Amend No. 0002-W912HY21B0019.FINAL-CT-20Aug21.pdf

PDF 3 MB Posted

Attached to
Gulf Intracoastal Waterway, Texas High Island to Rollover and Bolivar Flare, Pipeline Dredging
Solicitation number
W912HY21B0019
Issued by

About this file

This solicitation is for pipeline dredging services along the Gulf Intracoastal Waterway in Texas. USACE seeks dredging of Sections 1 through 7 and 10 through 20 from High Island to Bollover, and Sections 19 and 20 at Bolivar Flare. Optional work includes Sections 8 and 9 at Rollover Pass, Section 21 from the Channel to Port Bolivar, and Sections 22 and 23 with placement in Pierce Marsh cells. Responses are due by August 30, 2021. The work must be completed within specified time periods ranging from 15 to 55 additional calendar days depending on the option, if exercised. Pricing is to be provided using the bid schedule format attached, covering mobilization, management and dredging quantities by section. Evaluation will consider all options prices combined.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

THE SPECIFICATIONS FOR SOLICITATION NO. W912HY21B0019, GIWW, TEXAS HIGH ISLAND TO ROLLOVER AND BOLIVAR FLARE PIPELINE DREDGING, FOR WHICH BID OPENING IS SCHEDULED FOR 30 AUGUST 2021 AT 2:00 P.M. Local Time ARE HEREBY

AMENDED AS FOLLOWS:

CONTINUE ON PAGE 2

1. CONTRACT ID CODE PAGE OF PAGES

1 24

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912HY21B0019

X 9B. DATED (SEE ITEM 11)

29-Jul-2021

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO.

5. PROJECT NO.(If applicable)

6. ISSUED BY

3.EFFECTIVE

DATE

20-Aug-2021

CODE

US ARMY CORPS OF ENGINEERS

2000 FORT POINT ROAD

P.O. BOX 1229

GALVESTON TX 77553-1229

W912HY 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912HY21B0019

A0002-2

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

1.THE SPECIFICATIONS FOR SOLICITATION NO. W912HY21B0019, GIWW, TEXAS HIGH

ISLAND TO ROLLOVER AND BOLIVAR FLARE PIPELINE DREDGING, IN CHAMBERS

AND GALVESTON COUNTIES, TEXAS, ARE HEREBY AMENDED AS FOLLOWS:

a) Specifications.

(1) SECTION 00 21 00, INSTRUCTIONS TO BIDDERS- The enclosed SECTION 00 21 00 entitled SECTION 00 21 00 supersedes that issued with this Solicitation.

(2) SECTION 00 11 00.00 45, BID SCHEDULE – The enclosed SECTION 00 11 00.00 45 entitled BID SCHEDULE supersedes that issued with this Solicitation.

(3) SECTION 35 20 23.16 45, APPENDIX 1, QUANTITY SUMMARY TABLE – The enclosed

SECTION 35 20 23.16 45 entitled APPENDIX 1, QUANTITY SUMMARY TABLE supersedes that issued with this Solicitation.

b) Drawings.

(1) DRAWINGS (5) - The enclosed Drawings No. C-303, C-304, C-307 through C-309, supersedes that issued with this Solicitation.

2. This amendment shall be attached to and become a part of the solicitation.

3 Encls:

1. SECTION 00 11 00.00 45, BID SCHEDULE

2. SECTION 35 20 23.16 45, APPENDIX 1, QUANTITY SUMMARY TABLE

3. DRAWINGS NO. C-303, C-304, C-307 through C-309

4. SECTION 00 21 00, INSTRUCTIONS TO BIDDERS

SWG FILE NO.: IWW 1101-0299 SOLICITATION NO.: W912HY21B0019

SECTION TABLE OF CONTENTS

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

SECTION 00 11 00.00 45

BID SCHEDULE

PART 1 GENERAL

1.1 BID SCHEDULE

1.1.1 Schedule No. 1 AM#2

1.1.2 Option No. 1 AM#2

1.1.3 Option No. 2

1.1.4 Option No. 3

1.1.5 Option No. 4

1.2 EVALUATION OF OPTIONS (July 1990) (FAR 52.217-5)

-- End of Section Table of Contents --

DOCUMENT 00 11 00.00 45 Page 1

TO ACCOMPANY AMENDMENT NO. 0002 TO SOLICITATION W912HY21B0019

THIS PAGE INTENTIONALLY LEFT BLANK

DOCUMENT 00 11 00.00 45 Page 2

SECTION 00 11 00.00 45

BID SCHEDULE

AMENDMENT NO. 0002

PART 1 GENERAL

1.1 BID SCHEDULE

(TO BE ATTACHED TO STANDARD FORM 1442)

1.1.1 Schedule No. 1 AM#2

Item No. Description Estimated Quantity

Unit Unit Price Estimated Amount

SCHEDULE NO. 1

0001 Mobilization and Demobilization 1 JOB SUM $___________

0002 Pipeline Management - GIWW, High Island to Bolivar Flare - Section Nos. 1-7 & 10-20

1 JOB SUM $___________

0003 Dredging - GIWW High Island to Port Bolivar - Section Nos. 1-7 & 10-18

717,000 C.Y. $_________ $___________

0004 Dredging - GIWW - Bolivar Flare - Section Nos. 19 &

395,000 C.Y. $_________ $___________

TOTAL SCHEDULE NO. 1 $___________

NOTE: Completion time stated in SECTION 00 73 00.01 45 SPECIAL CONTRACT REQUIREMENTS, STANDARD is for Schedule No. 1 work.

DOCUMENT 00 11 00.00 45 Page 3

BID SCHEDULE (CONT'D)

(TO BE ATTACHED TO STANDARD FORM 1442)

1.1.2 Option No. 1 AM#2

Item No.

Description Estimated Quantity

Unit Unit Price Estimated Amount

OPTION NO. 1

0005 Pipeline Management - GIWW, Rollover Pass - Section Nos. 8 & 9

1 JOB SUM $___________

0006 Dredging - GIWW, Rollover Pass - Section Nos. 8 & 9

14,000 C.Y. $_________ $___________

TOTAL OPTION NO. 1 $___________

TOTAL SCHEDULE NO. 1 AND OPTION NO. 1 $___________

NOTE FOR OPTI ON NO. 1: The Gover nment may exer ci se t hi s Opt i on by wr i t t en not i ce t o t he Cont r act or pr i or t o compl et i on of al l aut hor i zed wor k. An addi t i onal t i me of 15 cal endar days wi l l be added t o t hi s Cont r act f or compl et i on of t hi s Opt i on.

