Bid Abstract_W912HY26BA003_CTH_27 March 2026.KOSigned.pdf
PDF 670 KB Posted
- Solicitation number
- W912HY26BA003
About this file
This is an Abstract of Offers for a construction contract issued by the U.S. Army Corps of Engineers, Galveston District. The solicitation number is W912HY26BA003, issued on February 26, 2026, with bids opened on March 26, 2026. The project title is "FY 26 Channel to Harlingen Placement Areas 18 and 22 Improvements, Cameron County, Texas" and is designated as a 100% Small Business Set-Aside. The government estimate (without profit) for Schedule No. 1 and Option No. 1 is $4,398,630.00, with Option No. 2 totaling $45,086.00. The project involves construction work at two placement areas, including mobilization/demobilization, drop-inlet structure installation, splash pad construction, containment dike work, training dike construction, as-built drawings, and geotechnical investigations. Quantities include 3,025 linear feet of semi-compacted containment dike construction and 200 linear feet of uncompacted training dike construction at Placement Area No. 22, with 4,728 linear feet of semi-compacted containment dike construction at Placement Area No. 18.
Four offerors submitted bids: Southern Gulf Solutions, LLC (Small Business, $3,757,421.88 for full scope), Tricore LLC (Other Than Small Business, $4,039,082.00 for full scope), CLORE EQUIPMENT LLC (Small Business, $3,309,752.54 for full scope, designated as the apparent low bidder at 25.52% below government estimate), and Roman Emperors Road, LLC (Other Than Small Business, $7,523,700.00 for full scope). The bid security information shows zero amendments acknowledged across all offers. CLORE EQUIPMENT LLC is identified as the apparent low bidder and is a small business located at 21220 FM 1420, Harlingen, TX 78550. The Contracting Officer certifying the abstract is Mirian Tudor.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CTH Bid Abstract_Updated_04.02.26_KO Signed.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ABSTRACT OF OFFERS - CONSTRUCTION
1. SOLICITATION NUMBER 2. DATE ISSUED 3. DATE OPENED PAGE OF
PAGES
4. ISSUING OFFICE
5. PROJECT TITLE
6. NUMBER OF AMENDMENTS ISSUED
I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.
NAME AND TITLE OF CERTIFYING OFFICIAL (Type)
SIGNATURE DATE SIGNED
7B. DESCRIPTION OF OFFERED ITEM
7C. EST.
QUANTITY
D.
UNIT
E. UNIT
PRICE
F. ESTIMATED
AMOUNT
D. UNIT
PRICE
E. ESTIMATED
AMOUNT
D. UNIT
PRICE
E. ESTIMATED
AMOUNT
8. GOVERNMENT ESTIMATE
(Check A, B or C and complete D, E, and F)
A. HIRED LABOR
B. REASONABLE CONTRACT
(Without Profit)
C. REASONABLE CONTRACT
(Including Profit)
9. OFFERS
NO. 1 NO. 2
A. OFFEROR
B. BID SECURITY (Type and amount)
C. AMENDMENTS ACKNOWLEDGED
A. OFFEROR
B. BID SECURITY (Type and amount)
C. AMENDMENTS ACKNOWLEDGED
AUTHORIZED FOR LOCAL REPRODUCTION
Previous edition is usable
NOTE: If more than two offers are received, continue on OF 1419A. OPTIONAL FORM 1419 (11-88)
7A.
ITEM
NO.
U.S. Army Corps of Engineers, Galveston District Contracting Division 2000 Fort Point Road Galveston, Texas 77550
FY 26 Channel to Harlingen Placement Areas 18 and 22 Improvements, Cameron County, Texas
W912HY26BA003 1 12
Mirian Tudor, Contracting Officer
Southern Gulf Solutions, LLC Tricore LLC
0 0
03/26/202602/26/2025
SEE CONTINUATION PAGES
CONTINUATION SHEET
1. SOLICITATION NUMBER PAGE OF
PAGES
INSTRUCTIONS Attach this form to OF 1419, Abstract of Offers - Construction, when more than 2 offers are received on a construction project. Each Continuation Sheet will accommodate 13 contract items to conform to the number of items which can be entered on the OF 1419. Use addit ional OF 1419's for contract items in excess of 13 and attach additional continuation Sheets (OF 1419A) as needed.
4. OFFERS (Continued)
NO.: NO.: NO.: NO.:
A. OFFEROR A. OFFEROR
B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount)
3. CONTRACT ITEMS C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED
A.
ITEM
NO.
B.
ESTIMATED
QUANTITY
C.
