180220_BIDSET_FitnessTrack_Specs.pdf

PDF 2 MB Posted

Attached to
Construct Fitness Track and Reroute Road Federal contract opportunity
Solicitation number
W912L7-18-B-5004
Issued by
Department of the Army Tennessee Army National Guard

About this file

SPECS

View the file

Other files for this federal contract opportunity

Other files attached to Construct Fitness Track and Reroute Road, newest first.
File Type Posted
Abstract_of_Quotes.xls XLS spreadsheet
SOLC_18-8-5004_MOD_4.pdf PDF
SOLC_18-8-5004_MOD_4_CF.pdf PDF
SOLC_18-8-5004_MOD_1X.pdf PDF
SOLC_18-8-5004_MOD_3.pdf PDF
FBO_POST_MOD_3.pdf PDF
Site_Visit_Slides_19_July_2018.ppt PPT presentation
SOLC_18-8-5004_MOD_2.pdf PDF
SOLC_18-8-5004_MOD_1.pdf PDF
180220_BIDSET_FitnessTrack_Plans.pdf PDF
SOLC_18-8-5004.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT MANUAL

February 2018

FOR THE PROJECT TITLED

BKTZ162008

CONSTRUCT PHYSICAL FITNESS TRACK

at

118TH WING,

NASHVILLE INTERNATIONAL AIRPORT,

240 KNAPP BLVD. NASHVILLE, TN 37217

CONTRACTING OFFICER:

TENNESSEE AIR NATIONAL GUARD

NASHVILLE, TN

DESIGNER:

Goodwyn Mills & Cawood

3310 West End Avenue, Suite 420

Nashville, TN 37203

Tel 615-333-7200 Fax 615-333-0529

GMC Project #: CNAS170077

Construct Physical Fitness Track BKTZ162008

118th Wing, Nashville International Airport Tennessee Air National Guard

PROJECT INFORMATION Section 00 01 02

SECTION 00 01 02

PROJECT INFORMATION

PART 1 GENERAL

1.01 PROJECT IDENTIFICATION

A. Project Name: Construct Physical Fitness Track

B. Government Project Number: BKTZ 162008

C. Project Location:

Berry Field, Nashville International Airport

240 Knapp Blvd.

Nashville, TN 37217

C. The Owner, hereinafter referred to as Government: Tennessee Air National Guard (TNANG).

1.02 PROJECT DESCRIPTION

A. Summary Project Description: This project consists of constructing a new quarter mile physical fitness track and relocating an existing drive.

1.03 PROJECT CONSULTANTS

A. The Civil Engineer, hereinafter referred to as Engineer: Goodwyn Mills and Cawood.

1. Address: 3310 West End Ave, Ste. 420.

2. City, State, Zip: Nashville, TN 37203.

3. Contact: Andrew McElhenny, PE

3. Phone/Fax: 615-333-7200.

4. E-mail: andrew.mcelhenny@gmcnetwork.com.

PART 2 PRODUCTS (NOT USED)

PART 3 EXECUTION (NOT USED)

END OF SECTION

mailto:andrew.mcelhenny@gmcnetwork.com

SEALS Section 00 01 05 Page 1

SECTION 00 01 05

SEALS

TABLE OF CONTENTS Section 00 01 10 Page 1

SECTION 00 01 10

TABLE OF CONTENTS

PROCUREMENT AND CONTRACTING REQUIREMENTS

1.01 DIVISION 00 -- PROCUREMENT AND CONTRACTING REQUIREMENTS

A. 00 01 01 – Project Manual Cover

B. 00 01 02 – Project Information

C. 00 01 05 – Seals Page

D. 00 01 10 – Table of Contents

E. 00 01 15 – List of Drawings

F. 00 33 00 – Bid Form

1.02 DIVISION 01 -- GENERAL REQUIREMENTS

A. 01 00 00 – General Requirements

B. 01 10 00 – Summary of Work

C. 01 13 00 – Submittals

D. 01 13 40 – Submittal Matrix

E. 01 45 00.00 10 – Quality Control

F. 01 56 80 – Erosion Control

1.03 DIVISION 02 –- EXISTING CONDITIONS

A. 02 41 00 – Demolition

1.04 DIVISION 03 -- CONCRETE

A. 03 20 00.00 10 – Concrete Reinforcing

B. 03 30 00 – Cast-In-Place Concrete

C. 03 41 33 – Precast Structural Pretensioned Concrete

1.05 DIVISION 06 – WOODS, PLASTIC, AND COMPOSITES

A. 06 10 00 – Rough Carpentry

1.06 DIVISION 09 -- FINISHES

A. 09 90 00 – Paints and Coatings

1.07 DIVISION 31 -- EARTHWORK

A. 31 00 00 – Earthwork

B. 31 10 00 – Clearing for Civil Works

C. 31 11 00 – Clearing and Grubbing

D. 31 23 00.00 20 – Excavation and Fill

1.08 DIVISION 32 – EXTERIOR IMPROVEMENTS

A. 32 12 16 – Roadway and Track Pavement

B. 32 18 23.33 – Running Track Surfacing (Black)

C. 32 92 19 – Seeding

TABLE OF CONTENTS Section 00 01 10 Page 2

1.09 DIVISION 33 – UTILITIES

A. 33 40 00 – Storm Drainage Utilities

END OF TABLE OF CONTENTS

Bid Form Section 00 33 00 Page 1

SECTION 00 33 00

BID FORM

In compliance with the solicitation for the construction of the CONSTRUCT PHYSICAL FITNESS TRACK, having examined the drawings and/or specifications with related documents and the site of the proposed work, and being familiar with all of the conditions surrounding the construction of the proposed project (including the availability of materials and labor), hereby proposes to furnish all labor to construct the project in accordance with the Contract Documents within the time set forth therein and at the prices stated below. These prices are to cover all expenses incurred in performing the work required under the bidding instruments, of which this proposal is a part.

