QUESTIONS_AND_ANSWERS_FOR_SOLICITATION_W912K6.docx

DOCX document 479 KB Posted

Attached to
HEMTT Spill Containment System
Solicitation number
W912K6-16-Q-0037
Issued by

About this file

Questions and Answers

View the file

Other files

File Type Posted
Q A_3.docx DOCX document
Q A_Cont2.docx DOCX document
Q A_Cont.docx DOCX document
HEMIT_Spill_Containment_FBO_solicitation.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUESTIONS AND ANSWERS FOR SOLICITATION W912K6-16-Q-0037

1. Height is listed as 14’. Is this accurate?

ANS: PER THE ATTACHED SOW THE HEIGHT IS A MINIMUM SIZE OF 14'

2. Will units be placed on a level surface?

ANS: UNITS WILL BE PLACED ON LEVEL SURFACE Size specified is 20 X 8 Sections.

3. Based on 44’ sections are not 8’. Is 40’ acceptable not including filtration systems?

ANS: THERE MUST BE ONE DRAIN PORT PER EVERY 20'X8' SECTION. 40' WOULD EXCEED THE MINIMUM.

4. Do you require 2 ramps per 20 X 8 Section?

ANS: SOW REFERENCES 2 RAMPS PER SYSTEM. NOTHING FOLLOWS

5. What is Canopy material and overall size?

ANS: STRUCTURAL STEEL TUBING IS CONSTRUCTED OF 14 TO 17 GAUGE TRIPLE GALVANIZED STRUCTURAL STEEL TUBING. THE FABRIC CANOPY IS CONSTRUCTED OF A HEAVY DUTY RIP STOP (CROSS WEAVE) POLYETHYLENE COVER MATERIAL THAT WEIGHS UP TO 12.5 OZ AND IS 24-MIL THICK. COVER IS RATED TO WINDS IN EXCESS OF 80 MPH. SIZE OF CANOPY WILL MATCH SIZE OF SYSTEM.

6. SINCE MINIMUM SIZE IS 14'H X 20'W X 44D Who is responsible for offloading at site?

ANS: VENDOR OFFLOAD

7. What is minimum loading requirement (PSF) for grating material?

ANS: 9000LB LIFT

8. Are there additional drawings/specifications available?

ANS: NO DRAWING AVAILABLE (SEE ATTACHED PICTURE)