DOCUMENT 00 11 00.00 45 Page 4

(TO BE ATTACHED TO STANDARD FORM 1442)

1.1.3 Option No. 2

Item No. Description Estimated Quantity

Unit Unit Price Estimated Amount

OPTION NO. 2

0007 Pipeline Management

- GIWW,Channel to Port Bolivar - Section No. 21

1 JOB SUM $___________

0008 Dredging - GIWW,Channel to Port Bolivar - Section No. 21

239,000 C.Y. $_________ $___________

TOTAL OPTION NO. 2 $___________

TOTAL SCHEDULE NO. 1 AND OPTIONS NOS. 1 AND 2 $___________

NOTE FOR OPTI ON NO. 2: The Gover nment may exer ci se t hi s Opt i on by wr i t t en not i ce t o t he Cont r act or pr i or t o compl et i on of al l aut hor i zed wor k. An addi t i onal t i me of 25 cal endar days wi l l be added t o t hi s Cont r act f or compl et i on of t hi s Opt i on.

DOCUMENT 00 11 00.00 45 Page 5

(TO BE ATTACHED TO STANDARD FORM 1442)

1.1.4 Option No. 3

Item No.

Description Estimated Quantity

Unit Unit Price Estimated Amount

OPTION NO. 3

0009 Pipeline Management - GIWW,Causeway to Greens Lake, Placement in Pierce Marsh BUS Cell 1 - Section No. 22

1 JOB SUM $___________

Dredging - GIWW,Causeway to Greens Lake, Placement in Pierce Marsh Cell 1 - Section No. 22

101,000 C.Y. $_________ $___________

0011 Perimeter Berm Raising - Pierce Marsh BUS Cell 1

7,500 L.F. $_________ $_________

TOTAL OPTION NO. 3 $___________

TOTAL SCHEDULE NO. 1 AND OPTIONS NOS. 1, 2, AND 3 $___________

NOTE FOR OPTI ON NO. 3: The Gover nment may exer ci se t hi s Opt i on by wr i t t en not i ce t o t he Cont r act or pr i or t o compl et i on of al l aut hor i zed wor k. An addi t i onal t i me of 55 cal endar days wi l l be added t o t hi s Cont r act f or compl et i on of t hi s Opt i on.

DOCUMENT 00 11 00.00 45 Page 6

1.1.5 Option No. 4

Item No.

Description Estimated Quantity

Unit Unit Price Estimated Amount

OPTION NO. 4

Pipeline Management - GIWW,Causeway to Greens Lake, Placement in Pierce Marsh BUS Cell 2 - Section No. 23

1 JOB SUM $___________

Dredging - GIWW,Causeway to Greens Lake, Placement in Pierce Marsh Cell 2 - Section No. 23

119,000 C.Y. $_________ $___________

0014 Perimeter Berm Raising - Pierce Marsh BUS Cell 2

2,500 L.F. $_________ $_________

TOTAL OPTION NO. 4 $___________

TOTAL SCHEDULE NO. 1 AND OPTIONS NOS. 1, 2, 3, AND 4 $___________

NOTE FOR OPTI ON NO. 4: The Gover nment may exer ci se t hi s Opt i on by wr i t t en not i ce t o t he Cont r act or pr i or t o compl et i on of al l aut hor i zed wor k. An addi t i onal t i me of 30 cal endar days wi l l be added t o t hi s Cont r act f or compl et i on of t hi s Opt i on.

DOCUMENT 00 11 00.00 45 Page 7

(TO BE ATTACHED TO STANDARD FORM 1442)

1.2 EVALUATION OF OPTIONS (July 1990) (FAR 52.217-5)

Except when it is determined in accordance with FAR 17.206(b) not to be in the Government's best interests, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the option(s).

-- End of Document --

DOCUMENT 00 11 00.00 45 Page 8

Document 00 21 00 - Page 1

Section 00 21 00 – Instructions to bidders

1.1 ESTIMATED CONSTRUCTION PRICE RANGE (FAR 36.204)

The estimated price range of the proposed construction is between $5,000,000.00 and $10,000,000.00

1.2 AVAILABILITY OF PLANS AND SPECIFICATIONS ON BETA.SAM.GOV WEBSITE (FAR

5.102(a)(1))

After solicitation issuance, contractors may register to be placed on the Interested Vendors List, view and/or download this solicitation and all amendments at https://sam.gov/ .

Plans and specifications will not be available in paper format or on compact disc. It is the offeror’s responsibility to monitor the Beta Sam website daily (using the above link) for amendments to the solicitation. You must be registered in the System for Award Management (SAM) to receive a government contract award. The website for SAM https://www.sam.gov/SAM/.

1.3 TECHNICAL INFORMATION DREDGING (FAR 14.211)

(a) For technical information regarding the plans and specifications submit questions in PROJNET, see paragraph 1.9 of this section for details.

(b) The Contractor [ ] shall [ X ] shall not be permitted to use self-propelled hopper dredges to perform the work specified herein.

1.4 PREAWARD INFORMATION DREDGING (FAR 9.105-1)

Bidders shall submit not later than the response date and time indicated in the solicitation the following information:

(a) A statement as to whether he is now or ever has been engaged in performing dredging of [ ] deep or [ X ] shallow draft channels.

(b) A list of key personnel available for the current project and their qualifications.

(c) A copy of the bidder's latest financial statement, including the names of banks or other financial institutions with which the bidder conducts business. If the financial statement is more than 60 days old, a certificate should be attached stating that the financial condition is substantially the same, or if not the same, the changes that have taken place. Such statement will be treated as confidential.

(d) A list of present commitments, including the dollar value thereof, name of office under which the work is being performed, the scheduled completion date of each, days ahead or behind schedule and the name of the dredge(s) to be used on the job.

Document 00 21 00 - Page 2

(e) Name and location of the firm's dredging plant to perform the work under this contract, the date this plant will commence work, and the plants capability to perform the work as required by the specifications.

(f) A preliminary schedule showing anticipated dates for start of work, based upon availability of contractor resources, and the plan for completing work within the contract performance period. For dredging contracts, this includes production rates for proposed dredging equipment together with an analysis showing how work will be accomplished within the contract performance period.

