Construction_PWS,_PSXE172011_Add_Alter_Facilities_Basewide.pdf

PDF 753 KB Posted

Attached to
Add Alter Numerous Facilities Base Wide Federal contract opportunity
Solicitation number
W912L7-18-B-7007
Issued by
Department of the Army Tennessee Army National Guard

About this file

Work Statement

View the file

Other files for this federal contract opportunity

Other files attached to Add Alter Numerous Facilities Base Wide, newest first.
File Type Posted
Questions_3-5.pdf PDF
W912L718B7007_Amendment_3.pdf PDF
W912L718B7007_Amendment_2.pdf PDF
Questions_1-2.pdf PDF
43_-_C9-2.pdf PDF
Sign_in_Sheet.pdf PDF
Site_Visit_Slides_19_Jul_2018.pdf PDF
Preproposal_minutes_W912L718B7007.pdf PDF
W912L718B7007_Amendment_1.pdf PDF
Drawings.pdf PDF
W912L718B7007.pdf PDF
Specifications_Add_Alter.pdf PDF
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(Ver. Jun 2014)

MANDATORY FORMAT FOR

PERFORMANCE WORK STATEMENT (PWS)

FOR

PSXE172011, Add / Alter Numerous Facilities Basewide

1.0 General:

1.1 Scope: The contractor shall provide all personnel, equipment, tools, materials, supervision, and quality control necessary, except as specified in Paragraph 3.0 as Government Furnished, to perform upgrades, repairs, and new construction to enhance numerous facilities basewide, to include all Services, as defined in this PWS.

1.2 Background: The Base requires properly maintained and adequate Air Force and Air National Guard compliant facilities and infrastructure to provide mission requirements in support of the 10 PAA KC-135R Air Refueling Wing, 119th Cyber Operations Squadron (COS), and the Air National Guard Training and Education Center. The maintenance of base infrastructure is vital to preserving a large portion of the Base capital investment.

Civil Engineering primarily serves as base sustainment and maintenance. Existing resources and personnel do not exist to perform large scale repair and construction activities, therefore contracted services are required to complete necessary upgrades, repairs, and construction of various facilities and infrastructure basewide.

1.3 Period of Performance (PoP): The Period of Performance shall be 180 days

1.4 General Information:

1.4.1 Quality Control (QC): The contractor shall develop and maintain an effective QC Plan (QCP) to ensure services are performed in accordance with this PWS. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The contractor’s QCP is the means by which it assures itself that its work complies with the requirements of the contract. As a minimum, the contractor shall develop QC procedures that address the areas identified in Technical Exhibit 1, Performance Requirements Summary.

1.4.2 Quality Assurance (QA): The Government shall evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the Government must do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and acceptable quality level(s) (defect rate(s)).

1.4.3 Recognized Holidays: The following are recognized US holidays. The contractor shall perform services on these days:

1106948859N Typewritten Text 22 May 2018

1.4.3.1 New Year’s Day: January 1st

1.4.3.2 Martin Luther King, Jr.’s Birthday

1.4.3.3 President’s Day

1.4.3.4 Memorial Day

1.4.3.5 Independence Day: July 4th

1.4.3.6 Labor Day

1.4.3.7 Columbus Day

1.4.3.8 Veteran’s Day: November 11th

1.4.3.9 Thanksgiving Day

1.4.3.10 Christmas Day

1.4.4 Place and Performance of Services: The contractor shall provide services between the hours of _0700 - 1700_ on _Monday through Friday_, except on recognized US holidays or when the Government facility/installation is closed due to local or national emergencies, administrative closings, or similar Government-directed facility/installation closings. Performance shall be performed _base wide_. The contractor shall at all times maintain an adequate work force for the uninterrupted performance of all tasks defined within this PWS when the Government facility/installation is not closed for the above reasons. When hiring personnel, the contractor shall keep in mind that the stability and continuity of the work force are essential.

1.4.4.1 Unscheduled gate closures by the Security Police may occur at any time causing all personnel entering or exiting a closed installation to experience a delay. This cannot be predicted or prevented. Contractors are not compensated for unexpected closures or delays. Vehicles operated by contractor personnel are subject to search pursuant to applicable regulations. Any moving violation of any applicable motor vehicle regulation may result in the termination of the contractor employee’s installation driving privileges.

