This is an Abstract of Offers for a construction solicitation issued by the U.S. Army Corps of Engineers, Galveston District for the FY 26 Channel to Harlingen Placement Areas 18 and 22 Improvements project in Cameron County, Texas. The solicitation number is W912HY26BA003, issued on February 26, 2026, with offers opened on March 26, 2026. This is a 100% Small Business Set-Aside contract. The project scope includes mobilization and demobilization, drop-inlet structure construction, splash pads, containment dike clearing and construction, uncompacted training dike construction, as-built drawings, onsite borrow soils geotechnical investigations, and demolition of existing structures across two placement areas. The contract is structured with a base Schedule No. 1, an Option No. 1, and an Option No. 2, with quantities measured in job (JB) and linear feet (LF) units.
Five offers were received from contractors: Southern Gulf Solutions LLC ($3,757,421.88 total), Tricore LLC ($4,039,082.00 total), CLORE EQUIPMENT LLC ($3,309,752.54 total—identified as the apparent low bidder at 25.52% below the government estimate of $4,443,716.00), Roman Emperors Road LLC ($7,523,700.00 total), and Maverick Constructors LLC ($4,064,894.00 total). CLORE EQUIPMENT LLC is designated as the apparent low bidder and qualifies as a small business. The government estimate for the total contract (Schedule No. 1 and both options combined) is $4,443,716.00. All offers have been opened, read, and recorded by Contracting Officer Mirian Tudor.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid Abstract_W912HY26BA003_CTH_27 March 2026.KOSigned.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UNIT
PRICE TOTAL
1 JB $425,000.00 $425,000.00
1 JB $1,244,300.00 $1,244,300.00
1 JB $104,700.00 $104,700.00
1 JB $240,500.00 $240,500.00
3,025 LF $108.00 $326,700.00
200 LF $178.00 $35,600.00
1 JB $41,300.00 $41,300.00
1 JB $18,000.00 $18,000.00
1 JB $113,800.00 $113,800.00
$2,549,900.00
1 JB $1,025,500.00 $1,025,500.00
1 JB $90,600.00 $90,600.00
1 JB $267,500.00 $267,500.00
4,728 LF $87.50 $413,700.00
1 JB $38,100.00 $38,100.00
1 JB $13,330.00 $13,330.00
$1,848,730.00
$4,398,630.00
500 LF $86.25 $43,125.00
1 JB $1,961.00 $1,961.00
$45,086.00TOTAL OPTION NO. 2
As-Built Drawings -Placement Area No. 22
TOTAL SCHEDULE NO.1 & OPTION NO.1
New Drop-Inlet Structure - Placement Area No. 18
OPTION NO. 1
Splash Pad for Drop-Inlet Structure - Placement Area No.
180011
Containment Dike Clearing, Grubbing, and Stripping -
Placement Area No. 18
Semi-compacted Containment Dike Construction -
Placement Area No. 18
As-Built Drawings - Placement Area No. 18
Onsite Borrow Soils Geotechnical Investigation -
Placement Area No. 18
Southern
Solicitation No.: W912HY26BA003 Date Issued: 26 February 2026 Date Opened: 26 March 2026 Issuing Office: USACE-Galveston Project Title: FY 26 Channel to Harlingen Placement Areas 18 and 22 Improvements, Cameron County, Texas, 100% Small Business Set-Aside
Number of Amendments Issued: 0 Government Estimate (Without Profit)
QUANTITY
TOTAL SCHEDULE NO. 1
Splash Pad for Drop-Inlet Structure - Placement Area No.
Onsite Borrow Soils Geotechical Investigation - Placement Area No. 22
Demolition of Existing Drop - Inlet Structure - Placement Area No. 22
TOTAL OPTION NO. 1
SCHEDULE NO. 1ITEM
Containment Dike Clearing, Grubbing, and Stripping - Placement Area No. 22
Uncompacted Training Dike Construction - Placement Area No. 22
NO. DESCRIPTION
Semi-Compacted Containment Dike Construction (Sta 0+00 to Sta. 5+61.49 and Sta. 10+61.83 to 35+00) - Placement Area No. 22
New Drop-Inlet Structure - Placement Area No. 22
Mobilization and Demobilization- Placement Area No. 22
OPTION NO. 2
Semi-compacted Containment Dike Construction (Sta.
