AF FORM 66
CONTRACTOR
DATE
01 AF 3064 (or equivalent)– Project Schedule x
02 AF 3065 – Progress Report x
03 AT Level 1 Training x
04 Environmental Management System Certification (http://www.142fw.ang.af.mil/resources/)
05 AF 66 Submittal Log
06 Safety Plan x
07 Quality Control Plan x
08 AF 103 x
09 MSDS (SUBMIT AS NEEDED)
10 AF 66 Submittal Log
11 Project Specific Submittals
11.01 Condensors x x x
11.02 AHU x x x
11.03 Coils x x x
11.04 Electrical Components x x x
11.05 DDC controls x x x x
11.06 DDC heads x x x x
11.07 HVAC Cassettes x x x
11.08 HVAC Grills x x x
11.09 Direct drive exhaust fans x x x
11.10 Boilers x x x
11.11 Blowers x x x
11.12 VRF System x x x x
11.13 Pump x x x
11.14 DDC Programmer Certifications x
11.15 HVAC Technician Certifications x
11.16 Electrical Technician Certifications x
11.17
11.18 Design B140 x
11.19 Design B290 x
11.20
11.21
11.31
11.41
11.51
11.61
11.71
11.81
11.91
12 Warranty Book 3 1
13 Record drawings
14 O&M Manual 3 1
Description (Catolag Data)
SUBMITTALS DUE BY DATE CONTRACTOR ENTERED INTO SUBMISSION DATE COLUMN (MUST BE 5 WORKING DAYS BEFORE USE)
SUBMITTALS DUE 5 WORKING DAYS BEFORE ON SITE WORK
SUBMITTAL DUE 10 DAYS AFTER RECIEPT OF NTP
COPIESCLOSE‐OUT DOCUMENTS
PROJECT ENGINEER
ALL DOCUMENT SUBMITTALS SHALL BE IN SEARCHABLE PDF FORMAT
SUBMITTALS DUE AT PRE‐CONSTRUCTION CONFERENCE
ITEMS TO BE SUBMITTED
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL
C O
L O
R S
E L
E C
T
IO
N
M A
N U
F A
C T
U R
E R
'S W
A R
R A
N T
Y
M F
G R
'S R
E C
O M
M E
N D
A T
IO
N
S
P H
Y S
IC
A
L S
A M
P L
E S
S H
O P
D R
A W
IN
G
S
2017 HVAC Base WideSCHEDULE OF MATERIAL SUBMITTALS
P E
R F
O R
M A
N C
E T
E S
T R
E P
O R
T
SCHEDULE REQUIREMENTS
SUBMISSION DATE
C E
R T
IF
IC
A T
E
S U
B M
IT
T
A L
N U
M B
E R
C A
T A
L O
G D
A T
A
O P
E R
A T
IO
N
IN
S
T R
U C
T
IO
N
O T
H E
R
Hard Copy
Hard Copy
Hard Copy
AF Form 66
Oct '89 Submittals required by Specifications and Drawings shall be made, regardless of whether or not they are listed on AF Form 66. Page 1 of 2
AF FORM 66
CONTRACTOR
DATE
PROJECT ENGINEER
ALL DOCUMENT SUBMITTALS SHALL BE IN SEARCHABLE PDF FORMAT
ITEMS TO BE SUBMITTED
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL
C O
L O
R S
E L
E C
T
IO
N
M A
N U
F A
C T
U R
E R
'S W
A R
R A
N T
Y
M F
G R
'S R
E C
O M
M E
N D
A T
IO
N
S
P H
Y S
IC
A
L S
A M
P L
E S
S H
O P
D R
A W
IN
G
S
2017 HVAC Base WideSCHEDULE OF MATERIAL SUBMITTALS
P E
R F
O R
M A
N C
E T
E S
T R
E P
O R
T
SCHEDULE REQUIREMENTS
SUBMISSION DATE
C E
R T
IF
IC
A T
E
S U
B M
IT
T
A L
N U
M B
E R
C A
T A
L O
G D
A T
A
O P
E R
A T
IO
N
IN
S
T R
U C
T
IO
N
O T
H E
R
Operating Proceedures
Troubleshooting
Maintenance Program
Preventative Maintenance
Corrective Maintenance
Training
Parts List
Drawings
15 Maintenance Summary Forms
16 DD 1354 Worksheet
Hard Copy
Hard Copy
AF Form 66
Oct '89 Submittals required by Specifications and Drawings shall be made, regardless of whether or not they are listed on AF Form 66. Page 2 of 2