Text version

BKTZ122005

TABLE OF CONTENTS 00003-1

SECTION 00003

TABLE OF CONTENTS

00001 TITLE PAGE 1

00003 TABLE OF CONTENTS 5

00004 LIST OF DRAWINGS 2

00200 INFORMATION AVAILABLE TO BIDDERS 1

DIVISION 1 – GENERAL REQUIREMENTS

01000 GENERAL REQUIREMENTS 14

01010 SUMMARY OF WORK 2

01035 ADDITIVE BID ITEMS (ABI) 1

01040 COORDINATION 1

01060 REGULATORY REQUIREMENTS 4

01200 PROJECT MEETINGS 5

01300 SUBMITTALS 6

01340 SUBMITTAL MATRIX 6

01354 LEED CREDIT SUMMARY 4

01355 LEED CERTIFICATION PROCEDURES 2

01356 LEED SUBMITTAL FORMS 1

01357 LEED MATERIAL COST SUMMARY FORM 1

01359 LEED METAL CONTAINING PRODUCT LIST 2

01360 LEED NEW PRODUCT CONTENT FORM 1

01361 LEED NEW PRODUCT SOURCE FORM 2

01363 LEED PROHIBITED CONTENT INSTALLER CERTIFICATION 1

01400 QUALITY CONTROL SERVICES 3

01421 ROOFING INSPECTION SERVICES 2

01500 CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS 3

01600 MATERIALS AND EQUIPMENT 2

01616 VOLATILE ORGANIC COMPOUND (VOC) CONTENT RESTRICTIONS 2

DOCUMENT

NUMBER TITLE PAGES

TABLE OF CONTENTS 00003-2

01617 ACCESSORY MATERIAL VOC CONTENT CERTIFICATION FORM 1

01700 CONTRACT CLOSEOUT 3

01720 PROJECT RECORD DOCUMENTS 3

01730 OPERATION AND MAINTENANCE DATA 2

01732 WASTE MANAGEMENT 5

01734 INDOOR AIR QUALITY 3

DIVISION 2 – SITEWORK

02080 ASBESTOS REMOVAL 10

02225 DEMOLITION 3

02522 SITE CONCRETE 5

02582 PAVEMENT MARKINGS 2

02665 WATER DISTRIBUTION SYSTEM 14

02722 STORM DRAINAGE FACILITIES 5

02730 SANITARY SEWER SYSTEM 11

02940 SODDING 3

DIVISION 3 – CONCRETE

03100 CONCRETE FORMS AND ACCESSORIES 6

03200 CONCRETE REINFORCEMENT 4

03300 CAST IN PLACE CONCRETE 14

DIVISION 4 - MASONRY

04065 MORTAR AND MASONRY GROUT 4

04201 PRECAST CONCRETE LINTELS 2

04810 UNIT MASONRY ASSEMBLIES 7

DIVISION 5 - METALS

05120 STRUCTURAL STEEL 6

05210 STEEL JOIST FRAMING 4

05310 STEEL DECKING 5

05440 COLD FORM METAL TRUSSES 5

TABLE OF CONTENTS 00003-3

05500 METAL FABRICATIONS 4

05510 METAL STAIRS 4

05520 HANDRAILS AND RAILINGS 3

DIVISION 6 - WOOD & PLASTICS

06100 ROUGH CARPENTRY 3

06410 CUSTOM CABINETS 6

06415 COUNTERTOPS 4

DIVISION 7 - THERMAL & MOISTURE PROTECTION

07140 FLUID APPLIED WATERPROOFING 3

07163 POLYMER MODIFIED CEMENT WATERPROOFING 5

07212 BOARD AND BATT INSULATION 3

07410 METAL WALL PANELS 3

07411 PREFORMED METAL ROOF PANELS 4

07542 THERMOPLASTIC POLYOLEFIN ROOFING (TPO) 6

07620 SHEET METAL FLASHING AND TRIM 3

07900 JOINT SEALANTS 3

07950 MANUFACTURED ISOLATION JOINT ASSEMBLIES 1

DIVISION 8 - DOORS AND WINDOWS

08110 STEEL DOORS AND FRAMES 4

08211 FLUSH WOOD DOORS 3

08700 HARDWARE 7

DIVISION 9 - FINISHES

09260 GYPSUM BOARD ASSEMBLIES 5

09300 TILE 4

09511 SUSPENDED ACOUSTIC CEILINGS 4

09650 RESILIENT FLOORING 3

09685 CARPET TILE 3

09900 PAINTS AND COATINGS 6

TABLE OF CONTENTS 00003-4

DIVISION 10 – SPECIALTIES

10170 PLASTIC TOILET COMPARTMENTS 3

10270 ACCESS FLOORING 3

10400 IDENTIFICATION DEVICES 2

10523 FIRE EXTINGUISHERS, CABINETS AND ACCESSORIES 2

10731 ALUMINIM CANOPY SYSTEM 2

10800 TOILET, BATH, AND LAUNDRY ACCESSORIES 2

DIVISION 11 - EQUIPMENT

NOT USED

DIVISION 12 – FURNISHINGS

NOT USED

DIVISION 13 - SPECIAL CONSTRUCTION

13010 COMMUNICATIONS 5

13020 INTERCOM SYSTEM 2

13030 MASS NOTIFICATION SYSTEM 16

DIVISION 14 - CONVEYING SYSTEMS

NOT USED

DIVISION 15 – MECHANICAL

15010 GENERAL PROVISIONS 8

15050 BASIC MATERIALS AND METHODS 4

15140 SUPPORTS AND ANCHORS 2

15180 INSULATION 3

15400 PLUMBING 6

15500 FIRE PROTECTION AND SPRINKLER 8

15602 HYDRONIC HEATING BOILER 3

15658 REFRIGERANT PIPING 1

15710 HVAC PIPING 3

15715 HVAC PUMPS 2

1106106424N Polygon

1106106424N Polygon

TABLE OF CONTENTS 00003-5

15720 PACKAGE ROOF TOP UNITS 3

15790 DUCTLESS SPLIT SYSTEM 3

15800 AIR DISTRIBUTION 5

15802 AIR TERMINAL UNITS VAV 2

15900 CONTROLS AND INSTRUMENTATION 4

15990 TESTING, ADJUSTING AND BALANCING 3

DIVISION 16 – ELECTRICAL

16010 GENERAL CONDITIONS 3

16020 POWER SERVICE AND GROUNDING 2

16031 CONDUCTORS 2

16032 CONDUIT 2

16033 WIRING BOXES 1

16034 WIRING DEVICES 2

16041 PANELBOARDS 2

16042 SAFETY SWITCHES 1

16043 TRANSFER SWITCHES 8

16045 TRANSIENT VOLTAGE SURGE SUPPRESSION (TVSS) 5

16046 ENGINE GENERATOR 11

16051 LIGHTING FIXTURES 2

16052 FLUORESCENT LIGHT EMERGENCY BATTERY PACK 1

16061 COMMUNICATIONS ROUGH-IN 1

16062 FIRE ALARM SYSTEM 8

16064 COMPUTER WIRING ROUGH-IN 1

16065 CABLE ANTENNA TELEVISION 1

16072 CONNECTIONS TO GOVERNMENT FURNISHED EQUIPMENT 1

16073 LIGHTENING PROTECTION 1

APPENDIX

A. REPORT OF GEOTECHNICAL EXPLORATION B736 SECURITY FORCES,