UNIT D. UNIT
PRICE
E. ESTIMATED
AMOUNT
E. ESTIMATED
AMOUNT
D. UNIT
PRICE
E. ESTIMATED
AMOUNT
D. UNIT
PRICE
E. ESTIMATED
AMOUNT
D. UNIT
PRICE
AUTHORIZED FOR LOCAL REPRODUCTION
Previous edition is usable
OPTIONAL FORM 1419A (11-88)
W912HY26BA003
2. PROJECT TITLE
FY 26 Channel to Harlingen Placement Areas 18 and 22 Improvements, Cameron County, Texas
0 0 0
C. AMENDMENTS ACKNOWLEDGED
2 12
3 4 5 6
A. OFFEROR
CLORE Equipment LLC Roman Emperors Road, LLC Maverick Constructors LLC
A. OFFEROR
UNIT
PRICE TOTAL
1 JB $425,000.00 $425,000.00
1 JB $1,244,300.00 $1,244,300.00
1 JB $104,700.00 $104,700.00
1 JB $240,500.00 $240,500.00
3,025 LF $108.00 $326,700.00
200 LF $178.00 $35,600.00
1 JB $41,300.00 $41,300.00
1 JB $18,000.00 $18,000.00
1 JB $113,800.00 $113,800.00
$2,549,900.00
1 JB $1,025,500.00 $1,025,500.00
1 JB $90,600.00 $90,600.00
1 JB $267,500.00 $267,500.00
4,728 LF $87.50 $413,700.00
1 JB $38,100.00 $38,100.00
1 JB $13,330.00 $13,330.00
$1,848,730.00
$4,398,630.00
500 LF $86.25 $43,125.00
1 JB $1,961.00 $1,961.00
$45,086.00TOTAL OPTION NO. 2
As-Built Drawings -Placement Area No. 22
TOTAL SCHEDULE NO.1 & OPTION NO.1
New Drop-Inlet Structure - Placement Area No. 18
OPTION NO. 1
Splash Pad for Drop-Inlet Structure - Placement Area No.
180011
Containment Dike Clearing, Grubbing, and Stripping -
Placement Area No. 18
Semi-compacted Containment Dike Construction -
Placement Area No. 18
As-Built Drawings - Placement Area No. 18
Onsite Borrow Soils Geotechnical Investigation -
Placement Area No. 18
Southern
Solicitation No.: W912HY26BA003 Date Issued: 26 February 2026 Date Opened: 26 March 2026 Issuing Office: USACE-Galveston Project Title: FY 26 Channel to Harlingen Placement Areas 18 and 22 Improvements, Cameron County, Texas, 100% Small Business Set-Aside
Number of Amendments Issued: 0 Government Estimate (Without Profit)
QUANTITY
TOTAL SCHEDULE NO. 1
Splash Pad for Drop-Inlet Structure - Placement Area No.
Onsite Borrow Soils Geotechical Investigation - Placement Area No. 22 Demolition of Existing Drop - Inlet Structure - Placement Area No. 22
TOTAL OPTION NO. 1
SCHEDULE NO. 1ITEM
Containment Dike Clearing, Grubbing, and Stripping - Placement Area No. 22
Uncompacted Training Dike Construction - Placement Area No. 22
NO. DESCRIPTION
Semi-Compacted Containment Dike Construction (Sta 0+00 to Sta. 5+61.49 and Sta. 10+61.83 to 35+00) - Placement Area No. 22
New Drop-Inlet Structure - Placement Area No. 22
Mobilization and Demobilization- Placement Area No. 22
OPTION NO. 2
Semi-compacted Containment Dike Construction (Sta.
5+61.49 to Sta. 10+61.83) Placement Area No. 22
As-Built Drawings Placement Area No. 22
$4,443,716.00
* The apparent low bidder, CLORE EQUIPMENT LLC, is 25.52 % below the Government's Estimate.
I CERTIFY THAT I HAVE OPENED, READ, AND RECORDED ON THIS ABSTRACT ALL OFFERS RECEIVED IN RESPONSE TO THIS
SOLICITATION.