(g) If bidder is a Large Business, a Sub-Contracting Plan, shall be submitted not later than the response date and time indicated in the solicitation.

1.5 DISPOSAL OF EXCAVATED MATERIAL

The following owners in the vicinity of the work to be accomplished under this Invitation for Bids are known to desire fill material:

NAME ADDRESS

If any of the areas owned by the above-listed owners are proposed to be utilized by the Contractor in the performance of the work, the provision for use of alternate areas DREDGING: PLACEMENT OF EXCAVATED MATERIAL of the specifications will be applicable.

1.6 BIDDER'S QUALIFICATIONS (FAR 9.105-1)

Before a bid is considered for award, the bidder may be requested by the Government to submit a statement regarding his previous experience in performing comparable work, his business and technical organization, financial resources, and plant available to be used in performing the work.

1.7 NOTICE TO BIDDERS (FAR 52.214-18)

All information required by the terms of the solicitation must be furnished.

MISTAKES OR OMISSIONS CAN BE COSTLY. Important items for you to check are included in but not limited to, those listed below. This checklist is furnished only to assist you in submitting a proper offer. Check as you read.

Have you acknowledged all amendments?

Have you completed SECTION 00 45 00, REPRESENTATIONS & CERTIFICATIONS portion of the solicitation package to include 52.204-24 and 52.204-26?

Is your offer properly signed?

If a bid guarantee is required, is it included with your offer?

(A late bid guarantee is treated the same as a late offer).

Is your bid guarantee in the proper amount? Bid guarantee shall be in the amount of 20 percent of the amount of the offer, or $3 million, whichever is less.

Document 00 21 00 - Page 3

If your bid guarantee is in the form of a bid bond, is the bond properly signed by both the bidder and surety and are all required seals affixed?

Is the name in which you submitted the offer the same as your bid bond?

If required have you entered a unit price for each item? (The solicitation will specifically state when this is necessary).

Are decimals in unit prices in the proper places? Are your figures legible?

Are the extensions of your unit prices, and your total offer price correct?

Are all erasures or corrections initialed by the person signing the offer?

I have not restricted my offer by altering the provisions of the solicitation.

REMINDER TO BIDDERS

REMINDER #1 - Acknowledge all Amendments on the reverse side of SF 1442, Item 19, Solicitation, Offer, and Award.

REMINDER #2 - The Contracting Officer signing this contract is the Primary Contracting Officer. However, any Contracting Officer assigned to the Galveston District may take formal action. See Section entitled "Specific Project Requirements".

1.8 SPECIAL INSTRUCTIONS PERTAINING TO ELECTRONIC BID SUBMISSION: (FAR

14.302 and 14.304)

The Bid, a copy of the SF24 Bid Bond and the PreAward Information as specified in Paragraph 1.4 in Section 00 21 00 -Instructions to bidders shall be submitted via email to SWG-CT- Execution-Proposals@usace.army.mil , not later than the response date and time indicated in the solicitation. Identify the Solicitation Number W912HY21B0019 in subject line of the emai1.

Bid Opening will be held by WebEx/teleconference.

WebEx:

https://usace1.webex.com/usace1/j.php?MTID=m81c2a8c3920804de2b22ca13f9247331 Meeting Number: 199 493 2846 Password: vMcqt8sN4@3

Join by phone +1-844-800-2712 US Toll Free +1-669-234-1177 US Toll Access code: 199 493 2846

1.9 BIDDER INQUIRY – PROJNET (FAR 14.211)

1. Prospective Offerors should submit questions concerning this solicitation via Bidder Inquiry in ProjNet at www.projnet.org/projnet.

A. To submit and review bid inquiry items, bidders will need to be a current registered user or self-register into the system. To self-register, Document 00 21 00 - Page 4 go to the aforementioned web page and click on the BID tab. Select Bidder Inquiry, select agency USACE, and enter the Bidder Inquiry Key for this solicitation listed below, your email address, and then click login. Fill in all required information and click create user. Verify that information on next screen is correct and click continue.

***Please Note: Offerors shall only submit one question per inquiry.

Inquiries containing multiple questions may be rejected.

B. From this page, you may view all bidder inquiries or add inquiry.

C. Offerors will receive an acknowledgement of their question via email, followed by an answer to their question after it has been processed by our technical team.

D. The Solicitation Number is: W912HY20B0019 The Bidder Inquiry Key is: ZMPJ5R-QQH63G

2. The Bidder Inquiry System will be unavailable for new inquires fifteen

(15) calendar days prior to offer submission in order to ensure adequate time is allotted to form an appropriate response and amend the solicitation if necessary.

3. Offerors are requested to review the specification in its entirety, review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry.

4. The call center operates weekdays from 8AM to 5PM U.S. Central Time Zone (Chicago). The telephone number for the Call Center is 800-428-HELP.

1.10 CONSTRUCTION WAGE RATE REQUIREMENTS (FAR 52.222-6)

Paragraph entitled CONSTRUCTION WAGE RATE REQUIREMENTS of (CONTRACT CLAUSES - Section 00 72 00, FAR 52.222-6) is applicable to this solicitation. Wage Rates will be incorporated by amendment, if they are not included in this solicitation.

CLAUSES INCORPORATED BY REFERENCE

52.204-7 System for Award Management OCT 2018 52.204-22 Alternative Line Item Proposal JAN 2017 52.214-3 Amendments To Invitations For Bids DEC 2016 52.214-4 False Statements In Bids APR 1984 52.214-5 Submission Of Bids DEC 2016 52.214-6 Explanation To Prospective Bidders APR 1984 52.214-7 Late Submissions, Modifications, and

Withdrawals of Bids

NOV 1999

52.214-18 Preparation of Bids-Construction APR 1984 52.214-19 Contract Award-Sealed Bidding-Construction AUG 1996 52.214-34 Submission Of Offers In The English Language APR 1991 52.214-35 Submission Of Offers In U.S. Currency APR 1991 52.215-20 Requirements for Certified Cost or Pricing Data or

OCT 2010

Information Other Than Certified Cost or

Document 00 21 00 - Page 5

Pricing Data 52.217-5 Evaluation Of Options JUL 1990 52.232-13 Notice Of Progress Payments APR 1984 52.232-14 Notice Of Availability Of Progress Payments

Exclusively For

APR 1984

Small Business Concerns 52.232-38 Submission of Electronic Funds Transfer

Information with

JUL 2013

Offer 252.215-7007 Notice of Intent to Resolicit JUN 2012

CLAUSES INCORPORATED BY FULL TEXT

52.214-15 PERIOD FOR ACCEPTANCE OF BIDS (APR 1984)

In compliance with the solicitation, the bidder agrees, if this bid is accepted within 60 calendar days (60 calendar days unless a different period is inserted by the bidder) from the date specified in the solicitation for receipt of bids, to furnish any or all items upon which prices are bid at the price set opposite each item, delivered at the designated point(s), within the time specified in the Schedule.