GEOSERVICES PROJECT NO. 21-17320

TABLE OF CONTENTS 00003-6

B. ASBESTOS-CONTAINING MATERIALS AND LEAD BASED PAINT SURVEY,

GEOSERVICES PROJECT NO. 24-17567

C. CONTRACTOR HAZARDOUS MATERIAL TRACKING SHEET

END OF SECTION

ADDITIVE BID ITEM (ABI) 01035-1

SECTION 01035

ADDITIVE BID ITEMS (ABIs)

Part 1 GENERAL

1.1 SUMMARY

A. This section includes identification of each Option by number, and describes the basic changes to be incorporated into the Work if a particular item is made a part of the work by specific provisions in the Agreement between the Government and the Contractor.

B. Related work:

1. Documents affecting work of this Section include, but are not necessarily limited to, General

Conditions, Supplementary Conditions, and Sections in Division 1 of these Specifications.

2. Materials and methods to be used in the Base Bid and in the ABIs also may be described on the Drawings and/or in pertinent other Sections of these Specifications.

1.2 SUBMITTALS

A. All ABIs described in this Section are required to be reflected on the Proposal Form as submitted by the Bidder.

B. Do not submit ABIs other than as described in this section.

1.3 DELIVERY, STORAGE, AND HANDLING

A. If the Government elects to proceed on the basis of one or more of the described ABIs, make modifications to the Work required in providing the selected Option or Options to the approval of the Contracting Officer and at no additional cost to the Government except as proposed in the Bid.

1.4 ADVANCE COORDINATION

A. Immediately after award of the Contract, or as soon thereafter as the Government has made a decision on which if any of the ABIs will be selected, thoroughly and clearly advise necessary personnel and suppliers as to the nature of ABIs selected by the Government.

PART 2 PRODUCTS

1.1 ADDITIVE BID ITEMS

PART 3 EXECUTION (NOT USED)

END OF SECTION

1106106424N Polygon

ALUMINUM CANOPY SYSTEM 09650 - 1

SECTION 10731

ALUMINUM CANOPY SYSTEM

PART 1 GENERAL

1.1 SECTION INCLUDES

A. Aluminum canopy System: Pre-engineered aluminum canopy. Hanger rod supported.

B. Hanger rods, fascia channels, and trim.

C. Installation accessories.

1.2 RELATED REQUIREMENTS

A. Section 01616 - Volatile Organic Compound (VOC) Content Restrictions.

B. Section 04810 – Unit Masonry Assemblies.

C. Section 07620 – Joint Sealers.

D. Section 09900 – Paints and Coatings

1.3 REFERENCE STANDARDS

A. AASCE 7 – Minimum Design Loads for Buildings and Other Structures.

B. ASTM B 221 – Standard Specification for Aluminum and Aluminum-Alloy Extruded Bars, Rods, Wire, Profiles and Tubes.

C. ASTM B 429 - Standard Specification for Aluminum-Alloy Extruded Pipe and Tube.

D. ALUMINUM ASSOCIATION AA DAF 45 – Designation System for Aluminum Finishes.

E. AAMA 2603 – Voluntary Specification, Performance Requirements and Test Procedures for Pigmented Organic Coatings on Architectural Extrusions and Panels.

F. AAMA 2605 – Voluntary Specification, Performance Requirements and Test Procedures for Superior Performing Coatings on Architectural Extrusions and Panels.

1.4 SUBMITTALS

A. See Section 01300 - Administrative Requirements, for submittal procedures.

B. Product Data: Provide data on specified products, describing physical and performance characteristics; including sizes, patterns and colors available; and installation instructions.

C. Verification Samples: Submit two samples, 2 x 2 inch in size illustrating color and pattern.

D. Shop Drawings: Include dimensioned plans, elevations, sections and details to illustrate fabrication.

1. Verify dimensions by field measurements before fabrication and indicate on shop drawings.

E. Buy American Act Certification: Submit documentation certifying that products comply with provisions of the Buy American Act BAA - 41 U.S.C. §§ 10a-10d

F. LEED Submittal:

1. Submit 01360 LEED New Product Content Form.

2. Submit 01361 LEED New Product Source Form.

3. See 01356 for form submittal procedures.

1.5 FIELD CONDITIONS

A. Field verify dimensions and existing constructions.

B. Store products with labels intact, in manufacturer’s unopened packaging until ready for installation.

C. Handle materials so as to protect materials, coatings and finishes during transportation and installation to prevent damage or staining.

ALUMINUM CANOPY SYSTEM 09650 - 2

PART 2 PRODUCTS

2.1 Aluminum Canopy System

A. Aluminum Canopy System: Basis of design – Lumishade, hanger rod supported aluminum canopy, size as indicated on drawings as manufactured by Mapes Industries, Inc., Lincoln Nebraska, phone number 1-888-273-1132.