1.4.4.2 The contractor’s employees shall become familiar with and obey the regulations of the installation; including fire, traffic, safety and security regulations while on the installation. Contractor employees should only enter restricted areas when required to do so and only upon prior approval. All contractor employees shall carry proper identification with them at all times. The contractor shall ensure compliance with all regulations and orders of the installation which may affect performance.

1.4.5 Security Requirements. The contractor shall comply with all applicable installation/facility access and local security policies and procedures, which may be obtained from the Contracting Officer’s Representative (COR). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. The contractor shall ensure compliance with all personal identity verification requirements as directed by DOD, HQDA and/or local policy.

Should the Force Protection Condition (FPCON) change, the Government may require changes in contractor security matters or processes.

1.4.5.1 COMSEC/IT Security. All communications with DOD organizations are subject to communications security (COMSEC) review. All telephone communications networks are continually subject to intercept by unfriendly intelligence organizations. DOD has authorized the military departments to conduct COMSEC monitoring and recording of telephone calls originating from, or terminating at, DOD organizations. Therefore, the contractor is advised that any time contractor place or receive a call they are subject to COMSEC procedures. The contractor shall ensure wide and frequent dissemination of the above information to all employees dealing with DOD information. The contractor shall abide by all Government regulations concerning the authorized use of the Government's computer network, including the restriction against using the network to recruit Government personnel or advertise job openings.

1.4.5.2 AT Level 1 Awareness Training (AT): All contractor employees requiring access to Army Installations, facilities, and controlled access areas shall complete Level 1 AT within 30 calendar days after contract start date and within 30 calendar days of new employees commencing performance. The contractor shall submit certificates of completion for each affected contractor and subcontractor employee, to the COR, or to the KO if a COR is not assigned, within 15 calendar days after completion of training.

Level 1 AT is available at https://atlevel1.dtic.mil/at/.

1.4.6 Physical Security. The contractor shall safeguard all Government property provided for contractor use. At the close of each work period, Government facilities, equipment and materials shall be secured. The contractor is responsible for the safe and secure storage of all materials and equipment used in the performance of this project. A bed-down area will be provided, upon request, for equipment and materials onsite or in the adjacent parking areas.

1.4.6.1 Personnel Badging / Visitor Passes: All employees must have a valid badge or visitors pass throughout operations unless a government escort is provided. Badges will be obtained through MTAB Security Forces. A 134th Air Refueling Wing Form #5 shall be completed by each applicant and submitted to the Contracting Officer’s Representative (COR) for approval prior to submittal to Security Forces for final approval & badging.

1.4.7 Post Award Conference/Periodic Progress Meetings: The contractor agrees to attend any post award conference convened by the KO in accordance with Federal Acquisition Regulations Subpart 42.5. The KO, Contracting Officer’s Representative (COR), and other Government personnel, as appropriate, may meet periodically with the contractor to review the contactor’s performance. At these meetings, the Contacting Officer will apprise the contractor of how the Government views the contractor’s performance and the contractor shall apprise the Government of problems, if any, being experienced The contractor shall resolve outstanding issues raised by the Government.

Contractor attendance at these meetings shall be at no additional cost to the Government.

1.4.8 Contract Manager (CM): The contactor shall designate a CM who shall ensure performance under this contract. The name of this person, and an alternate who shall act for the contractor when the CM is absent, shall be designated in writing to the KO. The

CM or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract. The CM shall work through the COR, (or the KO if a COR is not assigned), to resolve issues, receive technical instructions, and ensure adequate performance of services. The CM shall ensure that contractor employees do not perform any services outside the scope of the contract without an official modification issued by the KO. The CM shall ensure contractor employees understand that services performed outside the scope of the contract are performed wholly at the expense of the contractor.