The undersigned does hereby declare and stipulate that this proposal is made in good faith, without collusion or connection with any other person or persons bidding for the same work, and that it is made in pursuance of and subject to all the terms and conditions of the construction contract, the detailed specifications, and the drawings pertaining to the work to be done, all of which have been examined by the undersigned.

The offerer hereby agrees to commence work under this contract on or before a date to be specified in a written "Notice to Proceed" and to complete the contract fully within one hundred eighty (180) consecutive calendar days. The offerer further agrees to pay, as liquidated damages, the sum of $ per day for each consecutive calendar day that expires after the time specified for completion until the project is fully complete.

The Bidder hereby agrees that preference will be given to domestic construction materials and further agrees to require subcontractors, materialmen, and suppliers also to give preference to domestic construction materials.

The Bidder acknowledges receipt of the following addenda:

No. Dated No. Dated ______ No.______ Dated______

The offerer agrees to furnish all plant, labor, equipment, and incidentals necessary for the construction, testing, and placing into operation of the CONSTRUCT PHYSICAL FITNESS TRACK all in accordance with the drawings and specifications. The offerer's proposal is a firm fixed price. The unit prices listed in the following bid schedule are for evaluation purposes of the government and will be used to negotiate any change orders to the contract if a situation occurs in accordance with FAR clause FAR 52.211.18, "Variation of Estimated Quantities".

(CONTINUED ON FOLLOWING PAGE)

Bid Form Section 00 33 00 Page 2

TENNESSEE AIR NATIONAL GUARD

CONSTRUCT PHYSICAL FITNESS TRACK, BKTZ162008

118TH WING

BERRY FIELD

Item Item Description Related

Sections

Estimated

Quantity Unit Unit Price Total Price

1. Mobilization 01 00 00 1 LS

2. Clearing and Grubbing 31 11 00 550 CY

3. Construction Entrance 01 56 80 1 EA

4. Silt Fence 01 56 80 100 LF

5. Check Dam 01 56 80 3 EA

6. Inlet Protection 01 56 80 3 EA

7. 12" HDPE 33 40 00 37 LF

8. 18" RCP 33 40 00 108 LF

9. 24" RCP 33 40 00 103 LF

10. 24" CMP 33 40 00 45 LF

11. Headwalls 33 40 00 6 EA

12. Area Drain (22" X 22") 34 40 00 1 EA

13. Sidewalk Removal 02 41 00 140 SY

14. Asphalt Removal 02 41 00 2,194 SY

15. Tree Removal 31 11 00 33 EA

16. Fill Material 31 23 00.00 20 4,998 CY

17.

Base Stone

(Road/Parking/Track)

32 12 16 896 TON

18.

Prime Coat

(Road/Parking/Track)

32 12 16 4 TON

19.

Tack Coat

(Road/Parking)

32 12 16 1 TON

20.

Asphalt Binder

(Road/Parking)

32 12 16 170 TON

Bid Form Section 00 33 00 Page 3

Item Item Description Related

Sections

Estimated

Quantity Unit Unit Price Total Price

21.

Surface Course

(Road/Parking)

32 12 16 120 TON

22. Surface Course (Track) 32 12 16 200 TON

23. Running Track Surface 32 18 23.33 1,805 SY

24. Track Stripping (2") 09 90 00 5,416 LF

25. Parking Stripping (4") 09 90 00 54 LF

TOTAL BASE BID

(words)

(CONTINUED ON FOLLOWING PAGE)

Bid Form Section 00 33 00 Page 4

Total amount for the Bid shall be shown in both words and figures. In case of discrepancy, the amount shown in words will govern.

The above unit prices shall include all labor, materials (excluding the items listed on page 2), bailing, shoring, removal, overhead, profit, insurance, etc., to cover the finished work of the several kinds called for.

The offerer agrees that this bid shall be good and may not be withdrawn for a period of ninety (90) calendar days after the scheduled closing time for receiving bids.

All the various phases of work enumerated in the detailed specifications with their individual jobs and overhead, whether specifically mentioned, included by implication, or appurtenant thereto, are to be performed by the Contractor under one of the items listed in the bid schedule above, irrespective of whether they are named in said list.

Payment for work performed will be in accordance with the bid schedule, subject to changes provided for in the construction contract.

Respectfully submitted, (SEAL - if Bid is by a corporation) Offerer

By (signed)

Title

Business Address

Telephone Number

Contractor's License Number

Contractor's

Monetary Limit:

Effective Date:

* Type or print name below signature.

General Conditions Section 01 00 00 Page 1

Section 01 00 00

General Requirements

1. INSURANCE - MINIMUM AMOUNTS

1.1. Reference Contract Clause titled, “Insurance -Work on a Government Installation (FAR 52.228-5). Kinds and minimum amounts are as follows:

KIND AMOUNTS (FAR 28.307-2)

Workmen’s Compensation $100,000 (see paragraph 1.2, below)

Comprehensive General Liability $500,000 per occurrence for bodily injury

Comprehensive Automobile Liability $200,000 per person and $500,000 per accident for bodily injury and $20,000 for property damage

(If applicable) $200,000 per person and $500,000 per occurrence

Aircraft Public and Passenger for bodily injury, other than passenger

Liability liability and $200,000 per occurrence for property damage; coverage for passenger liability bodily injury shall be at least

$200,000 multiplied by the number of seats

$200,000 multiplied by the number of seats or passengers, whichever is greater

1.2. Except in states with exclusive or monopolistic funds that do not permit workers’ compensation to be written by private carriers.