1. Decking shall consist of an interlocking roll formed 2 ½” W style pan (aluminum .032 aluminum).

2. Intermediate framing members shall be extruded aluminum, alloy 6063 -T6, in profile and thickness.

3. Hanger rods and attachment hardware shall be powder coated.

4. Fascia shall be standard 8” extruded J style (minimum .125 aluminum).

5. Escutcheon Plates: square

6. Color: As selected in manufacturer’s standard color selections.

7. Manufacturers:

a. Mapes: www.mapescanopies.com.

b. Substitutions: See Section 01600 - Product Requirements.

2.2 ACCESSORIES

A. Anchors and Fasteners.

1. Stainless steel or hot dip galvanized and corrosion resistant.

PART 3 EXECUTION

3.1 EXAMINATION

A. Confirm that surrounding area is ready for the canopy installation.

B. Installer shall confirm dimensions and elevations to be as indicated on drawings provided by canopy manufacturer.

C. Erection shall be performed by an approved installer and scheduled after all masonry and roofing in the area is completed.

3.2 PREPARATION

A. Clean surfaces thoroughly prior to canopy installation.

B. Prepare surfaces using the methods recommended by the manufacturer for achieving the best result for the substrate under the project conditions.

3.3 INSTALLATION

A. Starting installation constitutes acceptance of existing conditions.

B. Install in accordance with manufacturer's instructions.

C. Installation shall be in strict accordance with manufacturer’s shop drawings. Particular attention shall be given to protecting the finish during handling and erection.

D. Anchor system to building components: provide adequate clearance for movement caused by thermal expansion and required wind loads.

3.4 CLEANING

A. Clean in accordance with manufacturer’s instructions.

B. Restore any marred or abraded surfaces to original conditions as approved by the Contracting Officer.

3.5 PROTECTION

A. Protect installed canopy until completion of project.

MASS NOTIFICATION SYSTEMS

13030 - 1

SECTION 13030

MASS NOTIFICATION SYSTEMS

PART 1 - GENERAL

1.1 REFERENCES:

Governing criteria documents are listed below.

Unified Facilities Criteria (UFC)

A. UFC 1-200-01 – General Building Requirements (August 16, 2010)

B. UFC 4-021-01 – Design and O&M Mass Notification Systems (September 26, 2006 Change 1, 14 July 2009)

C. UFC 3-600-02 – O & M: Inspection, Testing, and Maintenance of Fire Protection Systems (September 8, 2010)

International Electrotechnical Commission (IEC)

A. IEC 60849 - Sound Systems for Emergency Purposes.

B. IEC 60268, Part 16 - The Objective Rating of Speech Intelligibility by Speech Transmission Index.

American National Standards Institute (ANSI)

A. ANSI S3.2-1989 - Method for Measuring the Intelligibility of Speech over Communication Systems.

B. ANSI A117.1 – Accessible and Usable Buildings and Facilities.

National Fire Protection (NFPA)

A. NFPA 70 - National Electrical Code (2008)

B. NFPA 72 - National Fire Alarm Code (2010)

C. NFPA 101 - Life Safety Code (2009)

The American with Disabilities Act (ADA)

A. ABA Accessibility Standard for Department of Defense Facilities

Underwriters Laboratories (UL)

A. UL 2017 – Standard for Safety for General-Purpose Signaling Devices and Systems

B. UL 1971 – Signaling Devices for the Hearing Impaired

13030 - 2

C. UL 464 Audible Signal Appliances

D. UL 864, 9th Edition – Control Units and Accessories for Fire Alarm Systems

E. UL Electrical Const Directory – Electrical Construction Equipment

F. UL Fire Prot. Dir. – Fire Protection Equipment Directory

Air National Guard Engineering Technical Letters and Policies

A. Air National Guard Design Policy – ANG ETL 01-1-1 (Revised March 2004)

B. Mass Notification Systems – ANG/CE Policy (August 2005)

1.2 SUMMARY

A. Section Includes:

1. Preamplifiers, amplifiers, and tone generators

2. Local Operators Console

3. Loudspeakers.

4. Strobes

5. Surge Protection Device

6. Battery Backup Power Unit.

1.3 DEFINITIONS

A. Channels: Separate parallel signal paths, from sources to loudspeakers or loudspeaker zones, with separate amplification and switching that permit selection between paths for speaker alternative program signals.

B. Zone: Separate group of loudspeakers and associated supply wiring that may be arranged for selective switching between different channels.

13030 - 3

1.4 SYSTEM DESCRIPTION

This work includes design and installation of a new Mass Notification System (MNS) system, non-coded, and dedicated to MNS service only per ANG ETL 01-1-1 and the ANG/CE Policy in the TN ANG Buildings 747 and 721. Equipment, materials, installation, workmanship, inspection, and testing shall be in strict accordance with the required and advisory provisions of NFPA 72, ABA, NFPA 101, IEC 60849, IEC 60268; Part 16, UFC 4-021-01, ETL 02-15, and ANG ETL 01-1-1 except as modified herein. The system layout on the drawings show the intent of coverage and are shown in suggested locations. Final quantity, system layout, and coordination is the responsibility of the Contractor. This specification is written to strictly adhere to the ANG ETL 01-1-1 and ANG/CE MNS Policy. The contractors shall fully read and understand the Technical Letters and Polices prior to bid and the design phase. Provisions of ANG ETL 01-1-1 Section 15.2 Automatic Detection and Notification Systems are adopted by this specification. Discrepancies between provisions of the ETL and the contract documents shall be reported to the Contracting Officer prior to bid.

1.5 PERFORMANCE REQUIREMENTS

A. System is designed to have head end control unit that is UL 864 listed that supervises all critical components of the mass notification system or UL 2017 listed where all components are supervised. The head end control unit shall be capable of receiving inputs for background music and paging.

B. The MNS shall temporarily override the fire alarm audible and visual signals and to provide intelligible voice commands during simultaneous fire and terrorist events.

