This document is a Statement of Work (SOW) for a demolition services contract at the Camp Bowie Training Center (CBTC) in Brownwood, Texas, issued by the Texas Army National Guard.
The SOW outlines the requirements for the demolition and removal of 18 modular buildings at CBTC. The contractor shall provide all necessary personnel, equipment, tools, materials, and supervision to perform the work. The key tasks include disconnecting utilities, demolishing the buildings, cleaning the work area, and complying with OSHA safety standards. The contract duration is 45 calendar days after the notice to proceed. The related federal contract opportunity is a solicitation (W912L1-24-B-0001) for the demolition project, which is set aside 100% for small businesses under NAICS code 238910. The pre-bid conference is scheduled for April 15, 2024, and bids are due on May 8, 2024.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Training Centers Garrison Command Texas Army National Guard
STATEMENT OF WORK (SOW)
Demolition Camp Bowie Project # 12045220
Date: 2 April 2024
Table of Contents
1. Project Title
2. Introduction
3. Background
4. Objectives
5. Job Site Information
5.1. Location
5.2. Hours of Operation
5.3. Federal Holidays
5.4. Gate Access Requirements
5.5. Gate Closures
6. Security Requirements
6.1. AT Level 1 Training
6.2 Access and General Protection Procedures
6.3. Contractors That Do Not Require a CAC
6.4. iWatch Training
7. Specific Requirements
7.1. Task 1 - Disconnect Utilities
7.2. Task 2 - Demolition
7.3. Task 3 - Clean Work Area
7.4. Task 4 - Compliance with OSHEA
8. Safety Considerations
9. Government Furnished Property, Materials, Equipment
9.1. Property
9.2. Utilities
10. Points of Contact
Exhibit 1
Attachment 1
1. Project Title Demolition at Camp Bowie
2. Introduction The Texas Army National Guard is pursuing the acquisition of a demolition services at Camp Bowie Training Center (CBTC) in Brownwood, Texas. The contractor shall provide all personnel, equipment, tools, materials, supervision, and quality control necessary, except as specified in Paragraph 9 as Government Furnished, to perform Modular Building Demolition and Removal Services, as defined in this Statement of Work (SOW).
This SOW issued by the Texas Army National Guard describes the goals expected to be achieved in regard to the demolition and removal of (18) existing modular buildings.
3. Background BTBs 17 through were previously used as barracks during training events at CBTC. The structures are 26’x70’ buildings that are no longer being used. The intent is to remove the BTBs completely by demolition in place and thorough cleanup of all debris. The contractor is also authorized to section the structures into (2) 13’x70’ trailers and haul away. The demolition and/or removal process of this structure will not degrade CBTC ability to provide a safe training environment for National Guard, Reserve and Active-Duty service members who utilize the training center.
4. Objectives The objective of this SOW is to specify the demolition work that needs to be completed on Camp Bowie. This project will consist of the demolition of 18 modular buildings, disconnection of utilities, haul section or haul away debris, and cleanup.
5. Job Site Information
5.1. Location
Camp Bowie Training Center, 4611 FM 45 South, Brownwood, Texas.
5.2. Hours of Operation
7:00 a.m. – 5:00 p.m. Monday through Friday except on federal holidays.
5.3. Federal Holidays
New Years Day 1 January Martin Luther King's Birthday Third Monday of January Presidents Day Third Monday of February Memorial Day Last Monday of May
Juneteenth 19 June Independence Day 4 July Labor Day First Monday in September Columbus Day. Second Monday in September Veterans Day 11 November Thanksgiving Day Fourth Thursday in November Christmas Day 25 December
5.4. Gate Access Requirements
Contractors must check in at the security gate. All contractors are required to present a valid driver’s license upon arrival. Vehicles are subject to inspection of (1) vehicle registration, (2) valid driver’s license, (3) proof of insurance for the vehicle, (4) safety inspection and car rental agreement if applicable.
5.5. Gate Closures
Unscheduled gate closures by Texas Military Department may occur at any time causing all personnel entering or exiting a closed installation to experience a delay. This cannot be predicted or prevented. Contractors are not compensated for unexpected closures or delays. Vehicles operated by contractor personnel are subject to search pursuant to applicable regulations. Any moving violation of any applicable motor vehicle regulation may result in the termination of the contractor employee’s installation driving privileges.
6. Security Requirements
6.1. AT Level 1 Training: This provision/contract text is for contractor employees with an area of performance within a National Guard controlled installation, facility or area.
All contractor employees, to include subcontractor employees, requiring access to National Guard installations, facilities and controlled access shall complete AT Level I awareness training. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the Contracting Officer’s Representative (COR) within 5 days after the award. AT Level 1 awareness training is available at the following website: https://jko.jten.mil/courses/AT-level1/launch.html.
6.2. Access and General Protection/Security Policy and Procedures: If applicable, Contractor and all associated sub-contractors employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition.
https://jko.jten.mil/courses/AT-level1/launch.html
6.3. For Contractors That Do Not Require CAC, But Require Access to a DOD Facility or Installation:
Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05/AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.