1.4.9. Combating Trafficking in Persons: The United States Government has adopted a zero tolerance policy regarding trafficking in persons. Contractors and contractor employees shall not engage in severe forms of trafficking in persons during the period of performance of the contract; procure commercial sex acts during the period of performance of the contract; or use forced labor in the performance of the contract. The Contractor shall notify its employees of the United States Government’s zero tolerance policy, the actions that will be taken against employees for violations of this policy. Such actions may include, but are not limited to, removal from the contract, reduction in benefits, or termination of employment. The Contractor shall take appropriate action, up to and including termination, against employees or subcontractors that violate the US Government policy as described at FAR 22.17.

1.4.10 Data Rights: The Government has unlimited rights to all documents/material produced under this contract. All documents and materials, to include the source codes of any software, produced under this contract shall be Government owned and are the property of the Government with all rights and privileges of ownership/copyright belonging exclusively to the Government. These documents and materials may not be used or sold by the contractor without written permission from the KO. All materials supplied to the Government shall be the sole property of the Government and may not be used for any other purpose. This right does not abrogate any other Government rights.

1.4.11 Organizational Conflicts of Interest (OCI): The contractor and subcontractor personnel performing services under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent OCIs, as defined in FAR Subpart 9.5. The contractor shall notify the KO immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the KO to avoid or mitigate any such OCI. The contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the KO and in the event the KO unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the KO may affect other remedies as he or she deems necessary, including prohibiting the contractor from participation in subsequent contracted requirements which may be affected by the OCI.

2.0 Definitions and Acronyms:

2.1.1 CONTRACTOR. A supplier or vendor awarded a contract to provide specific supplies or service to the government. The term used in this contract refers to the prime.

2.1.2 CONTRACTING OFFICER (KO). A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the government. Note: The only individual who can legally bind the government.

2.1.3 CONTRACTING OFFICER'S REPRESENTATIVE (COR). An employee of the U.S.

Government designated by the KO to monitor contractor performance. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.

2.1.4 DEFECTIVE SERVICE. A service output that does not meet the standard of performance associated with the Performance Work Statement.

2.1.5 DELIVERABLE. Anything that can be physically delivered and includes non-manufactured things such as meeting minutes or reports.

2.1.6 KEY PERSONNEL. Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the Key Personnel listed in the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.

2.1.7 PHYSICAL SECURITY. Actions that prevent the loss or damage of Government property.

2.1.8 QUALITY ASSURANCE. The government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.

2.1.9 QUALITY ASSURANCE SURVEILLANCE PLAN (QASP). An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.

2.1.10 QUALITY CONTROL. All necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.

2.1.11 SUBCONTRACTOR. One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.

2.1.12 WORK DAY. The number of hours per day the Contractor provides services in accordance with the contract.

2.1.13 WORK WEEK. Monday through Friday, unless specified otherwise.

2.2 ACRONYMS:

AFARS Army Federal Acquisition Regulation Supplement AR Army Regulation AT/OPSEC Antiterrorism/Operational Security CFR Code of Federal Regulations CONUS Continental United States (excludes Alaska and Hawaii) COR Contracting Officer Representative COTS Commercial-Off-the-Shelf DA Department of the Army DD250 Department of Defense Form 250 (Receiving Report) DD254 Department of Defense Contract Security Requirement List DFARS Defense Federal Acquisition Regulation Supplement DOD Department of Defense FAR Federal Acquisition Regulation GFP/M/E/S Government Furnished Property/Material/Equipment/Services IA Information Assurance IS Information System(s) KO Contracting Officer OCI Organizational Conflict of Interest ODC Other Direct Costs PII Personally Identifiable Information PIPO Phase In/Phase Out POC Point of Contact PRS Performance Requirements Summary PWS Performance Work Statement QA Quality Assurance QAP Quality Assurance Program QASP Quality Assurance Surveillance Plan QC Quality Control QCP Quality Control Program TE Technical Exhibit

3.0 Government Furnished Property, Material, Equipment and Services (GFP/M/E/S):

The Government will provide the property, material, equipment, and/or services listed below solely for the purpose of performance under this contract:

3.1 Utilities: All utilities in the facility will be available for the contactor’s use in the performance of this contract. The contractor shall instruct employees in utilities conservation practices. The contractor shall operate under conditions that preclude the waste of utilities, which include turning off the water faucets or valves after using the required amount.