C. Shall automatically repeat pre-recorded messages until they are terminated

D. The MNS system pre-recorded messages shall automatically terminate after 10 minutes.

E. Be able to switch between MNS and fire alarm notification functions without generating trouble alarms either way.

F. Provide a supervisory signal if the MNS is used to override fire alarm audible messages and visible signals during simultaneous fire and terrorist events. The supervisory signal shall be annunciated at the fire alarm control panel and any remote fire alarm annunciator and be transmitted to the fire department. The visual annunciation of the separate supervisory signal shall be distinctly labeled or otherwise clearly indicated.

G. Ensure speakers in the vicinity of the DVC will not create acoustical feedback or otherwise interfere with the ability to deliver live voice messages.

1.6 SUBMITTALS

A. Submittals shall be designed by the following:

1. Shop Drawings and product data shall be prepared and signed by persons having proof of meeting one of the following qualifications (Qualification documentation required with submittal, a NICET Technician certification does not meet this qualification):

a. Fire Protection Professional Engineer (FPE) registration by successfully passing the NCEES standard exam for fire protection engineering.

13030 - 4

b. Qualification as a GS 804-series FPE.

c. PE registration in a related discipline with a minimum of relative five (5) years' work experience in fire protection engineering, and provide references that can verify the five years.

The FPE shall be responsible for performing and overseeing all engineering aspects of the MNS system construction, including but not limited to, calculations, layout, shop drawings, equipment selection, and inspections. In addition the FPE shall be responsible for the testing plan and for final commissioning and testing of the system. Drawings signed and sealed by the Fire Protection Engineer is an Air National Guard ETL requirement. NICET certification or years experience in the fire alarm field is not a substitute for this qualification. The shop drawings shall be signed and sealed by the Registered Professional Engineer for each submittal. Shop drawings not bearing the Registered Professional Engineer’s seal and signature will be returned to the preparer without review. The Fire Protection Engineer’s services shall be commissioned before design of the mass notification system commences and the system design shall be performed under the direct supervision of the Fire Protection Engineer during all stages of the design phase. There shall be one FPE responsible for all fire alarm, Mass Notification, and Sprinkler systems. This shall be coordinated with the Prime Contractor if separate contracts are awarded for any of these items.

B. Product Data: For each type of product provided including items provided but not detailed in this specification. Where the products or design deviates from the contract documents, the submittals shall clearly indicate the deviations. The fire alarm package shall be submitted as an entire package. Partial packages of product data and calculations will not be approved without working shop drawings.

C. Shop Drawings: Include plans, elevations, sections, details, attachments to other work, and all interfaces with other equipment and systems. Where the drawings deviate from the contract documents, the changes shall be clearly noted and detailed as for the reason for the deviation.

1. All Drawings shall be signed and sealed by the Fire Protection Engineer.

2. Comply with recommendations in the "Documentation" Section of the "Fundamentals of Fire Alarm Systems" Chapter in NFPA 72 and related appendix or annex.

3. Include voltage drop calculations for notification appliance circuits.

4. Include battery size calculations.

5. Include performance parameters and installation details for each detector, verifying that each detector is listed for the complete range of air velocity, temperature, and humidity possible when air-handling system is operating.

6. Include plans, sections, and elevations of heating, ventilating, and air-conditioning ducts, drawn to scale and coordinating installation of duct smoke detectors and access to them.

Show critical dimensions that relate to placement and support of sampling tubes, detector housing, and remote status and alarm indicators. Locate detectors according to manufacturer's written recommendations.

7. Include floor plans to indicate final outlet locations showing zone designation of each device. Show size and route of cable and conduits.

8. Provide a system action matrix for all system input and outputs.

9. Provide a detailed riser diagram showing all devices, wiring, wire gauge, outputs, TVSS, and power supplies. Generic wiring diagrams are not acceptable.

10. A fire alarm symbol legend shall be provided for each symbol and shall be provided with descriptive detail of the device and a part number for each symbol

11. Include a system grounding plan. This plan shall show all details for grounding and bonding of antennas and control panels. Details shall identify methods and locations of building and equipment grounds and bonds.

13030 - 5

D. Coordination Drawings: Reflected ceiling plans, drawn to scale, on which ceiling-mounted items including lighting fixtures, diffusers, grilles, speakers, sprinklers, access panels, and special moldings are shown and coordinated with each other, using input from installers of the items involved.

E. Qualification Data: For qualified Installer and Fire Protection Engineer

F. Operations and Maintenance Manuals: Provide no later than at the 75% construction complete stage. Three copies of final manuals are required: In addition to items specified in Division 01 Section "Operation and Maintenance Data include the following:

1. Comply with the "Records" Section of the "Inspection, Testing and Maintenance" Chapter in NFPA 72.

2. Provide "Record of Completion Documents" according to NFPA 72 article "Permanent Records" in the "Records" Section of the "Inspection, Testing and Maintenance" Chapter.

3. Record copy of site-specific software.

4. Provide "Maintenance, Inspection and Testing Records" according to NFPA 72 article of the same name and include the following:

a. Frequency of testing of installed components.

b. Frequency of inspection of installed components.

c. Requirements and recommendations related to results of maintenance.

d. Manufacturer's user training manuals.

5. Manufacturer's required maintenance related to system warranty requirements.

6. Abbreviated operating instructions for framing and mounting at fire-alarm control unit.

7. Include full instructions on servicing and maintenance requirements.

8. Include operating instructions including start up, emergency shut down, and start up, seasonal servicing and start up, etc.

9. Include owner’s manuals for each item of equipment.

10. Include all equipment wiring diagrams.

11. Include all piping and wiring systems diagrams and operational diagrams.

12. Include full parts list and exploded schematic diagrams.

13. Include full warranty information.

14. Include all available manufacturer installation and O & M manuals.

15. Include full names, addresses, phone numbers, suppliers, service companies, contract numbers and other points of contact/information relative to the job.

G. Field quality-control reports.

H. Operation and Maintenance Data: For mass notification systems to include in emergency, operation, and maintenance manuals.

