Attachment A-1 PWS.pdf

PDF 148 KB Posted

Attached to
Light Sets Fort Custer
Solicitation number
W912JB26QA084
Issued by

About this file

This is a Performance Work Statement (PWS) for portable light tower rental services supporting the Expert Badge Event (E3B26) at Fort Custer Training Center in Michigan.

The contractor shall provide rental of 15 portable light towers with generator capabilities for the period of September 9 through October 9, 2026. Each light tower unit must be a 4000W system with four 1000W lights mounted on a vertical mast capable of illuminating up to 26,200 square feet, reaching heights of 279 inches, and towed by pickup truck. All units must include an integrated generator with a minimum 43-gallon fuel tank. Equipment delivery is required by 1200pm ET on September 9, 2026, to a designated location on Fort Custer Training Center. The contractor must provide all labor, supervision, quality control, transportation, and maintenance necessary to support the event. All equipment must be fully operational and fully fueled upon delivery; daily refueling will be performed by the Government. The contractor shall respond to any repair or replacement requests within 48 hours of notification. Equipment removal is scheduled for October 9, 2026, with final removal no later than 1000am ET on October 16, 2026. The contractor must submit delivery reports confirming equipment arrival in proper working condition and removal reports confirming complete site clearance. Contractor personnel must comply with all Fort Custer facility access requirements, security regulations, and installation policies. No service will be provided on recognized U.S. holidays or when the installation is closed due to emergency. The contractor must maintain an effective Quality Control Plan and designate a Contract Manager with authority over daily contract operations.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT (PWS)

FOR

PORTABLE LIGHT TOWER RENTAL FOR Expert Badge Event (E3B26)

Fort Custer Training Center (FCTC), Michigan

1.0 General:

1.1 Scope: The contractor shall provide all labor, supervision, quality control, tools, equipment, vehicles, and transportation necessary for the delivery of Portable Light Tower with Generator Capabilities Rental service, as defined in this PWS.

1.2 Background: The Expert Badge Event (E3B) will be conducted at Fort Custer (FCTC), MI. Facilities are required to be delivered to one location specified in Fort Custer to accommodate the Service Members participating in the exercise and provide lighting for the night operation and safety.

1.3 Period of Performance (PoP): 09 September – 09 October 2026. Delivery shall occur before 1200pm ET 09

September 2026. Pick up of equipment shall occur between 8:00pm ET 09 October 2026 and NLT 1000am ET 16

October. Reference Technical Exhibit 1 (TE) 1.

1.3.1 Place of Performance: Light Towers are to be delivered to identified location on Fort Custer Training Center

(FCTC), MI; Placement of the equipment at different locations will be conducted by the government.

1.4 General Information:

1.4.1 The contractor shall provide all labor, supervision, quality control, and transportation, to include any other services or replacements of defective equipment for a daily maximum of 15 Light Towers with Generator capabilities. See Technical Exhibit 2 (TE) 2 for performance requirement summary. There shall be no service on recognized US holidays or when the Government facility/installation is closed due to local or national emergency, or similar Government-directed facility/installation closings. The performance shall be at Fort Custer Training Center.

Specific locations will be identified when contract is approved. The Contractor shall always maintain an adequate work force for the uninterrupted performance of all tasks defined within this Performance Work Statement (PWS) when the Government facility/installation is not closed for the above reasons. When hiring personnel, the contractor shall keep in mind that stability and continuity of the work force are essential. Teleworking is not authorized.

1.4.1.2 Unscheduled gate closures by the Security Police may occur at any time causing all personnel entering or exiting a closed installation to experience a delay. This cannot be predicted or prevented. Contractors are not compensated for unexpected closures or delays. Vehicles operated by contractor personnel are subject to search pursuant to applicable regulations. Any moving violation of any applicable motor vehicle regulation may result in the termination of the contractor employee’s installation driving privileges.

1.4.1.3 The contractor’s employees shall become familiar with and obey the regulations of the installation, including fire, traffic, safety and security regulations while on the installation. Contractor employees should only enter restricted areas when required to do so and only upon prior approval. All contractor employees shall always carry proper identification with them and shall be subject to such checks as may be deemed necessary. The contractor shall ensure compliance with all regulations and orders of the installation, which may affect performance. The

Government reserves the right to direct the removal of an employee from Government property or revoke access to

Government systems for misconduct, security reasons, or any overt evidence of communicable disease. Removal of contractor employees for reasons stated above does not relieve the Contractor from responsibility for total performance of this contract.

