QASP_ENS.pdf
PDF 35 KB Posted
- Attached to
- Emergency/Mass Notification System Federal contract opportunity
- Solicitation number
- W912JB-16-T-0643
About this file
Quality Assurance Surveillance Plan
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Answers_to_Questions.pdf | ||
| Emergency_Notification_System_Solicitation.pdf | ||
| Reps_and_Certs.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUALITY ASSURANCE SURVEILLANCE PLAN
(QASP)
Introduction
This quality assurance surveillance plan (QASP) is pursuant to the requirements listed in the performance work statement (PWS) entitled Emergency/Mass Notification System. This plan sets forth the procedures and guidelines used to ensure the required performance standards or services levels are achieved by the contractor.
Purpose
The purpose of the QASP is to describe the systematic methods used to monitor performance and to identify the required documentation and the resources to be employed. The QASP provides a means for evaluating whether the contractor is meeting the performance standards/quality levels identified in the PWS and the contractor’s quality control plan (QCP), and to ensure that the government pays only for the level of services received.
Performance Management Approach
The PWS structures the acquisition around “what” service or quality level is required, as opposed to “how” the contractor should perform the work (i.e., results, not compliance). This QASP will define the performance management approach to monitor and manage the contractor’s performance to ensure the expected outcomes or performance objectives communicated in the PWS are achieved.
Performance Management Strategy
The contractor is responsible for the quality of all work performed. The contractor measures that quality through the contractor’s own quality control program (QCP). The contractor’s QCP will set forth the staffing and procedures for self-inspecting the quality, timeliness, responsiveness, customer satisfaction, and other performance requirements in the PWS.
The Contracting Officer
The contracting officer (KO) is responsible for monitoring contract compliance, contract administration, and cost control and for resolving any differences between the observations documented by the Government Point of Contact (GPOC). The KO will designate one GPOC as the government authority for performance management. The number of additional representatives serving as technical inspectors depends on the complexity of the services measured, as well as the contractor’s performance, and must be identified and designated by the KO. The KO will designate a GPOC to assist in administering the contract. Any changes the contractor deems may affect contract price, terms or conditions shall be referred to the KO.
METHODOLOGIES TO MONITOR PERFORMANCE
Surveillance Techniques
In an effort to minimize the performance management burden, simplified surveillance methods shall be used by the government to evaluate contractor performance when appropriate. The primary methods of surveillance are (include those that apply)
Random monitoring, randomly sampling a statistically significant sample
100% Inspection – evaluates all outputs
Periodic Inspection –a comprehensive evaluation of selected outputs
Customer Feedback
The contractor is expected to establish and maintain professional communication between its employees and customers. The primary objective of this communication is customer satisfaction.
Customer satisfaction is the most significant external indicator of the success and effectiveness of all services provided and can be measured through customer complaints.
Acceptable Quality Levels
The acceptable quality levels (AQLs) a r e included in the Quality Assurance Surveillance Plan to assess contractor performance. The Government shall use the monitoring methods cited to determine whether the performance standards/service levels/AQLs have been met. If the contractor has not met the minimum requirements, it may be asked to develop a corrective action plan to show how and by what date it intends to bring performance up to the required levels. The government will not provide payment for services not received IAW PWS.
Quality Assurance Surveillance Plan (Required Services )
Required Services (Tasks)
Performance Standards
Acceptable Quality
Levels
Methods of Surveillance
Kick off meeting PWS 5.1 Complies 100% of the time.
100% Inspection
Initial Training PWS 5.2 Complies 100% of the time.
100% Inspection
Initial Site Implementation
PWS 6.1 Complies 100% of the time.
100% Inspection
Remaining 40 Sites Implementation
PWS 6.1 Complies 100% of the time.
100% Inspection
Technical Support PWS 7.1 Complies 100% of the time.
Periodic Inspection
User Training PWS 7.2 Complies 100% of the time.
Periodic Inspection
Contractor Manpower Reporting
PWS 9.0 Inputs data NLT 31 October of the following fiscal year.
100% Inspection
Initial Site Implementation
PWS 6.1 Complies 100% of the time.
100% Inspection
Remaining 40 Sites Implementation
PWS 6.1 Complies 100% of the time.
100% Inspection
Technical Support PWS 7.1 Complies 100% of the time.
Periodic Inspection
User Training PWS 7.2 Complies 100% of the time.
Periodic Inspection
Contractor Manpower Reporting
PWS 10.0 Inputs data NLT 31 October of the following fiscal year.
100% Inspection
File details come from the government source that posted it. Updated .