1.7 QUALITY ASSURANCE

A. Installer Qualifications: Manufacturer's authorized representative who is trained and approved for installation of units required for this Project.

1. Personnel certified by NICET as Audio Systems or Fire Alarm Systems Level III Technician.

13030 - 6

B. Testing Agency Qualifications: Qualified agency, with the experience and capability to conduct testing indicated.

1. Testing Agency's Field Supervisor: Currently certified by the Equipment Manufacturer to supervise on-site testing.

C. Source Limitations: Obtain mass notification systems from single source from single manufacturer.

D. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70, by a qualified testing agency, and marked for intended location and application.

E. Comply with NFPA 70.

1.8 COORDINATION

A. Coordinate layout and installation of system components and suspension system with other construction that penetrates ceilings or is supported by them, including light fixtures, HVAC equipment, fire-suppression system, and partition assemblies.

PART 2 - PRODUCTS

2.1 MANUFACTURERS

A. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following:

1. Honeywell NotifIer DVC-EM Series

2. Approved Equal

2.2 FUNCTIONAL DESCRIPTION OF SYSTEM

A. System Functions:

1. As per ANG ETL 01-1-1 provide non-proprietary generic type devices that are listed or approved to be interchangeable with other brands that are readily available. Addressable Signal Line Circuits (SLC) are requied and shall be Class A. MNS panels shall be field expandable. Panels may be field programmable provided that this can be accomplished at the unit (panel) level, without the use of proprietary software, keys, the changing of electronic hardware, or use of any proprietary device (unless provided to the ANG at time of installation). Any software, device, password or other element used to program any component of the fire system shall be specified to become property of the Government, along with the installed program. All panels shall include input and output modules and terminations. The system shall include wiring, raceways, pull boxes, terminal cabinets, outlet and mounting boxes, control equipment, alarm, dedicated and separate supervisory signal initiating devices, alarm notification appliances, supervising station fire alarm and fire suppression system control panels and transmitters, and other accessories and miscellaneous items required for a complete operating system even though each item is not specifically mentioned or described. All panels, including notification

13030 - 7 appliance power supplies, amplifiers, booster power supplies, etc., shall be located in one location as shown on the plans. Provide systems complete and ready for operation.

2. Modular, power-limited design with electronic modules.

3. Panels shall be addressable and field expandable.

4. Panels may be field programmable provided that this can be accomplished at the panel level, without the use of proprietary software, keys, the changing of electronic hardware, or use of any proprietary device (unless provided to the ANG upon installation)

5. Any software, device, password, or other element used to program any component shall be provided and shall become property of the ANG.

6. Software that requires a yearly renewal fee is not acceptable. New revisions of the software shall be provided to the ANG at no additional cost.

7. Include a real-time clock for time annotation of events.

8. Include all expansion boards, backplanes, and control boards for indicated zones, including spares, electively connect any zone to any available signal channel.

9. Selectively control sound from microphone outlets and other inputs.

10. "All-call" feature shall connect the all-call sound signal simultaneously to all zones regardless of zone or channel switch settings.

11. Produce a program-signal tone that is amplified and sounded over all speakers, overriding signals currently being distributed.

12. Reproduce high-quality sound that is free of noise and distortion at all loudspeakers at all times during equipment operation including standby mode with inputs off; output free of nonuniform coverage of amplified sound.

13. Provide electrical supervision of the primary power (AC) supply presence of the battery, battery voltage, and placement of system modules within the control panel.

14. The notification appliance network consists of audio speakers located to provide intelligible instructions at all locations in the building. The Mass Notification System announcements shall take priority over all other function of the system including the audible and visual output of the fire alarm system in a normal or alarm state. All fire alarm system functions shall continue in an alarm state except for the output signals of the audible and visual notification appliances.

15. An autonomous voice notification control unit is used to monitor and control the notification appliance network and provide consoles for local operation. Using a console, personnel in the building can initiate delivery of pre-recorded voice messages, provide live voice messages and instructions, and initiate visual strobes. The autonomous voice notification control unit will temporarily override audible fire alarm notification while delivering Mass Notification messages to ensure they are intelligible.

B. Circuits:

1. Provide a minimum of 2 spare speaker zones and 2 spare NAC strobe zones. The spare zones shall be provided with the required hardware such as backplanes and control boards as well as software versions required for active usage. Providing only space or future capability for expansion is unacceptable. Refer to the fire alarm plans for any additional spare zones for buildings. Spares zones shall be installed in the fire alarm panel with a labeled jumper identifying the zone.

a. Notification Appliance Circuit(s), NFPA 72, Class A.

C. Circuit wiring: Fire alarm and MNS wiring shall be in separated conduit systems. Outgoing and return conduits shall be separated by a minimum of one foot vertically and four feet horizontally except when exiting and returning to the control unit, in accordance with Class A circuits as found in NFPA 72.

13030 - 8

2.3 GENERAL EQUIPMENT AND MATERIAL REQUIREMENTS

A. The Voice Notification System shall comply with the requirements of NFPA 72 for Emergency Voice/Alarm Communications System requirements ISO 7240-16, IEC 60268-16, except as spec-ified herein. The system shall be a one-way single-channel voice notification system incorporating user selectability of a minimum 8 distinct sounds for tone signaling, and the incorporation of a voice module for delivery of prerecorded messages. The visual strobes and audible message shall automatically be broadcast on the floor of fire alarm origin, [the floor][two floors] immediately above the floor of fire alarm origin, and the floor immediately below the floor of fire alarm origin. A live voice message shall override the automatic audible output through use of a microphone input at the control panel.

1. a. When using the microphone, live messages shall be broadcast through all speakers.

The system shall be capable of operating all speakers at the same time. The digitalized voice message shall consist of a non-volatile (EPROM) microprocessor based input to the amplifiers. The microprocessor shall actively interrogate circuitry, field wiring, and dig-ital coding necessary for the immediate and accurate rebroadcasting of the stored voice data into the appropriate amplifier input. Loss of operating power, supervisory power, or any other malfunction that could render the digitalized voice module inoperative shall au-tomatically cause the fire alarm tone to take over all functions assigned to the failed unit.

