Pre-Bid_RFI_W912L6-19-B-5000_4_Apr_2019.pdf

PDF 97 KB Posted

Attached to
BLDG 1001 Reconfigure
Solicitation number
W912L619B5000
Issued by

About this file

Answered RFI's 4 Apr

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Date:

RFI No.

RFP

Reference

(Sect/Para/Pag e)

QUESTION GOVERNMENT RESPONSE

3/18/2019

Quality Control Please confirm if a full time on-site Quality Control Manager is required.

Yes. Specification 01 45 00.00 10 will be added by Addendum.

3/18/2019

DDC Controls 23 52 00 (Heating Boilers)

States that " Controls shall be provided by Johnson Controls and shall be interlocked with Base Wide EMCS" Is Johnson Controls required for all DDC Controls? Also, Please indicate all equipment that is i d h id CS

Yes the base controls are propriortary to Johnson Controls. Refer to the control drawings, sheets M- 801 thru M-803, all of the items shown on these sheets are required to report to the base EMCS h i h f h i3/18/2019

Comm Cable Demo

There are several runs of Communication cable that run between the project area and the area of the building that is not in scope. Please clarify who is responsible for the disconnect and removal of this cable.

OKANG to self-perform communication demolition work of existing cabiling.

3/25/2019

Chiller Piping Is there any spec. on the underground pre-insulated chiller piping.

Yes refer to section 33 61 13.13

PREFABRICATED UNDERGROUND

HYDRONIC ENERGY DISTRIBUTION.

3/25/2019

U.S. Made Products

Are we to use U.S. made products. Yes.

3/25/2019

Fire Extinguishers

Where are the Fire Extinguishers located that are specified in Division 10 44 16??

Fire Extinguishers are not required per G-002.

Specification 10 44 16 will be removed via Addendum

4/1/2019

Are the AC Pads on the north end of the bulding to be removed in demo of ac units

Yes, demo pads

Is it possible to obtain the 2018 Civil 3D base file so that we can perform the most accurate takeoff for the earthwork for this project?

CAD files are accompanied as a separate attachment. All dimenstions and data obtained from the CAD files is to be field verified by the contractor.

C-110 SITE PLAN.dwg C-100 DEOMOLITION PLAN.dwg

Pre-Bid RFI Log for W912L6-19-B-5000 Bldg 1001 Renovation, YZEU142040