1.4.2 Recognized Holidays: Reserved.

1.4.3 Quality Control (QC): The contractor shall develop and maintain an effective Quality Control Plan (QCP) to ensure services are performed in accordance with this PWS. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The contractor’s QCP is the means by which it assures itself that its work complies with the requirements of the contract. As a minimum, the contractor shall develop QC procedures that address the areas identified in Technical Exhibit 1, (TE) 1 .Performance Requirements

Summary (PRS). A final QCP shall be submitted to the Contracting Officer Representative (COR) NLT 10 days after contract award. After acceptance of the QCP, the contractor shall obtain the Contracting Officer’s (KO’s) acceptance in writing of any proposed changes to its QCP.

1.4.4 Quality Assurance (QA): The Government will evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the

Government will do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and acceptable quality level(s) or defect rate(s).

1.4.5 Installation Access and Security Requirements. The contractor shall comply with all applicable installation/facility access and local security policies and procedures, which may be obtained from the COR. The contractor and all associated subcontractor employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of

Emergency Services, or Security Office. The contractor shall ensure compliance with all personal identity verification requirements as directed by Department of Defense (DoD), Headquarters Department of Army (HQDA) and/or local policy (see PWS 6.0). Should the Force Protection Condition (FPCON) change, the Government may require changes in contractor security matters or processes.

1.4.5.1 Communications Security/Information Technology (COMSEC/IT) Security. All communications with DoD organizations are subject to COMSEC review. All telephone communications networks are continually subject to intercept by unfriendly intelligence organizations. DoD has authorized the military departments to conduct

COMSEC monitoring and recording of telephone calls originating from, or terminating at, DoD organizations.

Therefore, the contractor is advised that any time contractor personnel place or receive a call they are subject to

COMSEC procedures. The contractor shall ensure wide and frequent dissemination of the above information to all employees dealing with DoD information. The contractor shall abide by all Government regulations concerning the authorized use of the Government's computer network, including the restriction against using the network to recruit

Government personnel or advertise job openings.

1.4.6 Physical Security. The contractor shall safeguard all Government property provided for contractor use. At the close of each work period, Government facilities, equipment and materials shall be secured.

1.4.7 Special Qualification: Reserved

1.4.8 Post Award Conference/Periodic Progress Meetings: The contractor agrees to attend any post award conference convened by the KO in accordance with FAR 42.5. The KO, COR and other Government personnel, as appropriate, may meet periodically with the contractor to review the contactor’s performance. At these meetings, the

KO will apprise the contractor of how the Government views the contractor’s performance and the contractor shall apprise the Government of problems, if any, being experienced. The contractor shall resolve outstanding issues raised by the Government. Contractor attendance at these meetings shall be at no additional cost to the Government.

1.4.9 Contract Manager (CM): The contactor shall designate a CM who shall ensure performance under this contract. The name of this person, and an alternate who shall act for the contractor when the CM is absent, shall be designated in writing to the KO. The CM or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract. The CM shall work through the COR to resolve issues, receive technical instructions, and ensure adequate performance of services. The CM shall ensure that contractor employees do not perform any services outside the scope of the contract without an official modification issued by the KO. The

CM shall ensure contractor employees understand that services performed outside the scope of the contract are performed wholly at the expense of the contractor.

1.4.10 Identification of Contractor Employees: Contractor personnel shall wear identification badges distinguishing themselves as such. The badges shall have the company name, employee name and the word “contractor” displayed.

1.4.11. Combating Trafficking in Persons: The United States Government has adopted a zero-tolerance policy regarding trafficking in persons. Contractors and contractor employees shall not engage in severe forms of trafficking in persons during the period of performance of the contract; procure commercial sex acts during the period of performance of the contract; or use forced labor in the performance of the contract. The Contractor shall notify its employees of the United States Government’s zero tolerance policy, the actions that will be taken against employees for violations of this policy. The contractor shall take appropriate action, up to and including termination, against employees or subcontractors that violate the US Government policy as described at FAR 22.17.

1.4.12 Organizational Conflicts of Interest (OCI): The contractor and subcontractor personnel performing services under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent OCIs, as defined in FAR Subpart 9.5.

The contractor shall notify the KO immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the KO to avoid or mitigate any such OCI.

The contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the KO. In the event the KO unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the KO may impose other remedies as he or she deems necessary, including prohibiting the contractor from participation in subsequent contracted requirements which may be affected by the OCI.

2.0 Definitions and Acronyms:

2.1 Definitions:

2.1.1 Contractor: A supplier or vendor awarded a contract to provide specific supplies or service to the Government.

The term used in this contract refers to the prime.

2.1.2 Defective Service: A service output that does not meet the standard of performance associated with the PWS.

2.1.3 Deliverable: Anything that can be physically delivered and includes non-manufactured things such as meeting minutes or reports.