2. The Mass Notification functions shall override the manual or automatic fire alarm notifica-tion functions. The system shall have the capability of utilizing a remote microphone sta-tion with redundant controls of the notification system control panel. Class "A" Notification Appliance Circuits (NAC) shall be provided for the activation of strobe appliances. The activation of the NAC Circuits shall follow the operation of the speaker NAC circuits. Au-dio output shall be selectable for line level (600 ohms), 25 or 70.7 volt output. The audio amplifier outputs shall be not greater than 100 watts RMS output. The strobe NAC Cir-cuits shall provide at least 2 amps of 24 VDC power to operate strobes and have the abil-ity to synchronize all strobes. A hand held microphone shall be provided and, upon acti-vation, shall take priority over any tone signal, recorded message or PA microphone op-eration in progress, while maintaining the strobe NAC Circuits activation. All outputs and operational modules shall be fully supervised with on-board diagnostics and trouble re-porting circuits. Form "C" contacts shall be provided for system alarm and trouble condi-tions. Circuits shall be provided for operation of auxiliary appliance during trouble condi-tions. The Control Panel for the Voice Notification System shall be independent of the Fire alarm system and shall be capable of autonomous operation. The system shall be housed in a separate panel that contains an independent power supply and batteries, as specified above. Mass Notification functions shall take precedence over all other. Func-tion performed by the Voice Notification System. The pre-recorded messages shall be specified by the AHJ. Provide capability for 8 pre-recorded messages. Provide an alert-ing sound prior to playing pre-recorded messages.

2.4 PREAMPLIFIERS, AMPLIFIERS, AND TONE GENERATORS

A. Any amplifiers, preamplifiers, tone generators, digitalized voice generators and any other hardware necessary for a complete, operational, audible circuit conforming to NFPA 72 shall be housed in a fire alarm control unit, terminal cabinet or in the mass notification control panel.

B. The system shall automatically operate and control all building mass notification speakers.

Each amplifier shall be a single output channel.

13030 - 9

2.5 LOCAL OPERATORS CONSOLE

A. The DVC shall incorporate a Push-To-Talk (PTT) microphone, status LED indicators, redundant controls and system status indicators for the system.

B. The unit shall incorporate microphone override of any tone generation or prerecorded messages. The unit shall be fully supervised from the control panel.

C. Provide 8 push on/push off buttons to activate the digitial messages in the ON position. A message name plate holder shall be provided above the pushbuttons.

D. The DVC shall be fully supervised from the FACP and shall contain front panel LED’s for System Normal, Trouble, and Alarm conditions.

E. The DVC shall be flush mounted with a ½ inch skirt around the door section.

F. The DVC shall disengage the fire alarm signal as well as any background music and general paging announcements.

G. DVC shall be protected from tampering by use of a break-glass, thumb-lock, tamper wire, alarm, or equivalent protection. Enclosures that can be opened only by a key shall not be used.

2.6 VOLUME CONTROL

A. Minimum Performance Requirements:

1. Audio Power Output: up to 35 watts of 70.7 volt audio power input

2. Adjustment Settings: 0-10, in 3 dB increments.

3. Maximum RMS Current: 10.0 mA

4. Wall mountable in standard double gang, 3 ½” deep backbox.

5. UL 864 Listed.

6. Volume controls shall be provided with a supervised 24 volt override capable of providing full power of the selected wattage upon activation of an emergency mass notification announcement.

7. Speakers controlled through volume controls shall also be supervised and wired Class A.

2.7 LOUDSPEAKERS

A. Cone-Type Loudspeakers:

1. Minimum Axial Sensitivity: 91 dB at one meter, with 1-W input.

2. Frequency Response: Within plus or minus 3 dB from 200 to 10,000 Hz.

3. Size: 8 inches (200 mm) with 1-inch (25-mm) voice coil and minimum 5-oz. (140-g) ceramic magnet.

4. Minimum Dispersion Angle: 100 degrees.

5. Rated Output Level: 1/8 - 8 W.

6. Matching Transformer: Full-power rated with minimum of four taps. Maximum insertion loss of 0.5 dB.

7. Surface-Mounting Units: Ceiling, wall, or pendant mounting, as indicated, in steel back boxes, acoustically dampened. Front face of at least 0.0478-inch (1.2-mm) steel and whole assembly rust proofed and shop primed for field painting.

13030 - 10

8. Flush-Ceiling-Mounting Units: In steel back boxes, acoustically dampened. Metal ceiling grille with gray baked enamel.

9. UL Listed under Standard 1480 for fire Protective Service.

B. Horn-Type Loudspeakers:

1. Type: Single-horn units, double-reentrant design, with minimum full-range power rating of 15 W.

2. Matching Transformer: Full-power rated with four standard taps. Maximum insertion loss of 0.5 dB.

3. Frequency Response: Within plus or minus 3 dB from 250 to 12,000 Hz.

4. Dispersion Angle: 130 by 110 degrees.

5. Mounting: Integral bracket.

6. Units at Exterior Locations: Listed and labeled for environment in which they are located.

2.8 STROBES

A. Visual notification appliances shall conform to the applicable requirements of UL 1971 and conform to the Americans With Disabilities Act (ADA).

B. Amber colored lens shall comply with UL 1638. The manufacturer shall have the color lens tests to the full UL 1971 polar plotting criteria, voltage drop, and temperature rise as stated in 1971.

C. Mass Notification Appliances shall have amber high intensity optic lens, xenon flash tubes, and output white light and be marked "ALERT" in red letters.

D. The light pattern shall be disbursed so that it is visible above and below the strobe and from a 90 degree angle on both sides of the strobe.

E. Strobe flash rate shall be 1 flash per second and a minimum of 15 candela (actual output after derating for tinted lens) based on the UL 1971 test.

