PreBid_Questions_and_Answers.docx
DOCX document 14 KB Posted
- Attached to
- KYANG Aircraft Parking Apron Crack Repairs
- Solicitation number
- W912KZ-19-B-5001
About this file
PreBid Questions and Answers
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W912KZ-19-B-5001_-_Abstract.pdf | ||
| W912KZ-19-B-5001-0001.pdf | ||
| Delpatch_Repair_Example.pdf | ||
| Apron_Cracks_-_3.pdf | ||
| Apron_Cracks_-_4.pdf | ||
| Apron_Cracks_-_1.pdf | ||
| Site_Survey_Sign_In_Sheet.pdf | ||
| Apron_Cracks_-_2.pdf | ||
| 2_-_WEAS192003_-_KYANG_Apron_Map.pdf | ||
| W912KZ-19-B-5001.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pre-Bid Inquiries and Responses
W912KZ-19-B-5001
KYANG Aircraft Parking Apron Crack Repairs
1. Question: What is the required minimum total width of the patch?
Answer: Contractor is to follow the manufacturer’s recommendation for patch width.
2. Question: What is the required minimum depth of the patch Answer: Minimum depth of the patch should be less than 4”.
3. Question: Do we have the correct wage decision?
Answer: After further review, the wage decision is being changed from “Building” to “Highway” in classification.
4. Question: In regard to Performance and Payment Bonds for the project, which is required for this job?
Answer: Upon notification of award, the awardee will be required to obtain both a Performance and Payment bond.
5. Question: Section 00010, note 4 says a complete bid package must contain the 1442 form signed, section 00010 line items priced, bid bond, reps and certs, amendments acknowledgements but section 4.2 lists statement of qualifications, past performance, description of past projects, technical approach and quality control plan must be submitted. So which is correct or do we need to submit everything in both descriptions?
Answer: Section 00010 is correct. Section 4.2 of the Performance Work Statement has been removed.
6. Question: Does the Quality Control Plan need to be submitted with our proposal?
Answer: No, the Quality Control Plan does not need to be submitted with bid, however the awarded contractor will need to submit an accepted Quality Control Plan prior to receiving the Notice to Proceed.
7. Section 6, Table 1 says bid to be Electronic (PDF) – email, but section 00010, note #2 says facsimile transmission of bid is not authorized and electronic submission of the bid will not be accepted. So, what format do we submit our proposal?
Answer: Section 00010 is correct and Section 6, Table has been corrected to reflect this. Bids must include an original, notarized Bid Bond and a hard copy of the bid that may be mailed or hand delivered.