Questions_1-4.pdf
PDF 9 KB Posted
- Attached to
- Repair Airfield and Exterior Lighting
- Solicitation number
- W912L7-18-B-7006
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Abstract_of_offers_18B7006.pdf | ||
| Questions_9-13.pdf | ||
| Lumeware_JA.pdf | ||
| Questions_5-8.pdf | ||
| Sign_in_Sheet.pdf | ||
| Preproposal_minutes_W912L718B7006.pdf | ||
| Site_Visit_Slides_19_Jul_2018.pdf | ||
| W912L7-18-B-7006_Amendment_1.pdf | ||
| Specifications.zip | ZIP file | |
| Construction_PWS,_PSXE152004_Repair_Upgrade_Airfield_&_Exterior_Lighting.pdf | ||
| W912L7-18-B-7006.pdf | ||
| Drawings.zip | ZIP file |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. Question: Is the voltage on this apron over 4160 volts?
1. Answer: No. Voltage is 480 volts for the apron lighting
2. Question: There are two bid due dates referenced in the solicitation, August 2 and August 3. Which date is correct?
2. Answer: 2 August 2018. See Amendment 1
3. Question: The solicitation has ABI # 1 as Mid. Ramp Lighting and ABI # 2 Upper Ramp Lighting.
The drawings sheets SE2.2 (which is the Mid Ramp) states that this lighting is ABI # 2 and SE2.3 (which is the Upper Ramp) states that this lighting is ABI # 1. Please clarify what ramp lighting is in ABI # 1 and
ABI # 2.
3. Answer: Both ABI #1 & #2 have been removed from this project. Contractors shall provide bids for Base Bid Items only. See Amendment 1.
4. Question: In the case of unforeseen site conditions will the contractor be charged $355.23 per modification? On Page 29 of the SF1442, Section 52.211-12 Liquidated Damages, (a).
4. Answer: No.