1.3. NOTE: Before commencing work under this contract, the Contractor shall certify to the Contracting

Officer, in writing, that the required insurance has been obtained. The policies referenced in the certification (s) shall contain an endorsement to the effect that any cancellation or any material change adversely affecting the

Government’s interest shall not be effective (1) for such period as the laws of the state in which this contract is to be performed prescribe or (2) until 30 days after the insurer or the Contractor gives written notice to the Contracting

Officer, whichever period is longer. The Contractor shall maintain a copy of proofs of required insurance, and shall make copies available to the Contracting Officer upon request. The Contractor shall maintain a copy of all subcontractors’ proofs of required insurance, and shall make copies available to the Contracting Officer upon request.

2. ORDER OF PRECEDENCE (REFERENCE FAR 52.236-21)

Any inconsistency in this solicitation or contract will be resolved by giving precedence in the following order:

1) Representations and other instructions,

2) Contract clauses,

3) Other documents, to include special contract requirements Section 00800, exhibits, and attachments,

4) The specifications

5) The drawings

3. SCHEDULING

3.1. Normal base work hours for the Contractor will be between the hours of 7:00 AM through 4:30 PM, excluding Saturdays, Sundays, and Federal Holidays. If the Contractor desires to work during periods other than above, he must notify the Contracting Officer’s Representative (COR) five (5) working days in advance of his

General Conditions Section 01 00 00 Page 2 intention to work during other periods to allow assignment of additional inspection forces. When the COR determines that they are reasonably available, he may authorize the Contractor to perform work during periods other than normal duty hours/days. However, if inspectors are required to perform in excess of their normal duty hours/days solely for the benefit of the Contractor, the actual cost of the inspection, at overtime rates, will be charged to the Contractor and will be deducted from the final payment of the Contract amount.

3.2. The following Federal legal Holidays are observed by this base:

New Year’s Day 1 January

Martin Luther King’s Birthday Third Monday of January

President’s Day Third Monday of February

Memorial Day Last Monday of May

Independence Day 4 July

Labor Day First Monday in September

Columbus Day Second Monday in October

Veteran’s Day 11 November

Thanksgiving Day Fourth Thursday in November

Christmas Day 25 December

3.3. NOTE: Any of the above holidays falling on a Saturday will be observed the preceding Friday; holidays falling on a Sunday will be observed on the following Monday.

3.4. Prior to commencing work on the job initially, resumption of work after prolonged interruption (7 calendar days or more), commencement of any warranty work, and upon completion of warranty work, the contractor must notify the Contracting Officer (or the Contracting Officer’s Representative). When relocating to new sites, returning to sites for follow-up work on a phased work plan, notification to the Contracting Officer’s Representative is sufficient. Notification should be by personal contact; however, advance notification may be by telephone, or in writing, and should be accomplished sufficiently in advance to allow scheduling of inspection forces. The purpose of the above precautions is to ensure construction inspection and recording of work proceedings.

3.5. The organization of the specifications into divisions, sections, and articles, and the arrangement of the drawings shall not control the Contractor in dividing the work among subcontractors or in establishing the extent of the work to be performed by any trade.

4. INVOICING AND PAYMENT

4.1. Properly prepared invoices, bearing the contract number, shall be submitted in quadruplicate to the

Contracting Office, 1Bryan White, on designated invoice forms provided at the pre-construction meeting PRIOR to uploading in Wide Area Workflow (WAWF) the DFAS paying system. This submission will be for review prior to submitting an electronic invoice through Wide Area Workflow (WAWF). See end of this Section for important information and codes needed.). Payment will be made by in accordance with FAR Clause 52.232-5

Fixed-Price Construction Contracts and FAR Clause 52.232-27, Prompt Payment for Construction Contracts, All payments will be made by electronic transfer of funds (EFT).

4.2. To meet compliance with DFARS 252.232-7003, Electronic Submission of Payment Requests, you shall submit your request for payment (invoice) through WAWF. For more information on the WAWF system, including how to register, visit https://wawf.eb.mil. Payment will be made by paying office specified in the contract award in accordance with the clauses Payments under Fixed-Price Construction Contracts, FAR 52.232-5, and Prompt Payment for Construction Contracts, FAR 52.232-27.

4.3. The Government will make payment through WAWF upon satisfactory completion of work AND receipt of a proper certification for payment. Do not input invoice into WAWF until the pre-approval of

1 BRYAN WHITE, 118 CONTRACT OFFICE (FA 6421), 118 CONTRACT & ADMINISTRATION

240 KNAPP BLVD, NASHVILLE TN 37217-2538

General Conditions Section 01 00 00 Page 3 invoice is received from the contracting officer. This will lessen the need for rejections in WAWF Payment may be withheld unless all contractual requirements including but not limited to: RECEIPT OF PROPER

WEEKLY PAYROLLS IAW DAVIS BACON REQUIREMENTS, Small Business Subcontracting Reports, have been timely received.

