This is an Abstract of Offers for a construction contract issued by the U.S. Army Corps of Engineers, Galveston District. The solicitation number is W912HY26BA003, issued on February 26, 2026, with bids opened on March 26, 2026. The project title is "FY 26 Channel to Harlingen Placement Areas 18 and 22 Improvements, Cameron County, Texas" and is designated as a 100% Small Business Set-Aside. The government estimate (without profit) for Schedule No. 1 and Option No. 1 is $4,398,630.00, with Option No. 2 totaling $45,086.00. The project involves construction work at two placement areas, including mobilization/demobilization, drop-inlet structure installation, splash pad construction, containment dike work, training dike construction, as-built drawings, and geotechnical investigations. Quantities include 3,025 linear feet of semi-compacted containment dike construction and 200 linear feet of uncompacted training dike construction at Placement Area No. 22, with 4,728 linear feet of semi-compacted containment dike construction at Placement Area No. 18.

Four offerors submitted bids: Southern Gulf Solutions, LLC (Small Business, $3,757,421.88 for full scope), Tricore LLC (Other Than Small Business, $4,039,082.00 for full scope), CLORE EQUIPMENT LLC (Small Business, $3,309,752.54 for full scope, designated as the apparent low bidder at 25.52% below government estimate), and Roman Emperors Road, LLC (Other Than Small Business, $7,523,700.00 for full scope). The bid security information shows zero amendments acknowledged across all offers. CLORE EQUIPMENT LLC is identified as the apparent low bidder and is a small business located at 21220 FM 1420, Harlingen, TX 78550. The Contracting Officer certifying the abstract is Mirian Tudor.

View the file

Other files

File Type Posted
CTH Bid Abstract_Updated_04.02.26_KO Signed.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ABSTRACT OF OFFERS - CONSTRUCTION

1. SOLICITATION NUMBER 2. DATE ISSUED 3. DATE OPENED PAGE OF

PAGES

4. ISSUING OFFICE

5. PROJECT TITLE

6. NUMBER OF AMENDMENTS ISSUED

I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.

NAME AND TITLE OF CERTIFYING OFFICIAL (Type)

SIGNATURE DATE SIGNED

7B. DESCRIPTION OF OFFERED ITEM

7C. EST.

QUANTITY

D.

UNIT

E. UNIT

PRICE

F. ESTIMATED

AMOUNT

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

8. GOVERNMENT ESTIMATE

(Check A, B or C and complete D, E, and F)

A. HIRED LABOR

B. REASONABLE CONTRACT

(Without Profit)

C. REASONABLE CONTRACT

(Including Profit)

9. OFFERS

NO. 1 NO. 2

A. OFFEROR

B. BID SECURITY (Type and amount)

C. AMENDMENTS ACKNOWLEDGED

A. OFFEROR

B. BID SECURITY (Type and amount)

C. AMENDMENTS ACKNOWLEDGED

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition is usable

NOTE: If more than two offers are received, continue on OF 1419A. OPTIONAL FORM 1419 (11-88)

7A.

ITEM

NO.

U.S. Army Corps of Engineers, Galveston District Contracting Division 2000 Fort Point Road Galveston, Texas 77550

FY 26 Channel to Harlingen Placement Areas 18 and 22 Improvements, Cameron County, Texas

W912HY26BA003 1 12

Mirian Tudor, Contracting Officer

Southern Gulf Solutions, LLC Tricore LLC

0 0

03/26/202602/26/2025

SEE CONTINUATION PAGES

CONTINUATION SHEET

1. SOLICITATION NUMBER PAGE OF

PAGES

INSTRUCTIONS Attach this form to OF 1419, Abstract of Offers - Construction, when more than 2 offers are received on a construction project. Each Continuation Sheet will accommodate 13 contract items to conform to the number of items which can be entered on the OF 1419. Use addit ional OF 1419's for contract items in excess of 13 and attach additional continuation Sheets (OF 1419A) as needed.

4. OFFERS (Continued)

NO.: NO.: NO.: NO.:

A. OFFEROR A. OFFEROR

B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount)

3. CONTRACT ITEMS C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED

A.

ITEM

NO.

B.

ESTIMATED

QUANTITY

C.

