfm

DoDM 1000.13-M-V1 DoD Identification (ID) Cards (Enclosure 2, paragraph 3.b)

01/23/201

(Change 1:

07/28/202

0) http://www.esd.whs.mil/Directive s/issuance s/dodm

Federal Information Processing Standards

(FIPS) Publication 201-2 Personal Identity

Verification (PIV) of Federal Employees and

Contractors (paragraph 9)

August http://nvlpubs.nist.gov/nistpubs/

FIPS/NIST.

FIPS.201-2.pdf

DoDM 5200.2 Procedures for the DoD Personnel Security

Program (PSP)

04/03/201 https://www.esd.whs.mil/Directive s/issuanc es/dodm/

DoDI 5200.46 DoD Investigative and Adjudicative Guidance for Issuing the Common

Access Card (CAC)

09/09/14 (Change 1:

05/04/201

8) https://www.esd.whs.mil/Directiv es/issuanc es/dodi/

Homeland Security Presidential Directive (HSPD)-12 Policy for a Common

Identification Standard for Federal Employees and

Contractors

08/27/200 https://www.dhs.gov/homela nd-security-presidential-directive-12

DoDI 5400.11 Department of Defense

Privacy and Civil Liberties Programs

01/29/201 https://www.esd.whs.mil/Directiv es/issuanc es/dodi/ http://www.acquisition.gov/?q=browsefar http://www.acquisition.gov/?q=browsefar http://www.acq.osd.mil/dpap/dars/dfarspgi/c http://www.acq.osd.mil/dpap/dars/dfarspgi/c http://www.acquisition.gov/dfars http://www.defensetravel.dod.mil/site/trave http://www.defensetravel.dod.mil/site/trave http://www.esd.whs.mil/Directives/issuance http://www.esd.whs.mil/Directives/issuance http://nvlpubs.nist.gov/nistpubs/FIPS/NIST http://nvlpubs.nist.gov/nistpubs/FIPS/NIST http://www.esd.whs.mil/Directives/issuanc http://www.esd.whs.mil/Directives/issuanc http://www.esd.whs.mil/Directives/issuanc http://www.esd.whs.mil/Directives/issuanc http://www.dhs.gov/homeland-security-http://www.dhs.gov/homeland-security-http://www.esd.whs.mil/Directives/issuanc http://www.esd.whs.mil/Directives/issuanc

DoD 5400.11-R Department of Defense

Privacy Program

05/14/200 https://www.esd.whs.mil/Directive s/issuanc es/dodm/

DoDD 8140.01 https://www.esd.whs.mil/Directiv es/issuanc es/dodd/

Cyberspace Workforce Management

10/05/202

DoD 8570.01-M Information Assurance

Workforce Improvement Program

12/19/200 5 (Change

4:

11/10/201

5) https://www.esd.whs.mil/Directiv es/issuanc es/dodm/

DoD 5220.22-M National Industrial Security Program Operating Manual

(NISPOM)

02/28/200

(Change 2:

05/18/201

6) https://www.esd.whs.mil/Directiv es/issuanc es/dodm/

Army Directive 2014- 05 Policy and

Implementation Procedures for

Common Access Card Credentialing and Installation Access for

Uncleared Contractors

03/07/201 https://armypubs.army.mil/Prod uctMaps/Pu bForm/ArmyDi r.aspx

AR 25-2

Information Assurance

04/04/201 http://armypubs.army.mil/Produ ctMaps/Pub Form/AR.aspx

AR 530-1

Operations Security

09/26/201 http://armypubs.army.mil/Produ ctMaps/Pub Form/AR.aspx

AR 525-13

Antiterrorism

12/09/201 http://armypubs.army.mil/Produ ctMaps/Pub Form/AR.aspx

AR 381-12

Threat Awareness and

Reporting Program (TARP) (Section II, ¶ 2-4.b)