(End of clause)

52.216-1 TYPE OF CONTRACT (APR 1984)

The Government contemplates award of a Firm-Fixed Price contract resulting from this solicitation.

(End of provision)

52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS--SECONDARY SITE OF THE WORK (MAY

2014)

(a)(1) The offeror shall notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Construction Wage Rate Requirements, of this solicitation.

(2) If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror shall request a determination from the Contracting Officer.

(b)(1) If the wage determination provided by the Government for work at the primary site of the work is not applicable to the secondary site of the work, the offeror shall request a wage determination from the Contracting Officer.

Document 00 21 00 - Page 6

(2) The due date for receipt of offers will not be extended as a result of an offeror's request for a wage determination for a secondary site of the work.

(End of provision)

52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL

EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)

(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.

(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:

Goals for minority participation for each trade

Goals for female participation for each trade

71% 6.9%

These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.

(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction,'' and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.

(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the --

(1) Name, address, and telephone number of the subcontractor;

Document 00 21 00 - Page 7

(2) Employer's identification number of the subcontractor;

(3) Estimated dollar amount of the subcontract;

(4) Estimated starting and completion dates of the subcontract; and

(5) Geographical area in which the subcontract is to be performed.

(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is Galveston and Chambers Counties, Texas

52.233-2 SERVICE OF PROTEST (SEP 2006)

(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from “Contracting Officer, US Army Corps of Engineers, Galveston District, PO Box 1229, Galveston, Texas 77553-1229, submitting the protest at SWG-CT-protests@usace.army.mil”

(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.

52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) Site visits may be arranged during normal duty hours by contacting:

Name: Brandon Smolinsky

Telephone: 409-370-3958

52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)

This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text.

Document 00 21 00 - Page 8

Upon request, the Contracting Officer will make their full text available.

The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer.

In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):

https://www.acquisition.gov/content/regulations (End of provision)

52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (NOV 2020)

(a) The use in this solicitation of any Federal Acquisition Regulation (48 CFR Chapter 1) provision with an authorized deviation is indicated by the addition of "(DEVIATION)" after the date of the provision.

(b) The use in this solicitation of any Defense Acquisition Regulation (48 CFR Chapter 2) provision with an authorized deviation is indicated by the addition of "(DEVIATION)" after the name of the regulation.

SWG FILE NO.:IWW 1101-0299 SOLICITATION NO.: W912HY-21-B-0019

Section No.

From Station

To Station

Length of Station (Feet)

Required Depth

(CY)

Allowable Overdepth

(CY)

Total Estimated

(CY)

1 162+000.00 166+000.00 4,000 23,000 10,000 33,000 PA 33

2 172+000.00 174+000.00 2,000 6,000 5,000 11,000 PA 33

3 178+000.00 180+000.00 2,000 4,000 2,000 6,000 PA 33

4 187+000.00 190+000.00 3,000 13,000 6,000 19,000 PA 34

5 192+000.00 195+000.00 3,000 9,000 6,000 15,000 PA 34

6 201+000.00 206+000.00 5,000 28,000 21,000 49,000 PA 35

7 206+000.00 208+400.00 2,400 14,000 9,000 23,000 PA 35

10 221+000.00 225+000.00 4,000 27,000 20,000 47,000 PA 36

11 225+000.00 230+000.00 5,000 60,000 24,000 84,000 PA 36

12 249+600.00 255+000.00 5,400 62,000 24,000 86,000 PA 38

13 255+000.00 260+000.00 5,000 53,000 24,000 77,000 PA 38

14 260+000.00 265+000.00 5,000 33,000 19,000 52,000 PA 39

15 265+000.00 270+000.00 5,000 47,000 22,000 69,000 PA 39

16 277+600.00 283+000.00 5,400 27,000 25,000 52,000 PA 40

17 294+000.00 300+000.00 6,000 60,000 26,000 86,000 PA 41

18 314+000.00 315+000.00 1,000 3,000 5,000 8,000 PA 43

63,200 469,000 248,000 717,000

19 315+000.00 320+000.00 5,000 201,000 53,000 254,000 PA 43

20 320+000.00 321+000.00 1,000 120,000 21,000 141,000 PA 43

6,000 321,000 74,000 395,000

69,200 790,000 322,000 1,112,000

8 208+400.00 212+000.00 3,600 6,000 1,000 7,000 PA 35

9 212+000.00 215+000.00 3,000 5,000 2,000 7,000 PA 35

6,600 11,000 3,000 14,000

21 -00+30 10+00 1,030 134,000 105,000 239,000 PA 43

1,030 134,000 105,000 239,000

22 386+000.00 392+000.00 6,000 73,000 28,000 101,000 Pierce Marsh Cell 1

6,000 73,000 28,000 101,000

23 394+000.00 400+000.00 6,000 93,000 26,000 119,000 Pierce Marsh Cell 2

6,000 93,000 26,000 119,000

19,630 311,000 162,000 473,000

88,830 1,101,000 484,000 1,585,000

Includes anticipated shoaling.

The term “Required Depth” is synonymous with the term “Prescribed Depth” and “Required Dredging Prism” used elsewhere in the specifications.

GIWW, HIGH ISLAND TO PORT BOLIVAR - SCHEDULE NO. 1

SUBTOTAL, SCHEDULE NO. 1

SUBTOTAL, SCHEDULE NO. 1

GIWW, BOLIVAR FLARE - SCHEDULE NO. 1

TOTAL, SCHED. NO. 1, OPTION

NOs. 1 - 4

TOTAL, OPTION NOs. 1 - 4.