4.4. All requests for payments through WAWF must include a Subcontractor Payment Register pursuant to

FAR Clause 52.232-5 and a contractor’s certification that reads as follows:

I hereby certify, to the best of my knowledge and belief that –

The amounts requested are only for performance in accordance with the specifications, terms and conditions of the contract; All payments due to subcontractors and suppliers from previous payments received under the contract have been made, and timely payments will be made from the proceeds of the payment covered by this certification, in accordance with subcontract agreements and requirements of Chapter 39 of Title 31, United

States Code; This request for progress payments does not include any amounts which the prime contractor intends to withhold or retain from subcontractor or supplier in accordance with the terms and conditions of the subcontract; and This certification is not to be construed as final acceptance of a subcontractor’s performance.

4.5. The Government will make payment upon satisfactory completion of work AND receipt of a proper certification for payment. Payment may be withheld unless all contractual requirements, including but not limited to: RECEIPT OF PROPER WEEKLY PAYROLLS IAW DAVIS BACON REQUIREMENTS, 2and Small

Business Subcontracting Reports, have been timely received. Payrolls shall indicate CLIN to which they are applicable.

4.6. A release of claims is required for all final payment requests and shall be submitted by the contractor with the final invoice.

5. CONTRACT ADMINISTRATION

5.1. The contracting office of the 3118TH Wing, is the office having administrative jurisdiction over this contract for all matters. A list of the names and telephone numbers of the Government team comprising the contract administrator, Contracting Officer’s Representative (COR), consultant, and point of contact at the project site will be provided at the post-award/pre-construction conference.

5.2. All correspondence shall be addressed to the Contracting Officer. A copy of all correspondence shall be furnished to the contracting officer’s representative. Enclosures attached to or transmitted with the correspondence shall also be furnished with an original and one copy. Each letter shall make reference to the contract name, contract number, project number, and project title, and shall have only one subject. For tracking purposes, a sequential numbering system should be used for all correspondence.

6. PAPERLESS CONTRACTING

6.1. The National Guard is fully committed to the Federal Government’s electronic commerce and paperless contracting initiatives. As such, it is anticipated that to the maximum extent possible to include but not limited to correspondence, modification distribution, etc., to include specifications and drawings, will be issued using electronic methods, i.e., electronic mail (e-mail). Contractors shall have and maintain capability to receive documents in this manner.

6.2. Additionally, it is anticipated that within the life of this contract, other electronic processes will be enacted.

These include, but are not limited to, electronic bidding/offers, change order proposals, and electronic invoicing.

When implemented by the Contracting Officer, contractors shall participate fully in any of these new requirements at no additional cost to the Government.

2 Delete reference to subcontracting plan if set-aside

3 118 CONTRACT OFFICE (FA 6421), 118 CONTRACT & ADMINISTRATION

240 KNAPP BLVD, NASHVILLE TN 37217-2538

General Conditions Section 01 00 00 Page 4

7. TELEPHONE COMMUNICATIONS SECURITY MONITORING

All communications with DOD organizations are subject to communications security (COMSEC) review. Contractor personnel must be aware that telephone communications networks are continually subject to intercept by unfriendly intelligence organizations. The DOD has authorized the military departments to conduct COMSEC monitoring and recording of telephone calls originating from, or terminating at, DOD organizations. Therefore, civilian contractor personnel are advised that any time they place a call to, or receive a call from, a DOD organization, they are subject to COMSEC procedures. The contractor shall assume the responsibility for ensuring wide and frequent dissemination of the above information to all employees dealing with DOD information.

8. UTILITY SERVICES

The Contracting Officer has determined that Government-operated utilities are adequate and will be furnished to the contractor without charge where existing outlets are available. The contractor is responsible for installing temporary service outlets, as necessary, at its expense in accordance with the clause entitled “Availability and Use of Utility

Services” (FAR Clause 52.236-14). The following utilities will be available: None.4

9. PREPARATION OF MATERIAL APPROVAL SUBMITTALS

The contractor shall submit all materials and articles requiring approval, as required by the Material and

Workmanship Clause, FAR 52.236-5. Submittals shall be made using AF Form 3000, or approved equal.

Submittals shall be processed in accordance with the procedures in Section 01 13 00, Submittals. Submittals shall be given a distinct identification system by CLIN if multiple CLINS are applicable. Individual submittal documents shall not be comprised of items for more than one CLIN. Address for delivery of submittals will be provided at the post award/pre-construction conference. The contractor is reminded that an individual within the company who has authority to make the certification must sign the certification on the AF Form 3000.

10. WORK PROGRESS AND PREPARATION OF PROGRESS SCHEDULES AND REPORTS

10.1. A weekly meeting may be held with the Contractor, COR and Contracting Officer (KO), if necessary, to discuss work progress, problems and potential change orders. The Contractor shall attend these meetings at no additional cost to the Government. Prior to beginning work on specific work elements of a project, the contractor shall confer with the COR and agree on a sequence of procedures and means of access to premises and buildings;

space for storage of materials and equipment; delivery of materials; and use of approaches, use of corridors, stairways and similar means of passage.

10.1.1. In accordance with FAR Clause 52.236-15, “Schedules for Construction Contracts”, the contractor shall within five days after work commences on the contract, or another period of time determined by the KO, prepare and submit to the KO for approval three copies of a practicable schedule showing the order in which the contractor proposes to perform the work, and the dates on which the Contractor contemplates starting and completing features of work. A composite schedule for the overall contract shall also be provided. The schedule shall be on an AF Form 3064, Contract Progress Schedule, or an approved computer generated format similar to the

AF Form 3064. The work shall be scheduled so that, upon the start of construction, work progresses in a continuous and diligent manner. A schedule which does not reflect steady and reasonable progress throughout the construction period will be rejected. Both the Contractor and the COR are required to provide monthly progress reports covering the period from notice to proceed through final inspection. Unless agreement cannot be made on the applicable percentage of progress a joint report will be submitted to the Contracting Officer. This reports shall be submitted on the NGB Contract Progress Report form (similar to an AF Form 3065), or an approved computer generated similar format. These reports shall track progress by CLIN, if contract contains multiple CLINs, multiple AF Form 3064 and NG Contract Progress Reports will also be required for payment purposes.

