RFI_5_24_2018.docx

DOCX document 12 KB Posted

Attached to
Construction of Storage Facility Federal contract opportunity
Solicitation number
W912JA-18-B-6002
Issued by
Department of the Army Alabama Army National Guard

About this file

RFI

View the file

Other files for this federal contract opportunity

Other files attached to Construction of Storage Facility, newest first.
File Type Posted
Abstract.pdf PDF
2018-05-24_Addendum__2.pdf PDF
W912JA-18-B-6002_SF_30_Amend_0003.pdf PDF
W912JA-18-B-6002_Amend_0003.pdf PDF
CE_Structure_Site_Visit_Roster.pdf PDF
W912JA-18-B-6002_Amend_0002.pdf PDF
2018-05-17_Addendum__1.pdf PDF
W912JA-18-B-6002_SF_30_Amend_0002.pdf PDF
Pre-Bid_slides.ppt PPT presentation
W912JA-18-B-6002_SF_30_Amend_0001.pdf PDF
W912JA-18-B-6002_Amend_0001.pdf PDF
W912JA-18-B-6002_FINAL.pdf PDF
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Q1: Will there be a metal shelving specification be forthcoming?

A2: The shelving is not a manufactured product and we don't intend to provide a metal shelving specification. The shelves are intended to be constructed using standard steel tubes, plates, and channels. The shelving construction is detailed on sheet A5.3. Steel sections called on out sheet A5.3 should be in accordance with the requirements of specification section 05 5000 "Metal Fabrications"

Q2: In reading the project manual it appears to be conflicting in terms of who is to pay for construction testing and inspections. See below. Please confirm if the contractor is to include the cost of ALL construction testing and inspections.

1.Section 01 4000-1.05.A states the GC is to pay for these services.
2.Section 04 4000-1.05.E states the Owner will pay for these services if not specifically noted as the GC’s responsibility.
3.Section 03 3300-3.16-A states the GC is to pay for these services required for this section of work.
4.Section 05 1200-3.04-A states the GC is to pay for these services required for this section of work.
5.Section 31 2210-1.05.A states the Owner is to pay for these services required for this section of work.
6.Section 32 1314-3.09.A states the Owner is to pay for these services required for this section of work.

A2: Please refer to Addendum 2.