4.0 Contractor Furnished Property, Materials, and Equipment (CFP/M/E):

4.1 General: Except for those items specifically stated to be Government-Furnished in Paragraph 3.0, the contractor shall furnish everything required to perform these services as indicated in Paragraph 1.1.

5.0 Requirements: The contractor shall provide the following in accordance with this PWS and the associated plans and specifications:

5.1 Progress Schedule, Submittals, & Requests for Information (RFIs):

5.1.1 Contractor will provide Progress Schedule by direction of the Contracting Officer not to exceed ten (10) days after contract award.

5.1.2 Contractor shall submit the manufacturer’s products requested as in accordance with this PWS and the provided plans and specifications. Contractor shall wait for approval before purchasing material. The contractor will supply all equipment and material unless otherwise stated in scope of work. A list of all recovered materials and quantities must be submitted by the contractor following project completion. The contractor must submit a list of hazardous materials required for project completion, if any, to the Base Environmental Manager (EM) before project execution begins. All unused product, if any, must be removed from base upon project completion.

5.1.3 Contractor will immediately notify Contracting Officer when conflicts or delays are identified that require additional information from the Government to proceed. Contractor shall submit Requests for Information (RFIs) to the Contracting Officer within 5 calendar days of identification.

5.2 Site Visits: Contracting will schedule tour of site between 8:00 A.M. and 4 P.M Monday through Friday. Contact Capt Travis Vaughn at (865) 336-4228 for appointments.

5.3 Coordination: All work will require coordination with the Tennessee Air National Guard Civil Engineering. The contractor shall conduct their work in a manner that will not interfere with or stop the operations being conducted in and around the work area.

Contractors are NOT to connect to the base water distribution system without prior approval from Civil Engineering. Once approval is received, the contractor must provide a functional backflow prevention device to ensure cross contamination is prevented.

5.4 Performance: Submission of a bid by a contractor shall be accepted as evidence that they have read the work scope and have satisfied themselves as to the nature and location of the proposed work and all matters which can in any way affect the work or cost under this contract. Any failure of the contractor to acquaint themselves with all available information from including physical survey of the site of the proposed work will not relieve them from performing all work to be done for a complete and acceptable job. Work shall be completed in compliance with all applicable local, state, and federal codes and regulations.

5.5 Drawings: The drawings show and the specifications describe the work intended, but the Contractor shall be solely responsible for taking his own measurements and installing the work to fit the conditions encountered everything necessary for a complete and satisfactory installation shall be furnished and installed by this Contractor performing work under this contract, whether or not specifically shown or specified. This is not intended to cover major items of equipment not shown or specified but is intended and will be interpreted to cover all miscellaneous parts, devices, accessories, controls, and appurtenances which are required by any applicable code, ordinance, regulation or law required to complete and place the system in satisfactory operation and required for a first class job which is complete in every respect.

5.6 Deviations: No deviations from the plans and specifications shall be made without the full knowledge and consent of the Base Contracting Officer. Should this Contractor find at any time during the progress of the work that, in his judgment, existing conditions made desirable a modification in requirements covering any item he shall report such items to the Base Contracting Officer for his decision and instructions. No changes shall be made until written request has been made by the Contractor to the Base Contracting Officer and written approval of said change has been given by the Base Contracting Officer.

5.7 Omissions: The drawings and specifications shall both be considered as part of the contract. Any work or material shown in one and omitted in the other shall be furnished and performed as though shown in both to give a complete job approvable by the Base Contracting Officer. The awarding of the contract shall be construed to mean that this Contractor will install a complete and satisfactory system, furnishing all items of materials and labor to accomplish this result whether or not such items are particularly specified or shown on plans. Should any discrepancy or omission be discovered in the plans or specifications, such must be reported to the Base Contracting Officer immediately in order that any necessary addenda may be issued before the bids are received.

5.8 Interpretation: The meaning and intent of the plans and specifications shall be subject to the interpretations of the Base Contracting Officer whose decision on all questions pertaining thereto shall be binding upon the Contractor.