5+61.49 to Sta. 10+61.83) Placement Area No. 22
As-Built Drawings Placement Area No. 22
$4,443,716.00
* The apparent low bidder, CLORE EQUIPMENT LLC, is 25.52 % below the Government's Estimate.
I CERTIFY THAT I HAVE OPENED, READ, AND RECORDED ON THIS ABSTRACT ALL OFFERS RECEIVED IN RESPONSE TO THIS
SOLICITATION.
Mirian Tudor
CONTRACTING OFFICER
TOTAL SCHEDULE NO.1 & OPTION NO.1 & 2
1 JB $711,500.00 $711,500.00
1 JB $1,239,850.00 $1,239,850.00
1 JB $133,950.00 $133,950.00
1 JB $109,750.00 $109,750.00
3,025 LF $45.40 $137,335.00
200 LF $172.20 $34,440.00
1 JB $22,000.00 $22,000.00
1 JB $23,200.00 $23,200.00
1 JB $30,500.00 $30,500.00
$2,442,525.00
1 JB $632,600.00 $632,600.00
1 JB $133,950.00 $133,950.00
1 JB $290,000.00 $290,000.00
4,728 LF $36.96 $174,746.88
1 JB $22,000.00 $22,000.00
1 JB $23,200.00 $23,200.00
$1,276,496.88
$3,719,021.88
Splash Pad for Drop-Inlet Structure - Placement Area No. 22
Uncompacted Training Dike Construction - Placement Area No.
DESCRIPTION QUANTITY
Solicitation No.: W912HY26BA003 Date Issued: 26 February 2026 Date Opened: 26 March 2026 Issuing Office: USACE-Galveston
ABSTRACT OF OFFERS (CONT'D) Page of
ITEM SCHEDULE NO. 1
Business Size: Small Business
NO.
Project Title: FY 26 Channel to Harlingen Placement Areas 18 and 22 Improvements, Cameron County, Texas, 100% Small Business Set-Aside
Offeror 1: Southern Gulf Solutions, LLC 1001 North Market St. Brazoria, TX 77422
Containment Dike Clearing, Grubbing, and Stripping - Placement Area No. 22
Semi-Compacted Containment Dike Construction (Sta 0+00 to Sta. 5+61.
49 and Sta. 10+61.83 to 35+00) - Placement Area No. 22
Mobilization and Demobilization - Placement Area No.
New Drop-Inlet Structure - Placement Area No. 22
As - Built Drawings - Placement Area No. 22
Onsite Borrow Soils Geotechnical Investigation - Placement Area No.
Demolition of Existing Drop - Inlet Structure - Placement Area No. 22
TOTAL SCHEDULE NO. 1
TOTAL OPTION NO. 1
OPTION NO. 1
New Drop-inlet Structure - Placement Area No. 18
Splash Pad for Drop-inlet Structure - Placement Area No.
Containment Dike Clearing, Grubbing, and Stripping - Placement Area No. 18
Semi-compacted Containment Dike Construction - Placement Area No. 18
As-Built Drawings-Placement Area No. 18
Onsite Borrow Soils Geotechnical Investigation - Placement Area No.
TOTAL SCHEDULE NO.1 & OPTION NO.1
500 LF $32.80 $16,400.00
1 JB $22,000.00 $22,000.00
$38,400.00
$3,757,421.88
TOTAL OPTION NO. 2
TOTAL SCHEDULE NO.1 & OPTION NO.1 & 2
OPTION NO. 2
Semi-compacted Containment Dike Construction (Sta. 5+61.49 to Sta.