UNIT D. UNIT

PRICE

E. ESTIMATED

AMOUNT

E. ESTIMATED

AMOUNT

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

D. UNIT

PRICE

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition is usable

OPTIONAL FORM 1419A (11-88)

W912HY26BA003

2. PROJECT TITLE

FY 26 Channel to Harlingen Placement Areas 18 and 22 Improvements, Cameron County, Texas

0 0 0

C. AMENDMENTS ACKNOWLEDGED

2 12

3 4 5 6

A. OFFEROR

CLORE Equipment LLC Roman Emperors Road, LLC Maverick Constructors LLC

A. OFFEROR

UNIT

PRICE TOTAL

1 JB $425,000.00 $425,000.00

1 JB $1,244,300.00 $1,244,300.00

1 JB $104,700.00 $104,700.00

1 JB $240,500.00 $240,500.00

3,025 LF $108.00 $326,700.00

200 LF $178.00 $35,600.00

1 JB $41,300.00 $41,300.00

1 JB $18,000.00 $18,000.00

1 JB $113,800.00 $113,800.00

$2,549,900.00

1 JB $1,025,500.00 $1,025,500.00

1 JB $90,600.00 $90,600.00

1 JB $267,500.00 $267,500.00

4,728 LF $87.50 $413,700.00

1 JB $38,100.00 $38,100.00

1 JB $13,330.00 $13,330.00

$1,848,730.00

$4,398,630.00

500 LF $86.25 $43,125.00

1 JB $1,961.00 $1,961.00

$45,086.00TOTAL OPTION NO. 2

As-Built Drawings -Placement Area No. 22

TOTAL SCHEDULE NO.1 & OPTION NO.1

New Drop-Inlet Structure - Placement Area No. 18

OPTION NO. 1

Splash Pad for Drop-Inlet Structure - Placement Area No.

180011

Containment Dike Clearing, Grubbing, and Stripping -

Placement Area No. 18

Semi-compacted Containment Dike Construction -

Placement Area No. 18

As-Built Drawings - Placement Area No. 18

Onsite Borrow Soils Geotechnical Investigation -

Placement Area No. 18

Southern

Solicitation No.: W912HY26BA003 Date Issued: 26 February 2026 Date Opened: 26 March 2026 Issuing Office: USACE-Galveston Project Title: FY 26 Channel to Harlingen Placement Areas 18 and 22 Improvements, Cameron County, Texas, 100% Small Business Set-Aside

Number of Amendments Issued: 0 Government Estimate (Without Profit)

QUANTITY

TOTAL SCHEDULE NO. 1

Splash Pad for Drop-Inlet Structure - Placement Area No.

Onsite Borrow Soils Geotechical Investigation - Placement Area No. 22 Demolition of Existing Drop - Inlet Structure - Placement Area No. 22

TOTAL OPTION NO. 1

SCHEDULE NO. 1ITEM

Containment Dike Clearing, Grubbing, and Stripping - Placement Area No. 22

Uncompacted Training Dike Construction - Placement Area No. 22

NO. DESCRIPTION

Semi-Compacted Containment Dike Construction (Sta 0+00 to Sta. 5+61.49 and Sta. 10+61.83 to 35+00) - Placement Area No. 22

New Drop-Inlet Structure - Placement Area No. 22

Mobilization and Demobilization- Placement Area No. 22

OPTION NO. 2

Semi-compacted Containment Dike Construction (Sta.

5+61.49 to Sta. 10+61.83) Placement Area No. 22

As-Built Drawings Placement Area No. 22

$4,443,716.00

* The apparent low bidder, CLORE EQUIPMENT LLC, is 25.52 % below the Government's Estimate.

I CERTIFY THAT I HAVE OPENED, READ, AND RECORDED ON THIS ABSTRACT ALL OFFERS RECEIVED IN RESPONSE TO THIS

SOLICITATION.

Mirian Tudor

CONTRACTING OFFICER

TOTAL SCHEDULE NO.1 & OPTION NO.1 & 2

1 JB $711,500.00 $711,500.00

1 JB $1,239,850.00 $1,239,850.00

1 JB $133,950.00 $133,950.00

1 JB $109,750.00 $109,750.00

3,025 LF $45.40 $137,335.00

200 LF $172.20 $34,440.00

1 JB $22,000.00 $22,000.00

1 JB $23,200.00 $23,200.00

1 JB $30,500.00 $30,500.00

$2,442,525.00

1 JB $632,600.00 $632,600.00

1 JB $133,950.00 $133,950.00

1 JB $290,000.00 $290,000.00

4,728 LF $36.96 $174,746.88

1 JB $22,000.00 $22,000.00

1 JB $23,200.00 $23,200.00

$1,276,496.88

$3,719,021.88

Splash Pad for Drop-Inlet Structure - Placement Area No. 22

Uncompacted Training Dike Construction - Placement Area No.