5.9 Permits, Licenses and Insurance: The Contractor shall obtain and pay for all permits, licenses, fees, etc., required for his work.

5.10 Guarantee: The Contractor shall furnish a guarantee covering all labor and materials for a period of one year from date of acceptance of his work which shall include an agreement to repair replace and make good at his expense, any and all defects which may appear in his work or materials during that time, which in the judgment of the Base Contracting Officer arise from defective workmanship or imperfect or inferior materials.

5.11 Cleanup: Contractor will repair all surfaces that may have been damaged during work to acceptable conditions as determined by Civil Engineering. Prior to final acceptance, the Contractor shall remove all waste materials and debris arising from construction and shall present all maintenance areas in a broom clean condition.

Construction debris will be removed on a daily basis. Contractor will dispose of removed material and maintenance excess as determined by Civil Engineering.

5.12 The Contractor shall ensure that all of the following tasks are properly accomplished in strict compliance with this specification to include but not limited to the following tasks:

5.12.1 Paint Interior Bldg 132

Prepare walls and paint 2 coats of finish paint using Sherwin Williams Duration Satin. Coordinate with COR for color selection. Government estimate’s 50,000 SF with minor sheetrock touchups. However, contractor shall perform field verification for required SF.

5.12.2 Bldg 132 Sidewalk and Drive

Contractor shall demolish, form, and pour approximately 1,366 SF of 4” concrete and 100 SF of 6” to repair existing sidewalk and driveway as seen on AF-1 to include new expansion/construction joints. New concrete shall maintain original grade. Existing concrete bollard bases shall be removed and placed in new sidewalk. Concrete drive shall be doweled by machine per the below detail.

‐ All dimensions to be field verified by contractor.

‐ Before placing aggregate contractor shall treat subgrade with an effective herbicide to prevent growth of vegetation.

‐ Place and compact aggregate in conformance with TDOT Standard

Specification Sections 303.09 and 401.04 ‐ Note #1: Mineral Aggregate, Type A Base, Grading D (TDOTSS Section 903.05) ‐ Note #4: Type 1 Concrete – 4,000 psi Compressive Strength ‐ The following detail shall be utilized when placing concrete.

5.12.3 McCutchan St Gate replacement

Contractor shall furnish and install one HySecurity Gate Operator Model 222 SS with Smart Touch Controller according to manufacturer recommendations to include the following options:

Vehicle Detector Gate edge Sensor Thru Beam Photoelectric Eye Internal Entrapment Sensor Free Exit detector Miller’s Edge

Contractor shall furnish and install 1ea 38’ long x 6’ high cantilever aluminum security gate. Gate must utilize existing exit loop and entry keypad for operation.

5.12.4 Building Pressure Reducing Valves

Contractor shall provide and install pressure reducing valves with sizes and locations correlated in below table. Contractor shall remove existing pressure reducing valve if existing and replace with High-Capacity Pressure Reducing Valves with a max pressure rating of 300 psi. Wilkins or equivalent.

Building Size Location

1 1/4" - Must be installed in the ground before it gets to the BLDG

240 1 1/2" In Mechanical Room

111 3 " In Mechanical Room

110 1" In Bathroom

101 2" In Janitors Closet

90 2" In Stock Room

134 2 1/2" In Mechanical Room

323 1" In Hot Box with Backflow

400 2" In Mechanical Room

320 3" In Mechanical Room

5.12.5 Hardscape at Building 134

Contractor shall remove and dispose of existing hardscaping and geotex fabric.

Contractor shall grade area to comply with the detail provided below. Contractor shall replace hardscape in areas shown on AF-2 in compliance with the below detail. Washed river slick hardscape shall be D50 12” washed river slicks with no stones smaller than 4” in smallest dimension.

5.12.6 Fire Department Hallways

Contractor shall remove via grinding, sanding, etc existing epoxy floor coating, transition strips, and cove base in the areas shown on AF-3. Contractor shall prepare flooring per manufacturer recommendations in preparation for ceramic tile flooring, Crossville Shades Collection or equivalent. Contractor shall provide and install ceramic tile flooring, cove base and transition strips per the attached specifications. Colors and patterns shall be coordinated with COR. SPEC’S

5.12.7 Bldg 320 Wall Repair

Contractor shall conduct the following repairs on 6,000 SF of wall space on AF-4:

Remove existing coping caps as designated in the aerial photo.

