PJMS__152035_Amendment_to_SOW_Replacement_of_Two_Boilers_April_5_2016.pdf
PDF 62 KB Posted
- Attached to
- Boiler replacement
- Solicitation number
- W912K-16-T-0001
About this file
Solicitation Amendment 5Apr16
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W912K6-16-T-0001.pdf | ||
| JApost.pdf | ||
| Trane_Contacts.docx | DOCX document | |
| Base_access_form.doc | DOC document | |
| EXHIBIT_F.doc | DOC document | |
| W912K6-16-T-0001.pdf | ||
| Base_Location-New_Gate.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MEMORANDUM
AMENDMENT TO STATEMENT OF WORK
PROJECT NUMBER: PJMS #152035
PROJECT NAME: REPLACEMENT OF 2 BOILERS – A-10 HANGAR BLDG. 1070
DATE: APRIL 05, 2016
The ADDITION to the Statement of Work is as follows:
Contractor shall remove existing vents and provide with new vents per manufacturer’s instructions. Provide new rain cap and curb assembly as required for water tight operation. Replace curb cap with stack rated or high temperature rated butyl-rubber cone and cinch to new stack and go right over the existing curb).
Regarding paragraph 2.8.1.4. – Contractor does not have to make sure the existing vents are compatible for the new boilers. The Contractor shall remove existing vents and provide new vents per manufacturer’s instructions.
Regarding paragraph 2.8.1.5. – Contractor does not have verify the existing vents meet manufacturer’s recommendation. The Contractor is to provide new vents that meet manufacturer’s recommendation.
Regarding paragraph 2.8.1.10. – Paragraph should read: The new vent connection shall be made from the new boiler as per manufacturer’s recommendation.