4 None

General Conditions Section 01 00 00 Page 5

10.2. Additionally, for projects exceeding $1M, the contractor shall provide a project plan in a commercially available network scheduling software that meets requirements of the specification to define work tasks and track progress. At least five days prior to work initiation, the contractor shall provide the Contracting

Officer a hardcopy CPM and a formatted diskette or CD copy, or e-mail file copy, of the plan that shall include definition of rescues. No work may start until the Contracting Officer approves the plan in writing.

10.3. The Contractor shall prepare a work progress schedule required for completion of each of the various divisions of work. Updated plans and Form 3064 showing work progress (hardcopy and formatted diskette or CD, or e-mail file copy), unless otherwise directed by the Contracting Officer, shall be provided 5 monthly. If there are possible deviations from the original plan, those must be noted and approved by the Contracting Officer before work changes are implemented. The schedule shall be submitted to the Contracting Officer, in the number of copies as directed. Reference Contract Clause FAR 52.236-15, “Schedules for Construction Contracts”. The reports contemplated by the clause herein titled “Schedules for Construction Contracts” shall be accomplished on and in accordance with instructions pertaining to AF Form 3064, “Contract Progress Schedule” and a National Guard

Contract Progress Report”.

11. NOTICE OF COMPLETION OF CONSTRUCTION/PRE-FINAL AND FINAL INSPECTION

11.1. The contractor shall conduct a pre-final inspection in the presence of the Contracting Officer’s

Representative (COR) prior to the date scheduled for Final Inspection. Any discrepancies noted shall be corrected prior to Final Inspection.6

11.2. The contractor shall request scheduling of a final inspection in writing to the Contracting Officer at least 7five (5) working days prior to the desired date or as otherwise negotiated with the Contracting Officer.

11.3. Civil Engineering personnel and the Contracting Officer will perform the Final Inspection in the presence of the contractor, and any discrepancies noted shall be corrected within the time specified by the

Contracting Officer.

11.4. Final Inspection shall not constitute acceptance of a project unless so stipulated by issuance of a separate acceptance notice.

11.5. The contractor is cautioned to ensure they have completed adequate Quality Control reviews prior to scheduling pre-final or final inspections. In the event the Contracting Officer finds that the project is not ready for the applicable inspection, (too many discrepancies) the contractor may be held liable for the costs of a repeat inspection. If the inspection involves A/E personnel these costs may include additional labor, travel and miscellaneous expenses.

12. DESIGNATION OF TECHNICAL REPRESENTATIVE

The Contracting Officer will appoint a qualified Contracting Officer’s Representative (COR) for the purposes of technically administering the contract; however, all matters concerning this contract or any work ordered placed against this contract must first be approved by the Contracting Officer. This in no way authorizes anyone other than the Contracting Officer to commit the Government to changes in terms of the contract.

13. CONTRACTOR STAFF AND EMPLOYEES

13.1. Prior to commencing on-site construction, the contractor shall provide the Contracting Officer with a telephone number and FAX number at which the contractor or his representative may be contacted at any time

5 (insert frequency for this requirement e.g. beginning of work-week, monthly etc.).

6 Tailor this paragraph as required to meet the requirements of your location. In this scenario the CONTRACTOR does the prefinal, with COR along, corrects list established then requests a final. Also, be sure what you have here does not contradict what is in Division 1.

7 Change to appropriate number of days if not the same

General Conditions Section 01 00 00 Page 6 during regular working hours and an emergency number at which the contractor may be contacted in situations requiring immediate attention.

13.2. Supervision. The Government shall not exercise any supervision or control over the contractor employees performing services under this contract; such employees shall be accountable not to the Government, but solely to the contractor, who in turn is responsible to the Government.

13.3. Contractor’s Employees. All work under this contract shall be performed in a skillful and workmanlike manner. The Contracting Officer may, in writing, require the contractor to remove from the job site, any employee the Contracting Officer deems incompetent, careless or otherwise objectionable.

14. CONTRACTOR OFFICE AND STORAGE

14.1. Parking of contractor vehicles shall be restricted to the contractor’s designed on-site area or the work area. The company name shall be prominently displayed on all construction vehicles parked on the job site.

14.2. Security of material storage areas on the job site shall be the responsibility of the contractor. The area shall be kept neat and orderly and free of debris.

15. RECORD DRAWINGS

During construction of a project and on the job site, the contractor shall maintain a completed record of all changes and corrections from the layout shown on the drawings, if applicable. The contractor shall enter such changes and corrections on contract or record drawings promptly, and submit the “red line” drawings to the Contracting Officer upon completion of the project. The record drawings shall indicate all changes and corrections concerning the actual locations of all sub-surface utility lines. In order for the location of these lines and appurtenances to be determined in the event the surface opening or indictors become covered or obscured, the record drawings shall show, by offset dimensions to two permanently fixed surface features, the end of the each run including each change in direction.

Valves splice boxes, and similar appurtenances shall be located by dimensioning along the utility run from a reference point. The average depth below the surface of each run shall also be recorded. The Government does not guarantee the accuracy of existing record drawings; it is the contractor’s responsibility to verify all as-built conditions.