F. All strobes shall be synchronized.

G. Speaker strobe combination units shall comply with sections 2.10 and 2.11.

2.9 SURGE PROTECTION DEVICE (SPD)

A. Alternating Current (ac) Power SPD Devices. These devices will have been tested in accordance with UL 1449, Standard for Safety Transient Voltage Surge Suppressors, Second Edition, and UL 1283, Electromagnetic Interference Filters, latest edition, by a nationally recognized testing laboratory. The SPD devices must provide normal sine wave tracking, with Category A1 ring wave suppression (2000 volts [V], 67 amperes, 180 degrees) of less than 50 V for nominal 120 V alternating current (Vac) legs. The TVSS will provide independent, distinct, and dedicated circuitry for each possible protection mode (i.e., line-to-line, line-to-neutral, line-to-ground, neutral-to-ground).

B. Data, Signal, and Control Wire SPD Devices. The SPD devices must be designed by the same manufacturer as the ac power SPD devices to ensure overall compatibility and system reliability. The SPD manufacturer will provide the SPD devices based on evaluation of individual system parameters, including: conductor size and length, number of conductors, shield type, 13030 - 11 peak current and voltage, signal type, signal baud rate, frequency bandwidth, maximum attenuation, maximum standing-wave ratio, and maximum reflection coefficient. SPD device circuitry must be fully encapsulated for protection of the circuitry and to provide longer.

2.10 BATTERY BACKUP POWER UNIT

A. Unit shall be rack mounted, consisting of time-delay relay, sealed gel cel battery, battery charger, on-off switch, "normal" and "emergency" indicating lights, and adequate capacity to supply maximum equipment power requirements for one hour of continuous full operation at immediate loss of AC power.

B. Unit shall provide 72 hours of battery standby and 15 minutes of alarm load or separate calculation with 60 minutes full alarm load upon immediate loss of AC, whichever is greater.

This shall be provided for all amplifiers; remote or local, and power supplies. Upon full depletion of battery, the system shall provide a full battery charge within 48 hours.

C. Battery shall be on float charge when not supplying system and to transfer automatically to supply system after three to five seconds of continuous outage of normal power, as sensed by time-delay relay.

D. Unit shall automatically retransfer system to normal supply when normal power has been reestablished for three to five seconds continuously.

PART 3 - EXECUTION

3.1 WIRING METHODS

A. Wiring Method: Install cables in raceways and cable trays except within consoles, cabinets, desks, and counters.

1. Comply with requirements for raceways and boxes specified in Division 26 Section "Raceway and Boxes for Electrical Systems."

B. Wiring Method: Conceal conductors and cables in accessible ceilings, walls, and floors where possible.

C. Wiring within Enclosures: Bundle, lace, and train cables to terminal points with no excess and without exceeding manufacturer's limitations on bending radii. Provide and use lacing bars and distribution spools.

3.2 CONDUCTORS, CABLES, AND EQUIPMENT BACKBOX

A. Wiring shall be THHN or TFFN stranded with crimp on terminal ends affixed.

1. Insulation for Wire in Conduit: Thermoplastic, not less than 1/32 inch (0.8 mm) thick.

2. The use of multi-conductor twisted pair or similar wiring is not permitted.

3. The use of wire nuts in MNS systems is not permitted.

4. All wiring shall be color-coded and fully identified and standard throughout the facility.

13030 - 12

5. Use of multi-conductor twisted pair or similar wiring is not permitted except for where required by the equipment manufacturer for speakers.

B. Equipment back boxes and raceway junction boxes shall be of the size and nature to accommodate all connections and terminations for its intended use.

1. No expansion rings shall be installed.

2. Boxes shall be securely fastened to the structure. No boxes are allowed to be supported only by the raceway connection.

3.3 INSTALLATION OF RACEWAYS

A. Comply with requirements in Division 26 Section "Raceway and Boxes for Electrical Systems" for installation of conduits and wireways with the following modifications:

1. All junction, terminal, and pull boxes and covers shall be painted red.

2. All conduits, raceways, FMC (if allowed) shall be painted the color red.

3. Conduit shall be EMT. Exception may be allowed for locations deemed unsuitable for EMT conduit. In such cases, submit for prior approval based on the manufacturer’s recommended raceway suitable for the installation conditions. Use of FMC or Liquid-Tite (or similar) is not permitted except when a request has been made in writing and an approval issued only for locations unsuitable for raceways. In such instances, the length shall be no greater than six feet. Each end shall be secured and terminated in accordance with NFPA 70, 72, manufacturer’s recommendations, and this specification.

4. Minimum conduit size shall be ¾” diameter trade size.

5. IDC (Initiating Device Circuit) and NAC (Notification Appliance Circuit) wiring shall be installed in separated conduit systems. IDC’s and NAC shall not share the same raceway or conduit for ease of maintenance.

6. Fire and mass notification, are not allowed to share conduits. Provide completely separate raceways for all systems.

7. All conduits and junction boxes shall be identified through coding and labeling.

8. All junction, terminal and pulling boxes and covers shall be painted the color red and shall be identified with engraved labels by the zone and circuit that it contains.

B. Install manufactured conduit sweeps and long-radius elbows whenever possible.

C. For system installation comply with NFPA 70 for installation requirements.

3.4 INSTALLATION OF CABLES

A. Comply with NFPA 70, NFPA 72, and ANG ETL 01-1-1.

B. General Cable Installation Requirements:

1. Cable terminations shall be in accordance with ANG ETL 01-1-1.

2. The use of wire nuts is prohibited.

3. Splicing of wire shall not be permitted. All wiring is to be continuous from panel to panel and from device to device.

4. Terminal blocks shall be used only where absolutely necessary, e.g. devices with integral pigtails.

5. T-tapping is prohibited.

13030 - 13

6. Terminate conductors; no cable shall contain un-terminated elements. Make terminations only at outlets and terminals.

7. Splices, Taps, and Terminations: Arrange on numbered terminal strips in junction, pull, and outlet boxes; terminal cabinets; and equipment enclosures. Cables may not be spliced.

8. Do not install bruised, kinked, scored, deformed, or abraded cable. Do not splice cable between termination, tap, or junction points. Remove and discard cable if damaged during installation and replace it with new cable.