10+61.83) Placement Area No. 22
As-Built Drawings Placement Area No. 22
1 JB $604,182.00 $604,182.00
1 JB $125,000.00 $125,000.00
1 JB $56,200.00 $56,200.00
1 JB $120,000.00 $120,000.00
3,025 LF $400.00 $1,210,000.00
200 LF $235.00 $47,000.00
1 JB $13,500.00 $13,500.00
1 JB $45,000.00 $45,000.00
1 JB $32,100.00 $32,100.00
$2,252,982.00
1 JB $86,500.00 $86,500.00
1 JB $56,200.00 $56,200.00
1 JB $120,000.00 $120,000.00
4,728 LF $266.67 $1,260,800.00
1 JB $13,500.00 $13,500.00
1 JB $35,600.00 $35,600.00
$1,572,600.00
ITEM SCHEDULE NO. 1
NO. DESCRIPTION
ABSTRACT OF OFFERS (CONT'D) Page of
Solicitation No.: W912HY26BA003 Date Issued: 26 February 2026 Date Opened: 26 March 2026 Issuing Office: USACE-Galveston Project Title: FY 26 Channel to Harlingen Placement Areas 18 and 22 Improvements, Cameron County, Texas, 100% Small Business Set-Aside
Offeror 2: Tricore LLC 4795 Meadow Wood Lane Suite 125E Chantilly, VA 20151 Business Size: Other Than Small Business
QUANTITY
OPTION NO. 1
TOTAL OPTION NO. 1
New Drop-inlet Structure - Placement Area No. 18
Splash Pad for Drop-inlet Structure - Placement Area No.
Containment Dike Clearing, Grubbing, and Stripping - Placement Area No. 18
Semi-compacted Containment Dike Construction - Placement Area No. 18
As-Built Drawings-Placement Area No. 18
Onsite Borrow Soils Geotechnical Investigation - Placement Area No.
Mobilization and Demobilization - Placement Area No.
As - Built Drawings - Placement Area No. 22
TOTAL SCHEDULE NO. 1
Onsite Borrow Soils Geotechnical Investigation - Placement Area No.
Demolition of Existing Drop - Inlet Structure - Placement Area No. 22
New Drop-Inlet Structure - Placement Area No. 22
Splash Pad for Drop-Inlet Structure - Placement Area No. 22
Containment Dike Clearing, Grubbing, and Stripping - Placement Area No. 22
Semi-Compacted Containment Dike Construction (Sta 0+00 to Sta. 5+61.
49 and Sta. 10+61.83 to 35+00) - Placement Area No. 22
Uncompacted Training Dike Construction - Placement Area No.
$3,825,582.00
500 LF $400.00 $200,000.00
1 JB $13,500.00 $13,500.00
$213,500.00
$4,039,082.00
OPTION NO. 2
TOTAL SCHEDULE NO.1 & OPTION NO.1
TOTAL OPTION NO. 2
TOTAL SCHEDULE NO.1 & OPTION NO.1 & 2
Semi-compacted Containment Dike Construction (Sta. 5+61.49 to Sta.
10+61.83) Placement Area No. 22
1 JB $361,313.00 $361,313.00
1 JB $853,642.00 $853,642.00
1 JB $152,117.00 $152,117.00
1 JB $160,176.00 $160,176.00
3,025 LF $78.18 $236,494.50
200 LF $333.24 $66,648.00
1 JB $2,289.00 $2,289.00
1 JB $32,223.00 $32,223.00
1 JB $28,593.00 $28,593.00
$1,893,495.50
1 JB $716,314.00 $716,314.00
1 JB $92,403.00 $92,403.00
1 JB $165,641.00 $165,641.00
4,728 LF $78.18 $369,635.04
1 JB $2,289.00 $2,289.00
1 JB $32,223.00 $32,223.00
$1,378,505.04
$3,272,000.54
Onsite Borrow Soils Geotechnical Investigation - Placement Area No.
Demolition of Existing Drop - Inlet Structure - Placement Area No. 22
New Drop-Inlet Structure - Placement Area No. 22
Splash Pad for Drop-Inlet Structure - Placement Area No. 22
Containment Dike Clearing, Grubbing, and Stripping - Placement Area No. 22
Semi-Compacted Containment Dike Construction (Sta 0+00 to Sta. 5+61.