TOTAL, OPTION NO. 4

GIWW, ROLLOVER PASS - OPTION NO. 1

TOTAL, OPTION NO. 1

APPENDIX 1

QUANTITY SUMMARY TABLE

SECTIONS QUANTITIES

Placement Area Distribution

CHANNEL TO PORT BOLIVAR - OPTION NO. 2

CAUSEWAY TO GREENS LAKE, PIERCE MARSH BUS CELL 1- OPTION NO. 3

CAUSEWAY TO GREENS LAKE, PIERCE MARSH BUS CELL 2- OPTION NO. 4

TOTAL, SCHEDULE NO. 1

TOTAL, OPTION NO. 2

TOTAL, OPTION NO. 3

Section 35 20 23.16 45 - Page A-1 of Engineers U.S. Army Corps

Galveston District

G A

L V

E S

T O

N T

E X

A S

C O

R P

S O

F E

N G

IN

E E

R S

U .S

A R

M Y E

N G

IN

E E

R D

IS

T R

IC

T

G A

L V

E S

T O

N

A S S

H O

W N

D a te

R e v

S u b m it te d b y

A p p ro v e d b y

A p p ro v a l R e c o m m e n d e d

S c a le

D ra w n b y

D e s ig n e d b y

C h e c k e d b y

D e s c ri p ti o n

D a te

R e v

B y

Drawing No.:

J U

L Y

W

IL

L

IE

J

O E H

O N

Z A P .E

W912HY21B0019

SOLICITATION NO.:

IWW 1101-0299SWG FILE NO.

F il e

M o d e l

N a m e

C -3

B y m a o x tw

:4

:4

A

M D a te

T im e

W

C A

D D p ro je c ts

IW

W -0

H ig h I s la n d t o R o ll o v e r a n d B o li v a r

F la re F

Y P la n s -S

C

IW

W -1

-0

C -3

-G

IW

W -X

S E

C T x S c -8

.d g n

C-303

C O

L O

N E

L E

N

U .S

A R

M Y

C O

M M

A N

D

IN

G

T

IM

O T

H Y R

V A

IL

P R

E P

A R

E D U

N D

E R T

H E D

IR

E C

T

IO

N O

F R

A L P

H E S

T E

IN

E R P .E P

M P

A re a E n g in e e r

R e s id e n t E n g in e e r

L A

U R

A L

Y N

N V

E R

A P .E

P

IP

E L

IN

E D

R E

D G

IN

G

H

IG

H I S

L A

N D T

O R

O L L

O V

E R A

N D B

O L

IV

A R F

L A

R E

G U

L F I

N T

R A

C O

A S

T A

L W

A T

E R W

A Y T

E X

A S

T B

W

S A

C

R K

H

C h ie f, E n g in e e ri n g B ra n c h

-10

-20

-30

E L E

V A

T

IO

N I

N U .S F

E E

T

0 50 100 150 200-50-100-150-200

<-- GREEN - RED --->

-10

-20

-30

E L E

V A

T

IO

N I

N U .S F

E E

T

0 50 100 150 200-50-100-150-200

<-- GREEN - RED --->

-10

-20

-30

E L E

V A

T

IO

N I

N U .S F

E E

T

0 50 100 150 200-50-100-150-200

<-- GREEN - RED --->

-10

-20

-30

E L E

V A

T

IO

N I

N U .S F

E E

T

0 50 100 150 200-50-100-150-200

<-- GREEN - RED --->

-10

-20

-30

E L E

V A

T

IO

N I

N U .S F

E E

T

0 50 100 150 200-50-100-150-200

<-- GREEN - RED --->

-10

-20

-30

E L E

V A

T

IO

N I

N U .S F

E E

T

0 50 100 150 200-50-100-150-200

<-- GREEN - RED --->

-10

-20

-30

E L E

V A

T

IO

N I

N U .S F

E E

T

0 50 100 150 200-50-100-150-200

<-- GREEN - RED --->

-10

-20

-30

E L E

V A

T

IO

N I

N U .S F

E E

T

0 50 100 150 200-50-100-150-200

<-- GREEN - RED --->

-10

-20

-30

E L E

V A

T

IO

N I

N U .S F

E E

T

0 50 100 150 200-50-100-150-200

<-- GREEN - RED --->

-10

-20

-30

E L E

V A

T

IO

N I

N U .S F

E E

T

0 50 100 150 200-50-100-150-200

<-- GREEN - RED --->

-10

-20

-30

E L E

V A

T

IO

N I

N U .S F

E E

T

0 50 100 150 200-50-100-150-200

209+096.08

<-- GREEN - RED --->

-10

-20

-30

E L E

V A

T

IO

N I

N U .S F

E E

T

0 50 100 150 200-50-100-150-200

<-- GREEN - RED --->

-10

-20

-30

E L E

V A

T

IO

N I

N U .S F

E E

T

0 50 100 150 200-50-100-150-200

<-- GREEN - RED --->

-10

-20

-30

E L E

V A

T

IO

N I

N U .S F

E E

T

0 50 100 150 200-50-100-150-200

<-- GREEN - RED --->

-10

-20

-30

E L E

V A

T

IO

N I

N U .S F

E E

T

0 50 100 150 200-50-100-150-200

<-- GREEN - RED --->

206+000 209+000 213+000

205+000 208+400 212+000

204+000 208+232 211+000

203+000 210+000

202+000 207+000

S T

A T

O S

T A

C R

O S

S S

E C

T

IO

N S

G U

L F I

N T

R A

C O

A S

T A

L W

A T

E R

W A

Y

208+000

17' REQ'D. DEPTH

1' OVERDEPTH

13' FED. AUTH.

62.5' 62.5'

CHANGE

TEMPLATE

17' REQ'D. DEPTH

1' OVERDEPTH

13' FED. AUTH.

62.5' 62.5'

SURVEYED JULY 2021

SURVEYED MARCH/JULY 2021

SURVEYED JULY 2021

SURVEYED MARCH 2021

SURVEYED MARCH 2021

S A

C U

P D

A T

E D

R

O

C T

IO

N S

SOLICITATION NO. W912HY21B0019

AMENDMENT NO. 0002 TO

THIS DRAWING ACCOMPANIES

Galveston District

G A

L V

E S

T O

N T

E X

A S

C O

R P

S O

F E

N G

IN

E E

R S

U .S

A R

M Y E

N G

IN

E E

R D

IS

T R

IC

T

G A

L V

E S

T O

N

A S S

H O

W N

D a te

R e v

S u b m it te d b y

A p p ro v e d b y

A p p ro v a l R e c o m m e n d e d

S c a le

D ra w n b y

D e s ig n e d b y

C h e c k e d b y

D e s c ri p ti o n

D a te

R e v

B y

Drawing No.:

J U

L Y

W

IL

L

IE

J

O E H

O N

Z A P .E

W912HY21B0019

SOLICITATION NO.:

IWW 1101-0299SWG FILE NO.