16. VERIFICATION OF DIMENSIONS

The contractor shall be responsible for the coordination and proper relation of all aspects of the work. He/she shall field verify all dimensions and advise the Contracting Officer of any discrepancies prior to proceeding with any phase of the work. Where exact locations are not given for the positioning of equipment and devices, they shall be positioned to permit easy access for maintenance and for removal and replacement of component parts.

17. SECURITY REQUIREMENTS

17.1. The contractor shall comply with all security regulations imposed by the base/post commander and/or agency occupying the space where work is to be performed. Any necessary security clearances shall be obtained prior to commencement of work.

17.2. It is expected that new security requirements to satisfy contractor personal identification requirements in Homeland Security Presidential Directive (HSPD-12), ''Policy for a Common Identification

Standard for Federal Employees and Contractors,'' and Federal Information Processing Standards Publication (FIPS

PUB) Number 201, ''Personal Identity Verification (PIV) of Federal Employees and Contractors” are incorporated in the life of this contract. Contractor shall comply with all requirements, at no additional cost to the Government.

17.3. The contractor shall ensure that all parts of the facility where work is being performed are adequately protected against vandalism and theft.

General Conditions Section 01 00 00 Page 7

17.4. 8Contractors shall follow instructions provided by the Security Forces for access to the Berry Field. If a gate pass is not granted to a contractor allowing the delivery of goods, execution of warranty support, or performance of services please contact the contracting officer. Be sure that all of your employees have the proper

ID (drivers license, state ID, immigration card, U.S. Passport, etc.). If they do not have the proper ID, they will be turned away.

17.5. The Prime Contractor and all of its subcontractors will be required to wear orange or lime colored safety vests while performing work on the installation.

17.6. U.S. Government will not be held liable for any delays or breach of contract caused by refusal of the

Security Forces to allow entry.

17.7. All prospective contractors MUST be U.S. citizens or MUST have established and maintain legal residence in the U.S., and are authorized by the US government to work in the United States (i.e. Green card, worker authorization, etc.). All prospective contractors MUST have at least one form of U.S. government issued photo identification (drivers license, U.S. passport, U.S. work visa, etc.) for entry to the installation. Security Forces will review any questionable identification documents for determination as to whether or not said identification is authorized for access to the installation.

17.8. All prospective contractors/contractor employees, once it has been established that they maintain the appropriate credential as described in one above, are subject to a Criminal History Check.

17.9. Note: For the purposes of Contracting services, it is implied that, that any and all parties agree to a

Criminal History Background Check once entered into any contract. Any documents that are provided and found fraudulent to include, but not limited to driver’s licenses, contracting licenses, etc., will result in an arrest and potential termination for default from the contract. All contractors are subject to search in order to obtain entry onto the installation and while working on the installation. Any refusal to submit to a search of their person or vehicle will be deemed as a violent act of aggression against the installation and will be cause for dismissal from the installation and revocation of future privileges and installation access.

17.10. AT Level I Training. This provision/contract text is for contractor employees with an area of performance within a National Guard controlled installation, facility or area. All contractor employees, to include subcontractor employees, requiring access to National Guard installations, facilities and controlled access shall complete AT Level I awareness training. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the Contracting Officer’s

Representative (COR).

17.10.1. AT Level 1 awareness training is available at the following website:

https://atlevel1.dtic.mil/at

18. REGULATIONS

18.1. The contractor shall comply with all applicable Federal, State, Local, DOD, National Guard Bureau, Army and Air Force regulations pertaining to safety, traffic control and fire prevention.

18.2. The contractor may use the Civil Engineering library, which contains most applicable Army and Air Force publications as well as some commercial project data information, or the Defense Procurement and Acquisition Policy website, http://www.acq.osd.mil/dpap/, which has links for several other sites with available publications, forms and project data information. These may also be acquired from the Government Printing Office website, http://www.gpoaccess.gov/index.html

8. Update/ Tailor as necessary for your location. If information is different for various locations add info for each location this section also covers the new requirement for AT Training for all contractors- Need to cover at the Pre-Con also https://atlevel1.dtic.mil/at http://www.acq.osd.mil/dpap/ http://www.gpoaccess.gov/index.html

General Conditions Section 01 00 00 Page 8

19. TRANSPORTATION, HANDLING AND STORAGE

19.1. The contractor shall coordinate with suppliers and shippers to ensure that incoming materials are properly identified with the contractor’s name, contract number and project title. The contractor shall designate an authorized individual to be available to receive shipment. The Government will not provide storage other than that available at the project site.

19.2. Storage of supplies, materials and equipment on the project site shall be accomplished in such a manner so as to prevent mechanical and climatic damage and loss due to vandalism or theft. Equipment temporarily removed in the performance of work and stored on the job site shall be stored and protected in accordance with previous paragraphs, and shall be replaced in a condition compatible with its original state. Security for equipment and material removed from the job site for temporary storage until reuse shall be the responsibility of the contractor.

20. CLEANUP AND DISPOSAL OF DEBRIS AND FILL MATERIALS

20.1. At the end of each workday, the contractor shall clean up the work and storage areas and stack all materials in a manner approved by the Contracting Officer or his designated representative. Upon completion of a project, the contractor shall ensure that all dirt, trash, and debris resulting from the construction operations are removed from the work area. Unless directed otherwise in the contract or by the Contracting Officer, disposal of debris shall be made at the contractor’s expense and shall be delivered to a state approved disposal site located off base. Debris shall not be left in such a manner that wind or other weather conditions can cause the debris to be scattered outside the work area (i.e., on nearby runways, ramps or taxiways).