Mirian Tudor
CONTRACTING OFFICER
TOTAL SCHEDULE NO.1 & OPTION NO.1 & 2
1 JB $711,500.00 $711,500.00
1 JB $1,239,850.00 $1,239,850.00
1 JB $133,950.00 $133,950.00
1 JB $109,750.00 $109,750.00
3,025 LF $45.40 $137,335.00
200 LF $172.20 $34,440.00
1 JB $22,000.00 $22,000.00
1 JB $23,200.00 $23,200.00
1 JB $30,500.00 $30,500.00
$2,442,525.00
1 JB $632,600.00 $632,600.00
1 JB $133,950.00 $133,950.00
1 JB $290,000.00 $290,000.00
4,728 LF $36.96 $174,746.88
1 JB $22,000.00 $22,000.00
1 JB $23,200.00 $23,200.00
$1,276,496.88
$3,719,021.88
Splash Pad for Drop-Inlet Structure - Placement Area No. 22
Uncompacted Training Dike Construction - Placement Area No.
DESCRIPTION QUANTITY
Solicitation No.: W912HY26BA003 Date Issued: 26 February 2026 Date Opened: 26 March 2026 Issuing Office: USACE-Galveston
ABSTRACT OF OFFERS (CONT'D) Page 5 of 12
ITEM SCHEDULE NO. 1
Business Size: Small Business
NO.
Project Title: FY 26 Channel to Harlingen Placement Areas 18 and 22 Improvements, Cameron County, Texas, 100% Small Business Set-Aside
Offeror 1: Southern Gulf Solutions, LLC 1001 North Market St. Brazoria, TX 77422
Containment Dike Clearing, Grubbing, and Stripping - Placement Area No. 22
Semi-Compacted Containment Dike Construction (Sta 0+00 to Sta. 5+61.
49 and Sta. 10+61.83 to 35+00) - Placement Area No. 22
Mobilization and Demobilization - Placement Area No.
New Drop-Inlet Structure - Placement Area No. 22
As - Built Drawings - Placement Area No. 22
Onsite Borrow Soils Geotechnical Investigation - Placement Area No.
Demolition of Existing Drop - Inlet Structure - Placement Area No. 22
TOTAL SCHEDULE NO. 1
TOTAL OPTION NO. 1
OPTION NO. 1
New Drop-inlet Structure - Placement Area No. 18
Splash Pad for Drop-inlet Structure - Placement Area No.
Containment Dike Clearing, Grubbing, and Stripping - Placement Area No. 18
Semi-compacted Containment Dike Construction - Placement Area No. 18
As-Built Drawings-Placement Area No. 18
Onsite Borrow Soils Geotechnical Investigation - Placement Area No.
TOTAL SCHEDULE NO.1 & OPTION NO.1
500 LF $32.80 $16,400.00
1 JB $22,000.00 $22,000.00
$38,400.00
$3,757,421.88
TOTAL OPTION NO. 2
TOTAL SCHEDULE NO.1 & OPTION NO.1 & 2
OPTION NO. 2
Semi-compacted Containment Dike Construction (Sta. 5+61.49 to Sta.
10+61.83) Placement Area No. 22
As-Built Drawings Placement Area No. 22
1 JB $604,182.00 $604,182.00
1 JB $125,000.00 $125,000.00
1 JB $56,200.00 $56,200.00
1 JB $120,000.00 $120,000.00
3,025 LF $400.00 $1,210,000.00
200 LF $235.00 $47,000.00
1 JB $13,500.00 $13,500.00
1 JB $45,000.00 $45,000.00
1 JB $32,100.00 $32,100.00
$2,252,982.00
1 JB $86,500.00 $86,500.00
1 JB $56,200.00 $56,200.00
1 JB $120,000.00 $120,000.00
4,728 LF $266.67 $1,260,800.00
1 JB $13,500.00 $13,500.00
1 JB $35,600.00 $35,600.00
$1,572,600.00
ITEM SCHEDULE NO. 1
NO. DESCRIPTION
ABSTRACT OF OFFERS (CONT'D) Page 7 of 12
Solicitation No.: W912HY26BA003 Date Issued: 26 February 2026 Date Opened: 26 March 2026 Issuing Office: USACE-Galveston Project Title: FY 26 Channel to Harlingen Placement Areas 18 and 22 Improvements, Cameron County, Texas, 100% Small Business Set-Aside
Offeror 2: Tricore LLC 4795 Meadow Wood Lane Suite 125E Chantilly, VA 20151 Business Size: Other Than Small Business
QUANTITY
OPTION NO. 1
TOTAL OPTION NO. 1
New Drop-inlet Structure - Placement Area No. 18
Splash Pad for Drop-inlet Structure - Placement Area No.
Containment Dike Clearing, Grubbing, and Stripping - Placement Area No. 18
Semi-compacted Containment Dike Construction - Placement Area No. 18
As-Built Drawings-Placement Area No. 18
Onsite Borrow Soils Geotechnical Investigation - Placement Area No.
Mobilization and Demobilization - Placement Area No.
