Preproposal_minutes_W912L718B7005.pdf
PDF 78 KB Posted
- Attached to
- Repair Roof B1799, Firing Range
- Solicitation number
- W912L7-18-B-7005
About this file
Pre-proposal Minutes
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Question_5.pdf | ||
| Question_4.pdf | ||
| Answers.pdf | ||
| 18B7005_solicitation_Mod_1.pdf | ||
| Sign_in_Sheet.pdf | ||
| Site_Visit_Slides_6_June_2018.pdf | ||
| Drawings.zip | ZIP file | |
| Specifications.zip | ZIP file | |
| 18B7005_solicitation.pdf | ||
| PWS,_PSXE162006_Repair_Roof_Bldg_1799.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TENNESSEE AIR NATIONAL GUARD
HEADQUARTERS 134TH AIR REFUELING WING
MCGHEE TYSON AIR NATIONAL GUARD BASE TENNESSEE
10 June 2018
MEMORANDUM FOR RECORD
SUBJECT: MINUTES OF PRE-PROPOSAL CONFERENCE AND SITE VISIT, SOLICITATION
W912L7-18-B-7005, Repair Roof B1799 Firing Range
Date: 6 Jun 2018, 0900 - 1000
1. The list of contractors attending the meeting is shown on the attached sign-in sheet. The following
Government representatives attended the subject meeting:
Name Position
CMSgt Richard Lusby 134 Contracting Office
SSgt Lisa Maxwell 134 Contracting Specialist
Major David Barrett 134 Civil Engineering
2. The following items were discussed during the Pre-proposal Conference:
a. SSgt Maxwell provided an over view of the solicitation requirements to attendees. (Power
Point presentation attached)
b. SSgt Maxwell discussed submission of questions and that contractors should not ask the
Architect and Engineering firm questions.
c. Major Barrett discussed the scope of the projects.
3. Attendees were allowed to visit work locations for Repair Roof B1799 Firing Range, Bldg 1799.
4. Questions must be submitted in writing via email, especially technical questions to:
Lisa.L.Maxwell4.Mil@Mail.Mil. DO NOT CONTACT the Design Engineers or the Government
Engineers. All questions must be routed through the Contracting Office. All Contractor questions when answered will be posted to FedBiz Ops. If a question arises that will result in a change to the plans or specifications, an official amendment will be issued. All correspondence, questions and answers, amendments etc. will be issued via email.
5. Any amendments that are issued will posted to FedBiz Ops. Contractors were advised to check the website frequently.
6. The pre-proposal conference and site visit concluded at 1030 hours.
LISA L MAXWELL, TNANG
CONTRACTING SPECIALIST
Attachment
Power Point Slides
Sign in sheet
| 2018-06-10T16:24:13-0400 | |
| MAXWELL.LISA.LORAINE.1266294472 |
File details come from the government source that posted it.