PreBid_Questions_and_Answers.docx

DOCX document 14 KB Posted

Attached to
KYANG Aircraft Parking Apron Crack Repairs
Solicitation number
W912KZ-19-B-5001
Issued by

About this file

PreBid Questions and Answers

View the file

Other files

File Type Posted
W912KZ-19-B-5001_-_Abstract.pdf PDF
W912KZ-19-B-5001-0001.pdf PDF
Delpatch_Repair_Example.pdf PDF
Apron_Cracks_-_3.pdf PDF
Apron_Cracks_-_4.pdf PDF
Apron_Cracks_-_1.pdf PDF
Site_Survey_Sign_In_Sheet.pdf PDF
Apron_Cracks_-_2.pdf PDF
2_-_WEAS192003_-_KYANG_Apron_Map.pdf PDF
W912KZ-19-B-5001.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Pre-Bid Inquiries and Responses

W912KZ-19-B-5001

KYANG Aircraft Parking Apron Crack Repairs

1. Question: What is the required minimum total width of the patch?

Answer: Contractor is to follow the manufacturer’s recommendation for patch width.

2. Question: What is the required minimum depth of the patch Answer: Minimum depth of the patch should be less than 4”.

3. Question: Do we have the correct wage decision?

Answer: After further review, the wage decision is being changed from “Building” to “Highway” in classification.

4. Question: In regard to Performance and Payment Bonds for the project, which is required for this job?

Answer: Upon notification of award, the awardee will be required to obtain both a Performance and Payment bond.

5. Question: Section 00010, note 4 says a complete bid package must contain the 1442 form signed, section 00010 line items priced, bid bond, reps and certs, amendments acknowledgements but section 4.2 lists statement of qualifications, past performance, description of past projects, technical approach and quality control plan must be submitted. So which is correct or do we need to submit everything in both descriptions?

Answer: Section 00010 is correct. Section 4.2 of the Performance Work Statement has been removed.

6. Question: Does the Quality Control Plan need to be submitted with our proposal?

Answer: No, the Quality Control Plan does not need to be submitted with bid, however the awarded contractor will need to submit an accepted Quality Control Plan prior to receiving the Notice to Proceed.

7. Section 6, Table 1 says bid to be Electronic (PDF) – email, but section 00010, note #2 says facsimile transmission of bid is not authorized and electronic submission of the bid will not be accepted. So, what format do we submit our proposal?

Answer: Section 00010 is correct and Section 6, Table has been corrected to reflect this. Bids must include an original, notarized Bid Bond and a hard copy of the bid that may be mailed or hand delivered.