9. Cold-Weather Installation: Bring cable to room temperature before de-reeling. Heat lamps shall not be used.

10. All terminal devices shall have engraved plastic or metallic alphanumeric identification, which shall be keyed to the posted operations and maintenance instructions. Systems shall include full identification

3.5 IDENTIFICATION

A. System shall include full identification.

1. All junction, terminal, and pull boxes shall be identified with engraved labels by the zone and circuit that it contains.

2. All detection and terminal devices shall have engraved plastic or metallic alphanumeric identification, which shall be keyed to the posted operations and maintenance instructions.

3. All terminal ends shall be clearly marked and numbered as to appropriate terminal and device.

4. All wire shall be color-coded and fully identified and standard throughout the facility.

B. Install framed operating instructions in a location visible from fire-alarm control unit. Posted instructions will include the following:

1. Operating instructions.

2. Facility floor plans showing all fire equipment and devices with coordinated identification.

3. System diagrams including fire alarm riser diagrams.

4. Wiring diagrams and schematics.

5. Equipment schedules.

3.6 INSTALLATION

A. Match input and output impedances and signal levels at signal interfaces. Provide matching networks where required.

B. Identification of Conductors and Cables: Color-code conductors and apply wire and cable marking tape to designate wires and cables so they identify media in coordination with system wiring diagrams.

C. Equipment Cabinets and Racks:

1. Group items of same function together, either vertically or side by side, and arrange controls symmetrically. Mount monitor panel above the amplifiers.

2. Arrange all inputs, outputs, interconnections, and test points so they are accessible at rear of rack for maintenance and testing, with each item removable from rack without disturbing other items or connections.

13030 - 14

3. Blank Panels: Cover empty space in equipment racks so entire front of rack is occupied by panels.

D. Volume Limiter/Compressor: Equip each zone with a volume limiter/compressor. Install in central equipment cabinet. Arrange to provide a constant input to power amplifiers.

E. Weatherproof Equipment: For units that are mounted outdoors, in damp locations, or where exposed to weather, install consistent with requirements of weatherproof rating.

F. Connect wiring according to Division 26 Section "Low-Voltage Electrical Power Conductors and Cables."

3.7 GROUNDING

A. Ground cable shields and equipment to eliminate shock hazard and to minimize ground loops, common-mode returns, noise pickup, cross talk, and other impairments.

B. Signal Ground Terminal: Locate at main equipment cabinet. Isolate from power system and equipment grounding.

C. Install grounding electrodes as specified in Division 26 Section "Grounding and Bonding for Electrical Systems."

3.8 FIELD QUALITY CONTROL

A. Testing Agency: Engage a qualified testing agency to perform tests and inspections.

B. Manufacturer's Field Service: Engage a factory-authorized service representative to inspect, test, and adjust components, assemblies, and equipment installations, including connections.

C. Perform tests and inspections.

1. Manufacturer's Field Service: Engage a factory-authorized service representative to inspect components, assemblies, and equipment installations, including connections, and to assist in testing.

D. Tests and Inspections:

1. System Pre-test: The system will be considered ready for final testing only after the following have been accomplished:

a. The required test plan has been submitted and approved

b. Preliminary tests have been made and deficiencies determined to have been corrected to the satisfaction of the equipment manufacturer’s technical representatives and the Contracting Officer.

c. Test reports, Record of Completion, including the required videotape of the preliminary tests, have been submitted and approved.

d. The control panels and detection systems have been in service for a break in period of at least 14 consecutive days prior to the final test

e. The Contractor has provided written notification to the Contracting Officer, at least 21 days prior to date of Final Test, that preliminary tests have been successfully completed.

13030 - 15

2. System Testing: Comply with "Test Methods" Table in the "Testing" Section of the "Inspection, Testing, and Maintenance" Chapter in NFPA 72.

3. Test intelligibility, as a CIS measurement of .8, as required by UFC 4-021-01. Areas of the building provided with hard wall and ceiling surfaces (such as metal and concrete) that are found to cause excessive sound reflections may be permitted to have a CIS score less than the minimum required value where approved by the DoD installation, and if the occupants in these areas can determine that a voice signal is being broadcast and they must walk no more than 33 ft. to find a location with at least the minimum required CIS value within the same area. Areas of the building where occupants are not expected to be normally present are permitted to have a CIS score less than the minimum required value if personnel can determine that a voice signal is being broadcast and they must walk no more than 50 ft. to a location with at least the minimum required CIS value within the same area. Measurements should be taken near the head level from most personnel in the space under normal conditions (e.g. standing, sitting, sleeping, as appropriate).

4. Commercially available test instrumentation shall be used to measure intelligibility a specified by IEC 60849 and IEC 60268-16. The mean value of at least three readings shall be used to compute the intelligibility score at each test location.

5. Test visible appliances for the public operating mode according to manufacturer's written instructions.

6. Provide full functional battery load test. Remove AC power from control panels for 60 hours and provide 15 minutes full alarm load. Re-connect AC power and verify full battery charge within 48 hours. After 48 hours provide 60 minute full system alarm load discharge test.

7. Factory-authorized service representative shall prepare the "Fire Alarm System Record of Completion" in the "Documentation" Section of the "Fundamentals of Fire Alarm Systems" Chapter in NFPA 72 and the "Inspection and Testing Form" in the "Records" Section of the "Inspection, Testing and Maintenance" Chapter in NFPA 72.

E. Provide a comprehensive “Test Plan” and a written request for the final acceptance testing.

F. Inspection: Verify that units and controls are properly labeled and interconnecting wires and terminals are identified. Prepare a list of final tap settings of paging speaker-line matching transformers.

G. Public address and mass notification systems will be considered defective if they do not pass tests and inspections.

H. Prepare test and inspection reports.

1. Include a record of final speaker-line matching transformer-tap settings, and signal ground-resistance measurement certified by Installer.

3.9 STARTUP SERVICE

A. Engage a factory-authorized service representative to perform startup service.

1. Verify that electrical wiring installation complies with manufacturer's submittal and installation requirements.

2.…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.