Cover the top of the wall with .045 EPDM and bond to the face of the wall.

Install manufacturer approved hat channels to the back side of the wall designated in the drawings above the lower back roof.

Install R-Mer Wall Panels with snap seam design and mesas in the face of the panel. See specification section 074214 for requirements. Color Selection to be coordinated with COR. Install new metal coping caps to match the wall panels and provided by the same manufacturer. Color selection to be coordinated with COR. Must comply with ES-1 standards. Only remove the existing coping where marked on the areal drawings. See specification section 076200 for requirements.

Remove existing roof designated on the roof where there is wet insulation and install new insulation and new roofing to match existing and to keep the warranty in good working standing (Tremco TPA FB – 55 Mil.).

5.12.8 Airfield

Contractor shall remove loose material and pressure wash areas shown for restriping of pavements. Contractor shall provide and apply white traffic paint and glass beads per attached specification for 600 LF as shown on AF-5 as well as 13,750 LF of Double yellow striping, 13,750 LF of single yellow striping, and all shown 3x24’ deceptive surface markings on taxiway, upper, middle, and lower apron shown on attached drawings C8.1 – C8.6. Contractor shall field verify all dimension.

5.12.9 Poles and Sign replacement

Contractor shall install new road signs and/or sign post at various locations base wide to include four(4) Stop signs, two(2) 25MPH speed limit signs, one(1) 35MPH speed limit sign, one(1) ‘One way do not enter’ sign, two(2) R 4-7 ‘keep right’ signs, and five(5) square channel galvanized post. Exact locations to be coordinated with COTR in field. The bottom of the sign shall be 7 feet above grade as indicated in the MUTCD. See figures 2A-2 and 2A-3 in section 2A.16 of

2009 MUTCD.

- Stop signs and ‘One way’ at front gate

- Keep Right, R 4-7, at old front gate

- Square galvanized post at Bonner

- Speed limit signs back gate

Contractor shall clean and paint from point A to point B to include hatching area as shown on AF-6. Contractor shall provide and apply edge striping paint per attached specification as shown on AF-6.

5.12.10 Bldg 113

Replace Doors E101B and E101C. Remove two existing exterior single metal doors and hollow metal door frames from openings in concrete walls. Remove aluminum thresholds. Dispose of doors, frames, hardware except cipher locks off

Base. Turn cipher locks over to Government. Temporarily remove alarm contacts from doors to prevent damage. Contacts to be reinstalled on new door and frame assemblies. Provide two new hollow metal frame and door assemblies complete with all hardware, one left hand reverse and one right hand reverse, and paint finish as specified below:

Hollow Metal Frame: Steelcraft F series, 3 sided 14 gauge fully welded and shop primed. Frame shall be sized for existing 3’ x 6’ – 10” opening in wall.

Contractor to field verify dimensions. Prepare frame with reinforcement and boxes for 3 hinges. Frame does not require box for door strike since door will have a rim exit device. Anchor frame to concrete wall. Fill frame with grout.

Door: Steelcraft L series, flush panel insulated steel door, 16 gauge, 3’ x 6’ – 7” to match existing door panel size. Door thickness to be 1 ¾” thick. Factory primed. Core insulation to be polystyrene.

Hardware: Provide the following for each door:

Threshold: 5” saddle aluminum.

Hinges: Stanley 5 knuckle full mortise heavy weight ball bearing hinges, steel, polished and plated.

Closer: Stanley CLD 4451 with heavy duty arm and compression stop, aluminum paint finish.

Rim Exit Device: Stanley Apex FL2100 Fire Exit Series, with standard strike, exit device to work with manual cipher lock and lever on opposite door entrance side.

Cipher Lock: Simplex L1000 series, mechanical push button, with passage lever and removable core insert for key override, entrance side. Core insert shall be for BEST locks removable core. Cipher lock shall be compatible for use with rim exit device. Finish to be satin chrome.

