View the file

Other files for this federal contract opportunity

Other files attached to Unrestricted with a Small Business Reserve - Architect and Engineering (A-E) Services to Support the Planning, Engineering, and Engineering During Construction, U. S. Army Corps of Engineers (USACE), Southwestern Division (SWD), Galveston District (SWG), newest first.
File Type Posted
Revised Synposis -07.03.2023.docx DOCX document
PPQ__.rtf RTF text file
Revised Synposis - 6.14.23.pdf PDF
ATTACHMENT 1 - SMALL BUSINESS PARTICIPATION PLAN FORM.docx DOCX document
900M A-E Pre-Proposal Conference Attendees List.pdf PDF
900M AE Preproposal Conference_Final_Slides.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INSTRUCTIONS FOR IMPLEMENTATION OF NAVFAC/USACE PAST PERFORMANCE QUESIONNAIRE (PPQ) FORM

1. Background: In many source selections and MATOC task order evaluations, the RFP encourages the Offeror to have their clients provide a completed PPQ directly to the contract specialist. In addition, throughout USACE, various formats of PPQs are being utilized. Industry expressed concern regarding the process by which PPQs are submitted, that completing multiple PPQs for the same type projects over time places a significant burden on their clients, and seeking a standard process and format to be implemented across USACE and NAVFAC.

2. Discussion: Based on input from industry, NAVFAC and USACE will still allow Offerors to submit PPQs with their proposal but will not require them to be sent directly from the client to the contracting office. In addition, NAVFAC and USACE will utilize a standard PPQ format for all requirements, when required as part of an evaluation. The standard PPQ form and process will allow Offerors to obtain clients’ completed PPQ at the completion of a contract or task order, and the Offeror may retain PPQs in its files for submission on future procurements. In cases where the validity of the completed PPQ is questioned, the contract specialist/contracting officer may contact the reference for verification or additional information. The standard PPQ for NAVFAC and USACE is Form PPQ-0 (9/30/11). NAVFAC/USACE does not intend to create and maintain a database of PPQs submitted by Offerors. Therefore, it will be the Offerors responsibility to insure the submission of the relevant PPQs in its files for each solicitation. Alternatively, the Offeror may obtain an updated/new PPQ from its client(s) for submission. This new process does not preclude the Government from utilizing previously submitted PPQ information in the past performance evaluation as a source of information. Also, as the completion of Contractor Performance Assessment Reports (CPARS) is required, Contracting Officers should search CPARS to determine if a relevant and recent evaluation is on file when one is not provided by the offeror. Recognizing CPARS evaluations are just one tool for assessing past performance, these evaluations are expected to be considered by the Contracting Officer. Discrepancies between CPARS evaluations and information provided in PPQs will be resolved by the Contracting Officer during the source selection evaluation process.

In completing the PPQ form, representatives that have direct knowledge of the Offerors past performance are encouraged to complete the PPQ (i.e., Administrative Contracting Officers, Contracting Officer Representatives, Project Engineers, etc., who had direct oversight/involvement with the project).

ACTIONS: Effective immediately, for all procurements that are using PPQs in the evaluation process:

1. Form PPQ-0 shall be utilized for all evaluations that require a PPQ. Offerors shall submit the PPQ with their proposal submission to the Contracting Office designated proposal submission location. The contract specialist or Contracting Officer shall not require the PPQ to be sent directly from the client. Solicitations that have previously been issued do not need to be amended to include this requirement.

2. RFPs utilizing PPQs shall incorporate language from the “Sample Solicitation Submittal Requirement” (below) stating, at a minimum, the following: “Completed Past Performance Questionnaires should be submitted with your proposal as required by RFP Section XXXXX. Offerors shall not incorporate by reference into their proposal PPQs previously submitted for other RFPs. This does not preclude the Government from utilizing previously submitted PPQ information in the past performance evaluation. While the Government may elect to consider data from other sources, the burden of providing detailed, current, accurate and complete past performance information rests with the Offeror. ”

NAVFAC

USACE

Past

Performance

Questionnaire

(PPQ)

Form

PPQ

-0

(9/30/11)

3. When Past Performance Questionnaires are being permitted/sought, the following sample language will be tailored to the specific acquisition and included in the solicitation:

Sample Solicitation Submittal Requirement:

“The Past Performance Questionnaire (PPQ) included in the solicitation is provided for the offeror or its team members to submit to the client for each project the offeror includes in its proposal for Factor (insert the applicable factor number, usually as “Factor 4” and insert the factor title, usually “Past Performance for the Prime Contractor”). Ensure correct phone numbers and email addresses are provided for the client point of contact. Completed Past Performance Questionnaires should be submitted with your proposal. If the offeror is unable to obtain a completed PPQ from a client for a project(s) before proposal closing date, the offeror should complete and submit with the proposal the first page of the PPQ (Attachment ), which will provide contract and client information for the respective project(s). Offerors should follow-up with clients/references to ensure timely submittal of questionnaires. If the client requests, questionnaires may be submitted directly to the Government’s point of contact, via email at prior to proposal closing date. Offerors shall not incorporate by reference into their proposal PPQs previously submitted for other RFPs. However, this does not preclude the Government from utilizing previously submitted PPQ information in the past performance evaluation.

