Answers.pdf
PDF 176 KB Posted
- Attached to
- Repair Roof B1799, Firing Range
- Solicitation number
- W912L7-18-B-7005
About this file
Response to Questions 1-3
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Question_5.pdf | ||
| Question_4.pdf | ||
| 18B7005_solicitation_Mod_1.pdf | ||
| Sign_in_Sheet.pdf | ||
| Site_Visit_Slides_6_June_2018.pdf | ||
| Preproposal_minutes_W912L718B7005.pdf | ||
| Drawings.zip | ZIP file | |
| Specifications.zip | ZIP file | |
| 18B7005_solicitation.pdf | ||
| PWS,_PSXE162006_Repair_Roof_Bldg_1799.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. Question: Is the canopy structure is over the firing line and if it must meet the ETL 11-18 RT60 of
1.5 seconds reverb time or the 85 dBA requirement?
1. Answer: The roof is over the berm where bullets impact the soil. It is not over the firing points and does not have to meet the ETL 11-18 RT60 of 1.5 seconds reverb time or the 85 dBA requirement.
2. Question: Can the northwest chain link fence can be removed and replaced during the construction process?
2. Answer: Removal of the existing chain linked fence to provide access is acceptable. Fence must be restored to original condition following construction
3. Question: What is the structural support of the southwest wall of the existing canopy to be demolished?
3. Answer: It consists of a shallow concrete foundation that is protected by railroad ties