Questions_5-8.pdf

PDF 13 KB Posted

Attached to
Repair Airfield and Exterior Lighting
Solicitation number
W912L7-18-B-7006
Issued by

View the file

Other files

File Type Posted
Abstract_of_offers_18B7006.pdf PDF
Questions_9-13.pdf PDF
Lumeware_JA.pdf PDF
Sign_in_Sheet.pdf PDF
Preproposal_minutes_W912L718B7006.pdf PDF
Site_Visit_Slides_19_Jul_2018.pdf PDF
Questions_1-4.pdf PDF
W912L7-18-B-7006_Amendment_1.pdf PDF
Specifications.zip ZIP file
Construction_PWS,_PSXE152004_Repair_Upgrade_Airfield_&_Exterior_Lighting.pdf PDF
W912L7-18-B-7006.pdf PDF
Drawings.zip ZIP file
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. Question: There are ambiguities between different sections of the specifications. REF: Specification Section 01600 Paragraph 1.4 A 2. No evaluations of potential equal products shall be made during the bidding process.

Paragraph 1.6.A.3. Contractor shall propose equal substitutions for products called for in any section of this specification,

5. Answer: The airfield lighting system, as a single major component, has been identified for pre-bid approval of substitutions. Requirements for pre-bid approval are found in Section 16052 Part 4.

Substitutions will not be allowed for the wireless control module, which must be connected to an existing wireless lighting control network and therefore must be compatible to operate correctly. Refer to Section 16055. The provisions of Section 01600 shall apply to all other components used throughout the project.

6. Question: Is this a Sole Source Manufacturer Job? REF: Specification Section 16052 Paragraph 2.4 C. No substitutions will be considered for this automatic control module.

Under item 2 of the definitions, will evaluations of potential equal products be allowed?

6. Answer: Correct, substitutions will not be allowed for the wireless control module, which is to be connected to an existing wireless lighting control network. Refer to Section 16055. See Justification and Approval posted on FBO

7. Question: Is this a Sole Source Manufacturer Job? REF: Specification Section 16052 Paragraph 4.0 D. Bidders are required to bid only products that have been approved by this specification.

7. Answer: Substitutions under this Section will be reviewed prior to bid. Refer to 4.0(B) for requirements for pre-bid approval of alternate products. This request is beyond the time period specified in paragraph 16052 4.0 A.

8. Question: Is this a Sole Source Manufacturer Job? REF: Specification Section 16055 Paragraph 2.4 A. No substitutions will be accepted.

8. Answer: Correct, substitutions will not be allowed for the wireless control module, which is to be connected to an existing wireless lighting control network. See Justification and Approval posted on FBO