Weather Stripping: Jamb- Hager 870S; Door Bottom Sweep- Hager 750S.

Protection Plate: Hager, 0.050” gauge with 3 side bevel, US32D finish.

Paint: Interior-Acrylic, Pro Industrial ProCRYL Universal Primer; 1st and 2nd

Coats, Pro Industrial 0-VOC Acrylic. Color: White. Exterior: TNEMEC High Performance Coating System. Primer, intermediate, and finish coat system by TNEMEC. Provide orange and white checkerboard finish coat pattern to match that on existing doors and frames to be removed. Orange and white TNEMEC colors to match exact colors used.

Alarm Contacts: Reinstall with assistance of Base Security Personnel.

Replace and Upgrade Hardware on Existing Double Doors E109B, E112B, and E123B. Remove existing cipher passage locksets from doors and turn over to Government. Remove existing automatic flush bolt sets and astragals on inactive leaf. Each door leaf measures 3’-0” x 7’-0”. Provide cover plates at existing openings at door edges where hardware is removed. Paint to match existing finish. Provide surface vertical rod fire exit devices on all active and inactive door leafs for each double door set as specified below:

Hardware: Provide the following on each door leaf, unless otherwise noted;

Surface Vertical Rod Exit Devices: Stanley Apex FL2200 Fire Exit Series, complete assembly with top and bottom strikes. Exit device finish 630. Top strike No. S300 Surface applied, Investment Cast Stainless Steel, Black Powder Coated. Bottom Strike No. S640, Flush mounted, Steel, Black Powder Coated.

Cipher Lock: Simplex L1000 series, mechanical push button, with passage lever and removable core insert for key override, provide on active door leaf only, entrance side. Other door leaf to be inactive. Core insert shall be for BEST locks removable core. Cipher lock shall be compatible for use with rim exit device. Finish to be satin chrome.

5.12.11 Bldg 416 and 404

Contractor shall provide and install single mode fiber per specifications from existing Simplex fire panel to communications rooms. All new conduit and wiring shall be installed within existing walls, suspended ceilings, etc. The contractor shall install all associated conduit, connections, etc. to ensure a complete system. Contractor shall perform field calculations for all materials. Contractor must ensure a complete and usable system that reports to the base fire department to include but not limited to:

Building 404 fiber shall be LC to ST single mode duplex fiber at least 100 feet long. Fiber shall run from the alarm panel in mechanical room B to comm room 119.

Building 416 fiber shall be LC to ST single mode duplex fiber at least 200 feet long. Fiber shall run from the alarm panel in mechanical room on the TECTV side to the comm room located at the center of the building.

5.12.12 Bldg 323

Remove and dispose of existing floor tile, level, and install epoxy floor coating approximately 430 SF, color shall be coordinated with COR.

System shall meet the following requirements:

Flammability: ASTM D 635, Self Extinguishing.

Fungus & Bacteria Growth: MIL-F-52505, Will not support growth of fungus or bacteria when subjected to mildew and bacteria tests.

Hardness: ASTM D 2240, 80-84 Shore D.

Bond Strength to Concrete: ACI #403, 300 psi minimum (2.07 MPa)

(100%concrete failure).

Coefficient of Friction: ASTM D 2047, 0.60 to 0.90, Varies by resin and use of non-skid aggregates Water Absorption: ASTM D 570, Nil.

Thermal Shock Resistance: ASTM C 884, Passes.

Abrasion Resistance: ASTM C 501, 32 mg typical, Varies by topcoat.

Impact Resistance: MIL-D-3134F, Varies by system.

Prepare substrate to receive coating in accordance with manufacturer's recommendations. Substrate shall be free of dirt, waxes, curing agents, and other foreign materials. Objectionable substrate irregularities that will transmit through coating system shall be removed. Prepare surfaces using the methods recommended by the manufacturer for achieving the best result for the substrate under the project conditions. Level tolerance: Concrete sub-floor shall be level with a maximum variation from level of 1/4 inch (6 mm) in 10 feet (3048 mm). Any irregularity of the surface requiring patching and/or leveling shall be done using material approved by the manufacturer.