F il e

M o d e l

N a m e

C -3

B y m a o x tw

:4

:4

A

M D a te

T im e

W

C A

D D p ro je c ts

IW

W -0

H ig h I s la n d t o R o ll o v e r a n d B o li v a r

F la re F

Y P la n s -S

C

IW

W -1

-0

C -3

-G

IW

W -X

S E

C T x S c -8

.d g

C-304

L O

N E

L E

N

U .S

A R

M Y

C O

M M

A N

D

IN

G

T

IM

O T

H Y R

V A

IL

P R

E P

A R

E D U

N D

E R T

H E D

IR

E C

T

IO

N O

F R

A L P

H E S

T E

IN

E R P .E P

M P

A re a E n g in e e r

R e s id e n t E n g in e e r

L A

U R

A L

Y N

N V

E R

A P

E L

IN

E D

R E

D G

IN

G

H

IG

H I S

L A

N D T

O R

O L L

O V

E R A

N D B

O L

IV

A R F

L A

R E

G U

L F I

N T

R A

C O

A S

T A

L W

A T

E R W

A Y T

E X

A S

T B

W

S A

C

R K

H

C h ie f, E n g in e e ri n g B ra n c h

-10

-20

-30

E L E

V A

T

IO

N I

N U .S F

E E

T

0 50 100 150 200-50-100-150-200

<-- GREEN - RED --->

-10

-20

-30

E L E

V A

T

IO

N I

N U .S F

E E

T

0 50 100 150 200-50-100-150-200

<-- GREEN - RED --->

-10

-20

-30

E L E

V A

T

IO

N I

N U .S F

E E

T

0 50 100 150 200-50-100-150-200

<-- GREEN - RED --->

-10

-20

-30

E L E

V A

T

IO

N I

N U .S F

E E

T

0 50 100 150 200-50-100-150-200

<-- GREEN - RED --->

-10

-20

-30

E L E

V A

T

IO

N I

N U .S F

E E

T

0 50 100 150 200-50-100-150-200

<-- GREEN - RED --->

-10

-20

-30

E L E

V A

T

IO

N I

N U .S F

E E

T

0 50 100 150 200-50-100-150-200

<-- GREEN - RED --->

-10

-20

-30

E L E

V A

T

IO

N I

N U .S F

E E

T

0 50 100 150 200-50-100-150-200

<-- GREEN - RED --->

-10

-20

-30

E L E

V A

T

IO

N I

N U .S F

E E

T

0 50 100 150 200-50-100-150-200

<-- GREEN - RED --->

-10

-20

-30

E L E

V A

T

IO

N I

N U .S F

E E

T

0 50 100 150 200-50-100-150-200

<-- GREEN - RED --->

-10

-20

-30

E L E

V A

T

IO

N I

N U .S F

E E

T

0 50 100 150 200-50-100-150-200

<-- GREEN - RED --->

-10

-20

-30

E L E

V A

T

IO

N I

N U .S F

E E

T

0 50 100 150 200-50-100-150-200

<-- GREEN - RED --->

-10

-20

-30

E L E

V A

T

IO

N I

N U .S F

E E

T

0 50 100 150 200-50-100-150-200

<-- GREEN - RED --->

-10

-20

-30

E L E

V A

T

IO

N I

N U .S F

E E

T

0 50 100 150 200-50-100-150-200

<-- GREEN - RED --->

-10

-20

-30

E L E

V A

T

IO

N I

N U .S F

E E

T

0 50 100 150 200-50-100-150-200

<-- GREEN - RED --->

-10

-20

-30

E L E

V A

T

IO

N I

N U .S F

E E

T

0 50 100 150 200-50-100-150-200

<-- GREEN - RED --->

223+000 228+000 251+000

222+000 227+000 250+000

221+000 226+000 249+600

215+000 225+000 230+000

214+000 224+000 229+000

S T

A T

O S

T A

C R

O S

S S

E C

T

IO

L F I

N T

R A

C O

A S

T A

L W

A T

E R

W A

Y

CHANGE

TEMPLATE

62.5' 62.5'

13' FED. AUTH.

17' REQ'D. DEPTH

1' OVERDEPTH

SUBMERGED PIPELINE

(1) - 6" PIPE

STA. 235+811

SUBMERGED PIPELINE

EARTHEN PLUG

STA. 235+461

62.5' 62.5'

17' REQ'D. DEPTH

1' OVERDEPTH

13' FED. AUTH.

SURVEYED JULY 2021

SURVEYED JULY 2021

SURVEYED MARCH/JULY 2021

SURVEYED MARCH 2021

SURVEYED MARCH 2021

S A

C U

P D

A T

O

C T

IO

N S

SOLICITATION NO. W912HY21B0019

Galveston District

G A

L V

E S

T O

N T

E X

A S

C O

R P

S O

F E

N G

IN

E E

R S

U .S

A R

M Y E

N G

IN

E E

R D

IS

T R

IC

T

G A

L V

E S

T O

N

A S S

H O

W N

D a te

R e v

S u b m it te d b y

A p p ro v e d b y

A p p ro v a l R e c o m m e n d e d

S c a le

D ra w n b y

D e s ig n e d b y

C h e c k e d b y

D e s c ri p ti o n

D a te

R e v

B y

Drawing No.:

J U

L Y

W

IL

L

IE

J

O E H

O N

Z A P .E

W912HY21B0019

SOLICITATION NO.:

IWW 1101-0299SWG FILE NO.

