Answers.pdf

PDF 176 KB Posted

Attached to
Repair Roof B1799, Firing Range
Solicitation number
W912L7-18-B-7005
Issued by

About this file

Response to Questions 1-3

View the file

Other files

File Type Posted
Question_5.pdf PDF
Question_4.pdf PDF
18B7005_solicitation_Mod_1.pdf PDF
Sign_in_Sheet.pdf PDF
Site_Visit_Slides_6_June_2018.pdf PDF
Preproposal_minutes_W912L718B7005.pdf PDF
Drawings.zip ZIP file
Specifications.zip ZIP file
18B7005_solicitation.pdf PDF
PWS,_PSXE162006_Repair_Roof_Bldg_1799.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. Question: Is the canopy structure is over the firing line and if it must meet the ETL 11-18 RT60 of

1.5 seconds reverb time or the 85 dBA requirement?

1. Answer: The roof is over the berm where bullets impact the soil. It is not over the firing points and does not have to meet the ETL 11-18 RT60 of 1.5 seconds reverb time or the 85 dBA requirement.

2. Question: Can the northwest chain link fence can be removed and replaced during the construction process?

2. Answer: Removal of the existing chain linked fence to provide access is acceptable. Fence must be restored to original condition following construction

3. Question: What is the structural support of the southwest wall of the existing canopy to be demolished?

3. Answer: It consists of a shallow concrete foundation that is protected by railroad ties