PJMS__152035_Amendment_to_SOW_Replacement_of_Two_Boilers_April_5_2016.pdf

PDF 62 KB Posted

Attached to
Boiler replacement
Solicitation number
W912K-16-T-0001
Issued by

About this file

Solicitation Amendment 5Apr16

View the file

Other files

File Type Posted
W912K6-16-T-0001.pdf PDF
JApost.pdf PDF
Trane_Contacts.docx DOCX document
Base_access_form.doc DOC document
EXHIBIT_F.doc DOC document
W912K6-16-T-0001.pdf PDF
Base_Location-New_Gate.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MEMORANDUM

AMENDMENT TO STATEMENT OF WORK

PROJECT NUMBER: PJMS #152035

PROJECT NAME: REPLACEMENT OF 2 BOILERS – A-10 HANGAR BLDG. 1070

DATE: APRIL 05, 2016

The ADDITION to the Statement of Work is as follows:

Contractor shall remove existing vents and provide with new vents per manufacturer’s instructions. Provide new rain cap and curb assembly as required for water tight operation. Replace curb cap with stack rated or high temperature rated butyl-rubber cone and cinch to new stack and go right over the existing curb).

Regarding paragraph 2.8.1.4. – Contractor does not have to make sure the existing vents are compatible for the new boilers. The Contractor shall remove existing vents and provide new vents per manufacturer’s instructions.

Regarding paragraph 2.8.1.5. – Contractor does not have verify the existing vents meet manufacturer’s recommendation. The Contractor is to provide new vents that meet manufacturer’s recommendation.

Regarding paragraph 2.8.1.10. – Paragraph should read: The new vent connection shall be made from the new boiler as per manufacturer’s recommendation.