2.1.4 Key Personnel: Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.

2.1.5 Physical Security: Actions that prevent the loss or damage of Government property.

2.1.6 Quality Assurance: The Government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.

2.1.7 Quality Assurance Surveillance Plan (QASP): An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.

2.1.8 Quality Control: All necessary measures taken by the Contractor to ensure that the quality of an end product or service shall meet contract requirements.

2.1.9 Subcontractor: One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.

2.2 Acronyms:

AEI Army Enterprise Infostructure

AR Army Regulation

AT/OPSEC Antiterrorism/Operational Security

BI Background Investigation

CM Contract Manager

COR Contracting Officer Representative

DA Department of the Army

DD254 Department of Defense Contract Security Classification Specification

DFARS Defense Federal Acquisition Regulation Supplement

DoD Department of Defense

FAR Federal Acquisition Regulation

GFP/M/E/S Government Furnished Property/Material/Equipment/Services

HQDA Headquarters, Department of the Army

HSPD Homeland Security Presidential Directive

IA Information Assurance

IS Information System(s)

KO Contracting Officer

NGB National Guard Bureau

OCI Organizational Conflict of Interest

PII Personally Identifiable Information

PIPO Phase In/Phase Out

POC Point of Contact

PRS Performance Requirements Summary

PWS Performance Work Statement

QA Quality Assurance

QASP Quality Assurance Surveillance Plan

QC Quality Control

QCP Quality Control Program

SCR Service Contract Reporting

SSN Social Security Number

TE Technical Exhibit

USD(I) Under Secretary of Defense for Intelligence

3.0 Government Property, Material, Equipment and Services:

3.1 Property: The contractor shall furnish everything required to perform the services as indicated in Section 1.

3.2 Materials: Reserved

3.3 Equipment: Reserved

3.4 Services: Reserved

3.5 Utilities: Reserved

4.0 Contractor Furnished Property, Materials, and Equipment (CFP/M/E):

4.1 The contractor shall furnish everything required to perform these services as indicated in Paragraph 1.1.

5.0 REQUIREMENTS:

5.1 The contractor shall provide the 15 each rental of portable light tower set to Fort Custer, Michigan. A light set is defined as a 4000W with four 1000W Lights on a vertical mast light tower typically used in outdoor settings such as emergency situations and large outdoor work areas. Must be able to illuminate up to 26,200 sq ft, reach heights of

279 inches, towable by pick up truck., own source of power such as a generator with minimum fuel tank of 43gal,

5.1.1 The contractor shall deliver the equipment to a designated location on September 09, 2026.

5.1.2 The contractor shall submit a report to the COR indicating that all equipment has been delivered to Fort Custer

Confidence Course on the required date.

5.2 The contractor shall provide fully functioning light tower equipment.

5.2.1 A report shall be provided to the COR indicating that all the equipment delivered is in proper working conditions

5.2.2. The contractor shall provide the light tower fully fueled. Daily refueling will be performed by the Government not the vendor.

5.2.3 The Government will ensure light set towers are fully fueled before vendors pick up the light set tower after the last day of scheduled use.

5.2.4 The contractor shall respond to timely repair or replacement of broken light tower set within 48 hours

5.3 Timely remove the equipment.

5.3.1 The equipment shall be removed the day after the last day of scheduled use, October 09, 2026.

5.3.2 The contractor shall provide a report to the COR indicating that all equipment has been removed from the site.

6.0 Applicable Publications: None Applicable.

TECHNICAL EXHIBIT 1

Equipment Delivery

Deliverable Title PWS Reference Frequency Submit To

Equipment Delivery 5.1 NLT 48 hours before

09September26 1200L

COR

Delivery Report 5.1.2 As delivered COR

Equipment repair or replacement

5.2.5 Random COR

Equipment Removal 5.3 100% Removal NLT 1000L

16OCT26

COR

Removal Report 5.3.2 As removed COR

TECHNICAL EXHIBIT 2

Performance Requirements Summary

PWS Paragraph Task Performance Standard Acceptable Quality

Level (AQL)

Surveillance

Method/By

Whom

5.1 Equipment

Delivery

100% on time delivery Equipment may be delivered on time

NLT 1200L 09SEP

COR

Direct

Inspection;

Customer

Feedback

5.2.5 Equipment repair

or replacement

100% on time repair or replacement

Equipment may be repair or replace

48hr after identification

COR

Direct

Inspection;

Customer

Feedback

5.3 Equipment

Removal

Equipment is removed timely 100% of the time

Equipment may be removed NLT

16OCT0800L

COR

Random inspection;

Customer

Feedback

File details come from the government source that posted it. Updated .