LDs_New_Calculations_Wash_Rack.doc

DOC document 35 KB Posted

Attached to
CFMO L294 Vehicle Wash Facility Renovation
Solicitation number
W912JC-15-R-FRMATOC0001
Issued by

About this file

LD's for L294 Project

View the file

Other files

File Type Posted
Amendment__3_dtd_7-7-15.doc DOC document
ADDENDUM_3_correct_Bldg_665.pdf PDF
TO__FORM_L294_Wash_Rack.docx DOCX document
TO__FORM_L294_Wash_Rack.docx DOCX document
AmendmentL294-WCI-062215.pdf PDF
TO__FORM_L294_Wash_Rack.docx DOCX document
CONTRACT-DRAWINGS_L294_CFTA_washrack_refurbishment.zip ZIP file
CFMO_L294_Specifications.zip ZIP file
Wage_Rates_for_Wash_Rack_.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DETERMINATION AND FINDINGS

DETERMINATION OF LIQUIDATED DAMAGES

MATOC PROJECT

The Contracting Division, USPFO for Kansas proposes to include FAR Clause 52.211-12 “Liquidated Damages – Construction” in the Contract for MATOC Task Order for CFMO L294 Wash Rack, Ft. Riley, KS.

FINDINGS

1.In accordance with FAR 36.206, Liquidated Damages will be assessed for each calendar day past the completion date required to complete the construction work on this project.

2. Liquidated Damages in the amount of $293.61 will be assessed daily on the Contractor for not completing the project within the specified amount of time. There is also a one-time charge of $200.00 for legal services that will apply.

3. The Government rates were determined by averaging the rates for each type of personnel (Engineers, Inspectors, Contracting Personnel, etc). Calculation of Construction Contract liquidated damages for Government personnel cost are computed using the accelerated rate for “All Others” in DFAS-DE 7010.5R paragraphs C&.8, C7.8.1.2, C7.8.1.3. and C7.8.2. Current FY civilian personnel fringe benefit factors and Military personnel reimbursement rates mandated by the directive found at http://www.dtic.mil/comptroller/rates were utilized in the calculation.

ITEMIZED COSTS

PER DAY COST

HOURLY

CIVIL ENGINEER

Rate Hours Engineer

$35.65 x 140.3% = $50.01 x 2 = $100.02 = $100.00 (per day) Inspector

Transportation Cost

Total Civil Engineer Cost

$100.00(per day)

CONTRACTING

Branch Chief/ Contracting Officer

$50.00 x 140.3% = $70.15 x 1 = $70.15= $70.15 (per day) __ Contract Administrator

$44.00 x 140.3% = $61.73 x 2 = $123.46 = 123.46 (per day) Transportation Cost

Total Procurement Cost per day

$193.61(per day) POSSIBLE ADDITIONAL LOSSES (Calculate if Applicable) A-E Inspection “C” Services

$ X = $ Loss of living quarters for non-completion

Loss of use of runways/ taxiways

Loss of revenue from facilities providing services or recreation

Rental of Building

Quarters allowance payment

Training time costs

Total Additional costs (Extra utilities)

TOTAL COST PER DAY Beyond Completion DATE

Total $293.61 (per day)

FIXED COSTS ONE - TIME CHARGE PER MODIFICATION

Staff Judge Advocate Review

$110.00 x 1 = $110.00 = $110.00_____ Preparation of Modification(s) 2hx$45

$45.00 x 2 = $90.00 = $ 90.00

One Time Transportation 240(miles)

One Time Inspector 2 m/h x $

One Time Engineer 2m/h x $

TOTAL ONE TIME FIXED COST

Total $200.00(1 Time) 6/15/15

Linda J. Criss

DATE

CONTRACTING OFFICER

USPFO for KANSAS