Questions_144-145.pdf

PDF 122 KB Posted

Attached to
Construction of New Dorm and Classroom Facility
Solicitation number
W912L7-14-B-0001
Issued by

About this file

Amendment 3 Questions and Answers

View the file

Other files

File Type Posted
W912L714B0001_Amendment_3.pdf PDF
W912L714B0001_Amendment_2.pdf PDF
Addendum_2.zip ZIP file
Questions_96-143_Answered.pdf PDF
W912L714B0001_Amendment_1.pdf PDF
Questions_1-95_Answered.pdf PDF
Addendum_1.zip ZIP file
Preproposal_Conference_Minutes_24_Apr_2014.pdf PDF
Sign_in_Sheet.pdf PDF
Bid_Bond_Form.pdf PDF
W912L714B0001_15_Apr_2014.pdf PDF
Wage_Determination_140078.pdf PDF
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

144. Question: On IT1.1, Note #4. A New 30” x 48” Precast Concrete Pullbox. Is there a detail drawing or a spec section describing in more detail what is required?

144. Answer: Pullbox to be a tier 15 quazite enclosure.

145. Question: On IT1.1, Note #5. A New 8’ x 8’ x 6’ with 3’-6” Cast Iron Frame and Lid. Is there a detail drawing or a spec section describing in more detail what is required?

145. Answer: Cast Iron Frame and Lid to be East Jordan Iron Works 1843 Solid Frame and Cover with “Communications” lettering.