Prepare approximately 680 SF of office interior walls and paint 2 coats of finish paint using Sherwin Williams Duration Satin. Coordinate with COR for color selection.

The contractor shall demolish existing overhead doors and construct associated structural components required for the installation of new overhead doors to be installed by the contractor as specified below. Contractor shall provide and install all material and repair surrounding area to match existing according the below table and notes:

Notes:

1. All existing doors and associated appurtenances shall be removed. Unless otherwise noted above*, basis of design is 625 Stormtite series rolling door as manufactured by Overhead Door Corporation with a RHX operator. All doors shall be powder coated with a Standard RAL color except as noted, colors to be selected by COR.

2. All overhead doors shall be labeled as indicated above and on floorplans** with an anodized aluminum 3"x5" label. The labels shall be mechanically fastened to the bottom center of the outside face of the door. Confirm door label, numbering and location with COR.

3. Contractor shall provide door frame, jamb and infill shop drawings as required with overhead door submittals.

5.12.13 Bldg 523

Contractor shall form, and pour 6” concrete to install a ramp from the building double doors to curb as seen on AF-7 to include new expansion joint. New concrete ramp shall be sloped to grade. All dimensions to be field verified by contractor. Before placing aggregate contractor shall treat subgrade with an effective herbicide to prevent growth of vegetation. Place and compact aggregate in conformance with TDOT Standard Specification Sections 303.09 and 401.04

Note #1: Mineral Aggregate, Type A Base, Grading D (TDOTSS Section 903.05) Note #4: Type 1 Concrete – 4,000 psi Compressive Strength The following detail shall be utilized when placing concrete.

5.12.14 Pumphouse Controls Upgrade

Contractor shall provide and install pump controls with the below components to integrate into the existing system. Due to knowledge of the system it is recommended the contractor uses or consults with Brann & Whittemore Inc., Franklin, TN. Contractor shall insure proper installation and programming, mounting of new equipment inside panel with all necessary wiring and programming changes.

1 - Honeywell UDC 3200 Set Point Controller to take PID off Individual drives;

DC3200-CE-100R-100-10000-00-0

1 - Dual Point Pressure Switch to operate lead/lag for small pumps; DPCT-CSI

5.13 Contractor Manpower Reporting Application (CMRA):

5.14 The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the National Guard Bureau via a secure data collection site.

5.15 The contractor shall completely fill in all required data fields using the following web address: http://www.ecmra.mil/. Reporting inputs shall be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year, beginning with 2013.

Contractors may direct questions to the help desk at http://www.ecmra.mil.

6.0 Applicable Publications: Publications applicable to this PWS are listed below:

Publication (Chapter/Page)

Date of Publication Mandatory or Advisory

Website

NFPA 70: National Electrical Code

2017 Mandatory

Illuminating Engineering Society of North America

(IESNA)

Advisory

TECHNICAL EXHIBIT 1

Performance Requirements Summary

This Performance Requirements Summary includes performance standards. The Government will use these standards to determine contractor performance and will compare contractor performance to the Acceptable Quality Level (AQL).

PWS Paragraph Task Performance

Standard Acceptable Quality

Levels (AQL) Surveillance Method /

By Whom

5.12 Complete

upgrade, repairs, & construction of numerous facilities basewide

In accordance with plans & specifications

Completed within POP

Weekly / COR

TECHNICAL EXHIBIT 2

Deliverables Schedule

PWS Reference / Deliverable Title

Frequency Number of Copies

Medium/Format Submit To

1.4.5.2 AT Level 1

Awareness Training Certificates

Provide within 15 calendar days after employee completes training.

1 Electronic Submission

COR

1.4.6.1 Identification Media

Return within 14 days of employee’s departure from contract performance.

Original(s) Hard Copy COR

5.1.1 Progress Schedule

10 Days after NTP and monthly there after

1 Electronic Submission

COR

Documentation As required per plans and specifications

1 Electronic Submission

KO

5.1.3 Request for

Information (RFIs)

Provide within 5 calendar days after question or concern is identified

1 Electronic

KO

5.1.2 Submittals

Provide within 60 calendar days per plans and specifications

1 Electronic

KO