OKANG_B1001_IFC_Drawings_-_T-101_with_Notes_(002).pdf

PDF 2 MB Posted

Attached to
BLDG 1001 Reconfigure Federal contract opportunity
Solicitation number
W912L619B5000
Issued by
Department of the Army National Guard

About this file

OKANG_B1001_IFC_Drawings

View the file

Other files for this federal contract opportunity

Other files attached to BLDG 1001 Reconfigure, newest first.
File Type Posted
Bid_opening_Signin_sheet.pdf PDF
Sealed_Bid_for_YZEU142040_W912L619B5000.pdf PDF
Pre-Bid_RFI_W912L6-19-B-5000_6_Apr_2019.pdf PDF
Technical-Specifications-SCIF-Construction.pdf PDF
C-100_DEOMOLITION_PLAN.dwg DWG drawing
C-110_SITE_PLAN.dwg DWG drawing
Pre-Bid_RFI_W912L6-19-B-5000_4_Apr_2019.pdf PDF
Pre-Bid_RFI_W912L6-19-B-5000_4_Apr_2019.pdf PDF
Addendum_001.pdf PDF
B1001_Site_Visit_Attendance_Sheet_14_March_2019.pdf PDF
OKANG_B1001_IFC_Drawings.pdf PDF
W912L619B5000.pdf PDF
OKANG_B1001_IFC_Specs.pdf PDF
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

P I H

P I H

P I H

P I H

PI/6HPI/6H

PI/6H

J J

VESTIBULE

ADMIN

CORRIDOR

DO OFFICE

ADV. TRAINING RM

CONF. ROOM

SERVER

124 STORAGE

OPERATIONS OPEN OFFICE

MECH. RM

CC OFF.

TRAINING RM

EQUIP. REPAIR

EQUIP. STOR.

LAB 1

LAB 2

BREAK RM

RR CORRIDOR

CORRIDOR

WOMEN

MEN

JAN.

TSO LOCKERS

POWER POLE

1 1

1 1

109876543

E

D

C

B

A

CR

CR

CR

CR CR

C R

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

D A

T E

P R

O

JE

C T

N O

Y Z

E U

-B

E D

-D O

W N

T H

A C

C T

S C

H O

O L

H O

U S

E O

K

LA

H O

M A

A

IR

N A

T

IO

N A

L G

U A

R D

, 1

T H

A

IR

R E

F U

E

LI

N G

W

IN

G O

K

LA

H O

M A

C

IT

Y , W

IL

L

R O

G E

R S

A

IR

G U

A R

D B

A S

E , O

K

LA

H O

M A

C .A

. E N

G

IN

E E

R

IN

G

E

X P

IR

E

S J

U N

E

0, C .A

. A R

C H

IT

E

C T

U R

E

E

X P

IR

E

S J

U N

E

0, C .H

. G U

E R

N S

E Y

C

O M

P A

N Y

N . G

R A

N D

B

LV

D

O K

LA

H

O M

A C

IT

Y

, O K

.4

.8

M R

K D

E S

C R

IP

T

IO

N

D A

T E

B Y

JA

N

U A

R Y

8, /1

/2

:3

:2

P

M C

W o rk

\R

-0

E tm a n a h a n

.r v t

T .M

A N

A H

A N

T .M

A N

A H

A N

T-101

O K

C O

M M

U N

IC

A

T

IO

N S

P

LA

N

1/8" = 1'-0"1

COMMUNICATIONS PLAN - FIRST FLOOR

8' 4' 0 8'

SCALE: 1/8" = 1'-0"

PLAN NORTH

KEYED NOTES:

1. SEE POWER PLAN EP101 FOR FILL AND CONDUIT ROUTING.

2. CARD READER TO BE MOUNTED ON ADA PEDESTAL. RUN CONDUIT ADJACENT TO POWER CONDUIT.

Notes:

1. (101) Fiber Data Ports for SIPRNet & JWICS, One Quad jack placed per drawing (approximate), Two SIPR fibers (Red, SC Connection) per jack, One JWICS fiber (Yellow, LC Connection) and one NSANet (orange, Connection per installation team guidance) per jack 50/125 micron, Multi-Mode fiber optic cable

2. (104) Fiber Data Ports for NIPRNet One Quad jack per 6ft of wall space or per drawing (approximate), Four fibers (Green, ST Connection) per jack 50/125 micron, Multi-Mode fiber optic cable

3. R124 grounding is green or green-striped # 6 gauge wire

4. One 208VAC 30-Amp circuit w/ L6-30R twist lock connection per comm rack

5. One dedicated110VAC 20-Amp circuit using L5-20R twist lock connection, on its own independent circuit mounted on the top of each equipment rack

6. One (1) dedicated 20-Amp circuit using NEMA 5-20P plug outlet mounted on the top of each equipment cabinet

7. Cable tray, wall jack boxes, and wall conduit stub-outs in place prior to cabling

8. Four yellow, unterminated multi-mode fiber strands running from existing communications room to R124

9. Communications racks contents are GFE

File details come from the government source that posted it.