6.4. iWatch Training: The contractor and all associated sub-contractors shall brief all employees on the local iWATCH program. This local developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training shall be completed within 5 calendar days of contract award and within 5 calendar days of new employees commencing performance with the results reported to the COR NLT 5 calendar days after contract award. Training can be viewed at https://www.youtube.com/embed/vlzYhQp7fPw
7. Specific Requirements The contractor shall provide all property, materials, and equipment necessary to completely remove the designated modular buildings from the designated TMD property. This includes all safety materials, such as PPE, as per OSHA standards for building demolition and removal. The designated BTB’s are 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33, and 34.
7.1. Task 1 - Disconnect Utilities
The Contractor shall:
• Disconnect electrical services from all applicable BTB’s
• Turn off, cut and tap incoming waterlines at ground level
• Cut and cap all waste-water lines at ground level
7.2. Task 2 - Demolition of all applicable BTB’s
The Contractor shall:
• Demolition of all applicable BTB’s
• Remove all debris or section and haul away
• Debris include all walls, flooring, ceiling material, empty shelving, and wires
7.3. Task 3 - Clean Work Area
The Contractor shall:
• Thoroughly clean the work area and remove all trash, debris and demolition materials resulting from the demolition or section and hauling of BTB’s 17 through 34 from TMD property.
https://www.youtube.com/embed/vlzYhQp7fPw
7.4. Task 4 - Compliance with OSHA
The Contractor shall:
• Perform all work measures to the safety standards of OSHEA for demolition work.
8. Safety Considerations
• See OSHA standards.
• Security of worksite & access control. Limit construction site to only those actively working on the demolition project.
• Protection of existing site and facilities not associated with demolition.
9. Government Furnished Property, Material, Equipment and Services The Government will provide the property, material, equipment, and/or services listed below solely for the purpose of performance under this contract:
9.1. Property
The Government will furnish the necessary workspace for the contractor to perform services outlined in this SOW to include temporary spaces for equipment parking and storage, temporary spaces for dumpster/debris, and temporary space for vehicle parking located in the cantonment area.
9.2. Utilities
The Government will furnish the necessary workspace for the contractor to perform services outlined in this SOW to include temporary spaces for equipment parking and storage, temporary spaces for dumpster/debris, and temporary space for vehicle parking located in the cantonment area.
10. Points of Contact Any issues or concerns with the tasks assigned to this contract shall be directed to the COR.
The only individual allowed to change the terms of this contract is the KO. Any work outside the scope of this contract shall be brought to the KO’s attention immediately.
Contracting Officer’s Representative (COR) Name: Michael Tomlinson Address: 2200 W. 35TH St. Austin, TX 78703 Email: michael.b.tomlinson.mil@army.mil Phone Number: 512-782-5909
Contracting Officer (KO) Name: Natalie Rodriguez Address: 2200 W. 35th St. Austin, TX 78703 mailto:michael.b.tomlinson.mil@army.mil
Email: natalie.j.rodriguez9.civ@army.mil Phone Number: 512-782-5529 mailto:natalie.j.rodriguez9.civ@army.mil
Exhibit 1
Deliverables
The following items shall be delivered to the COR:
Item Frequency Delivery Model(s) Submit To
AT Level 1 Training Provide 1 copy of certificates within 5 calendar days after contract has been awarded.
Electronic Submission COR iWatch Training Provide 1 copy of a roster with names that completed the training within 5 calendar days after contract has been awarded.
Electronic Submission COR
Contractor Schedule Provide 1 copy within 5 calendar days after contract has been awarded.
Electronic Submission COR
Quality Control Plan Provide 1 copy within 5 calendar days after contract has been awarded.
Electronic Submission COR
Attachment 1
Location of Main entrance and BTBs 17-34 on Camp Bowie, Brownwood TX
| 1. Project Title |
| 2. Introduction |
| 3. Background |
| 4. Objectives |
| 5. Job Site Information |
| 5.1. Location |
| 5.2. Hours of Operation |
| 5.3. Federal Holidays |
| 5.4. Gate Access Requirements |
| 5.5. Gate Closures |
| 6. Security Requirements |
| 6.1. AT Level 1 Training: This provision/contract text is for contractor employees with an area of performance within a National Guard controlled installation, facility or area. All contractor employees, to include subcontractor employees, requiring ... |
| 6.2. Access and General Protection/Security Policy and Procedures: If applicable, Contractor and all associated sub-contractors employees shall provide all information required for background checks to meet installation access requirements to be acco... |
| 6.3. For Contractors That Do Not Require CAC, But Require Access to a DOD Facility or Installation: |
| 6.4. iWatch Training: The contractor and all associated sub-contractors shall brief all employees on the local iWATCH program. This local developed training will be used to inform employees of the types of behavior to watch for and instruct employees... |
| 7. Specific Requirements |
| 7.1. Task 1 - Disconnect Utilities |
| 7.2. Task 2 - Demolition of all applicable BTB’s |
| 7.3. Task 3 - Clean Work Area |
| 7.4. Task 4 - Compliance with OSHA |
| 8. Safety Considerations |
| 9. Government Furnished Property, Material, Equipment and Services |
| 9.1. Property |
| 9.2. Utilities |
10. Points of Contact
File details come from the government source that posted it. Updated .