49 and Sta. 10+61.83 to 35+00) - Placement Area No. 22
As - Built Drawings - Placement Area No. 22
Splash Pad for Drop-inlet Structure - Placement Area No.
Containment Dike Clearing, Grubbing, and Stripping - Placement Area No. 18
Semi-compacted Containment Dike Construction - Placement Area No. 18
As-Built Drawings-Placement Area No. 18
Onsite Borrow Soils Geotechnical Investigation - Placement Area No.
New Drop-inlet Structure - Placement Area No. 18
OPTION NO. 1
ABSTRACT OF OFFERS (CONT'D) Page of
Solicitation No.: W912HY26BA003 Date Issued: 26 February 2026 Date Opened: 26 March 2026 Issuing Office: USACE-Galveston Project Title: FY 26 Channel to Harlingen Placement Areas 18 and 22 Improvements, Cameron County, Texas, 100% Small Business Set-Aside
Offeror 3: CLORE EQUIPMENT LLC 21220 FM 1420 Harlingen, TX 78550 ***Apparent Low Bidder*** Business Size: Small Business
QUANTITY
Uncompacted Training Dike Construction - Placement Area No.
ITEM SCHEDULE NO. 1
NO. DESCRIPTION
Mobilization and Demobilization - Placement Area No.
TOTAL SCHEDULE NO. 1
TOTAL OPTION NO. 1
TOTAL SCHEDULE NO.1 & OPTION NO.1
500 LF $72.59 $36,295.00
1 JB $1,457.00 $1,457.00
$37,752.00
$3,309,752.54
TOTAL OPTION NO. 2
TOTAL SCHEDULE NO.1 & OPTION NO.1 & 2
Semi-compacted Containment Dike Construction (Sta. 5+61.49 to Sta.
10+61.83) Placement Area No. 22
OPTION NO. 2
As-Built Drawings Placement Area
1 JB $400,000.00 $400,000.00
1 JB $400,000.00 $400,000.00
1 JB $400,000.00 $400,000.00
1 JB $800,000.00 $800,000.00
3,025 LF $500.00 $1,512,500.00
200 LF $500.00 $100,000.00
1 JB $50,000.00 $50,000.00
1 JB $100,000.00 $100,000.00
1 JB $50,000.00 $50,000.00
$3,812,500.00
1 JB $300,000.00 $300,000.00
1 JB $300,000.00 $300,000.00
1 JB $1,000,000.00 $1,000,000.00
4,728 LF $400.00 $1,891,200.00
1 JB $5,000.00 $5,000.00
1 JB $10,000.00 $10,000.00
$3,506,200.00
As - Built Drawings - Placement Area No. 22
Solicitation No.: W912HY26BA003 Date Issued: 26 February 2026 Date Opened: 26 March 2026 Issuing Office: USACE-Galveston Project Title: FY 26 Channel to Harlingen Placement Areas 18 and 22 Improvements, Cameron County, Texas, Texas, 100% Small Business Set-Aside
Offeror 4: ROMAN EMPERORS ROAD, LLC 11381 MEADOWGLEN LANE, SUITE E, HOUSTON, TX 77082 Business Size: Other Than Small Business
Splash Pad for Drop-Inlet Structure - Placement Area No. 22
Containment Dike Clearing, Grubbing, and Stripping - Placement Area No. 22
ITEM SCHEDULE NO. 1
NO. DESCRIPTION
Mobilization and Demobilization - Placement Area No.
New Drop-Inlet Structure - Placement Area No. 22
ABSTRACT OF OFFERS (CONT'D) Page of
OPTION NO. 1
TOTAL OPTION NO. 1
QUANTITY
Onsite Borrow Soils Geotechnical Investigation - Placement Area No.
Demolition of Existing Drop - Inlet Structure - Placement Area No. 22
New Drop-inlet Structure - Placement Area No. 18
Semi-Compacted Containment Dike Construction (Sta 0+00 to Sta. 5+61.
49 and Sta. 10+61.83 to 35+00) - Placement Area No. 22
Uncompacted Training Dike Construction - Placement Area No.