F il e

M o d e l

N a m e

C -3

B y m a o x tw

:4

:4

A

M D a te

T im e

W

C A

D D p ro je c ts

IW

W -0

H ig h I s la n d t o R o ll o v e r a n d B o li v a r

F la re F

Y P la n s -S

C

IW

W -1

-0

C -3

-G

IW

W -X

S E

C T x S c -8

.d g

C-307

L O

N E

L E

N

U .S

A R

M Y

C O

M M

A N

D

IN

G

T

IM

O T

H Y R

V A

IL

P R

E P

A R

E D U

N D

E R T

H E D

IR

E C

T

IO

N O

F R

A L P

H E S

T E

IN

E R P .E P

M P

A re a E n g in e e r

R e s id e n t E n g in e e r

L A

U R

A L

Y N

N V

E R

A P

E L

IN

E D

R E

D G

IN

G

H

IG

H I S

L A

N D T

O R

O L L

O V

E R A

N D B

O L

IV

A R F

L A

R E

G U

L F I

N T

R A

C O

A S

T A

L W

A T

E R W

A Y T

E X

A S

T B

W

S A

C

R K

H

C h ie f, E n g in e e ri n g B ra n c h

-10

-20

-30

E L E

V A

T

IO

N I

N U .S F

E E

T

0 50 100 150 200-50-100-150-200

<-- GREEN - RED --->

-10

-20

-30

E L E

V A

T

IO

N I

N U .S F

E E

T

0 50 100 150 200-50-100-150-200

<-- GREEN - RED --->

-10

-20

-30

E L E

V A

T

IO

N I

N U .S F

E E

T

0 50 100 150 200-50-100-150-200

<-- GREEN - RED --->

-10

-20

-30

E L E

V A

T

IO

N I

N U .S F

E E

T

0 50 100 150 200-50-100-150-200

<-- GREEN - RED --->

-10

-20

-30

E L E

V A

T

IO

N I

N U .S F

E E

T

0 50 100 150 200-50-100-150-200

<-- GREEN - RED --->

-10

-20

-30

E L E

V A

T

IO

N I

N U .S F

E E

T

0 50 100 150 200-50-100-150-200-250-300-350-400

<-- GREEN - RED --->

-10

-20

-30

E L E

V A

T

IO

N I

N U .S F

E E

T

0 50 100 150 200-50-100-150-200-250-300-350-400

<-- GREEN - RED --->

-10

-20

-30

E L E

V A

T

IO

N I

N U .S F

E E

T

0 50 100 150 200-50-100-150-200-250-300-350-400

<-- GREEN - RED --->

-10

-20

-30

E L E

V A

T

IO

N I

N U .S F

E E

T

0 50 100 150 200-50-100-150-200-250-300-350-400

<-- GREEN - RED --->

-10

-20

-30

E L E

V A

T

IO

N I

N U .S F

E E

T

0 50 100 150 200-50-100-150-200-250-300-350-400

<-- GREEN - RED --->

314+225 317+400

314+000 317+000

300+000 316+000

299+000 315+225

298+000 315+000

S T

A T

O S

T A

C R

O S

S S

E C

T

IO

L F I

N T

R A

C O

A S

T A

L W

A T

E R

W A

Y

237.5' 62.5'

237.5' 62.5'

198.1' 62.5'

13' FED. AUTH.

17' REQ'D. DEPTH

1' OVERDEPTH

62.5' 62.5'

62.5' 62.5'

CHANGE

TEMPLATE

SUBMERGED PIPELINE

(2) - 10" PIPE

STA. 302+316

SUBMERGED PIPELINE

(1) - 16" PIPE

STA. 302+417

SUBMERGED PIPELINE

(2) - CONCRETE PIPES

STA. 311+035

17' REQ'D. DEPTH

1' OVERDEPTH

13' FED. AUTH.

SURVEYED MARCH/AUGUST 2021

SURVEYED MARCH 2021

SURVEYED MARCH 2021

SURVEYED AUGUST 2021

SURVEYED AUGUST 2021

S A

C U

P D

A T

O

C T

IO

N S

SOLICITATION NO. W912HY21B0019

Galveston District

G A

L V

E S

T O

N T

E X

A S

C O

R P

S O

F E

N G

IN

E E

R S

U .S

A R

M Y E

N G

IN

E E

R D

IS

T R

IC

T

G A

L V

E S

T O

N

A S S

H O

W N

D a te

R e v

S u b m it te d b y

A p p ro v e d b y

A p p ro v a l R e c o m m e n d e d

S c a le

D ra w n b y

D e s ig n e d b y

C h e c k e d b y

D e s c ri p ti o n

D a te

R e v

B y

Drawing No.:

J U

L Y

W

IL

L

IE

J

O E H

O N

Z A P .E

W912HY21B0019

SOLICITATION NO.:

IWW 1101-0299SWG FILE NO.

F il e

M o d e l

N a m e

C -3

B y m a o x tw

:4

:4

A

M D a te

T im e

W

C A

D D p ro je c ts

IW

W -0

H ig h I s la n d t o R o ll o v e r a n d B o li v a r

F la re F

Y P la n s -S

C

IW

W -1

-0

C -3

-G

IW

W -X

S E

C T x S c -8

.d g

C-308

L O

N E

L E

N

U .S

A R

M Y

C O

M M

A N

D

IN

G

T

IM

O T

H Y R

V A

IL

P R

E P

A R

E D U

N D

E R T

H E D

IR

E C

T

IO

N O

F R

A L P

H E S

T E

IN

E R P .E P

M P

A re a E n g in e e r

R e s id e n t E n g in e e r

L A

U R

A L

Y N

N V

E R

A P

E L

IN

E D

R E

D G

IN

G

H

IG

H I S

L A

N D T

O R

O L L

O V

E R A

N D B

O L

IV

A R F

L A

R E

G U

L F I

N T

R A

C O

A S

T A

L W

A T

E R W

A Y T

E X

A S

T B

W

S A

C

R K

H

C h ie f, E n g in e e ri n g B ra n c h

-10

-20

-30

E L E

V A

T

IO

N I

N U .S F

E E

T

0 50 100 150 200-50-100-150-200-250-300-350-400

<-- GREEN - RED --->

-10

-20

-30

E L E

V A

T

IO

N I

N U .S F

E E

T

0 50 100 150 200-50-100-150-200-250-300-350-400-450-500-550-600

<-- GREEN - RED --->

-10

-20

-30

E L E

V A

T

IO

N I

N U .S F

E E

T

0 50 100 150 200-50-100-150-200-250-300-350-400-450-500-550-600

319+269.49

<-- GREEN - RED --->

-10

-20

-30

E L E

V A

T

IO

N I

N U .S F

E E

T

0 50 100 150 200-50-100-150-200-250-300-350-400-450-500-550-600-650-700-750-800

<-- GREEN - RED --->

-10

-20

-30

E L E

V A

T

IO

N I

N U .S F

E E

T

0 50 100 150 200-50-100-150-200-250-300-350-400-450-500-550-600-650-700-750-800

<-- GREEN - RED --->

320+225

320+000

319+000

318+000

S T

A T

O S

T A

C R

O S

S S

E C

T

IO

L F I

N T

R A

C O

A S

T A

L W

A T

E R

W A

Y

281.8' 62.5'

355.7' 62.5'

337.1' 62.5'

493' 62.5'

13' FED. AUTH.