Also include performance recognition documents received within the last (insert the number of years) such as awards, award fee determinations, customer letters of commendation, and any other forms of performance recognition.

In addition to the above, the Government may review any other sources of information for evaluating past performance. Other sources may include, but are not limited to, past performance information retrieved through the Contractor Performance Assessment Reporting System (CPARS), using all CAGE/DUNS numbers of team members (partnership, joint venture, teaming arrangement, or parent company/subsidiary/affiliate) identified in the offeror’s proposal, inquiries of owner representative(s), Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), and any other known sources not provided by the offeror.

While the Government may elect to consider data from other sources, the burden of providing detailed, current, accurate and complete past performance information rests with the Offeror.”

NAVFAC/USACE PAST PERFORMANCE QUESTIONNAIRE (Form PPQ-0)

CONTRACT INFORMATION (Contractor to complete Blocks 1-4)

1. Contractor InformationCAGE Code:
Firm Name:DUNs Number:Address:
Phone Number:Email Address:
Point of Contact:Contact Phone Number:

2. Work Performed as: Prime Contractor Sub Contractor Joint Venture Other (Explain) Percent of project work performed:

If subcontractor, who was the prime (Name/Phone #):

3. Contract Information Contract Number:

Delivery/Task Order Number (if applicable):

Contract Type: Firm Fixed Price Cost Reimbursement Other (Please specify): Contract Title:

Contract Location:

Award Date (mm/dd/yy): Contract Completion Date (mm/dd/yy): Actual Completion Date (mm/dd/yy):

Explain Differences:

Original Contract Price (Award Amount):

Final Contract Price (to include all modifications, if applicable):

Explain Differences:

4. Project Description:
Complexity of WorkHighMedRoutine

How is this project relevant to project of submission? (Please provide details such as similar equipment, requirements, conditions, etc.)

CLIENT INFORMATION (Client to complete Blocks 5-8)

5. Client Information
Name:Title:Phone Number:

Email Address:

6. Describe the client’s role in the project:

7. Date Questionnaire was completed (mm/dd/yy):

8. Client’s Signature:

NOTE: NAVFAC/USACE requests that the client completes this questionnaire and submits directly back to the offeror.

The offeror will submit the completed questionnaire to USACE with their proposal, and may duplicate this questionnaire for future submission on USACE solicitations. Clients are highly encouraged to submit questionnaires directly to the offeror. However, questionnaires may be submitted directly to USACE. Please contact the offeror for USACE POC information. The Government reserves the right to verify any and all information on this form.

ADJECTIVE

RATINGS

AND

DEFINITIONS

TO

BE

USED

TO

BEST

REFLECT

YOUR EVALUATION OF THE CONTRACTOR’S PERFORMANCE

RATING DEFINITION NOTE

(E) Exceptional
Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit.

The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor was highly effective.

An Exceptional rating is appropriate when the Contractor successfully performed multiple significant events that were of benefit to the Government/Owner. A singular benefit, however, could be of such magnitude that it alone constitutes an Exceptional rating. Also, there should have been NO significant weaknesses identified.

(VG) Very Good
Performance meets contractual requirements and exceeds some to the Government’s/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were

effective.

A Very Good rating is appropriate when the Contractor successfully performed a significant event that was a benefit to the Government/Owner. There should have been no significant weaknesses identified.

(S) Satisfactory
Performance meets minimum contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
A Satisfactory rating is appropriate when there were only minor problems, or major problems that the contractor recovered from without impact to the contract. There should have been NO significant weaknesses identified. Per DOD policy, a fundamental principle of assigning ratings is that contractors will not be assessed a rating lower than Satisfactory solely for not

performing beyond the requirements of the contract.

(M) Marginal
Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor's

proposed actions appear only marginally effective or were not fully implemented.

A Marginal is appropriate when a significant event occurred that the contractor had trouble overcoming which impacted the Government/Owner.

(U) Unsatisfactory
Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains serious problem(s) for which the contractor's corrective actions appear or were ineffective.
An Unsatisfactory rating is appropriate when multiple significant events occurred that the contractor had trouble overcoming and which impacted the Government/Owner. A singular problem, however, could be of such serious magnitude that it alone constitutes an

unsatisfactory rating.

