AMEND 0006_W912HY21B0016_9 Sep 21.pdf

PDF 669 KB Posted

Attached to
SABINE-NECHES WATERWAY CHANNEL IMPROVEMENT PROJECT-DREDGING
Solicitation number
W912HY21B0016
Issued by

About this file

This amendment modifies a solicitation for hopper dredging services along the Sabine-Neches Waterway in Texas. The bid opening date is rescheduled from September 14, 2021 at 2:00 PM Central Time. The solicitation seeks hopper dredging to deepen and extend an existing navigation channel from the Sabine Bank Channel to the Sabine Jetty Channel by 13 miles offshore. Dredging quantities and depths are to be determined, with work also including the potential deepening of an existing channel along the Sabine Pass Channel. The solicitation was issued by the U.S. Army Corps of Engineers Galveston District and is scheduled to award a contract for hopper dredging services to deepen and extend the channel.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The specifications for Unrestricted Procurement for Sabine-Neches Waterway, Texas, Channel Improvement Project, Sabine Extension Channel to Sabine Bank Channel in Jefferson County, Texas, is hereby amended as follows:

Reference Amendment No. 0005, dated 09-Sep-2021, the statement that read" extend the bid opening to 14 Sep 2021 at 2 pm" is hereby changed to read "Bid Opening is rescheduled for 14 Sep 2021 at 2:00 P.M. Central Time."

This amendment shall be attached to and become a part of the solicitation.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 1

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912HY21B0016

X 9B. DATED (SEE ITEM 11)

13-Aug-2021

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO.

5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

09-Sep-2021

CODE

US ARMY CORPS OF ENGINEERS

2000 FORT POINT ROAD

P.O. BOX 1229

GALVESTON TX 77553-1229

W912HY 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

X

35 20 23.12 45.pdf
35 20 23.12 45 - HOPPER DREDGING AMENDMENT NO. 0005
35 20 23.12 45 - HOPPER DREDGING
PART 1 GENERAL
1.1 SUMMARY
1.2 REFERENCES
1.3 MEASUREMENT AND PAYMENT
1.4 WORK COVERED BY THE CONTRACT PRICE
1.4.1 Existing Conditions
1.5 SUBMITTALS
1.6 CHARACTER OF MATERIAL
1.6.1 Debris Within the Dredging Limits
1.7 SIGNAL LIGHTS
1.8 UTILITIES ACROSS THE LIMITS OF DREDGING
1.8.1 Known Utility/Pipeline Crossings
1.9 ORDER OF WORK
1.10 OBSTRUCTION OF CHANNEL
1.11 TEMPORARY REMOVAL OF AIDS TO NAVIGATION
1.12 NOTIFICATION PRIOR TO COMMENCEMENT OF DREDGING OPERATIONS
1.13 NATIONAL DREDGING QUALITY MANAGEMENT PROGRAM DQM
1.14 CORPS OF ENGINEERS RESERVE FLEET
1.15 INSPECTION
1.15.1 Equipment
1.15.2 Transportation
1.16 QUANTITY SURVEYS
1.17 FINAL EXAMINATION AND ACCEPTANCE
1.17.1 Acceptance
1.18 SHOALS
1.19 UNANTICIPATED SHOALING
1.20 VARIATIONS IN ESTIMATED QUANTITIES - DREDGING
1.21 CONTINUITY OF WORK
1.22 ACCOMMODATIONS AND MEALS FOR INSPECTORS
PART 2 PRODUCTS
2.1 BRIDGE-TO-BRIDGE RADIOTELEPHONE EQUIPMENT
2.2 LOOKOUTS AND RADIO COMMUNICATIONS
PART 3 EXECUTION
3.1 DREDGING METHOD
3.2 ESTIMATED QUANTITY OF MATERIAL
3.2.1 Quantity Summary
3.2.2 Required Dredging Prism
3.2.3 Allowable Overdepth
3.2.4 Side And End Slopes
3.2.5 Excessive Dredging
3.2.6 Channel Surveys
3.3 AREAS TO BE DREDGED
3.4 BED LEVELING
3.5 CONDUCT OF DREDGING WORK
3.5.1 Pre-Operations Safety Coordination Meeting
3.5.2 Protection of Existing Waterways
3.5.3 Adjacent Property and Structures
3.5.4 Pre-Dredging Hazard SurveyAM#5
3.6 PLACEMENT OF EXCAVATED MATERIAL
3.6.1 General
3.6.2 Ocean Dredged Material Site ODMDS
3.6.3 ODMDS Monitor Surveys
3.7 ENDANGERED SPECIES PROTECTION PLAN
3.7.1 Content of Endangered Species Protection Plan
3.8 PRESERVATION OF PUBLIC AND PRIVATE PROPERTY
3.8.1 Damages
3.8.2 Accountability and Restoration
3.9 ALTERNATE ODMDSS PROPOSED BY CONTRACTOR WITH BID AFTER AWARD OF
3.9.1 Data Submittal
3.10 UNAUTHORIZED PLACEMENT OF MATERIAL
3.10.1 Debris Disposal
3.11 PORT ARTHUR VESSEL TRAFFIC SERVICE AREA
3.11.1 General
3.11.2 Report Changes
3.11.3 Port Arthur Vessel Traffic Service Location
3.11.4 Communications
3.11.5 Operations
3.12 DREDGING AND DREDGE RELATED MARINE WORK
3.13 AUTOMATIC IDENTIFICATION SYSTEM
3.14 DREDGE PLANT INSTRUMENTATION