As - Built Drawings - Placement Area No. 22
TOTAL SCHEDULE NO. 1
Onsite Borrow Soils Geotechnical Investigation - Placement Area No.
Demolition of Existing Drop - Inlet Structure - Placement Area No. 22
New Drop-Inlet Structure - Placement Area No. 22
Splash Pad for Drop-Inlet Structure - Placement Area No. 22
Containment Dike Clearing, Grubbing, and Stripping - Placement Area No. 22
Semi-Compacted Containment Dike Construction (Sta 0+00 to Sta. 5+61.
49 and Sta. 10+61.83 to 35+00) - Placement Area No. 22
Uncompacted Training Dike Construction - Placement Area No.
$3,825,582.00
500 LF $400.00 $200,000.00
1 JB $13,500.00 $13,500.00
$213,500.00
$4,039,082.00
OPTION NO. 2
TOTAL SCHEDULE NO.1 & OPTION NO.1
TOTAL OPTION NO. 2
TOTAL SCHEDULE NO.1 & OPTION NO.1 & 2
Semi-compacted Containment Dike Construction (Sta. 5+61.49 to Sta.
10+61.83) Placement Area No. 22
1 JB $361,313.00 $361,313.00
1 JB $853,642.00 $853,642.00
1 JB $152,117.00 $152,117.00
1 JB $160,176.00 $160,176.00
3,025 LF $78.18 $236,494.50
200 LF $333.24 $66,648.00
1 JB $2,289.00 $2,289.00
1 JB $32,223.00 $32,223.00
1 JB $28,593.00 $28,593.00
$1,893,495.50
1 JB $716,314.00 $716,314.00
1 JB $92,403.00 $92,403.00
1 JB $165,641.00 $165,641.00
4,728 LF $78.18 $369,635.04
1 JB $2,289.00 $2,289.00
1 JB $32,223.00 $32,223.00
$1,378,505.04
$3,272,000.54
Onsite Borrow Soils Geotechnical Investigation - Placement Area No.
Demolition of Existing Drop - Inlet Structure - Placement Area No. 22
New Drop-Inlet Structure - Placement Area No. 22
Splash Pad for Drop-Inlet Structure - Placement Area No. 22
Containment Dike Clearing, Grubbing, and Stripping - Placement Area No. 22
Semi-Compacted Containment Dike Construction (Sta 0+00 to Sta. 5+61.
49 and Sta. 10+61.83 to 35+00) - Placement Area No. 22
As - Built Drawings - Placement Area No. 22
Splash Pad for Drop-inlet Structure - Placement Area No.
Containment Dike Clearing, Grubbing, and Stripping - Placement Area No. 18
Semi-compacted Containment Dike Construction - Placement Area No. 18
As-Built Drawings-Placement Area No. 18
Onsite Borrow Soils Geotechnical Investigation - Placement Area No.
New Drop-inlet Structure - Placement Area No. 18
OPTION NO. 1
ABSTRACT OF OFFERS (CONT'D) Page 9 of 12
Solicitation No.: W912HY26BA003 Date Issued: 26 February 2026 Date Opened: 26 March 2026 Issuing Office: USACE-Galveston Project Title: FY 26 Channel to Harlingen Placement Areas 18 and 22 Improvements, Cameron County, Texas, 100% Small Business Set-Aside
Offeror 3: CLORE EQUIPMENT LLC 21220 FM 1420 Harlingen, TX 78550 ***Apparent Low Bidder*** Business Size: Small Business
QUANTITY
Uncompacted Training Dike Construction - Placement Area No.
ITEM SCHEDULE NO. 1
NO. DESCRIPTION
Mobilization and Demobilization - Placement Area No.
TOTAL SCHEDULE NO. 1
TOTAL OPTION NO. 1
TOTAL SCHEDULE NO.1 & OPTION NO.1
500 LF $72.59 $36,295.00
1 JB $1,457.00 $1,457.00
$37,752.00
$3,309,752.54
TOTAL OPTION NO. 2
TOTAL SCHEDULE NO.1 & OPTION NO.1 & 2
Semi-compacted Containment Dike Construction (Sta. 5+61.49 to Sta.