(N) Not Applicable
No information or did not apply to your contract
Rating will be neither positive nor negative.

TO BE COMPLETED BY CLIENT

PLEASE SELECT THE ADJECTIVE RATING WHICH BEST REFLECTS YOUR EVALUATION OF THE CONTRACTOR’S PERFORMANCE.

1. QUALITY

a) Quality of technical data/report preparation efforts

VG
S

M

U

N

b) Ability to meet quality standards specified for technical performance
E
VG
S

M

U

N

c) Timeliness/effectiveness of contract problem resolution without extensive customer guidance

E

VG

S

M

U

N

d) Adequacy/effectiveness of quality control program and adherence to contract quality assurance requirements (without adverse effect on performance)

2. SCHEDULE/TIMELINESS OF PERFORMANCE

a) Compliance with contract delivery/completion schedules including any significant intermediate milestones. (If liquidated damages were assessed or the schedule was not met, please address below)

b) Rate the contractor’s use of available resources to accomplish tasks identified in the contract

3. CUSTOMER SATISFACTION

a) To what extent were the end users satisfied with the project?
E
VG
S

M

U

N

b) Contractor was reasonable and cooperative in dealing with your staff (including the ability to successfully resolve disagreements/disputes; responsiveness to administrative reports, businesslike and communication)

c) To what extent was the contractor cooperative, businesslike, and concerned with the interests of the customer?

d) Overall customer satisfaction
E
VG
S

M

U

N

4. MANAGEMENT/ PERSONNEL/LABOR

a) Effectiveness of on-site management, including management of subcontractors, suppliers, materials, and/or labor force?

b) Ability to hire, apply, and retain a qualified workforce to this effort

E
VG

S

M

U

N

c) Government Property Control

E
VG

S

M

U

N

d) Knowledge/expertise demonstrated by contractor personnel

E
VG

S

M

U

N

e) Utilization of Small Business concerns

E
VG

S

M

U

N

f) Ability to simultaneously manage multiple projects with multiple disciplines

E
VG

S

M

U

N

g) Ability to assimilate and incorporate changes in requirements and/or priority, including planning, execution and response to Government changes

h) Effectiveness of overall management (including ability to effectively lead, manage and control the program)

5. COST/FINANCIAL MANAGEMENT

a) Ability to meet the terms and conditions within the contractually agreed price(s)?

b) Contractor proposed innovative alternative methods/processes that reduced cost, improved maintainability or other factors that benefited the client
E

VG

S

M

U

N

c) If this is/was a Government cost type contract, please rate the Contractor’s timeliness and accuracy in submitting monthly invoices with appropriate back-up documentation, monthly status reports/budget variance reports, compliance with established budgets and avoidance of significant and/or unexplained variances (under runs or overruns)

d) Is the Contractor’s accounting system adequate for management and tracking of costs? If no, please explain in Remarks section.

Yes

No

e) If this is/was a Government contract, has/was this contract been partially or completely terminated for default or convenience or are there any pending terminations? Indicate if show cause or cure notices were issued, or any default action in comment section below.

o

f) Have there been any indications that the contractor has had any financial problems? If yes, please explain below.

No

6. SAFETY/SECURITY

a) To what extent was the contractor able to maintain an environment of safety, adhere to its approved safety plan, and respond to safety issues? (Includes: following the users rules, regulations, and requirements regarding housekeeping, safety, correction of noted deficiencies, etc.)

E

VG

S

M

U

N

b) Contractor complied with all security requirements for the project and personnel security requirements.

E
VG
S
M
U
N

7. GENERAL

a) Ability to successfully respond to emergency and/or surge situations (including notifying COR, PM or Contracting Officer in a timely manner regarding urgent contractual issues).
E

VG

S

M

U

N

b) Compliance with contractual terms/provisions (explain if specific issues)
E
VG
S
M
U
N

c) Would you hire or work with this firm again? (If no, please explain below)

Yes

No

d) In summary, provide an overall rating for the work performed by this contractor.
E

VG

S

M

Please provide responses to the questions above (if applicable) and/or additional remarks. Furthermore, please provide a brief narrative addressing specific strengths, weaknesses, deficiencies, or other comments which may assist our office in evaluating performance risk (please attach additional pages if necessary):

image5.png image6.png image7.png image8.png image9.png image10.png image11.png image12.png image13.png image14.png image15.png image16.png image17.png image18.png image19.png image20.png image21.png image22.png image23.png image24.png image25.png image26.png image27.png image28.png image29.png image30.png image31.png image32.png image1.png image2.png image3.png image4.png

File details come from the government source that posted it. Updated .