RFI_Response_dated_19_Sep_2014_DV_Lounge.docx
DOCX document 13 KB Posted
- Attached to
- DV Lounge Renovation Federal contract opportunity
- Solicitation number
- W912K6-14-R-0007
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Plumbing.pdf | ||
| BLDG2040_New_Water_and_Drain.pdf | ||
| Lounge_Pictures.docx | DOCX document | |
| PJM142033_-SOW_-_Remodel_VIP_Lounge.doc | DOC document | |
| W912K6-12-R-0007.pdf | ||
| CLIN_0002_SOW.docx | DOCX document | |
| PJM142033_-Plans_-_Remodel_VIP_Lounge.docm | DOCM document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFI Response dated 19 Sep 2014
1) Question was asked about the length and direction of the water lines for the ice maker and return line. Can you provide pictures,diagrams, or information regarding the required path of supply and drain lines?
Attached is the drawing showing the general route. Distance from DV Lounge to Bathrooms for Drain and Supply Lines in Buildings 2040 is approx. 150' with 2 CMU walls to penetrate in between.
File details come from the government source that posted it. Updated .