DESCRIPTION QUANTITY

Solicitation No.: W912HY26BA003 Date Issued: 26 February 2026 Date Opened: 26 March 2026 Issuing Office: USACE-Galveston

ABSTRACT OF OFFERS (CONT'D) Page 5 of 12

ITEM SCHEDULE NO. 1

Business Size: Small Business

NO.

Project Title: FY 26 Channel to Harlingen Placement Areas 18 and 22 Improvements, Cameron County, Texas, 100% Small Business Set-Aside

Offeror 1: Southern Gulf Solutions, LLC 1001 North Market St. Brazoria, TX 77422

Containment Dike Clearing, Grubbing, and Stripping - Placement Area No. 22

Semi-Compacted Containment Dike Construction (Sta 0+00 to Sta. 5+61.

49 and Sta. 10+61.83 to 35+00) - Placement Area No. 22

Mobilization and Demobilization - Placement Area No.

New Drop-Inlet Structure - Placement Area No. 22

As - Built Drawings - Placement Area No. 22

Onsite Borrow Soils Geotechnical Investigation - Placement Area No.

Demolition of Existing Drop - Inlet Structure - Placement Area No. 22

TOTAL SCHEDULE NO. 1

TOTAL OPTION NO. 1

OPTION NO. 1

New Drop-inlet Structure - Placement Area No. 18

Splash Pad for Drop-inlet Structure - Placement Area No.

Containment Dike Clearing, Grubbing, and Stripping - Placement Area No. 18

Semi-compacted Containment Dike Construction - Placement Area No. 18

As-Built Drawings-Placement Area No. 18

Onsite Borrow Soils Geotechnical Investigation - Placement Area No.

TOTAL SCHEDULE NO.1 & OPTION NO.1

500 LF $32.80 $16,400.00

1 JB $22,000.00 $22,000.00

$38,400.00

$3,757,421.88

TOTAL OPTION NO. 2

TOTAL SCHEDULE NO.1 & OPTION NO.1 & 2

OPTION NO. 2

Semi-compacted Containment Dike Construction (Sta. 5+61.49 to Sta.

10+61.83) Placement Area No. 22

As-Built Drawings Placement Area No. 22

1 JB $604,182.00 $604,182.00

1 JB $125,000.00 $125,000.00

1 JB $56,200.00 $56,200.00

1 JB $120,000.00 $120,000.00

3,025 LF $400.00 $1,210,000.00

200 LF $235.00 $47,000.00

1 JB $13,500.00 $13,500.00

1 JB $45,000.00 $45,000.00

1 JB $32,100.00 $32,100.00

$2,252,982.00

1 JB $86,500.00 $86,500.00

1 JB $56,200.00 $56,200.00

1 JB $120,000.00 $120,000.00

4,728 LF $266.67 $1,260,800.00

1 JB $13,500.00 $13,500.00

1 JB $35,600.00 $35,600.00

$1,572,600.00

ITEM SCHEDULE NO. 1

NO. DESCRIPTION

ABSTRACT OF OFFERS (CONT'D) Page 7 of 12

Solicitation No.: W912HY26BA003 Date Issued: 26 February 2026 Date Opened: 26 March 2026 Issuing Office: USACE-Galveston Project Title: FY 26 Channel to Harlingen Placement Areas 18 and 22 Improvements, Cameron County, Texas, 100% Small Business Set-Aside

Offeror 2: Tricore LLC 4795 Meadow Wood Lane Suite 125E Chantilly, VA 20151 Business Size: Other Than Small Business

QUANTITY

OPTION NO. 1

TOTAL OPTION NO. 1

New Drop-inlet Structure - Placement Area No. 18

Splash Pad for Drop-inlet Structure - Placement Area No.

Containment Dike Clearing, Grubbing, and Stripping - Placement Area No. 18

Semi-compacted Containment Dike Construction - Placement Area No. 18

As-Built Drawings-Placement Area No. 18

Onsite Borrow Soils Geotechnical Investigation - Placement Area No.

Mobilization and Demobilization - Placement Area No.

As - Built Drawings - Placement Area No. 22

TOTAL SCHEDULE NO. 1

Onsite Borrow Soils Geotechnical Investigation - Placement Area No.