20.2. The hauling and disposal of excess fill material including rock, gravel, sod, broken concrete or asphalt, plaster, etc., shall be the responsibility of the contractor. Disposal shall be in accordance with applicable state and local regulations.

21. ENVIRONMENTAL IMPACT

All waste materials generated by any work under the contract performed on a Government installation shall at all times be handled, transported, stored, and disposed of by the contractor and by his subcontractors in accordance with all applicable Federal, state, and local laws, ordinances, regulations, court orders, and other types of rulings having the effect of the law. Should the United States Government be held liable for any neglect or improper actions by the contractor or any subcontractor regarding removal or disposal of any hazardous waste, the contractor shall reimburse the Government for all such liability.

22. HAZARDOUS MATERIALS

22.1. Any material suspected of being hazardous that is encountered during performance of a project shall immediately be brought to the attention of the Contracting Officer, at which time a determination will be made as to whether hazardous material testing shall be performed. If the Contracting Officer directs the contractor to perform tests, and/or the material is found to be of a hazardous nature requiring additional protective measures, a contract modification may be required, subject to equitable adjustment under the terms of the contract.

22.2. The contractor is advised that friable and/or non-friable asbestos-containing material may be encountered in project areas. Friable asbestos-containing material is any material that contains more than one percent asbestos by weight, and that hand pressure can crumble, pulverize or reduce to powder when dry. Non-friable asbestos-containing materials are materials in which asbestos fibers are bound by a matrix material, saturation, impregnation or coating. Non-friable asbestos-containing materials do not normally release airborne asbestos fiber during routine handling and end-use. However, excessive fiber concentrations may be produced during uncontrolled abrading, sanding, drilling, cutting, machining, removal, demolition, or other similar activities.

29 CFR 1910.1001 shall be referenced in the event asbestos-containing materials are encountered. Friable asbestos-containing materials are not authorized for use in new construction or maintenance projects.

General Conditions Section 01 00 00 Page 9

23. POLLUTION ABATEMENT

23.1. All work shall be performed in a manner minimizing pollution of air, water and land as required.

23.2. Transporting materials to or from the site shall be accomplished in a manner preventing materials or particles from becoming airborne. Earth materials shall be wetted or otherwise protected. Gravel, sand and concrete shall be contained within vehicles to prevent spillage. Tarpaulins must be fastened over load before entering surrounding streets. Removal of any materials dropped or blown off vehicles shall be the responsibility of the contractor.

23.3. Burning of any material is strictly prohibited.

23.4. Stream beds, lakes, drainage ways, sanitary and storm sewers, etc., shall not be polluted by fuels, oils, bitumen, acids or other harmful materials. Grading shall be accomplished to prevent surface drainage from the construction site containing harmful amounts of sediment from draining onto adjacent areas.

23.5. Flushing of concrete trucks is restricted to the location specifically designed for this purpose by the

Contracting Officer’s Representative.

23.6. Excess mortar, plaster or drywall materials shall not be disposed of on Government property. Water utilized for plastering or drywall equipment shall be disposed of in accordance with the instructions of the COR, and under no circumstances shall water be disposed of in areas which are planted or scheduled to be planted.

24. COORDINATION WITH GOVERNMENT ACTIVITIES

24.1. If it becomes necessary to interrupt work activities in buildings and/or areas for construction purposes, permission to do so must be requested in writing to the Contracting Officer 915 working days prior to commencing work on the planned interruption and shall be subject to Civil Engineering approval. Written requests for street closing shall be submitted for approval of the Civil Engineer 1015 working days prior to closing the street.

24.2. Work in connection with this contract which requires utility outages, including electrical, water, gas, steam, etc., which will close down or limit (as determined by the Contracting Officer) normal activities in the building, construction area or other affected areas, shall be performed by the contractor at a time other than the regular work period of the organization occupying the facility. Work required by the contractor on a non-standard basis or at premium pay shall be done at no additional cost to the Government. Request for utility outages shall be submitted to the Civil Engineer, in writing 1130 working days prior to commencing work and shall be subject to his/her approval.

24.3. Any temporary construction for facilities used by the contractor for preventing interruption of normal work activity or loss of utility services shall be subject to Contracting Officer’s approval.

25. UNAUTHORIZED PERSONNEL

The contractor shall inform all personnel working under his jurisdiction (including subcontractor and visiting supplier personnel) that access to areas outside of the immediate work area; excluding direct haul and access routes, contracting and Civil Engineering offices, and points of supply and storage; is prohibited. Circulation of said personnel will be limited to official business only. Persons in violation of the above will be apprehended and appropriately disciplined.

26. PERFORMANCE EVALUATION OF CONTRACTOR

9 Insert number of days 10 Insert number of days 11 Insert number of days

General Conditions Section 01 00 00 Page 10

26.1. As a minimum, the contractor’s performance will be evaluated upon final inspection. Any specific requirements for contract quality control and quality assurance by the Government personnel will be defined in the specifications. The contractor will be rated as outstanding, satisfactory or unsatisfactory in the areas of contract quality control, timely performance, effectiveness of management, compliance with labor standards, and compliance with safety standards. The contractor will be notified of any unsatisfactory rating, either in an individual element or in the overall rating, prior to completing the evaluation, and all contractor comments will be made a part of the official record. Performance evaluation reports will be available to all DoD Contracting Officers for their future use.

26.2 Past Performance evaluations will be posted via https://www.cpars.gov. It is the responsibility of the contractor to request access to this site.