TOTAL SCHEDULE NO. 1
Containment Dike Clearing, Grubbing, and Stripping - Placement Area No. 18
Semi-compacted Containment Dike Construction - Placement Area No. 18
As-Built Drawings-Placement Area No. 18
Onsite Borrow Soils Geotechnical Investigation - Placement Area No.
Splash Pad for Drop-inlet Structure - Placement Area No.
$7,318,700.00
500 LF $400.00 $200,000.00
1 JB $5,000.00 $5,000.00
$205,000.00
$7,523,700.00
ABSTRACT OF OFFERS (CONT'D) Page of
TOTAL OPTION NO. 2
TOTAL SCHEDULE NO.1 & OPTION NO.1 & 2
Semi-compacted Containment Dike Construction (Sta. 5+61.49 to Sta.
10+61.83) Placement Area No. 22
TOTAL SCHEDULE NO.1 & OPTION NO.1
OPTION NO. 2
ABSTRACT OF OFFERS (CONT'D) Page of
Solicitation No.: W912HY26BA003 Date Issued: 26 February 2026 Date Opened: 26 March 2026 Issuing Office: USACE-Galveston Project Title: FY 26 Channel to Harlingen Placement Areas 18 and 22 Improvements, Cameron County, Texas, 100% Small Business Set-Aside Offeror 5: Maverick Constructors, LLC 3091 Highway 104, Opelousas, LA 70570 Business Size: Small Business
ITEM
SCHEDULE NO. 1
NO. DESCRIPTION
QUANTITY PRICE TOTAL
Mobilization and Demobilization - Placement Area No. 22
1 JB $550,000.00 $550,000.00
New Drop-Inlet Structure - Placement Area No. 22 1 JB $900,000.00 $900,000.00
Splash Pad for Drop-Inlet Structure - Placement Area No. 22 1 JB $90,000.00 $90,000.00
Containment Dike Clearing, Grubbing, and Stripping - Placement Area No. 22
1 JB $128,045.00 $128,045.00
Semi-Compacted Containment Dike Construction (Sta 0+00 to Sta. 5+61.
49 and Sta. 10+61.83 to 35+00) - Placement Area No. 22 3,025 LF $108.00 $326,700.00
Uncompacted Training Dike Construction - Placement Area No.
22 200 LF $368.00 $73,600.00
As - Built Drawings - Placement Area No. 22 1 JB $55,000.00 $55,000.00
Onsite Borrow Soils Geotechnical Investigation - Placement Area No.
22 1 JB $100,000.00 $100,000.00
Demolition of Existing Drop - Inlet Structure - Placement Area No. 22
1 JB $62,000.00 $62,000.00
TOTAL SCHEDULE NO. 1
$2,285,345.00
OPTION NO. 1
New Drop-inlet Structure - Placement Area No. 18 1 JB $850,000.00 $850,000.00
Splash Pad for Drop-inlet Structure - Placement Area No. 18
1 JB $83,800.00 $83,800.00
Containment Dike Clearing, Grubbing, and Stripping - Placement Area No. 18 1 JB $166,605.00 $166,605.00
Semi-compacted Containment Dike Construction - Placement Area No. 18 4,728 LF $73.00 $345,144.00
As-Built Drawings-Placement Area No. 18 1 JB $45,000.00 $45,000.00
Onsite Borrow Soils Geotechnical Investigation - Placement Area No.
1 JB $90,000.00 $90,000.00
TOTAL OPTION NO. 1 $1,580,549.00
TOTAL SCHEDULE NO.1 & OPTION NO.1 $3,865,894.00
OPTION NO. 2
Semi-compacted Containment Dike Construction (Sta. 5+61.49 to Sta.
10+61.83) Placement Area No. 22
500 LF $328.00 $164,000.00
As-Built Drawings Placement Area No. 22 1 JB $35,000.00 $35,000.00
TOTAL OPTION NO. 2 $199,000.00
TOTAL SCHEDULE NO.1 & OPTION NO.1 & 2 $4,064,894.00