Demolition of Existing Drop - Inlet Structure - Placement Area No. 22

New Drop-Inlet Structure - Placement Area No. 22

Splash Pad for Drop-Inlet Structure - Placement Area No. 22

Containment Dike Clearing, Grubbing, and Stripping - Placement Area No. 22

Semi-Compacted Containment Dike Construction (Sta 0+00 to Sta. 5+61.

49 and Sta. 10+61.83 to 35+00) - Placement Area No. 22

Uncompacted Training Dike Construction - Placement Area No.

$3,825,582.00

500 LF $400.00 $200,000.00

1 JB $13,500.00 $13,500.00

$213,500.00

$4,039,082.00

OPTION NO. 2

TOTAL SCHEDULE NO.1 & OPTION NO.1

TOTAL OPTION NO. 2

TOTAL SCHEDULE NO.1 & OPTION NO.1 & 2

Semi-compacted Containment Dike Construction (Sta. 5+61.49 to Sta.

10+61.83) Placement Area No. 22

1 JB $361,313.00 $361,313.00

1 JB $853,642.00 $853,642.00

1 JB $152,117.00 $152,117.00

1 JB $160,176.00 $160,176.00

3,025 LF $78.18 $236,494.50

200 LF $333.24 $66,648.00

1 JB $2,289.00 $2,289.00

1 JB $32,223.00 $32,223.00

1 JB $28,593.00 $28,593.00

$1,893,495.50

1 JB $716,314.00 $716,314.00

1 JB $92,403.00 $92,403.00

1 JB $165,641.00 $165,641.00

4,728 LF $78.18 $369,635.04

1 JB $2,289.00 $2,289.00

1 JB $32,223.00 $32,223.00

$1,378,505.04

$3,272,000.54

Onsite Borrow Soils Geotechnical Investigation - Placement Area No.

Demolition of Existing Drop - Inlet Structure - Placement Area No. 22

New Drop-Inlet Structure - Placement Area No. 22

Splash Pad for Drop-Inlet Structure - Placement Area No. 22

Containment Dike Clearing, Grubbing, and Stripping - Placement Area No. 22

Semi-Compacted Containment Dike Construction (Sta 0+00 to Sta. 5+61.

49 and Sta. 10+61.83 to 35+00) - Placement Area No. 22

As - Built Drawings - Placement Area No. 22

Splash Pad for Drop-inlet Structure - Placement Area No.

Containment Dike Clearing, Grubbing, and Stripping - Placement Area No. 18

Semi-compacted Containment Dike Construction - Placement Area No. 18

As-Built Drawings-Placement Area No. 18

Onsite Borrow Soils Geotechnical Investigation - Placement Area No.

New Drop-inlet Structure - Placement Area No. 18

OPTION NO. 1

ABSTRACT OF OFFERS (CONT'D) Page 9 of 12

Solicitation No.: W912HY26BA003 Date Issued: 26 February 2026 Date Opened: 26 March 2026 Issuing Office: USACE-Galveston Project Title: FY 26 Channel to Harlingen Placement Areas 18 and 22 Improvements, Cameron County, Texas, 100% Small Business Set-Aside

Offeror 3: CLORE EQUIPMENT LLC 21220 FM 1420 Harlingen, TX 78550 ***Apparent Low Bidder*** Business Size: Small Business

QUANTITY

Uncompacted Training Dike Construction - Placement Area No.

ITEM SCHEDULE NO. 1

NO. DESCRIPTION

Mobilization and Demobilization - Placement Area No.

TOTAL SCHEDULE NO. 1

TOTAL OPTION NO. 1

TOTAL SCHEDULE NO.1 & OPTION NO.1

500 LF $72.59 $36,295.00

1 JB $1,457.00 $1,457.00

$37,752.00

$3,309,752.54

TOTAL OPTION NO. 2

TOTAL SCHEDULE NO.1 & OPTION NO.1 & 2

Semi-compacted Containment Dike Construction (Sta. 5+61.49 to Sta.

