Questions_5-8.pdf
PDF 13 KB Posted
- Attached to
- Repair Airfield and Exterior Lighting
- Solicitation number
- W912L7-18-B-7006
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Abstract_of_offers_18B7006.pdf | ||
| Questions_9-13.pdf | ||
| Lumeware_JA.pdf | ||
| Sign_in_Sheet.pdf | ||
| Preproposal_minutes_W912L718B7006.pdf | ||
| Site_Visit_Slides_19_Jul_2018.pdf | ||
| Questions_1-4.pdf | ||
| W912L7-18-B-7006_Amendment_1.pdf | ||
| Specifications.zip | ZIP file | |
| Construction_PWS,_PSXE152004_Repair_Upgrade_Airfield_&_Exterior_Lighting.pdf | ||
| W912L7-18-B-7006.pdf | ||
| Drawings.zip | ZIP file |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. Question: There are ambiguities between different sections of the specifications. REF: Specification Section 01600 Paragraph 1.4 A 2. No evaluations of potential equal products shall be made during the bidding process.
Paragraph 1.6.A.3. Contractor shall propose equal substitutions for products called for in any section of this specification,
5. Answer: The airfield lighting system, as a single major component, has been identified for pre-bid approval of substitutions. Requirements for pre-bid approval are found in Section 16052 Part 4.
Substitutions will not be allowed for the wireless control module, which must be connected to an existing wireless lighting control network and therefore must be compatible to operate correctly. Refer to Section 16055. The provisions of Section 01600 shall apply to all other components used throughout the project.
6. Question: Is this a Sole Source Manufacturer Job? REF: Specification Section 16052 Paragraph 2.4 C. No substitutions will be considered for this automatic control module.
Under item 2 of the definitions, will evaluations of potential equal products be allowed?
6. Answer: Correct, substitutions will not be allowed for the wireless control module, which is to be connected to an existing wireless lighting control network. Refer to Section 16055. See Justification and Approval posted on FBO
7. Question: Is this a Sole Source Manufacturer Job? REF: Specification Section 16052 Paragraph 4.0 D. Bidders are required to bid only products that have been approved by this specification.
7. Answer: Substitutions under this Section will be reviewed prior to bid. Refer to 4.0(B) for requirements for pre-bid approval of alternate products. This request is beyond the time period specified in paragraph 16052 4.0 A.
8. Question: Is this a Sole Source Manufacturer Job? REF: Specification Section 16055 Paragraph 2.4 A. No substitutions will be accepted.
8. Answer: Correct, substitutions will not be allowed for the wireless control module, which is to be connected to an existing wireless lighting control network. See Justification and Approval posted on FBO