27. CONTRACTOR QUALITY CONTROL

27.1. The contractor shall comply with the quality control provisions as specified herein. The Contractor shall perform all quality control inspection and/or testing required by this contract unless specifically designated to be performed by the Government. The quality control system consists of plans, workmanship, fabrication, construction, and operations that comply with contract requirements. The system shall cover construction operations, including fabrication both on-site and off-site, and shall be keyed to the proposed construction sequence.

If the contractor fails to submit an acceptable quality control plan within the time herein prescribed, the Contracting

Officer may refuse to allow construction to start if an acceptable interim plan is not furnished or may withhold funds from progress payments in accordance with the contract clause titled, “Payments under Fixed Price Construction

Contracts”, until such time as the contractor submits an acceptable final plan.

27.2. Quality Control Plan

27.2.1. General. Upon receipt of the Notice of Contract Award, the contractor’s quality control plan (2 copies) shall be submitted for acceptance in accordance with12 01 45 00.00 10 of specifications.

27.2.2. Acceptance. The Contracting Officer’s Representative will review the quality control plan.

The contractor shall make such changes and additions as necessary for clarity and completeness as requested by the

Contracting Officer’s Representative through the Contracting Officer. Acceptance of the contractor’s plan is predicated on satisfactory performance during construction. Acceptance is conditional and the Government reserves the right to require the contractor to make changes in quality control plans, personnel and operations to correct deficiencies and to assure contract compliance.

27.2.3. Changes. When the contractor proposes changes in the quality control plan or implementation during construction, the Contracting Officer shall be notified in writing. The contractor shall implement no changes prior to acceptance in writing by the Contracting Officer.

28. SAFETY ASSURANCE

28.1. Compliance with Regulations. All work including the handling of hazardous materials or the disturbance or dismantling of structures containing hazardous materials shall comply with the applicable requirements of 29 CFR 1910/1926. Work involving the disturbance or dismantling of asbestos or asbestos-containing materials; the demolition of structures containing asbestos; and/or disposal and removal of asbestos, shall also comply with the requirements of 40 CFR, Part 61, Subpart A. All work shall comply with applicable state and municipal safety and health requirements. Where there is a conflict between applicable regulations, the most stringent shall apply. The Safety Manual is available at the following web site:

http://www.usace.army.mil/SafetyandOccupationalHealth/SafetyandHealthRequirementsManual.aspx

28.2. Contractor Responsibility. The contractor shall assume full responsibility and liability for compliance with all applicable regulations pertaining to the health and safety of personnel during the execution of work. The Government shall not be held liable for any actions on the part of the contractor, his employees or subcontractors, which result in illness, injury or death.

12 insert applicable paragraph https://www.cpars.gov/ http://www.usace.army.mil/SafetyandOccupationalHealth/SafetyandHealthRequirementsManual.aspx

General Conditions Section 01 00 00 Page 11

28.2.1. Inspections, Tests and Reports. The required inspections, tests and reports made by the contractor, subcontractors, specially trained technicians, equipment manufacturers and others as required, shall be at the contractor’s expense.

28.2.2. Materials and Equipment. Special facilities, devices, equipment, clothing and similar items used by the contractor in the execution of work shall comply with applicable regulations.

28.2.3. Traffic Control Devices. The contractor shall comply with the recommendations contained in Part 6 of the U. S. Department of Transportation, Federal Highway Administration’s “Manual on

Uniform Traffic Control Devices”, 2003 edition with Revision 2 available at http://mutcd.fhwa.dot.gov/)to ensure proper warnings to motorists and adequate traffic control. The contractor shall provide all warning lights, barricades and other traffic control devices and signs.

29. WORK BY THE GOVERNMENT

The Government reserves the right to undertake performance by Government forces, for the same type or similar work as contracted herein, as the Government deems necessary or desirable, and to do so will not breach or otherwise violate this contract.

30. VALUE ENGINEERING CHANGE PROPOSALS

All value engineering change proposals (VECP’s) shall be submitted in accordance with the requirements of FAR

Clause 52.248-3, Value Engineering – Construction. All VECP’s shall be submitted in13 4 copies.

31. PRE-CONSTRUCTION CONFERENCE

Before work commences on this contract, the Contracting Officer will conduct a conference to acquaint the contractor with Government policies and procedures that are to be observed during the execution of the work and to develop mutual understanding relative to the administration of the contract. Contractors and/or major subcontractors shall attend this meeting at no additional cost to the Government.

32. PARTNERING14

The Government intends to encourage the formation of cohesive partnerships with the contractors on selected contracts. This partnership will be structured to draw on the strengths of each organization in order to identify and achieve reciprocal goals. The objective is effective contract performance in achieving completion within budget, on schedule, and in accordance with the Plans and Specifications. This partnership between the contractor and the

Government will be voluntary and its implementation will not be a part of the contract requirements nor will it result in a change to the contract price or terms.

33. MILITARY REAL PROPERTY DATA – DD FORM 1354

33.1. Contractors shall furnish real property data to the Government for each new construction and/or renovation project awarded, unless otherwise notified. The real property data shall be furnished via DD Form 1354, Transfer and Acceptance of Military Real Property, or in a format prescribed on the DD Form 1354. The Contractor is responsible for accuracy of data current up to the time of submission.

13 insert number of copies 14 (If you intend on making this mandatory, re-write and tell contractor what they will be responsible for cost wise.)

General Conditions Section 01 00 00 Page 12

33.2. For major renovation and/or complex projects, or those expected to exceed 12 months, the

Contractor shall furnish real property data no less than on a quarterly basis. Frequency of submission shall be standard throughout the duration of the project. Contractors are advised to record information on the DD Form 1354

(or approved facsimile) as the project progresses, due to the volume of data required to be furnished.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.