10+61.83) Placement Area No. 22

OPTION NO. 2

As-Built Drawings Placement Area

1 JB $400,000.00 $400,000.00

1 JB $400,000.00 $400,000.00

1 JB $400,000.00 $400,000.00

1 JB $800,000.00 $800,000.00

3,025 LF $500.00 $1,512,500.00

200 LF $500.00 $100,000.00

1 JB $50,000.00 $50,000.00

1 JB $100,000.00 $100,000.00

1 JB $50,000.00 $50,000.00

$3,812,500.00

1 JB $300,000.00 $300,000.00

1 JB $300,000.00 $300,000.00

1 JB $1,000,000.00 $1,000,000.00

4,728 LF $400.00 $1,891,200.00

1 JB $5,000.00 $5,000.00

1 JB $10,000.00 $10,000.00

$3,506,200.00

As - Built Drawings - Placement Area No. 22

Solicitation No.: W912HY26BA003 Date Issued: 26 February 2026 Date Opened: 26 March 2026 Issuing Office: USACE-Galveston Project Title: FY 26 Channel to Harlingen Placement Areas 18 and 22 Improvements, Cameron County, Texas, Texas, 100% Small Business Set-Aside

Offeror 4: ROMAN EMPERORS ROAD, LLC 11381 MEADOWGLEN LANE, SUITE E, HOUSTON, TX 77082 Business Size: Other Than Small Business

Splash Pad for Drop-Inlet Structure - Placement Area No. 22

Containment Dike Clearing, Grubbing, and Stripping - Placement Area No. 22

ITEM SCHEDULE NO. 1

NO. DESCRIPTION

Mobilization and Demobilization - Placement Area No.

New Drop-Inlet Structure - Placement Area No. 22

ABSTRACT OF OFFERS (CONT'D) Page 11 of 12

OPTION NO. 1

TOTAL OPTION NO. 1

QUANTITY

Onsite Borrow Soils Geotechnical Investigation - Placement Area No.

Demolition of Existing Drop - Inlet Structure - Placement Area No. 22

New Drop-inlet Structure - Placement Area No. 18

Semi-Compacted Containment Dike Construction (Sta 0+00 to Sta. 5+61.

49 and Sta. 10+61.83 to 35+00) - Placement Area No. 22

Uncompacted Training Dike Construction - Placement Area No.

TOTAL SCHEDULE NO. 1

Containment Dike Clearing, Grubbing, and Stripping - Placement Area No. 18

Semi-compacted Containment Dike Construction - Placement Area No. 18

As-Built Drawings-Placement Area No. 18

Onsite Borrow Soils Geotechnical Investigation - Placement Area No.

Splash Pad for Drop-inlet Structure - Placement Area No.

$7,318,700.00

500 LF $400.00 $200,000.00

1 JB $5,000.00 $5,000.00

$205,000.00

$7,523,700.00

ABSTRACT OF OFFERS (CONT'D) Page 12 of 12

TOTAL OPTION NO. 2

TOTAL SCHEDULE NO.1 & OPTION NO.1 & 2

Semi-compacted Containment Dike Construction (Sta. 5+61.49 to Sta.

10+61.83) Placement Area No. 22

TOTAL SCHEDULE NO.1 & OPTION NO.1

OPTION NO. 2

Bid Abstract_ Channel to Harlingen_ W912HY26BA003 (version 1).pdf
Page 1

CONTINUATION SHEET

1. SOLICITATION NUMBER PAGE OF

PAGES

INSTRUCTIONS Attach this form to OF 1419, Abstract of Offers - Construction, when more than 2 offers are received on a construction project. Each Continuation Sheet will accommodate 13 contract items to conform to the number of items which can be entered on the OF 1419. Use addit ional OF 1419's for contract items in excess of 13 and attach additional continuation Sheets (OF 1419A) as needed.

4. OFFERS (Continued)

NO.: NO.: NO.: NO.:

A. OFFEROR A. OFFEROR

B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount)

3. CONTRACT ITEMS C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED

A.

ITEM

NO.

B.

ESTIMATED

QUANTITY

C.

UNIT D. UNIT

PRICE

E. ESTIMATED

AMOUNT

D. UNIT

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition is usable

OPTIONAL FORM 1419A (11-88)

W912HY26BA003

2. PROJECT TITLE

FY 26 Channel to Harlingen Placement Areas 18 and 22 Improvements, Cameron County, Texas

0 0 0

C. AMENDMENTS ACKNOWLEDGED

2 8

3 4 5 6

CLORE Equipment LLC Roman Emperors Road, LLC Maverick Constructors LLC

2026-03-27T15:01:13-0500
TUDOR.MIRIAN.ROSA.1069051800
2026-03-27T15:03:33-0500
TUDOR.MIRIAN.ROSA.1069051800

File details come from the government source that posted it. Updated .