10+61.83) Placement Area No. 22
OPTION NO. 2
As-Built Drawings Placement Area
1 JB $400,000.00 $400,000.00
1 JB $400,000.00 $400,000.00
1 JB $400,000.00 $400,000.00
1 JB $800,000.00 $800,000.00
3,025 LF $500.00 $1,512,500.00
200 LF $500.00 $100,000.00
1 JB $50,000.00 $50,000.00
1 JB $100,000.00 $100,000.00
1 JB $50,000.00 $50,000.00
$3,812,500.00
1 JB $300,000.00 $300,000.00
1 JB $300,000.00 $300,000.00
1 JB $1,000,000.00 $1,000,000.00
4,728 LF $400.00 $1,891,200.00
1 JB $5,000.00 $5,000.00
1 JB $10,000.00 $10,000.00
$3,506,200.00
As - Built Drawings - Placement Area No. 22
Solicitation No.: W912HY26BA003 Date Issued: 26 February 2026 Date Opened: 26 March 2026 Issuing Office: USACE-Galveston Project Title: FY 26 Channel to Harlingen Placement Areas 18 and 22 Improvements, Cameron County, Texas, Texas, 100% Small Business Set-Aside
Offeror 4: ROMAN EMPERORS ROAD, LLC 11381 MEADOWGLEN LANE, SUITE E, HOUSTON, TX 77082 Business Size: Other Than Small Business
Splash Pad for Drop-Inlet Structure - Placement Area No. 22
Containment Dike Clearing, Grubbing, and Stripping - Placement Area No. 22
ITEM SCHEDULE NO. 1
NO. DESCRIPTION
Mobilization and Demobilization - Placement Area No.
New Drop-Inlet Structure - Placement Area No. 22
ABSTRACT OF OFFERS (CONT'D) Page 11 of 12
OPTION NO. 1
TOTAL OPTION NO. 1
QUANTITY
Onsite Borrow Soils Geotechnical Investigation - Placement Area No.
Demolition of Existing Drop - Inlet Structure - Placement Area No. 22
New Drop-inlet Structure - Placement Area No. 18
Semi-Compacted Containment Dike Construction (Sta 0+00 to Sta. 5+61.
49 and Sta. 10+61.83 to 35+00) - Placement Area No. 22
Uncompacted Training Dike Construction - Placement Area No.
TOTAL SCHEDULE NO. 1
Containment Dike Clearing, Grubbing, and Stripping - Placement Area No. 18
Semi-compacted Containment Dike Construction - Placement Area No. 18
As-Built Drawings-Placement Area No. 18
Onsite Borrow Soils Geotechnical Investigation - Placement Area No.
Splash Pad for Drop-inlet Structure - Placement Area No.
$7,318,700.00
500 LF $400.00 $200,000.00
1 JB $5,000.00 $5,000.00
$205,000.00
$7,523,700.00
ABSTRACT OF OFFERS (CONT'D) Page 12 of 12
TOTAL OPTION NO. 2
TOTAL SCHEDULE NO.1 & OPTION NO.1 & 2
Semi-compacted Containment Dike Construction (Sta. 5+61.49 to Sta.
10+61.83) Placement Area No. 22
TOTAL SCHEDULE NO.1 & OPTION NO.1
OPTION NO. 2
| Bid Abstract_ Channel to Harlingen_ W912HY26BA003 (version 1).pdf |
| Page 1 |
CONTINUATION SHEET
1. SOLICITATION NUMBER PAGE OF
PAGES
INSTRUCTIONS Attach this form to OF 1419, Abstract of Offers - Construction, when more than 2 offers are received on a construction project. Each Continuation Sheet will accommodate 13 contract items to conform to the number of items which can be entered on the OF 1419. Use addit ional OF 1419's for contract items in excess of 13 and attach additional continuation Sheets (OF 1419A) as needed.
4. OFFERS (Continued)
NO.: NO.: NO.: NO.:
A. OFFEROR A. OFFEROR
B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount)
3. CONTRACT ITEMS C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED
A.
ITEM
NO.
B.
ESTIMATED
QUANTITY
C.
UNIT D. UNIT
PRICE
E. ESTIMATED
AMOUNT
D. UNIT
AUTHORIZED FOR LOCAL REPRODUCTION
Previous edition is usable
OPTIONAL FORM 1419A (11-88)
W912HY26BA003
2. PROJECT TITLE
FY 26 Channel to Harlingen Placement Areas 18 and 22 Improvements, Cameron County, Texas
0 0 0
C. AMENDMENTS ACKNOWLEDGED
2 8
3 4 5 6
CLORE Equipment LLC Roman Emperors Road, LLC Maverick Constructors LLC
| 2026-03-27T15:01:13-0500 | |
| TUDOR.MIRIAN.ROSA.1069051800 |
| 2026-03-27T15:03:33-0500 | |
| TUDOR.MIRIAN.ROSA.1069051800 |
File details come from the government source that posted it. Updated .