Questions_1-4.pdf

PDF 9 KB Posted

Attached to
Repair Airfield and Exterior Lighting
Solicitation number
W912L7-18-B-7006
Issued by

View the file

Other files

File Type Posted
Abstract_of_offers_18B7006.pdf PDF
Questions_9-13.pdf PDF
Lumeware_JA.pdf PDF
Questions_5-8.pdf PDF
Sign_in_Sheet.pdf PDF
Preproposal_minutes_W912L718B7006.pdf PDF
Site_Visit_Slides_19_Jul_2018.pdf PDF
W912L7-18-B-7006_Amendment_1.pdf PDF
Specifications.zip ZIP file
Construction_PWS,_PSXE152004_Repair_Upgrade_Airfield_&_Exterior_Lighting.pdf PDF
W912L7-18-B-7006.pdf PDF
Drawings.zip ZIP file
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. Question: Is the voltage on this apron over 4160 volts?

1. Answer: No. Voltage is 480 volts for the apron lighting

2. Question: There are two bid due dates referenced in the solicitation, August 2 and August 3. Which date is correct?

2. Answer: 2 August 2018. See Amendment 1

3. Question: The solicitation has ABI # 1 as Mid. Ramp Lighting and ABI # 2 Upper Ramp Lighting.

The drawings sheets SE2.2 (which is the Mid Ramp) states that this lighting is ABI # 2 and SE2.3 (which is the Upper Ramp) states that this lighting is ABI # 1. Please clarify what ramp lighting is in ABI # 1 and

ABI # 2.

3. Answer: Both ABI #1 & #2 have been removed from this project. Contractors shall provide bids for Base Bid Items only. See Amendment 1.

4. Question: In the case of unforeseen site conditions will the contractor be charged $355.23 per modification? On Page 29 of the SF1442, Section 52.211-12 Liquidated Damages, (a).

4. Answer: No.

File details come from the government source that posted it.