06/01/201 http://armypubs.army.mil/Produ ctMaps/Pub Form/AR.aspx http://www.esd.whs.mil/Directives/issuanc http://www.esd.whs.mil/Directives/issuanc http://www.esd.whs.mil/Directives/issuanc http://www.esd.whs.mil/Directives/issuanc http://www.esd.whs.mil/Directives/issuanc http://www.esd.whs.mil/Directives/issuanc http://www.esd.whs.mil/Directives/issuanc http://www.esd.whs.mil/Directives/issuanc http://armypubs.army.mil/ProductMaps/Pub http://armypubs.army.mil/ProductMaps/Pub http://armypubs.army.mil/ProductMaps/Pub http://armypubs.army.mil/ProductMaps/Pub http://armypubs.army.mil/ProductMaps/Pub http://armypubs.army.mil/ProductMaps/Pub http://armypubs.army.mil/ProductMaps/Pub http://armypubs.army.mil/ProductMaps/Pub

6.1 Applicable Forms: Forms applicable to the PWS are listed below:

Form Date Website

DD 1172-2

Application for Identification Card/DEERS Enrollment

Mar 2017 http://www.dtic.mil/whs/directives/forms/index.htm

I-9 Employment Eligibility

Verification

10/21/201 https://www.uscis.gov/sites/default/files/files/form/i- 9.pdf

DD 441

Department of Defense

Security Agreement

Feb 2020 http://www.dtic.mil/whs/directives/forms/dd/ddforms 0001-0499.htm

DD 250

Material Inspection and

Receiving Report

Aug 2000 https://www.esd.whs.mil/Directives/forms/dd0001_0 499/

TECHNICAL EXHIBIT 1

Performance Requirements Summary (PRS)

This PRS includes performance objectives the Government will use to determine contractor performance and will compare contractor performance to the Acceptable Quality Level (AQL).

Performance Objective

Performance Standards Acceptable

Quality Levels (AQL)

Surveillanc e Method / By Whom

5.1.2 Servicing of

Shower Trailers

Service shower trailers at a frequency that ensures units remain fully functional and gray water is removed.

No more than three occurrences where a trailer is found have gray water collection tanks full.

Random Inspections /

COR

5.2 Gray and Black

Water Removal

Collection from holding systems shall be provided with sufficient capacity to prevent any overflow, leakage or spillage.

No more than two occurrences of overflow, leakage or spillage; any occurrence of overflow, leakage or spillage must be corrected within two hours of notification.

Random Inspections /

COR

http://www.dtic.mil/whs/directives/forms/index.htm http://www.uscis.gov/sites/default/files/files/form/i-http://www.dtic.mil/whs/directives/forms/dd/ddforms http://www.esd.whs.mil/Directives/forms/dd0001_0

TECHNICAL EXHIBIT 2

Deliverables Schedule

PWS

Reference /

Deliverable Title

Frequency Number of Copies

Medium/Format Submit To

1.4.3 Quality

Control (QC)

Provide NLT 10 days after contract award

1 Electronic Submission

KO & COR

1.4.5.3 AT

Level 1

Awareness Training

Certificates

Provide within 5 calendar days after employee completes training.

1 Electronic Submission

COR

1.4.5.4 iWATCH Training

Certificates

Provide within 5 calendar days after employee completes training.

1 Electronic Submission

COR

1.4.5.11 OPSEC

Training

Certificates

Provide within 5 calendar days of award and five (5) calendar days after new employee completes training.

1 Electronic Submission

COR

5.1 Provide Shower Trailers. Contractor shall provide at least two (2) shower trailers (one for male, one for female) capable of supporting eighty (80) personnel. Each Shower trailer shall have a minimum of six (6) shower heads, one (1) sink, and cli...
5.2 Gray and Black Water Removal. The Contractor shall provide removal of all gray and black water generated from the operation of the shower trailer, stored in contractor provided collection tanks. Collection from holding systems shall be provided wi...
5.3 Set Up and Break Down. Contractor shall be responsible for the erection, maintenance, and clearance of all facilities, to include wiring and hookup. Contractor shall be responsible for removal of all debris, trash, and materials from each worksite...
5.4 Service Contract Reporting: Not Applicable

File details come from the government source that posted it. Updated .