17' REQ'D. DEPTH

1' OVERDEPTH

SURVEYED AUGUST 2021

17' REQ'D. DEPTH

1' OVERDEPTH

13' FED. AUTH.

528' 62.5'

S A

C U

P D

A T

O

C T

IO

N S

R E P

L A

C

T

IR

H

E E

T

SOLICITATION NO. W912HY21B0019

Galveston District

G A

L V

E S

T O

N T

E X

A S

C O

R P

S O

F E

N G

IN

E E

R S

U .S

A R

M Y E

N G

IN

E E

R D

IS

T R

IC

T

G A

L V

E S

T O

N

A S S

H O

W N

D a te

R e v

S u b m it te d b y

A p p ro v e d b y

A p p ro v a l R e c o m m e n d e d

S c a le

D ra w n b y

D e s ig n e d b y

C h e c k e d b y

D e s c ri p ti o n

D a te

R e v

B y

Drawing No.:

J U

L Y

W

IL

L

IE

J

O E H

O N

Z A P .E

W912HY21B0019

SOLICITATION NO.:

IWW 1101-0299SWG FILE NO.

F il e

M o d e l

N a m e

C -3

B y m a o x tw

:4

:5

A

M D a te

T im e

W

C A

D D p ro je c ts

IW

W -0

H ig h I s la n d t o R o ll o v e r a n d B o li v a r

F la re F

Y P la n s -S

C

IW

W -1

-0

C -3

-G

IW

W -X

S E

C T x S c -8

.d g

C-309

L O

N E

L E

N

U .S

A R

M Y

C O

M M

A N

D

IN

G

T

IM

O T

H Y R

V A

IL

P R

E P

A R

E D U

N D

E R T

H E D

IR

E C

T

IO

N O

F R

A L P

H E S

T E

IN

E R P .E P

M P

A re a E n g in e e r

R e s id e n t E n g in e e r

L A

U R

A L

Y N

N V

E R

A P

E L

IN

E D

R E

D G

IN

G

H

IG

H I S

L A

N D T

O R

O L L

O V

E R A

N D B

O L

IV

A R F

L A

R E

G U

L F I

N T

R A

C O

A S

T A

L W

A T

E R W

A Y T

E X

A S

T B

W

S A

C

R K

H

C h ie f, E n g in e e ri n g B ra n c h

-10

-20

-30

E L E

V A

T

IO

N I

N U .S F

E E

T

0 50 100 150 200-50-100-150-200-250-300-350-400-450-500-550-600-650-700-750-800

<-- GREEN - RED --->

-10

-20

-30

E L E

V A

T

IO

N I

N U .S F

E E

T

0 50 100 150 200-50-100-150-200-250-300-350-400

<-- GREEN - RED --->

-10

-20

-30

E L E

V A

T

IO

N I

N U .S F

E E

T

0 50 100 150 200-50-100-150-200

<-- GREEN - RED --->

-10

-20

-30

E L E

V A

T

IO

N I

N U .S F

E E

T

0 50 100 150 200-50-100-150-200

<-- GREEN - RED --->

-10

-20

-30

E L E

V A

T

IO

N I

N U .S F

E E

T

0 50 100 150 200-50-100-150-200

<-- GREEN - RED --->

-10

-20

-30

E L E

V A

T

IO

N I

N U .S F

E E

T

0 50 100 150 200-50-100-150-200

<-- GREEN - RED --->

-10

-20

-30

E L E

V A

T

IO

N I

N U .S F

E E

T

0 50 100 150 200-50-100-150-200

<-- GREEN - RED --->

-10

-20

-30

E L E

V A

T

IO

N I

N U .S F

E E

T

0 50 100 150 200-50-100-150-200

<-- GREEN - RED --->

-10

-20

-30

E L E

V A

T

IO

N I

N U .S F

E E

T

0 50 100 150 200-50-100-150-200

<-- GREEN - RED --->

-10

-20

-30

E L E

V A

T

IO

N I

N U .S F

E E

T

0 50 100 150 200-50-100-150-200

<-- GREEN - RED --->

388+000 394+000

387+000 392+000

386+000 391+000

321+000 390+000

320+825 389+000

S T

A T

O S

T A

C R

O S

S S

E C

T

IO

L F I

N T

R A

C O

A S

T A

L W

A T

E R

W A

Y

17' REQ'D. DEPTH

1' OVERDEPTH

13' FED. AUTH.

528' 62.5'

206.9' 62.5'

17' REQ'D. DEPTH

1' OVERDEPTH

13' FED. AUTH.

62.5' 62.5'

62.5' 62.5'

CHANGE

TEMPLATE

DREDGING G.I.W.W.

WESTERLY LIMITS OF

SURVEYED MARCH/AUGUST 2021

SURVEYED AUGUST 2021

SURVEYED AUGUST 2021

SURVEYED MARCH 2021

SURVEYED MARCH 2021

S A

C U

P D

A T

O

C T

IO

N S

SOLICITATION NO. W912HY21B0019

Amend No. 0002_SF 30
Amend 0002 page-2
00 11 00.00 45
00 11 00.00 45 - BID SCHEDULE
00 11 00.00 45 - BID SCHEDULE
PART 1 GENERAL
1.1 BID SCHEDULE
1.1.1 Schedule No. 1 AM#2
1.1.2 Option No. 1 AM#2
1.1.3 Option No. 2
1.1.4 Option No. 3
1.1.5 Option No. 4

1.2 EVALUATION OF OPTIONS July 1990 FAR 52.217-5

QST - High Island to Rollover - 2021-08-16
2021-08-17-IWW-1101-0299-PLANS-AMD2.pdf
022-IWW-1101-0299-PLANS
023-IWW-1101-0299-PLANS
026-IWW-1101-0299-PLANS
027-IWW-1101-0299-PLANS
028-IWW-1101-0299-PLANS

File details come from the government source that posted it. Updated .